← Back
Four families
316 SOUTH 4 STREET
BROOKLYN · BIN 3321333
💬 Discuss this project
1910Year Built
4Stories
C3Building Class
R6Zoning
4,660 sfGross Floor Area
4Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Four families · Owner of record: 316 S. 4TH STREET LLC · 2,475 sf lot · 1.88 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BLANK PROPERTY GROUP1203/22/2026
316 S. 4TH STREET LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/03/2021$2.5M—— → —$526/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHUN ENGINEERING CONSULTANT PLLC706/20/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CITY BUILDERS INCGeneral Contractor603/21/2026
PLUMBING PLBG & PLBG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DAL H CHUN ENGINEER PC1972706/20/2023
Building Lifecycle
All (73)Filed (7)Permit Issued (4)Signed Off (3)Violation (4)Inspection (5)Objection (20)Special Inspection (30)
07/31/2023
Signed off — Alteration
RENOVATE EXISTING FOUR (4) RESIDENTIAL UNIT AND INSTALL NEW STAIRS TO ROOF.
B00760584-I1
07/29/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/13/2023
Signed off — Alteration
MECHANICAL FILING IN CONJUNCTION WITH DOB APPLICATION B00760584. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
B08045792-I1
07/13/2023
Signed off — Alteration
PLUMBING FILING IN CONJUNCTION WITH DOB APPLICATION B00760584. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
B08045788-I1
07/05/2023
Objection resolved — Addressed
06/30/2023
Objection raised — Other
06/20/2023
Filed — Alteration
RENOVATE EXISTING FOUR (4) RESIDENTIAL UNIT AND INSTALL NEW STAIRS TO ROOF.
B00760584-P2
06/20/2023
Special inspection requirement — HVAC-R and service water heating system controls
DAL CHUN
06/20/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
DAL CHUN
06/20/2023
Special inspection requirement — Maintenance information
DAL CHUN
06/20/2023
Special inspection requirement — Permanent certificate
DAL CHUN
06/20/2023
Special inspection requirement — Energy Code Compliance Inspections
DAL CHUN
06/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DAL CHUN
06/20/2023
Special inspection requirement — HVAC-R and service water heating equipment
DAL CHUN
06/20/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
DAL CHUN
06/20/2023
Special inspection requirement — Maintenance information
DAL CHUN
06/20/2023
Special inspection requirement — Permanent certificate
DAL CHUN
06/20/2023
Special inspection requirement — HVAC-R and service water heating system controls
DAL CHUN
06/20/2023
Special inspection requirement — Final
DAL CHUN
06/20/2023
Special inspection requirement — Mechanical Systems
DAL CHUN
06/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DAL CHUN
06/20/2023
Special inspection requirement — HVAC-R and service water heating equipment
DAL CHUN
06/19/2023
Filed — Alteration
PLUMBING FILING IN CONJUNCTION WITH DOB APPLICATION B00760584. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
B08045788-P1
06/19/2023
Filed — Alteration
MECHANICAL FILING IN CONJUNCTION WITH DOB APPLICATION B00760584. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
B08045792-P1
06/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DAL CHUN
06/19/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
DAL CHUN
06/19/2023
Special inspection requirement — Energy Code Compliance Inspections
DAL CHUN
06/19/2023
Special inspection requirement — Insulation placement and R values
DAL CHUN
06/19/2023
Special inspection requirement — Fenestration air leakage
DAL CHUN
06/19/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
DAL CHUN
06/13/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
06/07/2023
Objection resolved — Addressed
05/31/2023
Objection raised — Other
05/19/2023
Filed — Alteration
RENOVATE EXISTING FOUR (4) RESIDENTIAL UNIT AND INSTALL NEW STAIRS TO ROOF.
B00760584-P1
05/18/2023
Special inspection requirement — HVAC-R and service water heating system controls
DAL CHUN
05/18/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
DAL CHUN
05/18/2023
Special inspection requirement — Permanent certificate
DAL CHUN
05/18/2023
Special inspection requirement — Maintenance information
DAL CHUN
05/18/2023
Special inspection requirement — HVAC-R and service water heating equipment
DAL CHUN
05/18/2023
Special inspection requirement — Final
DAL CHUN
05/18/2023
Special inspection requirement — Mechanical Systems
DAL CHUN
05/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DAL CHUN
05/18/2023
Special inspection requirement — Fenestration air leakage
DAL CHUN
03/24/2023
Violation issued (HPD, closed)
A
02/07/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/03/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/31/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/30/2023
Permit issued — Mechanical Systems
B08045792-I1-MS
12/29/2022
Permit issued — Plumbing
B08045788-I1-PL
12/16/2022
Filed — Alteration
MECHANICAL FILING IN CONJUNCTION WITH DOB APPLICATION B00760584. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
B08045792-I1
12/07/2022
Filed — Alteration
PLUMBING FILING IN CONJUNCTION WITH DOB APPLICATION B00760584. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
B08045788-I1
12/06/2022
Permit issued — General Construction
B00760584-I1-GC
11/07/2022
Violation issued (HPD, closed)
I
10/19/2022
Permit issued — General Construction
B00760584-I1-GC
08/03/2022
Objection raised — Other
08/03/2022
Objection resolved — Addressed
08/03/2022
Objection raised — Other
08/03/2022
Objection resolved — Addressed
07/08/2022
Objection raised — Other
07/08/2022
Objection resolved — Addressed
Latest 60 of 73 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offCITY BUILDERS INC01/30/2023
DOB NOWPlumbingSigned-offPLUMBING PLBG & PLBG CORP12/29/2022
DOB NOWGeneral ConstructionSigned-offCITY BUILDERS INC12/06/2022
DOB NOWGeneral ConstructionSigned-offCITY BUILDERS INC10/19/2022
1 project · most recent 11/07/2022
General Wiring
FiledStatusContractorScope
11/07/2022CompleteMAC ELECT'L CONTR. INC.General Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/29/2023Pass-Final General Construction Non-Directive 14PassView ↗
06/13/2023Fail-Final General Construction Non-Directive 14FailView ↗
02/07/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/03/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/31/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
06/20/2023HVAC-R and service water heating system controlsDAL CHUNenergy_progress
06/20/2023HVAC-R and service water piping design and insulationDAL CHUNenergy_progress
06/20/2023Maintenance informationDAL CHUNenergy_progress
06/20/2023Permanent certificateDAL CHUNenergy_progress
06/20/2023Energy Code Compliance InspectionsDAL CHUNprogress
06/20/2023Fire-Resistant Penetrations and JointsDAL CHUNspecial
06/20/2023HVAC-R and service water heating equipmentDAL CHUNenergy_progress
06/20/2023HVAC-R and service water piping design and insulationDAL CHUNenergy_progress
06/20/2023Maintenance informationDAL CHUNenergy_progress
06/20/2023Permanent certificateDAL CHUNenergy_progress
06/20/2023HVAC-R and service water heating system controlsDAL CHUNenergy_progress
06/20/2023FinalDAL CHUNprogress
06/20/2023Mechanical SystemsDAL CHUNspecial
06/20/2023Fire-Resistant Penetrations and JointsDAL CHUNspecial
06/20/2023HVAC-R and service water heating equipmentDAL CHUNenergy_progress
06/19/2023Fire-Resistant Penetrations and JointsDAL CHUNspecial
06/19/2023Structural Stability – Alterations of existing buildingsDAL CHUNspecial
06/19/2023Energy Code Compliance InspectionsDAL CHUNprogress
06/19/2023Insulation placement and R valuesDAL CHUNenergy_progress
06/19/2023Fenestration air leakageDAL CHUNenergy_progress
06/19/2023Fenestration and door U-factor and product ratingsDAL CHUNenergy_progress
05/18/2023HVAC-R and service water heating system controlsDAL CHUNenergy_progress
05/18/2023HVAC-R and service water piping design and insulationDAL CHUNenergy_progress
05/18/2023Permanent certificateDAL CHUNenergy_progress
05/18/2023Maintenance informationDAL CHUNenergy_progress
Latest 25 of 35.
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/29/2026B00760584-I1Request digital key ↗
08/28/2026B08045788-P1Request digital key ↗
08/28/2026B08045788-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications22
▸DOB NOWProgress Inspector Seal & Signature10
08/28/2026B00760584-P1Open ↗
08/28/2026B00760584-P1Open ↗
08/26/2026B08045792-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/29/2026B00760584-P2Open ↗
08/29/2026B00760584-P1Open ↗
08/29/2026B00760584-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/28/2026B00760584-P1Open ↗
08/26/2026B08045792-I1Open ↗
08/25/2026B08045792-P1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/29/2026B00760584-I1Open ↗
08/28/2026B08045788-I1Open ↗
08/28/2026B08045788-P1Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/29/2026B00760584-I1Open ↗