← Back
BuildNYC
Elevator apt, miscellaneous
Brighton Beach
3161 BRIGHTON 6 STREET · Brighton Beach · BIN 3245130
💬 Discuss this project
1983Year Built
13Stories
D9Building Class
R7-1Zoning
120,000 sfGross Floor Area
154Units
LL97 CoveredRent Stabilized2 Active Violations 1 unresolved · 1 paperwork only ▸FISP: No Report FiledFDNY Report ↗
Elevator apt, miscellaneous · Owner of record: Brighton Beach Housing Development Fund · 30,000 sf lot · 4 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsInstall new chimney liner3 filings
Floor 21p · 1 filing · 11 docs
Floor 1Jasco, Inc. heavy duty sidewalk shed installation2p · 2 filings · 14 docs
Site & exteriorHeavy duty sidewalk shed installation1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Brighton Beach HDFC2703/22/2026
3161 Brighton 6th HDFC403/21/2026
Jasa304/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Laura Heim Architect111/03/2025
Shea + Printz Architects109/16/2025
Mje Professional Services109/08/2025
Michael Wolfman Architect201/15/2023
New York & Company609/30/2021
Mohammad Ahead, PE108/11/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Jung H. Choi Architect403/21/2026
New York & Company1203/21/2026
SNR Expediting Design203/21/2026
AV Expediting Services203/21/2026
VAA103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
G-Net ConstructionGeneral Contractor603/21/2026
National Mechanical Services PlumbingPlumbing407/08/2026
The Metro Groupspecialty_contractor403/21/2026
Kings Group NYScaffold303/21/2026
Titan Construction ServicesGeneral Contractor203/21/2026
Metro Groupspecialty_contractor203/21/2026
A Heating Plumbing WorksPlumbing203/21/2026
Power Cooling MechanicalGeneral Contractor103/21/2026
High Quality ElectricElectrical103/22/2026
Spring ScaffoldingGeneral Contractor103/21/2026
JascoScaffold107/08/2026
ApecPlumbing107/08/2026
Rockledge ScaffoldGeneral Contractor103/21/2026
Allied Fire ControlFire Protection103/21/2026
Elite Quality ConstructionGeneral Contractor104/09/2026
Expert EnterprisesGeneral Contractor103/21/2026
Adler WindowsGeneral Contractor112/18/2020
Barami ConstructionGeneral Contractor205/31/2023
Essential ElectricGeneral Contractor104/28/2015
Nobel ConstructionGeneral Contractor208/10/2015
Orion Plumbing & HeatingPlumbing104/30/2015
P.R. Plumbing & HeatingPlumbing108/09/2018
Yes ContractingGeneral Contractor107/07/2016
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Sandeep Gunnala Engineering8482111/03/2025
Rel Engineering9705109/16/2025
RI Consulting Services8904109/05/2025
New York Engineering Associates851409/30/2021
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
10/27/2026
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
B01260764-I1-GC
09/09/2026
Permit expired, never signed off — Suspended Scaffold
The city's record still shows this permit as issued, with no sign-off on its filing
B01282493-I1-SC
08/27/2026
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01281874-I1
06/12/2026
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
B01303420-I1-GC
155 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedG-Net Construction01/22/2026
DOB NOWGeneral ConstructionPermit IssuedG-Net Construction12/01/2025
DOB NOWGeneral ConstructionPermit IssuedElite Quality Construction10/27/2025
DOB NOWSuspended ScaffoldPermit IssuedElite Quality Construction & Contracting09/09/2025
DOB NOWSidewalk ShedSigned-offJasco09/09/2025
DOB NOWPlumbingSigned-offApec05/05/2023
DOB NOWSidewalk ShedSigned-offKings Group NY08/19/2021
DOB NOWBoiler EquipmentSigned-offNational Mechanical Services Plumbing08/02/2021
DOB NOWPlumbingSigned-offNational Mechanical Services Plumbing06/22/2021
DOB NOWMechanical SystemsPermit IssuedThe Metro Group06/09/2021
DOB NOWMechanical SystemsPermit IssuedThe Metro Group02/02/2021
DOB NOWBoiler EquipmentSigned-offNational Mechanical Services Plumbing01/19/2021
DOB NOWPlumbingSigned-offNational Mechanical Services Plumbing01/07/2021
BISOTISSUEDBarami Construction05/31/2023
BISOTISSUEDTitan Construction Services04/09/2021
BISOTISSUEDAdler Windows12/18/2020
BISOTISSUEDBarami Construction12/15/2020
BISOTISSUEDTitan Construction Services12/03/2020
BISPLISSUEDCam Energy Heating & Mechanical08/09/2018
BISOTISSUEDYes Contracting07/07/2016
BISOTISSUEDNobel Construction08/10/2015
BISOTISSUEDNobel Construction07/30/2015
BISPLISSUEDOrion Plumbing & Heating04/30/2015
BISOTISSUEDEssential Electric04/28/2015
BISPLISSUEDA. Heating and Plumbing Works02/19/2014
BISBLISSUEDA. Heating and Plumbing Works02/19/2014
BISEQISSUEDExpert Enterprises05/02/2013
BISOTISSUEDTitan Construction Services04/09/2013
BISEQISSUEDExpert Enterprises03/15/2013
BISMHISSUEDPower Cooling06/08/2011
BISFSISSUEDEdward Levinson11/28/2008
BISFPISSUEDAllied Fire Control02/27/2008
BISEQISSUEDRockledge Scaffold04/12/2007
BISMHISSUEDPower Cooling01/03/2007
BISEQISSUEDRockledge Scaffold12/11/2006
BISEQISSUEDSpring Scaffolding04/22/2003
1 project · most recent 09/30/2021
Gas
FiledStatusContractorScope
09/30/2021Signed-offNational Mechanical Services PlumbingGas
4 projects · most recent 09/11/2025
Boiler Controls General Wiring
FiledStatusContractorScope
09/11/2025Permit IssuedRichard Neu—
08/26/2022Permit IssuedThe Metro Group ElectricBoiler Controls
09/23/2021Permit IssuedHigh Quality Electric—
09/25/2020CompleteElectric EssentialsGeneral Wiring
1 project · most recent 09/08/2025
Sidewalk Shed
FiledStatusContractorScope
09/08/2025Signed-offJascoSidewalk Shed
1 project · most recent 09/05/2025
Suspended Scaffold
FiledStatusContractorScope
09/05/2025Permit IssuedElite Quality Construction & ContractingSuspended Scaffold
1 project · most recent 09/05/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
09/05/2025Permit IssuedElite Quality Construction & ContractingSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
05/11/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
10/31/2025Tenant Protection Plan ComplianceSandeep Gunnalaspecial
10/28/2025MeteringSandeep Gunnalaenergy_progress
10/28/2025Interior lighting powerSandeep Gunnalaenergy_progress
10/28/2025Structural Stability – Alterations of existing buildingsSandeep Gunnalaspecial
10/28/2025Lighting controlsSandeep Gunnalaenergy_progress
10/28/2025FinalSandeep Gunnalaprogress
10/28/2025Energy Code Compliance InspectionsSandeep Gunnalaprogress
09/05/2025Post-installed AnchorsMd Istiaque Hasanspecial
09/05/2025Alternative Materials - OTCR Buildings Bulletin NumberMd Istiaque Hasanspecial
10/01/2021Energy Code ComplianceLOUIS ARENAprogress
10/01/2021Mechanical SystemsLOUIS ARENAspecial
10/01/2021Chimneys and vents—special
10/01/2021Energy Code Compliance InspectionsLOUIS ARENAprogress
10/01/2021FinalLOUIS ARENAprogress
09/17/2021Chimneys and vents—special
09/14/2021Energy Code ComplianceLOUIS ARENAprogress
09/14/2021Mechanical SystemsLOUIS ARENAspecial
09/14/2021HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
09/14/2021HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
09/14/2021Maintenance informationLOUIS ARENAenergy_progress
09/14/2021FinalLOUIS ARENAprogress
09/14/2021Heating SystemsLOUIS ARENAspecial
303 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account