← Back
BuildNYC
Office with commercial, 7-19 stories
Finck Building
318 WEST 39TH STREET · Name © OpenStreetMap contributors · BIN 1013650
💬 Discuss this project
1915Year Built
12Stories
O6Building Class
C6-4MZoning
156,508 sfGross Floor Area
12Units
LL97 Covered4 Active Violations 0 unresolved · 4 paperwork only 21 likely answered 1 old, status unconfirmed ▸FISP: SWARMP
Office with commercial, 7-19 stories · Owner of record: Quadri-Planetary Associates · 12,343 sf lot · 12.68 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofGfp Real Estate LLCUnder Construction10p · 4 filings · 20 docs
BulkheadSuspended Scaffold Outrigger System for Facade Restoration, Under Construction1p · 1 filing · 4 docs
Floor 5Gfp Real Estate LLC5p · 1 filing · 10 docs
Floor 4
Floor 31 filing
Floor 2Gfp Real Estate LLC4p · 1 filing · 4 docs
Floor 1Los Tacos No. 1Under Construction49p · 9 filings · 20 docs
CellarLobby entrance construction and demolitionUnder Construction3p · 1 filing · 10 docs
Site & exteriorGfp Real Estate LLC8p · 1 filing · 5 docs
Filed — no permit issuedTemporary netting installation5p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GFP Real Estate6009/13/2026
Quadriplanetary Associates4403/22/2026
Apparel Group International303/21/2026
Nouveau Foundation Fashion203/21/2026
New Mark & Company103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Kma Designs107/17/2026
Surface Design205/21/2026
Tan Engineering603/10/2026
Rip Construction Consultants211/19/2025
Skyline Rigging109/29/2025
Jack Green Associates102/11/2025
Future Made Architecture101/30/2025
David Keane P.E101/27/2025
Walter T. Gorman, P.E109/18/2020
Openshop Architecture104/22/2020
Haider Engineering, P.E109/27/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rip CC1603/21/2026
Walter T Gorman PE803/21/2026
Riggining Consultants103/21/2026
Municipal Building Consultants103/21/2026
Meridian Code Consultants203/21/2026
SNR Expediting Design203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
North Star Air Condition*specialty_contractor303/21/2026
Midtown Interior ResourceGeneral Contractor303/21/2026
DK Construction OneGeneral Contractor307/22/2026
Accurate MechanicalFire Protection207/08/2026
Kings Group NYScaffold207/19/2026
A & M Electrical ServiceElectrical203/21/2026
Cooper WorksGeneral Contractor204/09/2026
Caputek Electrical ServicesElectrical203/21/2026
Accurate MechanicalPlumbing107/08/2026
All City ElectricalElectrical103/21/2026
Enobrac PlumbingPlumbing107/08/2026
Judd ElectricElectrical103/21/2026
Torres IvanElectrical103/21/2026
Doria ScaffoldingScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Francisco D. Perez PE3306107/13/2026
Tan Engineering1291803/10/2026
Metrospec Sia6420111/19/2025
Skyline Rigging7880109/29/2025
Jack Green Associates422102/11/2025
Walter T. Gorman, P.E., P268201/30/2025
Building Lifecycle
All (184)Filed (20)Permit Issued (16)Signed Off (7)Facade (FISP) (13)Violation (60)Inspection (9)Objection (30)Special Inspection (29)
08/03/2026
Signed off — Alteration
Propose to perform structural work. No change to use, egress or occupancy.
M01159795-I1
07/24/2026
Permit issued — Suspended Scaffold
M01426311-I1-SC
07/20/2026
Permit issued — General Construction
M01159672-I1-GC
07/17/2026
Filed — Alteration
FACADE RERAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M01358434-S1
07/17/2026
Permit issued — Sidewalk Shed
M01358434-S1-SH
07/13/2026
Filed — Alteration
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.
M01426311-I1
07/13/2026
Special inspection requirement — Post-installed Anchors
FRANCISCO PEREZ
06/30/2026
Objection resolved — Addressed
06/30/2026
Objection resolved — Addressed
06/30/2026
Objection resolved — Open
06/25/2026
Objection raised — Energy
06/25/2026
Objection raised — Other
06/25/2026
Objection raised — Admin
05/29/2026
Signed off — Alteration
Installation of new plumbing fixtures with piping as per plans. No change to use egress or occupancy.
M01182154-I1
05/29/2026
Signed off — Alteration
Installation, removal and relocation of sprinkler heads as per plans. No change to use, egress, or occupancy
M01182160-I1
05/21/2026
Filed — Alteration
FACADE RERAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M01358434-I1
05/08/2026
Special inspection requirement — Air barrier - visual inspection
03/23/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/19/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/17/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/13/2026
Permit issued — Sprinklers
M01182160-I1-EW-SP
03/13/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/12/2026
Special inspection requirement — Sprinkler Systems
Roger Tan
03/10/2026
Filed — Alteration
Installation, removal and relocation of sprinkler heads as per plans. No change to use, egress, or occupancy
M01182160-P1
03/10/2026
Filed — Alteration
Installation of new plumbing fixtures with piping as per plans. No change to use egress or occupancy.
M01182154-P1
03/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
03/03/2026
Special inspection requirement — Sprinkler Systems
Roger Tan
02/11/2026
Permit issued — General Construction
M01182150-I1-GC
02/11/2026
Special inspection requirement — Masonry
02/11/2026
Special inspection requirement — Final
02/11/2026
Special inspection requirement — Energy Code Compliance Inspections
12/22/2025
Objection resolved — Addressed
12/22/2025
Objection resolved — Addressed
12/17/2025
Objection resolved — Addressed
12/17/2025
Objection resolved — Addressed
12/17/2025
Objection resolved — Addressed
12/17/2025
Objection resolved — Addressed
12/17/2025
Objection resolved — Addressed
12/17/2025
Objection resolved — Addressed
12/17/2025
Objection resolved — Addressed
12/11/2025
Objection raised — Other
12/11/2025
Objection raised — Admin
12/11/2025
Objection raised — Other
12/11/2025
Objection raised — Other
12/11/2025
Objection raised — Scope
12/11/2025
Objection raised — Zoning
12/11/2025
Objection raised — Admin
12/11/2025
Objection raised — Scope
12/11/2025
Objection raised — Other
11/21/2025
Special inspection requirement — Mechanical Systems
Roger Tan
11/21/2025
Special inspection requirement — Final
Roger Tan
11/21/2025
Special inspection requirement — Energy Code Compliance Inspections
Roger Tan
11/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
11/19/2025
Filed — Alteration
Installation of mechanical system and commercial cooking system in 1st floor kitchen as per plans. No change to use egress or occupancy.
M01182157-P1
11/19/2025
Filed — Alteration CO
FILE FOR CHANGE OF USE & INTERIOR CONSTRUCTION AT 1ST FLOOR AS PER PLANS. EXISTING NON COMPLIANT BUILDING. NO CHANGE TO BUILDING HEIGHT OR BULK ZR 5430-5431
M01182150-I1
11/17/2025
Signed off — Alteration
Propose to relocate existing ductwork and install new units. No change to use, egress or occupancy.
M01169184-I1
11/11/2025
Special inspection requirement — Energy Code Compliance Inspections
Roger Tan
11/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
11/11/2025
Special inspection requirement — Mechanical Systems
Roger Tan
11/11/2025
Special inspection requirement — Final
Roger Tan
Latest 60 of 184 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedTribute Restoration07/24/2026
DOB NOWGeneral ConstructionPermit IssuedDK Construction One07/20/2026
DOB NOWSidewalk ShedPermit IssuedKings Group NY07/17/2026
DOB NOWSprinklersSigned-offAccurate Mechanical03/13/2026
DOB NOWGeneral ConstructionPermit IssuedCooper Works02/11/2026
DOB NOWStructuralSigned-offDK Construction One10/06/2025
DOB NOWGeneral ConstructionPermit IssuedDK Construction One10/06/2025
DOB NOWSuspended ScaffoldPermit IssuedDoria Scaffolding09/30/2025
DOB NOWGeneral ConstructionPermit IssuedCooper Works06/30/2025
DOB NOWMechanical SystemsSigned-offNorth Star Air Condition*06/30/2025
DOB NOWSprinklersSigned-offAccurate Mechanical06/09/2025
DOB NOWPlumbingSigned-offAnthony Disabato06/09/2025
DOB NOWSuspended ScaffoldSigned-offStructural Preservation System01/22/2024
DOB NOWGeneral ConstructionPermit IssuedMidtown Interior Resource09/13/2021
DOB NOWPlumbingSigned-offEnobrac Plumbing06/15/2021
DOB NOWSidewalk ShedSigned-offKings Group NY09/30/2019
BISOTISSUEDArea Builders06/18/2021
BISOTISSUEDContinental Window Cleani03/25/2020
BISSPISSUEDLemode Plumbing & Heating02/27/2020
BISSPISSUEDMcManus Mechanical Maintenance P&H Co10/21/2019
BISPLISSUEDDeem Plumbing09/17/2018
BISSPISSUEDGeneral Plumbing09/05/2018
BISMHISSUEDKaback Enterprises08/22/2018
BISSPISSUEDDemar Plumbing05/02/2018
BISMHISSUEDCool Breeze Air Con08/10/2017
BISPLISSUEDDeem Plumbing07/18/2017
BISMHISSUEDCool Breeze Air Con06/21/2017
BISMHISSUEDWhitestar Conslt. & Cont06/30/2016
BISSPISSUEDDemar Plumbing05/02/2016
BISEQISSUEDSpring Scaffolding04/27/2016
BISSPISSUEDGeneral Plumbing04/13/2016
BISOTISSUEDWhitestar Conslt. & Cont02/17/2016
BISSPISSUEDDemar Plumbing05/05/2015
BISPLISSUEDMcMillan Plumbing & Heating04/24/2015
BISMHRE-ISSUEDCentric FM Solutions03/31/2015
BISOTISSUEDWhitestar Conslt. & Cont03/04/2015
BISOTISSUEDCentric FM Solutions02/09/2015
BISOTISSUEDWhitestar Conslt. & Cont01/20/2015
BISOTISSUEDWhitestar Conslt. & Cont01/20/2015
BISOTISSUEDWhitestar Conslt. & Cont09/04/2014
+ 26 more permits on file
2 projects · most recent 11/19/2025
Heating and Air Conditioning Systems Ventilation Systems Refrigeration Systems
FiledStatusContractorScopeMake / Model / Capacity
11/19/2025——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Trane TPEFYP048MA144A (8) Indoor air handlers 54,000 BTU · Fan Coil Indoor ×16
NTXMSM120A1123AA (5) units 120,000 BTU · Condensing Unit ×10
TPEFYP048MA144A 54,000 BTU · Vrf Indoor ×4
NTXMSM96A1123AA 96,000 BTU · Condensing Unit ×2
Mitsubishi Electric TPLFYP048EM140B (6) 54,000 BTU · Vrf Indoor ×12
Ventilation
Greenheck BSQ-180 6,768 CFM · Exhaust Fan ×2
QEI-24-200-A10-G 116,000 CFM · Exhaust Fan ×2
SP-B110 133 CFM · Exhaust Fan ×2
04/22/2020——Refrigeration Systems
Refrigeration
Russell AA48-212B-4S 3,080 CFM ×4
1 project · most recent 03/10/2026
Gas Water/Sanitary
FiledStatusContractorScope
03/10/2026Signed-offQPR MechanicalGas, Water/Sanitary
6 projects · most recent 06/04/2026
General Wiring Boiler Controls
FiledStatusContractorScope
06/04/2026Permit IssuedHigh Quality Electric of NYC—
11/06/2025Permit IssuedAll City Electrical—
06/03/2025CompleteGreen Apple Electrical ServicesGeneral Wiring
12/01/2020CompleteNapstar ElectricGeneral Wiring
11/16/2020CompleteNapstar ElectricGeneral Wiring, Boiler Controls
10/01/2019CompleteRichard Neu—
1 project · most recent 01/27/2025
Steel Concrete
FiledStatusContractorScope
01/27/2025Signed-offDK Construction OneSteel, Concrete
1 project · most recent 07/17/2026
Sidewalk Shed
FiledStatusContractorScope
07/17/2026Permit IssuedKings Group NYSidewalk Shed
1 project · most recent 07/13/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
07/13/2026Permit IssuedTribute RestorationSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
03/23/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/19/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/17/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/13/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/16/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/29/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/29/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/25/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
07/13/2026Post-installed AnchorsFRANCISCO PEREZspecial
05/08/2026Air barrier - visual inspection—energy_progress
03/12/2026Sprinkler SystemsRoger Tanspecial
03/05/2026Fire-Resistant Penetrations and JointsRoger Tanspecial
03/03/2026Sprinkler SystemsRoger Tanspecial
02/11/2026Masonry—special
02/11/2026Final—progress
02/11/2026Energy Code Compliance Inspections—progress
11/21/2025Mechanical SystemsRoger Tanspecial
11/21/2025FinalRoger Tanprogress
11/21/2025Energy Code Compliance InspectionsRoger Tanprogress
11/21/2025Fire-Resistant Penetrations and JointsRoger Tanspecial
11/11/2025Energy Code Compliance InspectionsRoger Tanprogress
11/11/2025Fire-Resistant Penetrations and JointsRoger Tanspecial
11/11/2025Mechanical SystemsRoger Tanspecial
11/11/2025FinalRoger Tanprogress
05/29/2025FinalJOSEPH YOUNGprogress
03/05/2025Fire-Resistant Penetrations and JointsJOSEPH YOUNGspecial
03/05/2025Fire-Resistance Rated ConstructionJOSEPH YOUNGprogress
01/20/2025Mechanical SystemsJACK GREENspecial
01/20/2025HVAC-R and service water piping design and insulationJACK GREENenergy_progress
01/20/2025FinalJACK GREENprogress
01/20/2025Energy Code Compliance InspectionsJACK GREENprogress
01/20/2025Maintenance informationJACK GREENenergy_progress
01/20/2025HVAC-R and service water heating equipmentJACK GREENenergy_progress
Latest 25 of 29.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Los Tacos No. 1Restaurant / Food ServiceFloor 1
Project M01182150 Alteration CO · Permit Entire · 11/19/2025
Project M01182157 Alteration · Approved · 10/20/2025
Project M01233501 Alteration · Permit Entire · 06/09/2025
Project M01182154 Alteration · LOC Issued · 06/04/2025
Project M01182160 Alteration · LOC Issued · 06/04/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 780 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch20
08/28/2026M00981389-I1Request digital key ↗
08/27/2026M01066938-I1Request digital key ↗
08/25/2026M01159795-I1Request digital key ↗
Showing 3 of 20 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00231968-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00343292-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00346368-I1Request digital key ↗
▸Applications & Permits140
▸BISPLAN / WORK APPROVAL APPLICATION78
08/26/2021100742840Open ↗
08/26/2021100782244Open ↗
04/14/2021123586976Open ↗
Showing 3 of 78 on file for this type
▸BISWORK PERMIT APPLICATION60
06/18/2021140950040Open ↗
03/27/2020123854150Open ↗
02/28/2020121997492Open ↗
Showing 3 of 60 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications173
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION81
06/19/2020121997492Open ↗
06/19/2020121997492Open ↗
05/27/2020120699903Open ↗
Showing 3 of 81 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
08/27/2026M01066938-I1Open ↗
08/25/2026M01159795-I1Open ↗
08/25/2026M01159672-P1Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST20
07/24/2018123586976Open ↗
07/24/2017123328210Open ↗
Showing 2 of 20 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT12
07/24/2018123586976Open ↗
07/24/2017123328210Open ↗
06/20/2017140637247Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026M01159672-P1Open ↗
09/01/2026M01159672-P1Open ↗
08/31/2026M01169184-I1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/07/2026M01426311-I1Open ↗
09/01/2026M01182154-P1Open ↗
09/01/2026M01159672-P1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
09/23/2020140950040Open ↗
06/20/2017140637247Open ↗
Showing 2 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
06/20/2017140637247Open ↗
Showing 1 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/23/2020140950040Open ↗
▸Trade Schedules & Equipment84
▸BISEQUIPMENT USE APPLICATION/PERMIT20
11/08/2018123426417Open ↗
11/08/2018123426417Open ↗
11/08/2018123426417Open ↗
Showing 3 of 20 on file for this type
▸BISSELF-CERT PLUMBING NOTICE18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISEQUIPMENT USE PERMITS16
11/08/2018123426417Open ↗
09/06/2017123309696Open ↗
09/06/2017123309696Open ↗
Showing 3 of 16 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE13
02/21/2020121997492Open ↗
02/19/2020121997492Open ↗
03/26/2019123586976Open ↗
Showing 3 of 13 on file for this type
▸BISSCHEDULE B - PLUMBING12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISSPRINKLER INSP REPORT : FP-853
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection28
▸BISANTI-HARASSMENT CHECKLIST18
09/23/2020140950040Open ↗
07/24/2018123586976Open ↗
04/17/2018123426417Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWCertificate of No Harassment4
08/23/2026M01233501-P1Open ↗
08/20/2026M01182150-P1Open ↗
08/13/2026M01182150-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHPD-1: Anti-Harassment Area Checklist3
08/13/2026M00231968-I1Open ↗
08/13/2026M00343292-I1Open ↗
08/13/2026M00346368-I1Open ↗
▸DOB NOWStreet Tree Checklist2
08/20/2026M01182150-P1Open ↗
08/13/2026M01182150-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026M01182150-I1Open ↗
▸Environmental & Asbestos52
▸BISASBESTOS: CERTIFICATION (DEP ACP5)17
09/23/2020140950040Open ↗
02/03/2020123854150Open ↗
07/24/2018123586976Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
08/25/2026M01159795-I1Open ↗
08/25/2026M01159672-P1Open ↗
08/25/2026M01159672-I1Open ↗
Showing 3 of 16 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance56
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS24
06/19/2020121997492Open ↗
02/03/2020123854150Open ↗
11/15/2018123426417Open ↗
Showing 3 of 24 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS16
08/31/2020120699903Open ↗
06/24/2020121997492Open ↗
06/19/2020121997492Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: ENERGY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
12/21/2020140950040Open ↗
06/24/2020121997492Open ↗
06/24/2020121997492Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
07/08/2021140950040Open ↗
03/29/2021123586976Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
09/23/2020140950040Open ↗
06/20/2017140637247Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY13
07/08/2021140950040Open ↗
03/29/2021123586976Open ↗
09/23/2020140950040Open ↗
Showing 3 of 13 on file for this type
▸Approvals, Objections & Sign-offs57
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST32
07/13/2021140950040Open ↗
04/15/2021123586976Open ↗
08/31/2020120699903Open ↗
Showing 3 of 32 on file for this type
▸BISADMINISTRATIVE OBJECTIONS17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
07/11/2017140637247Open ↗
Showing 1 of 4 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION2
06/30/2017120688586Open ↗
06/30/2017120688586Open ↗
▸BISSUPERSEDING LETTER2
02/28/2020121997492Open ↗
10/21/2019120699903Open ↗
▸Cost, Insurance & Ownership65
▸BISCOST AFFIDAVIT62
09/23/2020140950040Open ↗
08/31/2020120699903Open ↗
02/03/2020123854150Open ↗
Showing 3 of 62 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
07/08/2021140950040Open ↗
03/29/2021123586976Open ↗
06/24/2020121997492Open ↗
▸Filing & Intake Forms69
▸BISEFILING COVER SHEET31
02/03/2020123854150Open ↗
07/24/2018123586976Open ↗
04/17/2018123426417Open ↗
Showing 3 of 31 on file for this type
▸BISADDITIONAL INFORMATION17
02/21/2020121997492Open ↗
07/15/2019121997492Open ↗
03/26/2019123586976Open ↗
Showing 3 of 17 on file for this type
▸BISBOROUGH INTAKE FORM16
05/27/2020120699903Open ↗
03/27/2020123854150Open ↗
02/19/2020121997492Open ↗
Showing 3 of 16 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
09/23/2020140950040Open ↗
06/20/2017140637247Open ↗
Showing 2 of 5 on file for this type
▸Other Documents20
▸DOB NOWProof of Historic Building6
08/20/2026M01182150-P1Open ↗
08/13/2026M01182154-I1Open ↗
08/13/2026M01182154-P1Open ↗
Showing 3 of 6 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWManufacturer's Specifications2
08/16/2026M01426311-I1Open ↗
08/13/2026M01294326-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/20/2026M01182150-P1Open ↗
08/20/2026M01182150-I1Open ↗
▸DOB NOWCalculations2
08/16/2026M01426311-I1Open ↗
08/13/2026M01294326-I1Open ↗
▸BISFEE EXEMPTION DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWIRA Certification1
08/13/2026M00981389-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026M01182150-I1Open ↗