1931Year Built
2Stories
M1Building Class
R8BZoning
11,000 sfGross Floor Area
1Units
Rent Stabilized13 Active Violations ▸
Church, synagogue, chapel · 12,771 sf lot · 0.86 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 2Remove and replace existing AC systemUnder Construction16p · 1 filing · 9 docs
Floor 1Remove and replace existing AC systemUnder Construction23p · 4 filings · 15 docs
CellarArchdiocesan Cathedral of Holy Trinity1p · 1 filing · 5 docs
Sub-BasementHoly Trinity Cathedral1 filing · 12 docs
Site & exteriorInstallation of pipe scaffold12p · 2 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Holy Trinity Cathedral807/08/2026
Cathedral of the Holy Trinity709/13/2026
Forum Owners403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Earth First Consulting207/29/2026
Koutsomitis Architects205/28/2026
Linea204/29/2024
GNK Engineering204/19/2024
Enthink Engineers103/12/2020
Sole Proprietor201/29/2020
Ashraf103/02/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
P.wolfe Consultants203/21/2026
Sol Building Consulting Services203/21/2026
Fluid Mechanics403/21/2026
HH Building Consulting & Architectu203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Intersystem InstallationScaffold1207/08/2026
Exo IndustriesScaffold1007/08/2026
Vincon EnterprisesGeneral Contractor203/21/2026
Airtemp Mechanical Servicesspecialty_contractor108/05/2026
Vincon EnterprisesScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Earth First Consulting9486207/29/2026
New York Engineering Associates851104/19/2024
Building Lifecycle
All (84)Filed (12)Permit Issued (14)Signed Off (6)Violation (28)Inspection (1)Objection (4)Special Inspection (19)
08/04/2026
Permit issued — Mechanical Systems
M01427021-I1-MS
07/30/2026
Special inspection requirement — Duct leakage testing, insulation and design
Matthew Ferguson
07/30/2026
Special inspection requirement — Shutoff dampers
Matthew Ferguson
07/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Matthew Ferguson
07/30/2026
Special inspection requirement — HVAC-R and service water heating equipment
Matthew Ferguson
07/30/2026
Special inspection requirement — HVAC-R and service water heating system controls
Matthew Ferguson
07/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Ferguson
07/30/2026
Special inspection requirement — Mechanical Systems
Matthew Ferguson
07/30/2026
Special inspection requirement — Final
Matthew Ferguson
07/30/2026
Special inspection requirement — Maintenance information
Matthew Ferguson
07/29/2026
Filed — Alteration
Filing to remove existing RTU's and install new Condensers with cassettes and ventilation within scope space.
M01427021-P1
07/07/2026
Filed — Alteration
Filing to remove existing RTU's and install new Condensers with cassettes and ventilation within scope space.
M01427021-I1
06/24/2026
Special inspection requirement — Public Assembly Emergency Lighting
Nicholas Koutsomitis
05/28/2026
Filed — No Work
M01311011-P2
05/07/2026
Special inspection requirement — Public Assembly Emergency Lighting
Nicholas Koutsomitis
04/29/2026
Violation issued (HPD, open)
A
12/23/2025
Objection resolved — Addressed
12/02/2025
Objection raised — Fire_Protection
11/17/2025
Violation issued (HPD, open)
I
10/31/2025
Filed — No Work
M01311011-I1
09/15/2025
Violation issued (ECB, closed)
Boilers
06/04/2025
Violation issued (HPD, open)
A
01/14/2025
Signed off — Alteration
LEGALIZATION OF EXIST #002 FUEL OIL STEAM BOILER USED FORHEATING. EXIST PIPING IS TO REMAIN, NO ADDITIONAL LOADS.
M00741052-S1
12/17/2024
Signed off — Alteration
REMOVAL OF EXISTING HC STAIR LIFT, INSTALLATION OF VERTICAL HC WHEELCHAIR LIFT. AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01025069-I1
11/22/2024
Violation issued (HPD, open)
I
11/18/2024
Signed off — Alteration
INSTALLATION OF SIDEWALK FENCE.
M01042189-I1
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/10/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/18/2024
Permit issued — Boiler Equipment
M00741052-S1-BE
04/29/2024
Filed — Alteration
INSTALLATION OF SIDEWALK FENCE.
M01042189-I1
04/29/2024
Permit issued — Construction Fence
M01042189-I1-FN
04/26/2024
Objection raised — Accessibility
04/26/2024
Objection resolved — Addressed
04/19/2024
Filed — Alteration
LEGALIZATION OF EXIST #002 FUEL OIL STEAM BOILER USED FORHEATING. EXIST PIPING IS TO REMAIN, NO ADDITIONAL LOADS.
M00741052-S1
04/01/2024
Permit issued — General Construction
M01025069-I1-GC
04/01/2024
Violation issued (HPD, open)
A
03/27/2024
Filed — Alteration
REMOVAL OF EXISTING HC STAIR LIFT, INSTALLATION OF VERTICAL HC WHEELCHAIR LIFT. AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01025069-I1
03/25/2024
Special inspection requirement — Final
Lisa Vangelas
11/15/2023
Violation issued (HPD, open)
I
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/23/2023
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00329951-I1
05/23/2023
Signed off — Alteration
Erection of supported pipe scaffold as per plans. No change in use, occupancy, or egress.
M00166085-I1
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/28/2023
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
LOUIS ARENA
03/15/2023
Violation issued (HPD, open)
A
11/02/2022
Violation issued (HPD, open)
I
05/19/2022
Filed — Alteration
LEGALIZATION OF EXIST #002 FUEL OIL STEAM BOILER USED FORHEATING. EXIST PIPING IS TO REMAIN, NO ADDITIONAL LOADS.
M00741052-I1
05/18/2022
Special inspection requirement — Heating Systems
05/18/2022
Special inspection requirement — Final
05/18/2022
Special inspection requirement — Energy Code Compliance Inspections
05/18/2022
Special inspection requirement — Mechanical Systems
05/18/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/15/2022
Violation issued (HPD, open)
A
02/15/2022
Violation issued (HPD, open)
I
12/03/2021
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS.
M00022403-I1
04/01/2021
Violation issued (HPD, open)
I
04/01/2021
Violation issued (HPD, open)
A
03/12/2021
Permit issued — Supported Scaffold
M00329951-I1-SF
Latest 60 of 84 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedAirtemp Mechanical Services08/04/2026
DOB NOWBoiler EquipmentSigned-offCam Energy Heating and Mechanical06/18/2024
DOB NOWConstruction FenceSigned-offVincon Enterprises04/29/2024
DOB NOWGeneral ConstructionSigned-offVincon Enterprises04/01/2024
DOB NOWSupported ScaffoldSigned-offExo Industries03/12/2021
DOB NOWSupported ScaffoldSigned-offIntersystem Installation09/04/2020
DOB NOWSupported ScaffoldSigned-offExo Industries03/16/2020
DOB NOWSupported ScaffoldSigned-offExo Industries11/13/2019
DOB NOWSupported ScaffoldSigned-offIntersystem Installation09/26/2019
DOB NOWSupported ScaffoldSigned-offIntersystem Installation07/24/2019
DOB NOWSupported ScaffoldSigned-offExo Industries05/22/2019
DOB NOWSupported ScaffoldSigned-offIntersystem Installation07/31/2018
DOB NOWSupported ScaffoldSigned-offIntersystem Installation05/14/2018
DOB NOWSupported ScaffoldSigned-offIntersystem Installation03/02/2018
BISOTISSUEDExo Industries02/26/2022
BISEQISSUEDIntersystem Installation08/25/2021
BISEQISSUEDExo Industries08/03/2021
BISOTISSUEDExo Industries03/12/2021
BISEQISSUEDExo Industries02/23/2021
BISEQISSUEDExo Industries08/05/2020
BISEQISSUEDIntersystem Installation07/09/2020
BISOTISSUEDExo Industries05/21/2020
BISEQISSUEDExo Industries02/24/2020
BISOTISSUEDExo Industries01/22/2020
BISBLISSUEDEast Coast Mechanical10/16/2019
BISEQISSUEDIntersystem Installation06/25/2019
BISFBISSUEDEast Coast Mechanical04/11/2019
BISEQISSUEDIntersystem S&S06/20/2018
BISFBISSUEDApproved Oil Co of Brooklyn03/04/2018
BISEQISSUEDIntersystem S&S06/30/2017
BIS—ISSUEDTri-State Building06/19/2015
BISOTISSUEDEuropean Royal Design03/28/2014
BISOTISSUEDEuropean Royal Design10/05/2010
BISMHISSUEDEuropean Royal Design10/05/2010
BISEQISSUEDCS Bridge04/19/2010
BISEQISSUEDColgate Scaff & Equipment Co03/04/2009
BISEQISSUEDPerimeter Bridge & Scaffold01/26/2006
BISEQISSUEDPerimeter Bridge & Scaffold01/17/2006
BISMHISSUEDMcQuay New York06/28/2005
BISEQISSUEDPerimeter Bridge & Scaffold06/14/2005
+ 12 more permits on file
1 project · most recent 07/29/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/29/2026Permit IssuedAirtemp Mechanical ServicesHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin RXYA72AATJA 6 tons · Vrf Outdoor ×6
RXF09BVJU9 9,000 BTU · Condensing Unit ×4
RXTA36AAVJU 3 tons · Vrf Outdoor ×2
Ventilation
Greenheck SQ-60-VG 50 CFM · Exhaust Fan ×6
SQ-7-VG 460 CFM · Exhaust Fan ×4
3 projects · most recent 08/10/2026
General Wiring
FiledStatusContractorScope
08/10/2026Permit IssuedAll Purpose ElectricGeneral Wiring
07/23/2024Permit IssuedCitywide Electrical WiringGeneral Wiring
01/11/2018CompleteSwitch Inc. Electrical Contracting—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
07/10/2024Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
07/30/2026Duct leakage testing, insulation and designMatthew Fergusonenergy_progress
07/30/2026Shutoff dampersMatthew Fergusonenergy_progress
07/30/2026HVAC-R and service water piping design and insulationMatthew Fergusonenergy_progress
07/30/2026HVAC-R and service water heating equipmentMatthew Fergusonenergy_progress
07/30/2026HVAC-R and service water heating system controlsMatthew Fergusonenergy_progress
07/30/2026Fire-Resistant Penetrations and JointsMatthew Fergusonspecial
07/30/2026Mechanical SystemsMatthew Fergusonspecial
07/30/2026FinalMatthew Fergusonprogress
07/30/2026Maintenance informationMatthew Fergusonenergy_progress
06/24/2026Public Assembly Emergency LightingNicholas Koutsomitisprogress
05/07/2026Public Assembly Emergency LightingNicholas Koutsomitisprogress
03/25/2024FinalLisa Vangelasprogress
03/28/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsLOUIS ARENAspecial
05/18/2022Heating Systems—special
05/18/2022Final—progress
05/18/2022Energy Code Compliance Inspections—progress
05/18/2022Mechanical Systems—special
05/18/2022Fire-Resistant Penetrations and Joints—special
02/26/2018FinalEric Fosterprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Holy Trinity CathedralReligiousSub-basement
Project M01311011 No Work · PAA Approved · 10/31/2025
Archdiocesan Cathedral of Holy TrinityReligiousCellar
Project M00741052 Alteration · LOC Issued · 05/19/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 275 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch7
09/06/2026M00022403-I1Request digital key ↗
08/27/2026M01025069-I1Request digital key ↗
08/27/2026M00741052-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold3
09/05/2026M00166085-I1Request digital key ↗
09/05/2026M00166085-P1Request digital key ↗
09/05/2026M00329951-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly2
08/17/2026M01311011-P2Request digital key ↗
08/17/2026M01311011-I1Request digital key ↗
▸Applications & Permits54
▸BISPLAN / WORK APPROVAL APPLICATION28
03/04/2025122080498Open ↗
01/24/2025122080498Open ↗
12/02/2021140744657Open ↗
Showing 3 of 28 on file for this type
▸BISWORK PERMIT APPLICATION18
08/25/2021140662496Open ↗
08/05/2020140921652Open ↗
07/10/2020140662496Open ↗
Showing 3 of 18 on file for this type
▸BISPLACE OF ASSEMBLY7
09/19/2025104344023Open ↗
09/18/2025104344023Open ↗
09/28/2018122186277Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
02/27/2025122080498Open ↗
▸Seals & Professional Certifications51
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
03/25/2020123689669Open ↗
01/10/2020123689669Open ↗
08/19/2019123689669Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/05/2026M00166085-I1Open ↗
09/05/2026M00166085-P1Open ↗
08/27/2026M00741052-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/28/2026M01311011-P2Open ↗
08/25/2026M01025069-I1Open ↗
08/24/2026M01427021-I1Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
07/17/2020140921652Open ↗
02/21/2020140888154Open ↗
03/02/2018140744657Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
07/17/2020140921652Open ↗
02/21/2020140888154Open ↗
03/02/2018140744657Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
07/17/2020140921652Open ↗
02/21/2020140888154Open ↗
03/02/2018140744657Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
06/25/2013121631902Open ↗
Showing 1 of 2 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
06/25/2013121631902Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026M00741052-S1Open ↗
08/24/2026M01427021-I1Open ↗
▸Trade Schedules & Equipment10
▸BISSELF-CERT PLUMBING NOTICE3
11/09/2010120456069Open ↗
11/05/2010120456069Open ↗
11/05/2010120456069Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
02/07/2020140744657Open ↗
03/02/2018140744657Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
09/28/2018122186277Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
03/31/2025122080498Open ↗
▸BISSCHEDULE B - PLUMBING1
08/28/2010120456069Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
05/15/2015103776763Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
03/26/2021140744657Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
08/20/2014122080498Open ↗
06/25/2013121631902Open ↗
▸BISTenant Protection Plan and Notes1
07/03/2019123689669Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/05/2026M00166085-P1Open ↗
09/05/2026M00166085-I1Open ↗
08/16/2026M01427021-P1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
12/10/2010120548425Open ↗
08/27/2010120456069Open ↗
Showing 2 of 3 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
03/02/2018140744657Open ↗
06/25/2013121631902Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
01/23/2020123689669Open ↗
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU0034MN201
07/17/2023123689669Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
03/25/2020123689669Open ↗
07/03/2019123689669Open ↗
08/20/2014122080498Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
07/14/2023123689669Open ↗
07/14/2023123689669Open ↗
03/02/2018140744657Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
07/21/2023123689669Open ↗
07/19/2023123689669Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
06/29/2017140662496Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
03/02/2018140744657Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY9
07/14/2023123689669Open ↗
07/14/2023123689669Open ↗
11/05/2021140662496Open ↗
Showing 3 of 9 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
09/28/2018122186277Open ↗
▸Approvals, Objections & Sign-offs45
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST16
07/21/2023123689669Open ↗
05/25/2023104134982Open ↗
05/24/2023140888154Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/17/2026M01311011-P2Open ↗
08/17/2026M01311011-I1Open ↗
08/16/2026M01427021-P1Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
06/25/2013121631902Open ↗
12/10/2010120548425Open ↗
Showing 2 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
08/25/2021140662496Open ↗
08/25/2021140662496Open ↗
07/10/2020140662496Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
03/22/2021122080498Open ↗
08/20/2014122080498Open ↗
Showing 2 of 3 on file for this type
▸BISSUPERSEDING LETTER2
04/12/2019140744657Open ↗
04/12/2019140744657Open ↗
▸BISSHED LETTER2
08/25/2021140662496Open ↗
06/22/2018140662496Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
03/25/2020123689669Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT11
07/14/2023123689669Open ↗
07/03/2019123689669Open ↗
03/02/2018140744657Open ↗
Showing 3 of 11 on file for this type
▸Filing & Intake Forms42
▸BISADDITIONAL INFORMATION15
03/31/2025122080498Open ↗
12/02/2021140744657Open ↗
04/07/2021122080498Open ↗
Showing 3 of 15 on file for this type
▸BISBOROUGH INTAKE FORM14
08/25/2021140662496Open ↗
07/10/2020140662496Open ↗
03/23/2020123689669Open ↗
Showing 3 of 14 on file for this type
▸BISEFILING COVER SHEET7
07/03/2019123689669Open ↗
06/25/2013121631902Open ↗
12/10/2010120548425Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
07/17/2020140921652Open ↗
02/21/2020140888154Open ↗
03/02/2018140744657Open ↗
Showing 3 of 6 on file for this type
▸Other Documents11
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
04/06/2021122080498Open ↗
07/10/2020140662496Open ↗
07/03/2019123689669Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWAlternate Plan 12
08/17/2026M01311011-I1Open ↗
08/17/2026M01311011-P2Open ↗
▸DOB NOWAlternate Plan 22
08/17/2026M01311011-P2Open ↗
08/17/2026M01311011-I1Open ↗
▸BISSupporting Document: Fee Deferment1
06/29/2015122186277Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll1
08/13/2026M01311011-I1Open ↗