| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01427021 | 319 EAST 74TH STREET MANHATTAN | Alteration | Permit Issued | 07/07/2026 | 10/30/2026 | Design EARTH FIRST CONSULTING Contractor AIRTEMP MECHANICAL SERVIC | REMOVE & REPLACE EXISTING AC SYSTEM W/DAIKIN VRV AIR COOLED CONDENSER & CASSETTE INDOOR UNITS. EXISTING EXHAUST SYSTEM TO REMAIN AS IS. |
| M01065741 ↗ | 343 EAST 74TH STREET MANHATTAN | Alteration | Signed-off | 07/23/2024 | 08/08/2025 | Design GACE DPC Contractor STRUCTURETECH NEW YORK IN | Filing for garage repair at the cellar floor. No change to use, egress, or occupancy. |
| M00741052 | 319 EAST 74TH STREET MANHATTAN | Alteration | Signed-off | 05/19/2022 | 06/18/2024 | Design GNK ENGINEERING, P.C Contractor CAM ENERGY HTG AND MECH Filer FLUID MECHANICS CORP. | LEGALIZATION OF EXIST #002 FUEL OIL STEAM BOILER USED FORHEATING. EXIST PIPING IS TO REMAIN, NO ADDITIONAL LOADS. |
| M01042189 | 319 EAST 74TH STREET MANHATTAN | Alteration | Signed-off | 04/29/2024 | 04/29/2024 | Design LINEA LLP Contractor VINCON ENTERPRISES, LLC | INSTALLATION OF SIDEWALK FENCE. |
| M01025069 | 319 EAST 74TH STREET MANHATTAN | Alteration | Signed-off | 03/27/2024 | 04/01/2024 | Design LINEA LLP Contractor VINCON ENTERPRISES, LLC | REMOVAL OF EXISTING HC STAIR LIFT, INSTALLATION OF VERTICAL HC WHEELCHAIR LIFT. AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR O… |
| Name | Projects together | Most recent |
|---|---|---|
| Linea | 2 | 04/29/2024 |
| Earth First Consulting | 1 | 07/29/2026 |
| Gace | 1 | 07/23/2024 |
| GNK Engineering | 1 | 04/19/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| Vincon Enterprises | 2 | 04/29/2024 |
| Airtemp Mechanical Services | 1 | 07/29/2026 |
| Cam Energy Heating and Mechanical | 1 | 04/19/2024 |
| Structuretech New York | 1 | 07/23/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| Sol Building Consulting Services | 2 | 04/29/2024 |
| Fluid Mechanics | 1 | 04/19/2024 |
| William Vitacco Associates | 1 | 07/23/2024 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01427021 | 319 EAST 74TH STREET MANHATTAN | Alteration | Permit Issued | 07/07/2026 | 10/30/2026 | Design EARTH FIRST CONSULTING Contractor AIRTEMP MECHANICAL SERVIC | REMOVE & REPLACE EXISTING AC SYSTEM W/DAIKIN VRV AIR COOLED CONDENSER & CASSETTE INDOOR UNITS. EXISTING EXHAUST SYSTEM TO REMAIN AS IS. |
| M01065741 ↗ | 343 EAST 74TH STREET MANHATTAN | Alteration | Signed-off | 07/23/2024 | 08/08/2025 | Design GACE DPC Contractor STRUCTURETECH NEW YORK IN | Filing for garage repair at the cellar floor. No change to use, egress, or occupancy. |
| M00741052 | 319 EAST 74TH STREET MANHATTAN | Alteration | Signed-off | 05/19/2022 | 06/18/2024 | Design GNK ENGINEERING, P.C Contractor CAM ENERGY HTG AND MECH Filer FLUID MECHANICS CORP. | LEGALIZATION OF EXIST #002 FUEL OIL STEAM BOILER USED FORHEATING. EXIST PIPING IS TO REMAIN, NO ADDITIONAL LOADS. |
| M01042189 | 319 EAST 74TH STREET MANHATTAN | Alteration | Signed-off | 04/29/2024 | 04/29/2024 | Design LINEA LLP Contractor VINCON ENTERPRISES, LLC | INSTALLATION OF SIDEWALK FENCE. |
| M01025069 | 319 EAST 74TH STREET MANHATTAN | Alteration | Signed-off | 03/27/2024 | 04/01/2024 | Design LINEA LLP Contractor VINCON ENTERPRISES, LLC | REMOVAL OF EXISTING HC STAIR LIFT, INSTALLATION OF VERTICAL HC WHEELCHAIR LIFT. AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR O… |
| Building | Filings | Most Recent |
|---|---|---|
| 319 EAST 74TH STREET ↗ | 5 | 07/29/2026 |
| 343 EAST 74TH STREET ↗ | 1 | 06/12/2024 |