Elevator cooperative
319 WEST 18 STREET
MANHATTAN · BIN 1013101
💬 Discuss this project
1928Year Built
6Stories
D4Building Class
R7BZoning
33,900 sfGross Floor Area
60Units
LL97 CoveredRent Stabilized0 Open ViolationsFISP: SAFE
Elevator cooperative · Owner of record: 319 WEST 18 STREET OWNERS CORP BUCHBINDE R LLC · 8,010 sf lot · 4.23 FAR built · Flood zone X
Locations of Work
Structural
Permit Issued — active, not yet Signed-off
Floor 6Under Construction1p · 1 filing · 5 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PLATINUM SERVICES NY707/08/2026
ALVEARY ARCHITECTURE1303/22/2026
319 WEST 18TH ST OWNERS3003/22/2026
JUNO CONTRACTING103/22/2026
319 W 18 ST OWNERS CORP603/22/2026
OWNER OF 319 W 18 ST103/22/2026
A.A.HILLS CO103/22/2026
DOUBLE CHAI PARTNERS1603/22/2026
AMAZING BUILDERS103/22/2026
VERTICAL SCAFFOLD LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ANDRA CONSTANTIN EXPEDITER1403/21/2026
MUNICIPAL BUILDING CONSULTANTS303/21/2026
NEW YORK ENGINEERING203/21/2026
JENNY FLORES EXPEDITING203/21/2026
NEXUS CONSULTING NYC, INC203/21/2026
GREEN STUDIO203/21/2026
LOMBARDO BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NORBERT GAJEWSKIElectrical603/21/2026
PLATINUM SERVICES NY LLCGeneral Contractor507/08/2026
I&E ELECTRIC, INCElectrical303/22/2026
IVAN DP CONSTRUCTION LLCGeneral Contractor307/08/2026
JERUSALEM CONSTRUCTION INGeneral Contractor303/21/2026
JUNO CONTRACTING CORPGeneral Contractor203/21/2026
PENTA RESTORATION CORPGeneral Contractor203/21/2026
METROTECH MECHANICAL CORPPlumbing207/08/2026
JOHN JR MARIElectrical103/21/2026
ANCHOR PLUMBING CORPPlumbing107/08/2026
MARIO CASTROElectrical103/21/2026
AMAZING BUILDERS AND RENOGeneral Contractor107/08/2026
JOSEPH WEINSTEIN ELECTRICElectrical103/22/2026
HAMILTON AIR COMPANY, INC.General Contractor107/08/2026
METRO INCORPORATEDPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS1803305/06/2026
ALAN MARGOLIN & ASSOC423506/11/2025
NEW YORK ENGINEERING ASSO851205/17/2023
BONSIGNORE ARCHITECTS, PC1109101/25/2022
LEO Y LEE ASSOCIATES2481106/07/2021
Building Lifecycle
All (146)Filed (20)Permit Issued (16)Signed Off (9)Facade (FISP) (13)Violation (34)Inspection (12)Objection (14)Special Inspection (28)
06/11/2026
Permit issued — Structural
M01386778-I1-ST
05/06/2026
Filed — Alteration
M01386778-I1
04/14/2026
Special inspection requirement — Structural Wood Frame
SAMI HAJJAR P.E
04/14/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
04/14/2026
Special inspection requirement — Structural Steel - Welding
SAMI HAJJAR P.E
04/14/2026
Special inspection requirement — Structural Steel - High Strength Bolting
SAMI HAJJAR P.E
04/14/2026
Special inspection requirement — Structural Steel - Details
SAMI HAJJAR P.E
04/14/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
03/20/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/12/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/03/2025
Signed off — Alteration
Installation of new PTAC units and modification to existing radiators filed in conjunction with the general construction application for apartment renovation as per plans filed herewith. No change to use, egress or occupancy.
M01086448-I1
10/03/2025
Signed off — Alteration
Cap and remove gas range and minor plumbing modification to existing bathroom in conjunction with general construction application for apartment combination and renovation, as per plans filed herewith. No change to use, egress or occupancy.
M01086412-I1
09/26/2025
Signed off — Alteration
Apartment combination per TPPN3/97 and renovation including removal and installation of non bearing partition and related finishes, with new masonry openings for PTAC units as per plans filed herewith. No change to use, egress or occupancy.
M01086363-I1
09/04/2025
Permit issued — General Construction
M01086363-I1-GC
08/25/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/25/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/27/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
06/25/2025
Special inspection requirement — Masonry
Young Suh
06/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
06/25/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Young Suh
06/25/2025
Special inspection requirement — Fire-Resistance Rated Construction
Young Suh
06/25/2025
Special inspection requirement — Final
Young Suh
06/20/2025
Objection raised — Scope
06/20/2025
Objection resolved — Addressed
06/11/2025
Filed — Alteration
Apartment combination per TPPN3/97 and renovation including removal and installation of non bearing partition and related finishes, with new masonry openings for PTAC units as per plans filed herewith. No change to use, egress or occupancy.
M01086363-P2
06/06/2025
Signed off — Alteration
FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M00984675-I1
06/04/2025
Special inspection requirement — Final
Young Suh
06/04/2025
Special inspection requirement — Fire-Resistance Rated Construction
Young Suh
06/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
06/04/2025
Special inspection requirement — Masonry
Young Suh
06/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Young Suh
05/13/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/27/2025
Signed off — Alteration
M01166207-I1
02/26/2025
Special inspection requirement — Mechanical Systems
Young Suh
02/26/2025
Special inspection requirement — Final
Young Suh
02/11/2025
Filed — Alteration
Apartment combination per TPPN3/97 and renovation including removal and installation of non bearing partition and related finishes, with new masonry openings for PTAC units as per plans filed herewith. No change to use, egress or occupancy.
M01086363-P1
02/11/2025
Permit issued — Suspended Scaffold
M01166207-I1-SC
02/10/2025
Filed — Alteration
Cap and remove gas range and minor plumbing modification to existing bathroom in conjunction with general construction application for apartment combination and renovation, as per plans filed herewith. No change to use, egress or occupancy.
M01086412-P1
02/10/2025
Filed — Alteration
Installation of new PTAC units and modification to existing radiators filed in conjunction with the general construction application for apartment renovation as per plans filed herewith. No change to use, egress or occupancy.
M01086448-P1
01/31/2025
Filed — Alteration
M01166207-I1
01/22/2025
Special inspection requirement — Mechanical Systems
Young Suh
01/22/2025
Special inspection requirement — Final
Young Suh
12/19/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/26/2024
Permit issued — Mechanical Systems
M01086448-I1-MS
09/26/2024
Permit issued — Plumbing
M01086412-I1-PL
09/12/2024
Permit issued — General Construction
M01086363-I1-GC
09/05/2024
Objection resolved — Addressed
08/27/2024
Objection resolved — Addressed
08/26/2024
Objection raised — Energy
08/23/2024
Objection raised — Other
08/13/2024
Objection resolved — Addressed
08/12/2024
Filed — Alteration
Installation of new PTAC units and modification to existing radiators filed in conjunction with the general construction application for apartment renovation as per plans filed herewith. No change to use, egress or occupancy.
M01086448-I1
08/12/2024
Filed — Alteration
Cap and remove gas range and minor plumbing modification to existing bathroom in conjunction with general construction application for apartment combination and renovation, as per plans filed herewith. No change to use, egress or occupancy.
M01086412-I1
08/09/2024
Filed — Alteration
Apartment combination per TPPN3/97 and renovation including removal and installation of non bearing partition and related finishes, with new masonry openings for PTAC units as per plans filed herewith. No change to use, egress or occupancy.
M01086363-I1
08/09/2024
Objection raised — Scope
05/13/2024
Filed — Alteration
FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M00984675-P2
04/22/2024
Permit issued — General Construction
M00984675-I1-GC
02/28/2024
Objection resolved — Addressed
02/27/2024
Objection raised — Energy
02/27/2024
Objection resolved — Addressed
Latest 60 of 146 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedAMAZING BUILDERS AND RENO06/11/2026
DOB NOWGeneral ConstructionSigned-offIVAN DP CONSTRUCTION LLC09/04/2025
DOB NOWSuspended ScaffoldSigned-offSKYTRAC ACCESS GROUP LLC02/11/2025
DOB NOWMechanical SystemsSigned-offIVAN DP CONSTRUCTION LLC09/26/2024
DOB NOWPlumbingSigned-offANCHOR PLUMBING CORP09/26/2024
DOB NOWGeneral ConstructionSigned-offIVAN DP CONSTRUCTION LLC09/12/2024
DOB NOWGeneral ConstructionSigned-offPENTA RESTORATION CORP04/22/2024
DOB NOWPlumbingSigned-offMETRO INCORPORATED04/19/2023
DOB NOWGeneral ConstructionSigned-offJERUSALEM CONSTRUCTION IN02/16/2022
DOB NOWStructuralSigned-offJUNO CONTRACTING10/13/2021
DOB NOWGeneral ConstructionSigned-offHAMILTON AIR COMPANY, INC.09/07/2021
DOB NOWPlumbingSigned-offMETROTECH MECHANICAL CORP07/15/2021
DOB NOWPlumbingSigned-offMETROTECH MECHANICAL CORP03/12/2021
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC02/19/2021
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC09/24/2020
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC06/04/2020
BISOTISSUEDGALLERY RESTORATION LTD01/18/2023
BISOTISSUEDJUNO CONTRACTING CORP03/24/2022
BISOTISSUEDJUNO CONTRACTING CORP03/30/2021
BISOTISSUEDO'MALLEY INTERIORS INC01/22/2021
BISOTISSUEDAMAZING BUILDERS AND RENO06/30/2020
BISOTISSUEDJUNO CONTRACTING CORP06/18/2020
BISPLISSUEDBENT MECHANICAL CORP09/06/2019
BISOTISSUEDGALLERY RESTORATION LTD07/24/2019
BISOTISSUEDGALLERY RESTORATION LTD06/12/2019
BISOTISSUEDAMAZING BUILDERS AND RENO03/12/2019
BISPLISSUEDMETROTECH MECHANICAL CORP05/23/2017
BISMHISSUEDO'MALLEY INTERIORS INC05/16/2017
BISOTISSUEDO'MALLEY INTERIORS INC05/11/2017
BISPLISSUEDMETROTECH MECHANICAL CORP12/04/2015
BISOTISSUEDO'MALLEY INTERIORS INC10/13/2015
BISOTISSUEDO'MALLEY INTERIORS INC10/13/2015
BISOTISSUEDAMERICAN QUALITY CONSTRUC06/26/2015
BISPLISSUEDABR PLBG&HTG CONTR INC06/11/2015
BISOTISSUEDAMERICAN QUALITY CONSTRUC05/18/2015
BISPLISSUEDMETROTECH MECHANICAL CORP04/17/2013
BISOTISSUEDMK WOODWORKING INC04/02/2013
BISOTISSUEDAMERICAN QUALITY CONSTRUC06/29/2012
BISOTISSUEDAMERICAN QUALITY CONSTRUC06/29/2012
BISOTISSUEDCUSTOM INTERIORS BY JBI I10/18/2011
+ 26 more permits on file
23 projects · most recent 09/23/2026
General Wiring
FiledStatusContractorScope
09/23/2026Permit IssuedI&E ELECTRIC, INCGeneral Wiring
09/23/2026Permit IssuedI&E ELECTRIC, INCGeneral Wiring
09/21/2026Permit IssuedSAMMY ELECTRIC SVCS CORPGeneral Wiring
08/12/2026Permit IssuedAMKRO ELECTRIC INCGeneral Wiring
07/10/2025CompleteI&E ELECTRIC, INCGeneral Wiring
07/10/2025CompleteI&E ELECTRIC, INCGeneral Wiring
04/08/2025CompleteWARREN OSTROFF ELEC., INC1 meters, 1 new_meters
01/13/2025CompleteI&E ELECTRIC, INCGeneral Wiring
11/25/2024CompleteWARREN OSTROFF ELEC., INCGeneral Wiring
11/25/2024CompleteJ.A. LEE ELEC SVCS LLCGeneral Wiring
10/07/2024CompleteWARREN OSTROFF ELEC., INC—
02/13/2023CompleteNION ELECTRIC CORPGeneral Wiring
02/12/2022CompleteSERENITY ELECTRIC CORPGeneral Wiring
02/08/2022Permit IssuedROBERT CHIMENTI34 meters, 1 new_meters
02/23/2021CompleteASSOCIATED ELEC CONT OF NGeneral Wiring
1 project · most recent 06/04/2020
Sidewalk Shed
FiledStatusContractorScope
06/04/2020Permit IssuedPLATINUM SERVICES NY LLCSidewalk Shed
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
03/20/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/12/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/25/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/25/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/27/2025Pass-Final PL - UndergroundPassView ↗
05/13/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/19/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/13/2023Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
06/13/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/09/2023Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
06/09/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/09/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
04/14/2026Structural Wood FrameSAMI HAJJAR P.Eprogress
04/14/2026Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
04/14/2026Structural Steel - WeldingSAMI HAJJAR P.Especial
04/14/2026Structural Steel - High Strength BoltingSAMI HAJJAR P.Especial
04/14/2026Structural Steel - DetailsSAMI HAJJAR P.Especial
04/14/2026FinalSAMI HAJJAR P.Eprogress
06/25/2025MasonryYoung Suhspecial
06/25/2025Fire-Resistant Penetrations and JointsYoung Suhspecial
06/25/2025Structural Stability – Alterations of existing buildingsYoung Suhspecial
06/25/2025Fire-Resistance Rated ConstructionYoung Suhprogress
06/25/2025FinalYoung Suhprogress
06/04/2025FinalYoung Suhprogress
06/04/2025Fire-Resistance Rated ConstructionYoung Suhprogress
06/04/2025Fire-Resistant Penetrations and JointsYoung Suhspecial
06/04/2025MasonryYoung Suhspecial
06/04/2025Structural Stability – Alterations of existing buildingsYoung Suhspecial
02/26/2025Mechanical SystemsYoung Suhspecial
02/26/2025FinalYoung Suhprogress
01/22/2025Mechanical SystemsYoung Suhspecial
01/22/2025FinalYoung Suhprogress
05/18/2023Energy Code Compliance InspectionsLOUIS ARENAprogress
05/18/2023Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
04/26/2023Energy Code Compliance InspectionsLOUIS ARENAprogress
04/26/2023Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
12/16/2021Fire-Resistant Penetrations and JointsRichard Bonsignorespecial
Latest 25 of 28.
▾Documents — 409 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch17
09/03/2026M00534282-I1Request digital key ↗
09/03/2026M00546336-P1Request digital key ↗
09/03/2026M00546336-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00436661-P1Request digital key ↗
09/04/2026M00436661-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00351929-I1Request digital key ↗
▸Applications & Permits79
▸BISWORK PERMIT APPLICATION40
01/19/2023123720303Open ↗
03/31/2021123875770Open ↗
01/22/2021140995378Open ↗
Showing 3 of 40 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION36
01/20/2023123720303Open ↗
12/27/2022123720303Open ↗
12/28/2020140995378Open ↗
Showing 3 of 36 on file for this type
▸BISLL114/19 PERMIT RESTRICTION2
01/10/2023123875770Open ↗
01/06/2021140995378Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
04/06/2020123875770Open ↗
▸Seals & Professional Certifications96
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION39
03/25/2020123875770Open ↗
03/25/2020123875770Open ↗
06/13/2019123720303Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
09/04/2026M00436661-I1Open ↗
09/03/2026M00534282-I1Open ↗
09/03/2026M00546336-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/02/2026M00648916-I1Open ↗
09/01/2026M01086363-P2Open ↗
08/29/2026M00792707-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
03/12/2019123827555Open ↗
10/05/2015122531698Open ↗
03/22/2013121397327Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/02/2026M00648916-I1Open ↗
09/01/2026M01086363-P2Open ↗
08/29/2026M00792707-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
03/22/2013121397327Open ↗
Showing 1 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
03/12/2019123827555Open ↗
10/05/2015122531698Open ↗
10/05/2015122531698Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
12/28/2020140995378Open ↗
▸BISProfessional and Owner Certification (POC3)1
05/13/2015122204989Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/28/2020140995378Open ↗
▸Trade Schedules & Equipment31
▸BISSCHEDULE B - PLUMBING12
03/22/2013121397327Open ↗
Showing 1 of 12 on file for this type
▸BISSELF-CERT PLUMBING NOTICE12
10/08/2015122204989Open ↗
09/09/2015122204989Open ↗
05/24/2013121397327Open ↗
Showing 3 of 12 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
03/12/2019123827555Open ↗
04/26/2017123086016Open ↗
06/14/2016122531698Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection11
▸BISTenant Protection Plan and Notes6
03/25/2020123875770Open ↗
05/16/2019123720303Open ↗
03/12/2019123827555Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWTenant Protection Plan3
09/04/2026M00436661-I1Open ↗
08/13/2026M00351929-I1Open ↗
08/13/2026M00436661-P1Open ↗
▸BISTPP1: TENANT PROTECTION PLAN2
01/22/2021140995378Open ↗
01/13/2021140995378Open ↗
▸Environmental & Asbestos33
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
09/04/2026M00436661-I1Open ↗
09/03/2026M00546336-P1Open ↗
09/03/2026M00546336-I1Open ↗
Showing 3 of 17 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
12/28/2020140995378Open ↗
03/25/2020123875770Open ↗
03/12/2019123827555Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: EXEMPTION (ASB4)1
05/13/2015122204989Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
06/13/2019123720303Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance33
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS13
03/25/2020123875770Open ↗
03/25/2020123875770Open ↗
06/13/2019123720303Open ↗
Showing 3 of 13 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
01/10/2023123875770Open ↗
01/06/2023123875770Open ↗
08/06/2021123827555Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
04/03/2023123720303Open ↗
01/06/2023123875770Open ↗
08/06/2021123827555Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
04/03/2023123720303Open ↗
01/17/2023140995378Open ↗
▸BISLIGHTING IN DWELLING UNITS2
04/03/2023123720303Open ↗
01/17/2023140995378Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
04/03/2023123720303Open ↗
01/17/2023140995378Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/28/2020140995378Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/03/2026M00546336-I1Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY8
04/03/2023123720303Open ↗
01/10/2023123875770Open ↗
01/10/2023123875770Open ↗
Showing 3 of 8 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
04/03/2023123720303Open ↗
▸Approvals, Objections & Sign-offs29
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST13
04/11/2023123720303Open ↗
08/06/2021123827555Open ↗
10/25/2017123086016Open ↗
Showing 3 of 13 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
03/22/2013121397327Open ↗
Showing 1 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
10/25/2017123086016Open ↗
08/21/2012120585857Open ↗
08/21/2012120585839Open ↗
Showing 3 of 6 on file for this type
▸BISFINAL2
04/03/2023123720303Open ↗
01/17/2023140995378Open ↗
▸Cost, Insurance & Ownership32
▸BISCOST AFFIDAVIT31
01/10/2023123875770Open ↗
01/06/2023123875770Open ↗
08/06/2021123827555Open ↗
Showing 3 of 31 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
04/11/2023123720303Open ↗
▸Filing & Intake Forms28
▸BISEFILING COVER SHEET15
03/25/2020123875770Open ↗
05/16/2019123720303Open ↗
03/12/2019123827555Open ↗
Showing 3 of 15 on file for this type
▸BISADDITIONAL INFORMATION7
01/27/2021123875770Open ↗
01/20/2021123875770Open ↗
11/24/2020123875770Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM4
03/31/2021123875770Open ↗
03/25/2020123875770Open ↗
09/30/2019123827555Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
12/28/2020140995378Open ↗
Showing 1 of 2 on file for this type
▸Other Documents8
▸BISDepartment of Consumer Affairs (DCA) Form3
03/12/2019123827555Open ↗
04/03/2013121397327Open ↗
Showing 2 of 3 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
06/18/2020123875770Open ↗
06/18/2020123875770Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWManufacturer's Specifications1
08/13/2026M01166207-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01166207-I1Open ↗