Elevator apt, fireproof without stores
Brownsville (NYCHA)
619 ROCKAWAY AVENUE · BIN 3326528
💬 Discuss this project
1975Year Built
6Stories
D3Building Class
R6Zoning
553,197 sfGross Floor Area
720Units
LL97 Covered7 Open Violations 6 unresolved · 1 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC HOUSING AUTHORITY · 465,500 sf lot · 1.19 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction8p · 4 filings · 20 docs
Bulkhead1p · 1 filing · 9 docs
Floor 21p · 1 filing · 20 docs
Floor 1
Cellar4p · 2 filings · 20 docs
Basement2p · 1 filing · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA2907/08/2026
NEW YORK CITY HOUSING AUTHORITY3807/08/2026
NYCHA 9 99103/22/2026
NYC HOUSING AUTHORITY503/22/2026
NYCHA 99103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUPERSTRUCTURES ENG + ARCH103/21/2026
WILLIAM VITACCO ASSOCIATES803/21/2026
AK CONSULTING SERVICES1203/21/2026
L J1603/21/2026
NYC APPROVALS203/21/2026
DVA Advisors103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROMA SCAFFOLDING INCGeneral Contractor1507/08/2026
GRYPHON CONSTRUCTION INCGeneral Contractor1307/08/2026
J & N CONSTRUCTION GROUPGeneral Contractor507/08/2026
I.M.P. PLBG. & HTG. CORPPlumbing507/08/2026
WELKIN MECHANICAL, LLCGeneral Contractor407/08/2026
VERDUGOS GENERAL CONTRACTORGeneral Contractor203/21/2026
A1 EXPEDITING SERVICE CORElectrical103/21/2026
WMP PLUMBING LLCPlumbing107/08/2026
CMAC ELECTRIC CORPElectrical103/22/2026
JOHN BUZZELLElectrical103/21/2026
THOMAS KELLYElectrical103/21/2026
ACCORD POWER INCGeneral Contractor107/08/2026
H.L. GENERAL CONTRACTORSGeneral Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SYNERGIC DESIGN LLC8561105/13/2026
MP ENGINEERS & ARCHITECTS14381212/11/2025
ALAN MARGOLIN & ASSOC423911/15/2024
AK CONSULTING SERVICES, I6198112/18/2023
BUREAU VERITAS NA6902210/17/2023
BITOPI CONSULTANTS LLC7036101/04/2023
Building Lifecycle
All (231)Filed (32)Permit Issued (29)Signed Off (19)Facade (FISP) (19)Violation (10)Inspection (12)Objection (80)Special Inspection (30)
06/01/2026
Permit issued — Solar
B01277795-I1-SL
05/13/2026
Filed — Alteration
Installation of 45.78 kw solar energy system on roof. No change of occupancy, use or egress.
B01277795-I1
05/12/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Malathi Ananthakrishnan
04/27/2026
Signed off — Alteration
Foundation work for Brownsville Community Center
B08033693-S1
03/12/2026
Signed off — Alteration
Foundation work for Brownsville Community Center
B08033693-I1
03/03/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/17/2026
Signed off — Alteration
Foundation work for Brownsville Community Center
B08033693-S6
02/17/2026
Signed off — Alteration
Foundation work for Brownsville Community Center
B08033693-S5
02/17/2026
Signed off — Alteration
Foundation work for Brownsville Community Center
B08033693-S2
02/13/2026
Signed off — Alteration
B08034957-I1
02/13/2026
Signed off — Alteration
Foundation work for Brownsville Community Center
B08033693-S3
12/19/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
JAMES WILSON
12/19/2025
Special inspection requirement — Concrete - Cast-In-Place
JAMES WILSON
12/19/2025
Special inspection requirement — Subgrade Inspections
JAMES WILSON
12/19/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAMES WILSON
12/19/2025
Special inspection requirement — Tenant Protection Plan Compliance
JAMES WILSON
12/19/2025
Special inspection requirement — Final
JAMES WILSON
12/19/2025
Special inspection requirement — Footing and Foundation
JAMES WILSON
12/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
JAMES WILSON
12/18/2025
Special inspection requirement — Metering
JAMES WILSON
12/18/2025
Special inspection requirement — Shutoff dampers
JAMES WILSON
12/18/2025
Special inspection requirement — Energy Code Compliance Inspections
JAMES WILSON
12/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
JAMES WILSON
12/18/2025
Special inspection requirement — Final
JAMES WILSON
12/18/2025
Special inspection requirement — Mechanical Systems
JAMES WILSON
12/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JAMES WILSON
12/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES WILSON
12/18/2025
Special inspection requirement — Maintenance information
JAMES WILSON
12/18/2025
Special inspection requirement — Electrical motors and elevators
JAMES WILSON
12/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
JAMES WILSON
12/11/2025
Filed — Alteration
Foundation work for Brownsville Community Center
B08033693-P1
12/08/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
12/04/2025
Filed — Alteration
Foundation work for Brownsville Community Center
B08033693-P2
11/10/2025
Special inspection requirement — Energy Code Compliance Inspections
JAMES WILSON
11/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
11/10/2025
Special inspection requirement — Mechanical Systems
JAMES WILSON
11/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES WILSON
11/10/2025
Special inspection requirement — Shutoff dampers
JAMES WILSON
11/10/2025
Special inspection requirement — Maintenance information
JAMES WILSON
11/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
JAMES WILSON
11/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JAMES WILSON
11/10/2025
Special inspection requirement — Final
JAMES WILSON
11/10/2025
Special inspection requirement — Electrical motors and elevators
JAMES WILSON
10/14/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
09/03/2025
Permit issued — General Construction
B08033693-I1-GC
09/03/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/28/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
08/25/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/15/2025
Permit issued — Plumbing
B08033693-S6-PL
05/21/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/10/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
02/26/2025
Signed off — Alteration
CELLAR SLAB ON GRADE REMOVAL AND REINSTALLATION FOR NEW SEWER LINES. INSTALL NEW CONCRETE SUMP PIT.
B00929686-I1
01/15/2025
Permit issued — General Construction
B08033693-I1-GC
01/13/2025
Permit issued — Plumbing
B08033693-S2-PL
01/13/2025
Permit issued — Foundation
B08033693-S3-FO
01/10/2025
Permit issued — General Construction
B08033693-I1-GC
01/08/2025
Signed off — Alteration
NYCHA REPLACEMENT OF UNDERGROUND COMBINED BUILDING DRAIN & COMBINED SEWER PIPING, RESTORE EXTERIOR CONDITIONS AFTER INSTALLATION OF THE NEW PIPE.
B00780888-I1
01/07/2025
Permit issued — Mechanical Systems
B08033693-S1-MS
01/07/2025
Permit issued — General Construction
B08033693-S5-GC-CX
01/07/2025
Permit issued — Structural
B08034957-I1-ST
Latest 60 of 231 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedACCORD POWER INC06/01/2026
DOB NOWGeneral ConstructionSigned-offGRYPHON CONSTRUCTION INC09/03/2025
DOB NOWPlumbingSigned-offI.M.P. PLBG. & HTG. CORP08/15/2025
DOB NOWGeneral ConstructionSigned-offGRYPHON CONSTRUCTION INC01/15/2025
DOB NOWPlumbingSigned-offI.M.P. PLBG. & HTG. CORP01/13/2025
DOB NOWFoundationSigned-offGRYPHON CONSTRUCTION INC01/13/2025
DOB NOWGeneral ConstructionSigned-offGRYPHON CONSTRUCTION INC01/10/2025
DOB NOWMechanical SystemsSigned-offGRYPHON CONSTRUCTION INC01/07/2025
DOB NOWGeneral ConstructionSigned-offGRYPHON CONSTRUCTION INC01/07/2025
DOB NOWStructuralSigned-offGRYPHON CONSTRUCTION INC01/07/2025
DOB NOWStructuralSigned-offWELKIN MECHANICAL, LLC03/07/2024
DOB NOWSupport of ExcavationSigned-offVERDUGOS GENERAL CONTRACT02/16/2024
DOB NOWStructuralSigned-offWELKIN MECHANICAL, LLC02/12/2024
DOB NOWConstruction FenceSigned-offWELKIN MECHANICAL, LLC01/16/2024
DOB NOWPlumbingSigned-offWMP PLUMBING LLC10/03/2023
DOB NOWGeneral ConstructionSigned-offJ & N CONSTRUCTION GROUP05/24/2023
DOB NOWConstruction FenceSigned-offJ & N CONSTRUCTION GROUP04/03/2023
DOB NOWSidewalk ShedSigned-offJ & N CONSTRUCTION GROUP04/03/2023
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC02/13/2023
DOB NOWSupported ScaffoldSigned-offROMA SCAFFOLDING INC01/05/2023
DOB NOWGeneral ConstructionSigned-offROMA SCAFFOLDING INC11/26/2022
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC07/07/2022
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC06/21/2022
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC07/07/2021
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC06/21/2021
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC06/16/2020
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC05/20/2020
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC05/29/2019
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC05/24/2019
BISOTISSUEDZORIA HOUSING, LLC12/04/2013
BISEQISSUEDZORIA HOUSING, LLC11/20/2013
BISEQISSUEDZORIA HOUSING, LLC10/17/2013
BISEQISSUEDAGFA CONSTRUCTION INC10/01/2009
BISEQISSUEDAGFA CONSTRUCTION INC04/16/2009
BISPLISSUEDKORDUN CONSTRUCTION CORP01/29/2008
BISPLISSUEDAMK CONT CORP10/04/2006
BISOTISSUEDA.M.K. CONTRACTING CORP08/31/2006
BISPLISSUEDAMK CONT CORP10/04/2005
BISOTISSUEDA.M.K. CONTRACTING CORP10/04/2005
BISOTISSUEDCROW CONSTRUCTION CO_JONES11/06/1998
+ 5 more permits on file
9 projects · most recent 09/03/2025
General Wiring
FiledStatusContractorScope
09/03/2025Permit IssuedACCORD POWER ELECTRIC LLC2 meters, 1 new_meters
07/23/2025CompleteCMAC ELECTRIC CORPGeneral Wiring
01/02/2025Permit IssuedCMAC ELECTRIC CORP1 meters, 1 new_meters
01/02/2025CompleteCMAC ELECTRIC CORPGeneral Wiring
03/24/2023Permit IssuedLIT MODE ELECL CONTG INC—
03/24/2023Permit IssuedLIT MODE ELECL CONTG INC—
04/19/2021CompleteHYLAN DATACOM & ELECL LLC—
09/12/2020CompleteAMIN ELECTRICAL CORP—
05/13/2019CompleteUSA ELECT'L SERVICES CORP—
1 project · most recent 12/11/2025
FiledStatusContractorScope
12/11/2025Signed-offGRYPHON CONSTRUCTION INC2 scope_items
1 project · most recent 05/13/2026
FiledStatusContractorScope
05/13/2026Permit IssuedACCORD POWER INC84 panels, 45.78 kw, 6,400.71 roof_area_sqft
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
03/03/2026Pass-Final General Construction Non-Directive 14PassView ↗
12/08/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
10/14/2025Pass-Final PL - UndergroundPassView ↗
09/03/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/28/2025Pass-Final PL - UndergroundPassView ↗
08/25/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/21/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/10/2025Pass-Final PL - UndergroundPassView ↗
10/25/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/02/2024Pass-Final PL - UndergroundPassView ↗
06/14/2024Pass-Final PL - UndergroundPassView ↗
04/29/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 74
DateRequirementInspectorRole
05/12/2026Structural Stability – Alterations of existing buildingsMalathi Ananthakrishnanspecial
12/19/2025Subgrade InspectionsJAMES WILSONspecial
12/19/2025Footing and FoundationJAMES WILSONprogress
12/19/2025FinalJAMES WILSONprogress
12/19/2025Structural Stability – Alterations of existing buildingsJAMES WILSONspecial
12/19/2025Subsurface Conditions – Fill Placement & In-Place DensityJAMES WILSONspecial
12/19/2025Tenant Protection Plan ComplianceJAMES WILSONspecial
12/19/2025Concrete - Cast-In-PlaceJAMES WILSONspecial
12/18/2025MeteringJAMES WILSONenergy_progress
12/18/2025Energy Code Compliance InspectionsJAMES WILSONprogress
12/18/2025FinalJAMES WILSONprogress
12/18/2025Fire-Resistant Penetrations and JointsJAMES WILSONspecial
12/18/2025Tenant Protection Plan ComplianceJAMES WILSONspecial
12/18/2025Mechanical SystemsJAMES WILSONspecial
12/18/2025HVAC-R and service water piping design and insulationJAMES WILSONenergy_progress
12/18/2025Maintenance informationJAMES WILSONenergy_progress
12/18/2025Shutoff dampersJAMES WILSONenergy_progress
12/18/2025HVAC-R and service water heating equipmentJAMES WILSONenergy_progress
12/18/2025Electrical motors and elevatorsJAMES WILSONenergy_progress
12/18/2025HVAC-R and service water heating system controlsJAMES WILSONenergy_progress
11/10/2025HVAC-R and service water heating system controlsJAMES WILSONenergy_progress
11/10/2025Fire-Resistant Penetrations and JointsJAMES WILSONspecial
11/10/2025Mechanical SystemsJAMES WILSONspecial
11/10/2025Tenant Protection Plan Compliance—special
11/10/2025Energy Code Compliance InspectionsJAMES WILSONprogress
Latest 25 of 74.
▾Documents — 233 on file (BIS + DOB NOW)
▸Plans & Drawings32
▸DOB NOWPlans/Sketch29
09/01/2026B00491925-I1Request digital key ↗
08/29/2026B00729889-P3Request digital key ↗
08/29/2026B00729889-I1Request digital key ↗
Showing 3 of 29 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/02/2026B00166707-P1Request digital key ↗
09/01/2026B00166707-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00172338-I1Request digital key ↗
▸Applications & Permits10
▸BISWORK PERMIT APPLICATION7
12/04/2013340089692Open ↗
11/29/2013340089754Open ↗
10/17/2013340089754Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
10/24/2013340089692Open ↗
10/17/2013340089754Open ↗
04/13/2009320006809Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/27/2026B08033693-I1Open ↗
▸Seals & Professional Certifications107
▸DOB NOWDPL-1: Design Professional Seal & Signature32
09/02/2026B00166707-I1Open ↗
09/02/2026B00166707-P1Open ↗
09/02/2026B00172338-I1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWProgress Inspector Seal & Signature30
09/01/2026B08033693-P1Open ↗
09/01/2026B08033693-P1Open ↗
09/01/2026B08033693-P1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature29
09/02/2026B00959970-I1Open ↗
09/01/2026B08033693-P1Open ↗
09/01/2026B08033693-P1Open ↗
Showing 3 of 29 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY-CERTIFICATION7
01/05/2015340089754Open ↗
06/30/2014340089692Open ↗
06/10/2014340089692Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
10/24/2013340089692Open ↗
10/17/2013340089754Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
10/24/2013340089692Open ↗
10/17/2013340089754Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
10/24/2013340089692Open ↗
10/17/2013340089754Open ↗
▸BISPC FULL REPORT1
10/05/2007310030560Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/05/2007310030560Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
10/05/2007310030560Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form10
09/01/2026B00491925-I1Open ↗
08/29/2026B00729889-I1Open ↗
08/27/2026B08034957-I1Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
10/24/2013340089692Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
04/13/2009320006809Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
08/11/2014340089692Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/05/2007310030560Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026B01277795-I1Open ↗
▸Energy Compliance2
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
10/17/2013340089754Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/01/2026B00491925-I1Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY2
10/24/2013340089692Open ↗
10/17/2013340089754Open ↗
▸DOB NOWSOIL REPORT2
08/27/2026B08033693-P2Open ↗
08/27/2026B08033693-S3Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/27/2026B08033693-S3Open ↗
▸Approvals, Objections & Sign-offs50
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter32
09/02/2026B00166707-I1Open ↗
09/02/2026B00166707-P1Open ↗
09/02/2026B00172338-I1Open ↗
Showing 3 of 32 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
01/05/2015340089754Open ↗
07/24/2014340089692Open ↗
12/04/2013340089692Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)4
08/27/2026B08033693-S6Open ↗
08/27/2026B08033693-S5Open ↗
08/27/2026B08033693-I1Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
04/17/2010320006809Open ↗
12/18/2009310030560Open ↗
01/05/2015340089754Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
04/13/2009320006809Open ↗
10/05/2007310030560Open ↗
▸DOB NOWDEP Variance (V5) letter2
09/01/2026B00491925-I1Open ↗
08/29/2026B00729889-I1Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026B00929686-I1Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
07/24/2014340089692Open ↗
10/24/2013340089692Open ↗
12/18/2009310030560Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET2
10/24/2013340089692Open ↗
10/17/2013340089754Open ↗
▸BISEFILING COVER SHEET1
04/13/2009320006809Open ↗
▸Other Documents4
▸DOB NOWSite Survey: Initial1
08/27/2026B08033693-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/27/2026B08033693-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00959970-I1Open ↗
▸DOB NOWPlot Diagram1
08/27/2026B08033693-I1Open ↗