320 KENT AVENUE
BROOKLYN · BIN 3426897
💬 Discuss this project
2022Year Built
1Stories
K1Building Class
R8Zoning
40,523 sfGross Floor Area
1Units
LL97 Covered0 Active ViolationsFDNY Report ↗
One story retail building · Owner of record: Domino Rme · 50,255 sf lot · 0.81 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofStretgh151p · 2 filings · 20 docs
Floor 1Stretgh, Frita +1294p · 6 filings · 20 docs
Mezzanine2p · 1 filing · 20 docs
CellarStretghUnder Construction289p · 5 filings · 20 docs
Sub-Cellar92p · 1 filing · 20 docs
Site & exteriorEmpirical, Todo ProductionsUnder Construction217p · 7 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Stretch 3203409/01/2026
Domino A LLC/Domino B1303/22/2026
19 Clay St103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DVA Advisors3903/21/2026
William Vitacco Associates503/21/2026
Municipal Building Consultants303/21/2026
Gallagher Bassett Services203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
316 Kent ConstructionGeneral Contractor4307/08/2026
Aik RenovationGeneral Contractor1007/08/2026
A&H Express Plumbing & HeatingPlumbing507/08/2026
Cara Plumbing GroupPlumbing507/08/2026
Arena Event ServicesGeneral Contractor407/08/2026
Winick ProductionsGeneral Contractor207/10/2026
Norton Mechanical IIPlumbing207/08/2026
Pace PlumbingPlumbing207/08/2026
Dependable MechanicalFire Protection206/28/2026
Aztec MechanicalPlumbing209/09/2026
Tristate Fire SprinklersFire Protection107/08/2026
NY TentGeneral Contractor104/09/2026
316 Kent ConstructionScaffold107/08/2026
Aldona Fire ProtectionElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Big Apple Group NY A Rma91681010/15/2026
Big Apple Group NY1258310/15/2026
Wavic Engineering17331607/06/2026
Domani Inspection Service843911/20/2024
Rosenwasser/Grossman111811/20/2024
Geodesign627409/30/2024
Building Lifecycle
All (280)Filed (53)Permit Issued (60)Signed Off (15)Violation (13)Inspection (31)Objection (78)Special Inspection (30)
10/15/2026
Filed — New Building
Plumbing work in conjunction with construction of new building.
B00629993-A4
10/08/2026
Special inspection requirement — Maintenance information
Soorjbally Harilall
10/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Soorjbally Harilall
10/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
Soorjbally Harilall
10/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
10/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
Soorjbally Harilall
10/08/2026
Special inspection requirement — Post-installed Anchors
Soorjbally Harilall
09/08/2026
Permit issued — Plumbing
B01117025-I1-PL
08/04/2026
Signed off — Alteration
B01122970-I1
08/04/2026
Signed off — Alteration
Temporary recreational climbing wall for Liquid IV and Spider-Man Movie, at Domino Square. Removed at the end of the programing. No changes to existing structures, use or egress.
B01425856-I1
07/07/2026
Permit issued — General Construction
B01425856-I1-GC
07/06/2026
Filed — Alteration
Installation of sprinkler system and associated fixtures for tenant fit out. No change in use, egress or occupancy.
B01122346-P7
07/02/2026
Filed — Alteration
Temporary recreational climbing wall for Liquid IV and Spider-Man Movie, at Domino Square. Removed at the end of the programing. No changes to existing structures, use or egress.
B01425856-I1
07/02/2026
Special inspection requirement — Final
ANDY ENGLER ROTH
06/29/2026
Special inspection requirement — Post-installed Anchors
DARIUSZ LUCZAK
06/29/2026
Special inspection requirement — Sprinkler Systems
DARIUSZ LUCZAK
06/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
DARIUSZ LUCZAK
05/18/2026
Special inspection requirement — Sprinkler Systems
DARIUSZ LUCZAK
05/15/2026
Filed — Alteration
Installation of plumbing system and associated fixtures for tenant fit out. No change in use, egress or occupancy.
B01122441-P3
05/07/2026
Special inspection requirement — Sprinkler Systems
DARIUSZ LUCZAK
05/04/2026
Permit issued — Plumbing
B00629993-Z1-PL
04/16/2026
Permit issued — General Construction
B00629993-I1-GC
03/31/2026
Signed off — Alteration
Installation of plumbing system and associated fixtures for tenant fit out. No change in use, egress or occupancy.
B01122441-I1
03/31/2026
Signed off — Alteration
Installation of sprinkler system and associated fixtures for tenant fit out. No change in use, egress or occupancy.
B01122346-I1
02/19/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
DARIUSZ LUCZAK
02/19/2026
Special inspection requirement — Maintenance information
DARIUSZ LUCZAK
02/19/2026
Special inspection requirement — HVAC-R and service water heating equipment
DARIUSZ LUCZAK
02/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
DARIUSZ LUCZAK
02/19/2026
Special inspection requirement — HVAC-R and service water heating system controls
DARIUSZ LUCZAK
02/19/2026
Special inspection requirement — Post-installed Anchors
DARIUSZ LUCZAK
02/18/2026
Filed — Alteration
Installation of sprinkler system and associated fixtures for tenant fit out. No change in use, egress or occupancy.
B01122346-P6
01/28/2026
Filed — Alteration
Installation of plumbing system and associated fixtures for tenant fit out. No change in use, egress or occupancy.
B01122441-P2
01/28/2026
Special inspection requirement — HVAC-R and service water heating equipment
DARIUSZ LUCZAK
01/28/2026
Special inspection requirement — Maintenance information
DARIUSZ LUCZAK
01/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
DARIUSZ LUCZAK
01/28/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
DARIUSZ LUCZAK
01/28/2026
Special inspection requirement — Post-installed Anchors
DARIUSZ LUCZAK
01/28/2026
Special inspection requirement — HVAC-R and service water heating system controls
DARIUSZ LUCZAK
01/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
DARIUSZ LUCZAK
01/06/2026
Special inspection requirement — Maintenance information
DARIUSZ LUCZAK
01/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
DARIUSZ LUCZAK
01/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
DARIUSZ LUCZAK
01/06/2026
Special inspection requirement — Post-installed Anchors
DARIUSZ LUCZAK
01/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
DARIUSZ LUCZAK
12/31/2025
Signed off — New Building
Plumbing work in conjunction with construction of new building.
B00629993-S1
12/10/2025
Signed off — New Building
Plumbing work in conjunction with construction of new building.
B00629993-S2
12/10/2025
Signed off — New Building
Plumbing work in conjunction with construction of new building.
B00629993-Z2
12/10/2025
Signed off — New Building
Plumbing work in conjunction with construction of new building.
B00629993-S9
12/10/2025
Permit issued — General Construction
B00629993-I1-GC
10/31/2025
Permit issued — General Construction
B01308223-I1-GC
10/27/2025
Filed — Alteration
Temporary structures for the Domino Square ice Rink, public access. Removed at the end of the programing. No changes to existing structures, use or egress.
B01308223-I1
10/24/2025
Signed off — Alteration
Temporary structures for a concert at Domino Square. Removed at the end of the programing. No changes to existing structures, use or egress.
B01284590-I1
10/10/2025
Violation issued (FDNY_ORDER, closed)
09/29/2025
Permit issued — Plumbing
B01117025-I1-PL
09/11/2025
Permit issued — General Construction
B01284590-I1-GC
09/11/2025
Objection raised — Other
09/11/2025
Objection resolved — Addressed
09/10/2025
Filed — Alteration
Temporary structures for a concert at Domino Square. Removed at the end of the programing. No changes to existing structures, use or egress.
B01284590-I1
09/10/2025
Filed — No Work
B01285097-I1
09/03/2025
Permit issued — Plumbing
B01122441-S2-PL
Latest 60 of 280 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAztec Mechanical09/08/2026
DOB NOWGeneral ConstructionSigned-offWinick Productions07/07/2026
DOB NOWPlumbingPermit IssuedCara Plumbing Group05/04/2026
DOB NOWGeneral ConstructionPermit Issued316 Kent Construction04/16/2026
DOB NOWGeneral ConstructionPermit Issued316 Kent Construction12/10/2025
DOB NOWGeneral ConstructionPermit IssuedNY Tent10/31/2025
DOB NOWPlumbingPermit IssuedAztec Mechanical09/29/2025
DOB NOWGeneral ConstructionSigned-offWinick Productions09/11/2025
DOB NOWPlumbingPermit IssuedA&H Express Plumbing & Heating09/03/2025
DOB NOWSprinklersSigned-offDependable Mechanical07/14/2025
DOB NOWSprinklersSigned-offDependable Mechanical05/20/2025
DOB NOWPlumbingPermit IssuedA&H Express Plumbing & Heating05/19/2025
DOB NOWPlumbingPermit IssuedPrime Plumbing & Heating of NY03/03/2025
DOB NOWGeneral ConstructionSigned-offArena Event Services02/03/2025
DOB NOWPlumbingPermit IssuedA&H Express Plumbing & Heating01/31/2025
DOB NOWPlumbingPermit IssuedA&H Express Plumbing & Heating01/30/2025
DOB NOWMechanical SystemsSigned-offAik Renovation01/03/2025
DOB NOWGeneral ConstructionSigned-offAik Renovation01/03/2025
DOB NOWMechanical SystemsSigned-offAik Renovation01/03/2025
DOB NOWGeneral ConstructionSigned-offAik Renovation01/03/2025
DOB NOWPlumbingPermit IssuedA&H Express Plumbing & Heating12/12/2024
DOB NOWGeneral ConstructionSigned-offArena Event Services10/09/2024
DOB NOWMechanical SystemsPermit Issued316 Kent Construction10/03/2024
DOB NOWEarth WorkSigned-off316 Kent Construction06/11/2024
DOB NOWPlumbingPermit IssuedPrime Plumbing & Heating of NY06/10/2024
DOB NOWPlumbingPermit IssuedPrime Plumbing & Heating of NY05/31/2024
DOB NOWSprinklersSigned-offTristate Fire Sprinkler04/09/2024
DOB NOWStructuralSigned-off316 Kent Construction04/03/2024
DOB NOWGeneral ConstructionPermit Issued316 Kent Construction04/03/2024
DOB NOWEarth WorkPermit Issued316 Kent Construction04/03/2024
DOB NOWPlumbingPermit IssuedPrime Plumbing & Heating of NY03/19/2024
DOB NOWConstruction FenceSigned-off316 Kent Construction02/29/2024
DOB NOWPlumbingPermit IssuedNorton Mechanical II02/14/2024
DOB NOWSupport of ExcavationSigned-off316 Kent Construction02/13/2024
DOB NOWFoundationSigned-off316 Kent Construction02/08/2024
DOB NOWPlumbingPermit IssuedNorton Mechanical II01/31/2024
DOB NOWStructuralSigned-off316 Kent Construction10/11/2023
DOB NOWPlumbingPermit IssuedPace Plumbing09/19/2023
DOB NOWFoundationSigned-off316 Kent Construction09/15/2023
DOB NOWStructuralSigned-off316 Kent Construction09/14/2023
+ 15 more permits on file
2 projects · most recent 07/06/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/06/2026Signed-offAik RenovationAir Conditioning Systems
Cooling
Daikin CFX060HH-LE-C-CUST-DOAS 1,400 CFM ×4
GCV048F1LTGMP 1,600 CFM · Condensing Unit ×4
WSCH048F1FRSCB 1,600 CFM · Chiller ×2
05/15/2026Signed-offAik RenovationAir Conditioning Systems
Cooling
Daikin GCH048 1,600 CFM · Condensing Unit ×3
GCH060 1,500 CFM · Rooftop Unit ×2
GCH042 1,275 CFM ×1
2 projects · most recent 07/06/2026
Sprinkler System
FiledStatusContractorScope
07/06/2026Signed-offA&H Express Plumbing & HeatingSprinkler System
05/15/2026Signed-offA&H Express Plumbing & HeatingSprinkler System
4 projects · most recent 10/15/2026
Water/Sanitary Gas Storm
FiledStatusContractorScope
10/15/2026Permit IssuedCara Plumbing GroupStorm, Water/Sanitary
07/06/2026Permit IssuedA&H Express Plumbing & HeatingGas, Water/Sanitary
05/15/2026Permit IssuedDependable MechanicalGas, Water/Sanitary
05/28/2024Permit IssuedA&H Express Plumbing & HeatingWater/Sanitary
4 projects · most recent 06/02/2025
General Wiring
FiledStatusContractorScope
06/02/2025CompleteJam Electrical—
04/08/2025Permit IssuedAldona Fire ProtectionGeneral Wiring
04/08/2025Permit IssuedAldona Fire ProtectionGeneral Wiring
06/29/2023Permit IssuedRoma ElectricGeneral Wiring
1 project · most recent 10/15/2026
Steel Concrete Masonry
FiledStatusContractorScope
10/15/2026Permit IssuedCara Plumbing GroupSteel, Concrete, Masonry
1 project · most recent 10/15/2026
Earthwork
FiledStatusContractorScope
10/15/2026Permit IssuedCara Plumbing GroupEarthwork
▾Field Inspections (DOB CAP) — 31
DateTypeResultReport
09/02/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/22/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/19/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/15/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/15/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/16/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/05/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/22/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/17/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/15/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/24/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/23/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
10/23/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/09/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/22/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
08/14/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
08/09/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/14/2024Pass-Final PL - UndergroundPassView ↗
06/07/2024Pass-Final PL - UndergroundPassView ↗
05/13/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/29/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/21/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
Latest 25 of 31.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
10/08/2026Post-installed AnchorsSoorjbally Harilallspecial
10/08/2026HVAC-R and service water heating system controlsSoorjbally Harilallenergy_progress
10/08/2026HVAC-R and service water heating equipmentSoorjbally Harilallenergy_progress
10/08/2026Maintenance informationSoorjbally Harilallenergy_progress
10/08/2026HVAC-R and service water piping design and insulationSoorjbally Harilallenergy_progress
10/08/2026Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
07/02/2026FinalANDY ENGLER ROTHprogress
06/29/2026Fire-Resistant Penetrations and JointsDARIUSZ LUCZAKspecial
06/29/2026Post-installed AnchorsDARIUSZ LUCZAKspecial
06/29/2026Sprinkler SystemsDARIUSZ LUCZAKspecial
05/18/2026Sprinkler SystemsDARIUSZ LUCZAKspecial
05/07/2026Sprinkler SystemsDARIUSZ LUCZAKspecial
02/19/2026Post-installed AnchorsDARIUSZ LUCZAKspecial
02/19/2026Fire-Resistant Penetrations and JointsDARIUSZ LUCZAKspecial
02/19/2026HVAC-R and service water heating system controlsDARIUSZ LUCZAKenergy_progress
02/19/2026HVAC-R and service water heating equipmentDARIUSZ LUCZAKenergy_progress
02/19/2026HVAC-R and service water piping design and insulationDARIUSZ LUCZAKenergy_progress
02/19/2026Maintenance informationDARIUSZ LUCZAKenergy_progress
01/28/2026Post-installed AnchorsDARIUSZ LUCZAKspecial
01/28/2026HVAC-R and service water heating system controlsDARIUSZ LUCZAKenergy_progress
01/28/2026HVAC-R and service water heating equipmentDARIUSZ LUCZAKenergy_progress
01/28/2026Maintenance informationDARIUSZ LUCZAKenergy_progress
01/28/2026HVAC-R and service water piping design and insulationDARIUSZ LUCZAKenergy_progress
01/28/2026Fire-Resistant Penetrations and JointsDARIUSZ LUCZAKspecial
01/06/2026HVAC-R and service water piping design and insulationDARIUSZ LUCZAKenergy_progress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
EmpiricalFitness / Recreation—
Project B01425856 Alteration · LOC Issued · 07/02/2026
Todo ProductionsEvents & gatherings—
Project B01284590 Alteration · LOC Issued · 09/10/2025
StretghOfficeCellar, Floor 1
Project B01122346 Alteration · Permit Entire · 11/21/2024
Project B01122441 Alteration · Permit Entire · 11/21/2024
Stretch PizzaRestaurant / Food ServiceFloor 1
Project B01046788 Alteration · Permit Entire · 05/29/2024
FritaRetailFloor 1
Project B01046804 Alteration · Permit Entire · 05/28/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 370 on file (BIS + DOB NOW)
▸Plans & Drawings53
▸DOB NOWPlans/Sketch52
08/31/2026B00660639-I1Request digital key ↗
08/26/2026B00972511-I1Request digital key ↗
08/25/2026B01046804-I1Request digital key ↗
Showing 3 of 52 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION2
05/10/2024340869652Open ↗
08/18/2020340755739Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
01/09/2024340869652Open ↗
08/07/2023340869652Open ↗
▸BISWORK PERMIT APPLICATION1
08/19/2020340755739Open ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications182
▸DOB NOWProgress Inspector Seal & Signature69
10/17/2026B00629993-A4Open ↗
09/21/2026B01122441-P2Open ↗
09/21/2026B01122441-P2Open ↗
Showing 3 of 69 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature57
10/17/2026B00629993-A4Open ↗
10/17/2026B00629993-A4Open ↗
09/21/2026B01122441-P3Open ↗
Showing 3 of 57 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature53
08/31/2026B00660639-I1Open ↗
08/26/2026B00972511-I1Open ↗
08/25/2026B01046804-I1Open ↗
Showing 3 of 53 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/18/2020340755739Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/18/2020340755739Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/18/2020340755739Open ↗
▸Trade Schedules & Equipment7
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸Safety & Tenant Protection13
▸DOB NOWStreet Tree Checklist7
08/23/2026B00629993-P9Open ↗
Showing 1 of 7 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
08/04/2023340869652Open ↗
▸BISSTREET TREE CHECKLIST1
08/04/2023340869652Open ↗
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos54
▸DOB NOWOER: Notice to Proceed30
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 30 on file for this type
▸DOB NOWOER: Notice of Satisfaction22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
08/04/2023340869652Open ↗
08/18/2020340755739Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY2
08/19/2020340755739Open ↗
08/18/2020340755739Open ↗
▸DOB NOWTR5 Test Report1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWSOIL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTR4 Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
08/18/2020340755739Open ↗
▸Filing & Intake Forms4
▸BISEFILING JOB APPLICATION COVER SHEET2
08/04/2023340869652Open ↗
08/18/2020340755739Open ↗
▸BISADDITIONAL INFORMATION2
05/10/2024340869652Open ↗
08/04/2023340869652Open ↗
▸Other Documents35
▸DOB NOWSite Survey: Initial7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWProperty Ownership Certification5
08/23/2026B00629993-P9Open ↗
Showing 1 of 5 on file for this type
▸DOB NOWAdjoining Owners Notification4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWLowest Floor Elevation Plan2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBPP-DOT: RELOCATE STREET LIGHT1
08/04/2023340869652Open ↗
▸DOB NOWFinal Survey1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProject Specific General Liability (PGL1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type