| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B00606335 ↗ | 1045 ATLANTIC AVENUE BROOKLYN | New Building | Permit Issued | 10/19/2021 | 07/09/2026 | Owner 1065 ATLANTIC AVENUE LLC Contractor J.E. LEVINE BUILDER INC | Support of Excavation work in conjunction with construction of New Building. Foundation and Superstructure filed separately under -S1 and -S… |
| X00871979 ↗ | RIVER AVENUE BRONX | New Building | Permit Issued | 05/15/2023 | 06/10/2026 | Design ESKW/A Owner COMMUNITY ACCESS, INC. Contractor MEGA CONTRACTING GP LLC Filer JM ZONING, LLC. | FOUNDATION WORK FOR NEW 20 STORY BUILDING AS PER PLANS. |
| B00580365 ↗ | 737 4TH AVENUE BROOKLYN | New Building | Permit Issued | 09/23/2021 | 06/09/2026 | Design COSENTINI ASSOCIATES Owner MOORE GROUP CORP Contractor CHRISTOPHER B. MESBAH | Wall Bracket as per plans filed herewith. |
| B00629993 ↗ | KENT AVENUE BROOKLYN | New Building | Permit Issued | 12/07/2021 | 05/04/2026 | Owner TWO TREES Contractor 316 KENT CONSTRUCTION LLC | Support of excavation in conjunction with construction of non-potable water facility and storage building. |
| B08015349 ↗ | 2015 BOARDWALK WEST BROOKLYN | New Building | Permit Issued | 10/28/2022 | 03/26/2026 | Design STEPHEN B JACOBS GROUP Contractor WEST 21ST CONSTRUCTION | SUPPORT OF EXCAVATION WORK FOR NEW 23 STORY BUILDING |
| M01219566 ↗ | 400 EAST 54 STREET MANHATTAN | Alteration | Permit Issued | 07/17/2025 | 10/31/2025 | Design RGCE Contractor INFRASTRUCTURE REPAIR SER Filer MK ARCHITECTURE PC | Filing for repairs to this existing garage. No change to use, occupancy or egress. |
| Name | Projects together | Most recent |
|---|---|---|
| RGCE | 14 | 06/29/2026 |
| COSENTINI ASSOCIATES | 3 | 06/29/2026 |
| DENCITYWORKS ARCHITECTURE PLLC. | 3 | 06/29/2026 |
| LANGAN ENGINEERING | 3 | 06/29/2026 |
| MATHEWS NIELSEN | 2 | 07/28/2023 |
| PHILIP HABIB & ASSOCIATES | 2 | 06/29/2026 |
| ESKW/A | 1 | 06/25/2026 |
| FTL DESIGN ENGINEERING STUDIO | 1 | 04/28/2025 |
| GEODESIGN INC. PC | 1 | 04/28/2025 |
| I.M. ROBBINS, P.C. | 1 | 02/19/2026 |
| JAMES CORNER FIELD OPERATIONS | 1 | 04/28/2025 |
| LOMBARDO PROFESSIONAL ENGINEERING | 1 | 04/28/2025 |
| MRCE | 1 | 06/25/2026 |
| MULLEN PALANDRANI ARCHITECTS | 1 | 11/14/2024 |
| OLA CONSULTING ENGINEERS, PC | 1 | 06/25/2026 |
| OSPINO ENGINEERING PLLC | 1 | 06/29/2026 |
| PILLORI ASSOCIATES | 1 | 02/19/2026 |
| STEPHEN B JACOBS GROUP | 1 | 02/19/2026 |
| STUDIO CADENA | 1 | 04/28/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| TFC PACIFIC PARK GC LLC | 3 | 07/28/2023 |
| FORWARD MECHANICAL CORP | 2 | 02/19/2026 |
| LINEAL CONSTRUCTION & RES | 2 | 06/07/2024 |
| NEW LINE STRUCTURES & DEV | 2 | 06/29/2026 |
| 316 KENT CONSTRUCTION LLC | 1 | 04/28/2025 |
| BIG SKY CONSTRUCTION CO | 1 | 12/08/2025 |
| BUD NORTH GC LLC | 1 | 05/07/2024 |
| BUD SOUTH GC LLC | 1 | 01/31/2024 |
| CARA PLUMBING GROUP INC | 1 | 04/28/2025 |
| CM AND ASSOCIATES CONST | 1 | 06/29/2026 |
| D.D.S. MECH PBG&HTG CORP | 1 | 06/25/2026 |
| INFRASTRUCTURE REPAIR SER | 1 | 02/13/2026 |
| J.E. LEVINE BUILDER INC | 1 | 12/08/2025 |
| KILREE CONSTRUCTION INC | 1 | 11/14/2024 |
| MEGA CONTRACTING GP LLC | 1 | 06/25/2026 |
| MOORE GROUP CORPORATION | 1 | 06/29/2026 |
| NORTON MECHANICAL II INC | 1 | 04/28/2025 |
| PACE PLUMBING CORP | 1 | 04/28/2025 |
| RAEL AUTOMATIC SPR.CO INC | 1 | 12/08/2025 |
| TRISTATE FIRE SPRINK INC | 1 | 04/28/2025 |
| TT MECHANICAL CORP | 1 | 06/29/2026 |
| WEST 21ST CONSTRUCTION | 1 | 02/19/2026 |
| WITH PRIDE AIR CONDITIONI | 1 | 06/25/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| 1065 ATLANTIC AVENUE LLC | 1 | 12/08/2025 |
| 400 EAST 54TH STREET COMPANY | 1 | 02/13/2026 |
| COMMUNITY ACCESS, INC. | 1 | 06/25/2026 |
| GEORGICA GREEN VENTURES, LLC | 1 | 02/19/2026 |
| ISTAR INC. | 1 | 02/19/2026 |
| MOORE GROUP CORP | 1 | 06/29/2026 |
| TWO TREES | 1 | 04/28/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| WILLIAM VITACCO ASSOCIATES | 3 | 06/29/2026 |
| JAM CONSULTANTS, INC. | 2 | 07/28/2023 |
| CLARKE CONSTRUCTION CONSULTANTS | 1 | 11/14/2024 |
| EDI CONSULTING GROUP, LLC | 1 | 04/09/2024 |
| Hierarch-E LLC | 1 | 06/29/2026 |
| JM ZONING, LLC. | 1 | 06/25/2026 |
| LOMBARDO PROFESSIONAL ENGINEERING | 1 | 04/28/2025 |
| MK ARCHITECTURE PC | 1 | 02/13/2026 |
| THE STEPHEN B. JACOBS GROUP PC | 1 | 02/19/2026 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B00606335 ↗ | 1045 ATLANTIC AVENUE BROOKLYN | New Building | Permit Issued | 10/19/2021 | 07/09/2026 | Owner 1065 ATLANTIC AVENUE LLC Contractor J.E. LEVINE BUILDER INC | Support of Excavation work in conjunction with construction of New Building. Foundation and Superstructure filed separately under -S1 and -S… |
| X00871979 ↗ | RIVER AVENUE BRONX | New Building | Permit Issued | 05/15/2023 | 06/10/2026 | Design ESKW/A Owner COMMUNITY ACCESS, INC. Contractor MEGA CONTRACTING GP LLC Filer JM ZONING, LLC. | FOUNDATION WORK FOR NEW 20 STORY BUILDING AS PER PLANS. |
| B00580365 ↗ | 737 4TH AVENUE BROOKLYN | New Building | Permit Issued | 09/23/2021 | 06/09/2026 | Design COSENTINI ASSOCIATES Owner MOORE GROUP CORP Contractor CHRISTOPHER B. MESBAH | Wall Bracket as per plans filed herewith. |
| B00629993 ↗ | KENT AVENUE BROOKLYN | New Building | Permit Issued | 12/07/2021 | 05/04/2026 | Owner TWO TREES Contractor 316 KENT CONSTRUCTION LLC | Support of excavation in conjunction with construction of non-potable water facility and storage building. |
| B08015349 ↗ | 2015 BOARDWALK WEST BROOKLYN | New Building | Permit Issued | 10/28/2022 | 03/26/2026 | Design STEPHEN B JACOBS GROUP Contractor WEST 21ST CONSTRUCTION | SUPPORT OF EXCAVATION WORK FOR NEW 23 STORY BUILDING |
| M01219566 ↗ | 400 EAST 54 STREET MANHATTAN | Alteration | Permit Issued | 07/17/2025 | 10/31/2025 | Design RGCE Contractor INFRASTRUCTURE REPAIR SER Filer MK ARCHITECTURE PC | Filing for repairs to this existing garage. No change to use, occupancy or egress. |
| M01038400 ↗ | 16S EAST 83 STREET MANHATTAN | Alteration | Signed-off | 05/06/2024 | 04/22/2025 | Design RGCE Contractor KILREE CONSTRUCTION INC | RESTORATION OF MAIN ENTRY, FOYER, SIDEWALK AND AREAWAY WALL. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| M01050119 ↗ | 1306 1 AVENUE MANHATTAN | Alteration | Permit Issued | 06/07/2024 | 06/21/2024 | Design RGCE Contractor LINEAL CONSTRUCTION & RES | SPOT REPAIR OF GARAGE AT CELLAR AND FIRST FLOOR, AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| Q00432951 ↗ | 2-21 MALT DRIVE QUEENS | Alteration | Signed-off | 12/21/2020 | 06/06/2024 | Design RGCE Contractor BUD NORTH GC LLC Filer JAM CONSULTANTS, INC. | (North Site) Structural work filed in conjunction with NB Construction. NB filed under DOB# NB#421133632. |
| Q00432968 ↗ | 2-20 MALT DRIVE QUEENS | Alteration | Signed-off | 12/21/2020 | 05/30/2024 | Design RGCE Contractor BUD SOUTH GC LLC Filer JAM CONSULTANTS, INC. | (South Site) Structural work filed in conjunction with NB Construction. NB filed under DOB NB#421133641. |
| M01026063 ↗ | 870 8 AVENUE MANHATTAN | Alteration | Permit Issued | 04/09/2024 | 05/23/2024 | Design RGCE Contractor LINEAL CONSTRUCTION & RES | REPAIR OF GARAGE AT CELLAR, AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| B00759517 ↗ | 550 VANDERBILT AVENUE BROOKLYN | Alteration | Signed-off | 06/22/2022 | 10/24/2022 | Design RGCE Contractor TFC PACIFIC PARK GC LLC Filer JAM CONSULTANTS, INC. | Application filed for structural landscape work in open spaces as per Pacific Park Design Guidelines set forth by Empire State Development (… |
| B00759494 ↗ | 535 CARLTON AVENUE BROOKLYN | Alteration | Signed-off | 06/22/2022 | 10/14/2022 | Design RGCE Contractor TFC PACIFIC PARK GC LLC Filer JAM CONSULTANTS, INC. | Application filed for structural landscape work in open spaces as per Pacific Park Design Guidelines set forth by Empire State Development (… |
| B00232980 ↗ | 595 DEAN STREET BROOKLYN | Alteration | Signed-off | 01/29/2020 | 02/04/2021 | Design RGCE Contractor TFC PACIFIC PARK GC LLC Filer JAM CONSULTANTS, INC. | structural work in conjunction with new building construction. NB filed under 321595403. |
| Building | Filings | Most Recent |
|---|---|---|
| 400 EAST 54 STREET ↗ | 2 | 02/13/2026 |
| RIVER AVENUE ↗ | 4 | 02/09/2026 |
| 1045 ATLANTIC AVENUE ↗ | 4 | 02/12/2025 |
| 2015 BOARDWALK WEST ↗ | 4 | 02/12/2025 |
| KENT AVENUE ↗ | 8 | 11/20/2024 |
| 1306 1 AVENUE ↗ | 1 | 06/07/2024 |
| 16S EAST 83 STREET ↗ | 1 | 05/13/2024 |
| 737 4TH AVENUE ↗ | 5 | 05/09/2024 |
| 2-21 MALT DRIVE ↗ | 2 | 05/07/2024 |
| 870 8 AVENUE ↗ | 1 | 04/09/2024 |
| 2-20 MALT DRIVE ↗ | 2 | 01/31/2024 |
| 535 CARLTON AVENUE ↗ | 3 | 07/28/2023 |
| 550 VANDERBILT AVENUE ↗ | 3 | 07/28/2023 |
| 595 DEAN STREET ↗ | 1 | 01/29/2020 |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 02/26/2026 | Final | 400 EAST 54 STREET | OMRI SEMADAR | progress |
| 02/26/2026 | Tenant Protection Plan Compliance | 400 EAST 54 STREET | — | special |
| 02/26/2026 | Post-installed Anchors | 400 EAST 54 STREET | SUCHITH JAYASENA | special |
| 02/26/2026 | Fire-Resistant Penetrations and Joints | 400 EAST 54 STREET | SUCHITH JAYASENA | special |
| 02/26/2026 | Concrete - Cast-In-Place | 400 EAST 54 STREET | OMRI SEMADAR | special |
| 02/26/2026 | Structural Stability – Alterations of existing buildings | 400 EAST 54 STREET | SUCHITH JAYASENA | special |
| 02/09/2026 | Concrete - Cast-In-Place | 400 EAST 54 STREET | OMRI SEMADAR | special |
| 02/09/2026 | Fire-Resistant Penetrations and Joints | 400 EAST 54 STREET | SUCHITH JAYASENA | special |
| 02/09/2026 | Post-installed Anchors | 400 EAST 54 STREET | SUCHITH JAYASENA | special |
| 02/09/2026 | Structural Stability – Alterations of existing buildings | 400 EAST 54 STREET | SUCHITH JAYASENA | special |
| 02/09/2026 | Tenant Protection Plan Compliance | 400 EAST 54 STREET | — | special |
| 02/09/2026 | Final | 400 EAST 54 STREET | OMRI SEMADAR | progress |
| 12/08/2025 | Structural Cold-Formed Steel | RIVER AVENUE | SAMI HAJJAR P.E | special |
| 11/24/2025 | Final | KENT AVENUE | OMRI SEMADAR | progress |
| 11/24/2025 | Structural Steel - High Strength Bolting | KENT AVENUE | JOHN MCMONAGLE | special |
| 11/24/2025 | Structural Steel - Welding | KENT AVENUE | JOHN MCMONAGLE | special |
| 11/24/2025 | Concrete - Cast-In-Place | KENT AVENUE | OMRI SEMADAR | special |
| 11/24/2025 | Masonry | KENT AVENUE | JOHN MCMONAGLE | special |
| 11/24/2025 | Post-installed Anchors | KENT AVENUE | JOHN MCMONAGLE | special |
| 11/24/2025 | Structural Steel - Details | KENT AVENUE | JOHN MCMONAGLE | special |
| 02/26/2025 | Structural Steel - Welding | 2015 BOARDWALK WEST | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 02/26/2025 | Concrete - Cast-In-Place | 2015 BOARDWALK WEST | OMRI SEMADAR | special |
| 02/26/2025 | Structural Steel - High Strength Bolting | 2015 BOARDWALK WEST | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 02/26/2025 | Masonry | 2015 BOARDWALK WEST | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 02/26/2025 | Post-installed Anchors | 2015 BOARDWALK WEST | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 02/26/2025 | Concrete - Precast | 2015 BOARDWALK WEST | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 02/26/2025 | Structural Cold-Formed Steel | 2015 BOARDWALK WEST | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 02/26/2025 | Structural Steel - Details | 2015 BOARDWALK WEST | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 02/26/2025 | Final | 2015 BOARDWALK WEST | SEBASTIAN SETTEDUCATE JR., P.E | progress |
| 02/19/2025 | Final | 1045 ATLANTIC AVENUE | OMRI SEMADAR | progress |
| 02/19/2025 | Structural Steel - Welding | 1045 ATLANTIC AVENUE | RICHARD GREENWALD | special |
| 02/19/2025 | Masonry | 1045 ATLANTIC AVENUE | RICHARD GREENWALD | special |
| 02/19/2025 | Structural Steel - Details | 1045 ATLANTIC AVENUE | RICHARD GREENWALD | special |
| 02/19/2025 | Concrete - Cast-In-Place | 1045 ATLANTIC AVENUE | OMRI SEMADAR | special |
| 02/19/2025 | Post-installed Anchors | 1045 ATLANTIC AVENUE | RICHARD GREENWALD | special |
| 02/19/2025 | Masonry | KENT AVENUE | JOHN MCMONAGLE | special |
| 02/19/2025 | Concrete - Cast-In-Place | KENT AVENUE | OMRI SEMADAR | special |
| 02/19/2025 | Final | KENT AVENUE | Soorjbally Harilall | progress |
| 02/19/2025 | Fire-Resistance Rated Construction | KENT AVENUE | Soorjbally Harilall | progress |
| 02/19/2025 | Energy Code Compliance Inspections | KENT AVENUE | Soorjbally Harilall | progress |
| 02/19/2025 | Lowest Floor Elevation | KENT AVENUE | BHASKAR SRIVASTAVA | progress |
| 02/19/2025 | Fenestration air leakage | KENT AVENUE | Soorjbally Harilall | energy_progress |
| 02/19/2025 | Insulation placement and R values | KENT AVENUE | Soorjbally Harilall | energy_progress |
| 02/19/2025 | Fenestration and door U-factor and product ratings | KENT AVENUE | Soorjbally Harilall | energy_progress |
| 02/19/2025 | Air barrier - visual inspection | KENT AVENUE | Soorjbally Harilall | energy_progress |
| 02/19/2025 | Fenestration areas | KENT AVENUE | Soorjbally Harilall | energy_progress |
| 02/19/2025 | Protection of exposed foundation insulation | KENT AVENUE | Soorjbally Harilall | energy_progress |
| 02/19/2025 | Air barrier continuity plan testing | KENT AVENUE | Soorjbally Harilall | energy_progress |
| 02/19/2025 | Footing and Foundation | 1045 ATLANTIC AVENUE | OMRI SEMADAR | progress |
| 02/19/2025 | Deep Foundation Elements | 1045 ATLANTIC AVENUE | Alan Poeppel | special |