1928Year Built
2Stories
G1Building Class
C8-2Zoning
23,204 sfGross Floor Area
1Units
0 Open Violations
All parking garages · Owner of record: 3220 JEROME LLC · 11,602 sf lot · 2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof6p · 1 filing · 20 docs
Floor 23p · 1 filing · 20 docs
Floor 17p · 1 filing · 20 docs
Cellar2p · 1 filing · 20 docs
Basement1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
3220 JEROME103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TROLYDIA ENGINEERING PLLC510/27/2025
GERALD CALIENDO ARCHITECTS309/12/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GERALD J. CALIENDO R.A., P.C.603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CONSTRUAI CORPGeneral Contractor307/08/2026
EXPERT FIRE SPRINKLER,LLCFire Protection207/08/2026
CAPE PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TROLYDIA TESTING & INSPEC4422810/27/2025
AA BUILDING & INSPECTION1519109/18/2024
Building Lifecycle
All (77)Filed (8)Permit Issued (6)Signed Off (5)Violation (1)Inspection (7)Objection (28)Special Inspection (22)
07/30/2026
Signed off — Alteration
APPLICATION HEREWITH FILED TO INSTALL INTERIOR PARTITIONS TO EXISTING TWO STORY AUTOMOTIVE ESTABLISHMENT. WORK AS PER PLANS. NO CHANGE TO USE , ERGRESS OR OCCUPANCY. Plumbing, mechanical sprinkler and structural filed under separate applications.
X01027380-S2
07/30/2026
Signed off — Alteration
APPLICATION HEREWITH FILED TO INSTALL INTERIOR PARTITIONS TO EXISTING TWO STORY AUTOMOTIVE ESTABLISHMENT. WORK AS PER PLANS. NO CHANGE TO USE , ERGRESS OR OCCUPANCY. Plumbing, mechanical sprinkler and structural filed under separate applications.
X01027380-I1
07/23/2026
Signed off — Alteration
APPLICATION HEREWITH FILED TO INSTALL INTERIOR PARTITIONS TO EXISTING TWO STORY AUTOMOTIVE ESTABLISHMENT. WORK AS PER PLANS. NO CHANGE TO USE , ERGRESS OR OCCUPANCY. Plumbing, mechanical sprinkler and structural filed under separate applications.
X01027380-S1
02/11/2026
Permit issued — Sprinklers
X01027380-S2-EW-SP
01/05/2026
Signed off — Alteration
APPLICATION HEREWITH FILED TO INSTALL INTERIOR PARTITIONS TO EXISTING TWO STORY AUTOMOTIVE ESTABLISHMENT. WORK AS PER PLANS. NO CHANGE TO USE , ERGRESS OR OCCUPANCY. Plumbing, mechanical sprinkler and structural filed under separate applications.
X01027380-S3
11/20/2025
Special inspection requirement — Mechanical Systems
JAIME MOYA
11/20/2025
Special inspection requirement — Shutoff dampers
JAIME MOYA
11/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAIME MOYA
11/20/2025
Special inspection requirement — Heating Systems
JAIME MOYA
11/20/2025
Special inspection requirement — Final
JAIME MOYA
11/20/2025
Special inspection requirement — Energy Code Compliance Inspections
JAIME MOYA
11/20/2025
Special inspection requirement — HVAC-R and service water heating system controls
JAIME MOYA
11/20/2025
Special inspection requirement — HVAC-R and service water heating equipment
JAIME MOYA
11/20/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JAIME MOYA
11/20/2025
Special inspection requirement — Maintenance information
JAIME MOYA
11/13/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/12/2025
Objection resolved — Addressed
10/31/2025
Objection raised — Admin
10/27/2025
Filed — Alteration
APPLICATION HEREWITH FILED TO INSTALL INTERIOR PARTITIONS TO EXISTING TWO STORY AUTOMOTIVE ESTABLISHMENT. WORK AS PER PLANS. NO CHANGE TO USE , ERGRESS OR OCCUPANCY. Plumbing, mechanical sprinkler and structural filed under separate applications.
X01027380-P3
10/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAIME MOYA
10/17/2025
Special inspection requirement — Post-installed Anchors
JAIME MOYA
10/16/2025
Objection resolved — Addressed
10/15/2025
Objection raised — Admin
09/29/2025
Objection resolved — Addressed
09/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
EDWARD TOROSSIAN
09/29/2025
Special inspection requirement — Final
EDWARD TOROSSIAN
09/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWARD TOROSSIAN
09/26/2025
Objection raised — Admin
09/24/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/12/2025
Filed — Alteration
APPLICATION HEREWITH FILED TO INSTALL INTERIOR PARTITIONS TO EXISTING TWO STORY AUTOMOTIVE ESTABLISHMENT. WORK AS PER PLANS. NO CHANGE TO USE , ERGRESS OR OCCUPANCY. Plumbing, mechanical sprinkler and structural filed under separate applications.
X01027380-P1
09/12/2025
Filed — Alteration
APPLICATION HEREWITH FILED TO INSTALL INTERIOR PARTITIONS TO EXISTING TWO STORY AUTOMOTIVE ESTABLISHMENT. WORK AS PER PLANS. NO CHANGE TO USE , ERGRESS OR OCCUPANCY. Plumbing, mechanical sprinkler and structural filed under separate applications.
X01027380-P2
09/11/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/05/2025
Special inspection requirement — Post-installed Anchors
JAIME MOYA
09/05/2025
Special inspection requirement — Final
EDWARD TOROSSIAN
09/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAIME MOYA
09/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWARD TOROSSIAN
09/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
EDWARD TOROSSIAN
08/13/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/02/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/06/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
02/24/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
12/16/2024
Permit issued — Plumbing
X01027380-S1-PL
12/11/2024
Permit issued — Sprinklers
X01027380-S2-EW-SP
11/21/2024
Signed off — Alteration
APPLICATION HEREWITH FILED TO INSTALL INTERIOR PARTITIONS TO EXISTING TWO STORY AUTOMOTIVE ESTABLISHMENT. WORK AS PER PLANS. NO CHANGE TO USE , ERGRESS OR OCCUPANCY. Plumbing, mechanical sprinkler and structural filed under separate applications.
X01027380-S4
11/19/2024
Objection resolved — Addressed
11/15/2024
Objection raised — Admin
11/07/2024
Objection resolved — Addressed
11/06/2024
Objection raised — Admin
10/29/2024
Objection resolved — Addressed
10/24/2024
Violation issued (ECB, closed)
Construction
10/15/2024
Permit issued — Structural
X01027380-S4-ST
10/15/2024
Objection raised — Admin
10/02/2024
Permit issued — Mechanical Systems
X01027380-S3-MS
09/26/2024
Permit issued — General Construction
X01027380-I1-GC
09/24/2024
Objection resolved — Addressed
09/24/2024
Objection resolved — Addressed
09/20/2024
Filed — Alteration
APPLICATION HEREWITH FILED TO INSTALL INTERIOR PARTITIONS TO EXISTING TWO STORY AUTOMOTIVE ESTABLISHMENT. WORK AS PER PLANS. NO CHANGE TO USE , ERGRESS OR OCCUPANCY. Plumbing, mechanical sprinkler and structural filed under separate applications.
X01027380-S2
09/18/2024
Filed — Alteration
APPLICATION HEREWITH FILED TO INSTALL INTERIOR PARTITIONS TO EXISTING TWO STORY AUTOMOTIVE ESTABLISHMENT. WORK AS PER PLANS. NO CHANGE TO USE , ERGRESS OR OCCUPANCY. Plumbing, mechanical sprinkler and structural filed under separate applications.
X01027380-S4
09/17/2024
Objection resolved — Addressed
09/17/2024
Objection resolved — Addressed
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offEXPERT FIRE SPRINKLER,LLC02/11/2026
DOB NOWPlumbingSigned-offCAPE PLUMBING INC12/16/2024
DOB NOWSprinklersSigned-offEXPERT FIRE SPRINKLER,LLC12/11/2024
DOB NOWStructuralSigned-offCONSTRUAI10/15/2024
DOB NOWMechanical SystemsSigned-offCONSTRUAI10/02/2024
DOB NOWGeneral ConstructionSigned-offCONSTRUAI09/26/2024
1 project · most recent 10/27/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/27/2025Signed-offCONSTRUAI CORPHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Carrier 48FCEM12A3A5A0A0A0 10 tons · Rooftop Unit ×8
Ventilation
Captiveaire CAS-HVAC1.I.100-15 1,000 CFM · Makeup Air ×2
1 project · most recent 10/27/2025
Gas Water/Sanitary
FiledStatusContractorScope
10/27/2025Signed-offCAPE PLUMBING INCGas, Water/Sanitary
3 projects · most recent 05/14/2026
General Wiring
FiledStatusContractorScope
05/14/2026Permit IssuedKNIGHT ELEC'L SERV. CORP.General Wiring
09/22/2024Permit IssuedA.C. MORGAN ELECTRICGeneral Wiring
06/16/2023Permit IssuedLVI NYC ELECTRICAL INCGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
11/13/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/24/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/11/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/13/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/02/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/06/2025Fail-Final CND-Occupancy InspectionFailView ↗
02/24/2025Fail-Final CND-Occupancy InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
11/20/2025Mechanical SystemsJAIME MOYAspecial
11/20/2025Shutoff dampersJAIME MOYAenergy_progress
11/20/2025Fire-Resistant Penetrations and JointsJAIME MOYAspecial
11/20/2025Heating SystemsJAIME MOYAspecial
11/20/2025FinalJAIME MOYAprogress
11/20/2025Energy Code Compliance InspectionsJAIME MOYAprogress
11/20/2025HVAC-R and service water heating system controlsJAIME MOYAenergy_progress
11/20/2025HVAC-R and service water heating equipmentJAIME MOYAenergy_progress
11/20/2025HVAC-R and service water piping design and insulationJAIME MOYAenergy_progress
11/20/2025Maintenance informationJAIME MOYAenergy_progress
10/17/2025Fire-Resistant Penetrations and JointsJAIME MOYAspecial
10/17/2025Post-installed AnchorsJAIME MOYAspecial
09/29/2025Structural Stability – Alterations of existing buildingsEDWARD TOROSSIANspecial
09/29/2025FinalEDWARD TOROSSIANprogress
09/29/2025Fire-Resistant Penetrations and JointsEDWARD TOROSSIANspecial
09/05/2025Post-installed AnchorsJAIME MOYAspecial
09/05/2025FinalEDWARD TOROSSIANprogress
09/05/2025Fire-Resistant Penetrations and JointsJAIME MOYAspecial
09/05/2025Fire-Resistant Penetrations and JointsEDWARD TOROSSIANspecial
09/05/2025Structural Stability – Alterations of existing buildingsEDWARD TOROSSIANspecial
07/08/2024Post-installed AnchorsJAIME MOYAspecial
05/02/2024Sprinkler SystemsJAIME MOYAspecial
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/20/2026X01027380-P1Request digital key ↗
08/20/2026X01027380-S4Request digital key ↗
08/20/2026X01027380-S3Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications28
▸DOB NOWSpecial Inspector Seal & Signature11
09/01/2026X01027380-S1Open ↗
09/01/2026X01027380-S1Open ↗
08/29/2026X01027380-P2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
08/29/2026X01027380-P1Open ↗
08/23/2026X01027380-I1Open ↗
08/23/2026X01027380-S3Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/13/2026X01027380-P1Open ↗
08/13/2026X01027380-I1Open ↗
08/13/2026X01027380-S1Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/13/2026X01027380-S1Open ↗
08/13/2026X01027380-P1Open ↗
08/13/2026X01027380-S4Open ↗
Showing 3 of 8 on file for this type
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X01027380-S3Open ↗