← Back
Condo, office space
Msk 61st Street Leashold Condominium
323 EAST 61ST STREET · Upper East Side-Lenox Hill-Roosevelt Island · BIN 1091713
💬 Discuss this project
2019Year Built
6Stories
RBBuilding Class
R8BZoning
49,843 sfGross Floor Area
7Units
LL97 Covered0 Open Violations
Condo, office space · 9,917 sf lot · 5.03 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneralOther
Roof23p · 2 filings · 20 docs
Floor 645p · 6 filings · 20 docs
Floor 550p · 7 filings · 20 docs
Floor 450p · 7 filings · 20 docs
Floor 352p · 7 filings · 20 docs
Floor 251p · 7 filings · 20 docs
Floor 154p · 10 filings · 20 docs
Cellar47p · 7 filings · 20 docs
Site & exterior64p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
323 EAST 61ST STREET LEASE1603/21/2026
ROCK GROUP NY1403/21/2026
TRI BOROUGH SCAFFOLDING103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RIZZO GROUP1403/21/2026
JCRC CONSULTING203/21/2026
GREEN STUDIO1403/21/2026
AE DESIGN SOLUTION603/21/2026
PERCIBALLI INDUSTRIES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACC CONSTRUCTION CORPGeneral Contractor507/08/2026
SIRINA FIRE PROT CORPFire Protection307/08/2026
C.M. RICHEY ELEC'L CONTRElectrical203/22/2026
FIU CORP DBA FIU ELECTRICElectrical103/22/2026
RICHARD DANTSITSElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AKF ENGINEERS, LLP2751411/03/2022
SOCOTEC ENGINEERING4983811/18/2020
ALLEN SHINFELD, P.E. PLLC1305109/27/2019
Building Lifecycle
All (88)Filed (27)Permit Issued (7)Signed Off (17)Violation (4)Inspection (3)Special Inspection (30)
11/09/2023
Signed off — Alteration
Mechanical modifications to the cellar and floors 1-6 as per plans filed herewith. No change in use, egress, or occupancy.
M00655041-I1
10/24/2023
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
10/19/2023
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
10/12/2023
Signed off — Alteration
General construction to the 1st floor as per plans filed herewith. No change in use, egress, or occupancy.
M08014530-I1
10/12/2023
Signed off — Alteration
M07997568-I1
07/11/2023
Signed off — Alteration
General construction modifications to the cellar and floors 1-6 as per plans filed herewith. No change in use, egress, or occupancy.
M00655030-I1
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/11/2023
Signed off — Alteration
Sprinkler modifications to the 1st floor as per plans filed herewith. No change in use, egress, or occupancy.
M08030744-I1
01/30/2023
Permit issued — Sprinklers
M08030744-I1-EW-SP
12/20/2022
Signed off — Alteration
Sprinkler modifications to the cellar and floors 1-6 as per the plans filed herewith. No change in use, egress, or occupancy.
M00655043-I1
11/21/2022
Permit issued — General Construction
M08014530-I1-GC
11/17/2022
Permit issued — Sprinklers
M08030744-I1-EW-SP
11/10/2022
Filed — Alteration
General construction to the 1st floor as per plans filed herewith. No change in use, egress, or occupancy.
M08014530-I1
11/03/2022
Filed — Alteration
Sprinkler modifications to the 1st floor as per plans filed herewith. No change in use, egress, or occupancy.
M08030744-I1
10/31/2022
Special inspection requirement — Sprinkler Systems
WILLIAM BLAIS
10/04/2022
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM BLAIS
10/04/2022
Special inspection requirement — Final
WILLIAM BLAIS
09/27/2022
Permit issued — General Construction
M07997568-I1-GC
09/14/2022
Filed — Alteration
M07997568-I1
08/23/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/14/2022
Permit issued — Sprinklers
M00655043-I1-EW-SP
06/10/2022
Permit issued — General Construction
M00655030-I1-GC
06/09/2022
Permit issued — Mechanical Systems
M00655041-I1-MS
06/07/2022
Filed — Alteration
Mechanical modifications to the cellar and floors 1-6 as per plans filed herewith. No change in use, egress, or occupancy.
M00655041-I1
06/07/2022
Filed — Alteration
General construction modifications to the cellar and floors 1-6 as per plans filed herewith. No change in use, egress, or occupancy.
M00655030-I1
06/07/2022
Filed — Alteration
Sprinkler modifications to the cellar and floors 1-6 as per the plans filed herewith. No change in use, egress, or occupancy.
M00655043-I1
03/02/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Gibson
12/29/2021
Special inspection requirement — Sprinkler Systems
Robert Gibson
12/29/2021
Special inspection requirement — Final
Robert Gibson
09/27/2021
Signed off — Alteration
SPRINKLER MODIFICATIONS TO THE CELLAR, 1ST TO 6TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00273149-I1
09/01/2021
Signed off — Alteration
NEW INSTALLATION OF BOILER EQUIPMENT ONLY
M00377645-I1
06/03/2021
Signed off — Alteration
INSTALLATION OF FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00124505-I1
03/29/2021
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00386402-I1
03/23/2021
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED, CONSTRUCTION FENCE, AND ROOF PROTECTION AS PER PLANS. SIDEWALK SHED LIVE LOAD 300 PSF SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00128745-I1
03/16/2021
Signed off — Alteration
MECHANICAL MODIFICATIONS TO THE CELLAR, 1ST TO 6TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00273133-I1
03/15/2021
Signed off — Alteration
M00273139-I1
02/03/2021
Signed off — Alteration
INSTALLATION OF A TEMPORARY DRY STANDPIPE WITH AIR PRESSURIZATION ALARM SYSTEM. FILE IN CONJUNCTION WITH NB #121188605. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00225064-I1
11/18/2020
Filed — Alteration
NEW INSTALLATION OF BOILER EQUIPMENT ONLY
M00377645-P3
11/18/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
11/18/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
11/18/2020
Special inspection requirement — HVAC and service water heating system controls
ALEXIS SCHLESSINGERMAN
11/18/2020
Special inspection requirement — HVAC and service water heating equipment
ALEXIS SCHLESSINGERMAN
11/18/2020
Special inspection requirement — Maintenance information
ALEXIS SCHLESSINGERMAN
11/16/2020
Filed — Alteration
NEW INSTALLATION OF BOILER EQUIPMENT ONLY
M00377645-P2
11/13/2020
Special inspection requirement — Maintenance information
ALEXIS SCHLESSINGERMAN
11/13/2020
Special inspection requirement — HVAC and service water heating equipment
ALEXIS SCHLESSINGERMAN
11/13/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
11/13/2020
Special inspection requirement — HVAC and service water heating system controls
ALEXIS SCHLESSINGERMAN
10/14/2020
Special inspection requirement — Final
asif jamil
10/12/2020
Filed — Alteration
INSTALLATION OF SIDEWALK SHED, CONSTRUCTION FENCE, AND ROOF PROTECTION AS PER PLANS. SIDEWALK SHED LIVE LOAD 300 PSF SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00128745-P6
10/06/2020
Special inspection requirement — Sprinkler Systems
ALEXIS SCHLESSINGERMAN
10/06/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
10/05/2020
Filed — Alteration
SPRINKLER MODIFICATIONS TO THE CELLAR, 1ST TO 6TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00273149-P1
10/05/2020
Filed — Alteration
INSTALLATION OF SIDEWALK SHED, CONSTRUCTION FENCE, AND ROOF PROTECTION AS PER PLANS. SIDEWALK SHED LIVE LOAD 300 PSF SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00128745-P5
09/17/2020
Filed — Alteration
INSTALLATION OF SIDEWALK SHED, CONSTRUCTION FENCE, AND ROOF PROTECTION AS PER PLANS. SIDEWALK SHED LIVE LOAD 300 PSF SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00128745-P4
08/18/2020
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00386402-I1
08/17/2020
Filed — Alteration
NEW INSTALLATION OF BOILER EQUIPMENT ONLY
M00377645-P1
Latest 60 of 88 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offSIRINA FIRE PROT CORP01/30/2023
DOB NOWGeneral ConstructionSigned-offACC CONSTRUCTION CORP11/21/2022
DOB NOWSprinklersSigned-offSIRINA FIRE PROT CORP11/17/2022
DOB NOWGeneral ConstructionSigned-offACC CONSTRUCTION CORP09/27/2022
DOB NOWSprinklersSigned-offSIRINA FIRE PROT CORP06/14/2022
DOB NOWGeneral ConstructionSigned-offACC CONSTRUCTION CORP06/10/2022
DOB NOWMechanical SystemsSigned-offACC CONSTRUCTION CORP06/09/2022
BISPLISSUEDFORWARD MECHANICAL CORP02/23/2021
BIS—ISSUEDCAULDWELL WINGATE CO LLC12/21/2020
BIS—ISSUEDCAULDWELL WINGATE CO LLC09/28/2020
BISPLISSUEDFORWARD MECHANICAL CORP02/18/2020
BIS—ISSUEDCAULDWELL WINGATE CO LLC10/04/2019
BISPLISSUEDFORWARD MECHANICAL CORP02/21/2019
BIS—ISSUEDCAULDWELL WINGATE CO LLC02/20/2019
11 projects · most recent 04/13/2023
General Wiring
FiledStatusContractorScope
04/13/2023CompleteFIU CORP DBA FIU ELECTRICGeneral Wiring
06/20/2022CompleteFIU CORP DBA FIU ELECTRICGeneral Wiring
03/12/2021CompleteC.M. RICHEY ELEC'L CONTR1 meters, 1 new_meters
03/02/2021CompleteC.M. RICHEY ELEC'L CONTRGeneral Wiring
02/28/2020CompleteTUXEDO ELEC'L CONTR'G INC—
02/19/2020CompleteC.M. RICHEY ELEC'L CONTR—
02/17/2020CompleteILLUMINOUS ELECTRIC CORP.—
01/28/2020CompleteC.M. RICHEY ELEC'L CONTR—
06/26/2019CompleteC.M. RICHEY ELEC'L CONTR1 meters, 1 new_meters
02/07/2019CompleteTOP SHELF ELECTRIC CORP—
09/19/2018CompleteNASH ELECTRIC SERVICES IN—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/24/2023Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
10/19/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
08/23/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
10/31/2022Sprinkler SystemsWILLIAM BLAISspecial
10/04/2022Fire-Resistance Rated ConstructionWILLIAM BLAISprogress
10/04/2022FinalWILLIAM BLAISprogress
03/02/2022Fire-Resistant Penetrations and JointsRobert Gibsonspecial
12/29/2021Sprinkler SystemsRobert Gibsonspecial
12/29/2021FinalRobert Gibsonprogress
11/18/2020Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
11/18/2020Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
11/18/2020HVAC and service water heating system controlsALEXIS SCHLESSINGERMANenergy_progress
11/18/2020HVAC and service water heating equipmentALEXIS SCHLESSINGERMANenergy_progress
11/18/2020Maintenance informationALEXIS SCHLESSINGERMANenergy_progress
11/13/2020Maintenance informationALEXIS SCHLESSINGERMANenergy_progress
11/13/2020HVAC and service water heating equipmentALEXIS SCHLESSINGERMANenergy_progress
11/13/2020Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
11/13/2020HVAC and service water heating system controlsALEXIS SCHLESSINGERMANenergy_progress
10/14/2020Finalasif jamilprogress
10/06/2020Sprinkler SystemsALEXIS SCHLESSINGERMANspecial
10/06/2020Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
08/17/2020Finalasif jamilprogress
08/11/2020Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
08/11/2020Maintenance informationALEXIS SCHLESSINGERMANenergy_progress
08/11/2020HVAC and service water heating system controlsALEXIS SCHLESSINGERMANenergy_progress
08/11/2020HVAC and service water heating equipmentALEXIS SCHLESSINGERMANenergy_progress
12/11/2019HVAC and service water heating system controls ALEXIS SCHLESSINGERMANenergy_progress
12/11/2019Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
Latest 25 of 35.
▾Documents — 306 on file (BIS + DOB NOW)
▸Plans & Drawings34
▸DOB NOWPlans/Sketch9
09/06/2026M00072085-I1Request digital key ↗
09/06/2026M00081302-I1Request digital key ↗
09/06/2026M00081305-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence8
09/05/2026M00124505-I1Request digital key ↗
09/05/2026M00128745-I1Request digital key ↗
09/05/2026M00128745-P4Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed7
09/05/2026M00128745-I1Request digital key ↗
08/15/2026M00128745-P1Request digital key ↗
08/15/2026M00128745-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment4
09/04/2026M00377645-I1Request digital key ↗
08/15/2026M00377645-P3Request digital key ↗
08/15/2026M00377645-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler2
09/04/2026M00273149-I1Request digital key ↗
08/15/2026M00273149-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/04/2026M00386402-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00273133-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe1
09/05/2026M00225064-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00273139-I1Request digital key ↗
▸Applications & Permits47
▸BISPLAN / WORK APPROVAL APPLICATION34
04/14/2022121188605Open ↗
02/26/2021121188605Open ↗
11/04/2020121188605Open ↗
Showing 3 of 34 on file for this type
▸BISWORK PERMIT APPLICATION8
08/05/2020121188605Open ↗
08/05/2020121188605Open ↗
02/19/2020121188605Open ↗
Showing 3 of 8 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
11/05/2020140821234Open ↗
09/01/2020140821234Open ↗
12/20/2018140821234Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
11/11/2020121188605Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
08/19/2021140821234Open ↗
▸Zoning, Tax Lot & Property Records7
▸BISZONING DIAGRAM2
02/19/2019121188605Open ↗
02/08/2019121188605Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
12/05/2018121188605Open ↗
▸BISVERIFY TAX LOT1
06/01/2022121188605Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
01/23/2019121188605Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
11/10/2021121188605Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
12/05/2018121188605Open ↗
▸Seals & Professional Certifications68
▸DOB NOWDPL-1: Design Professional Seal & Signature27
09/06/2026M00081305-I1Open ↗
09/05/2026M00225064-I1Open ↗
09/05/2026M00273139-I1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWProgress Inspector Seal & Signature21
09/05/2026M00124505-I1Open ↗
09/01/2026M00655030-I1Open ↗
09/01/2026M00081302-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/01/2026M00655030-I1Open ↗
08/29/2026M00273133-I1Open ↗
08/29/2026M00273133-I1Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
12/10/2019121188605Open ↗
02/21/2019121188605Open ↗
02/21/2019121188605Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment10
▸BISSCHEDULE B - PLUMBING4
10/06/2020121188605Open ↗
10/01/2019121188605Open ↗
09/25/2019121188605Open ↗
Showing 3 of 4 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
02/16/2022121188605Open ↗
▸BIS* BOILER (BL) SIGNOFF1
02/17/2022121188605Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
11/18/2021121188605Open ↗
▸BISEQUIPMENT USE PERMITS1
11/18/2021121188605Open ↗
▸BISFIRE PROTECTION PLAN (FPP): FDNY APPROVAL1
11/10/2021121188605Open ↗
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
11/10/2021121188605Open ↗
▸Safety & Tenant Protection7
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE3
02/21/2019121188605Open ↗
02/21/2019121188605Open ↗
02/21/2019121188605Open ↗
▸BISSTREET TREE CHECKLIST3
01/23/2019121188605Open ↗
01/23/2019121188605Open ↗
12/20/2018140821234Open ↗
▸BISSTREET TREE SIGNOFF1
11/22/2021121188605Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
08/19/2021140821234Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
09/06/2026M00081305-I1Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
02/01/2021121188605Open ↗
01/29/2021121188605Open ↗
01/30/2019121188605Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
02/01/2021121188605Open ↗
02/01/2021121188605Open ↗
02/01/2021121188605Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/19/2021140821234Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
03/04/2022121188605Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00655041-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00377645-I1Open ↗
▸Inspections & Test Reports37
▸BISTECHNICAL REPORT: RESPONSIBILITY21
02/12/2021121188605Open ↗
02/01/2021121188605Open ↗
02/01/2021121188605Open ↗
Showing 3 of 21 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION5
01/30/2019121188605Open ↗
01/30/2019121188605Open ↗
12/05/2018121188605Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
02/21/2019121188605Open ↗
02/21/2019121188605Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
02/12/2021121188605Open ↗
02/21/2019121188605Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF2
02/16/2022121188605Open ↗
11/18/2021121188605Open ↗
▸BISPRIOR TO NEXT TCO RENEWAL PLEASE SUBMIT STATUS OF BPP SIFNOFF, INSPECTION OR AN AFFIDAVIT WITH PICTURES CERTIFYING SIDEWALK SAFETY.1
07/29/2021121188605Open ↗
▸BISHYDRO FLOW TEST LETTER1
01/23/2019121188605Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
01/23/2019121188605Open ↗
▸BISBPP: SIDEWALK CONCRETE STRENGTH REPORT1
08/19/2021140821234Open ↗
▸BISBPP: FIELD INSPECTION1
08/19/2021140821234Open ↗
▸Approvals, Objections & Sign-offs31
▸BISLETTERS - SUPPORTING DOCUMENTATION12
07/07/2020123542201Open ↗
06/04/2020123542201Open ↗
10/04/2019121188605Open ↗
Showing 3 of 12 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE10
02/26/2021121188605Open ↗
11/04/2020121188605Open ↗
11/02/2020121188605Open ↗
Showing 3 of 10 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
08/19/2021140821234Open ↗
02/18/2021121188605Open ↗
02/12/2021121188605Open ↗
▸BISFUEL STORAGE (FS) SIGNOFF1
02/17/2022121188605Open ↗
▸BISHOUSE CONNECTION SIGNOFF1
11/22/2021121188605Open ↗
▸BISFUEL BURNING (FB) SIGNOFF1
02/17/2022121188605Open ↗
▸BISMECHANICAL (MH) SIGNOFF1
02/17/2022121188605Open ↗
▸BISMARQUEE (OT) SIGNOFF1
02/16/2022121188605Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
10/26/2018121188605Open ↗
▸Cost, Insurance & Ownership5
▸BISPROJECT-SPECIFIC GL INSURANCE2
10/04/2019121188605Open ↗
02/21/2019121188605Open ↗
▸BISBPP: ENGINEERS AFFIDAVIT1
08/19/2021140821234Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
02/21/2019121188605Open ↗
▸BISCOST AFFIDAVIT1
12/20/2018140821234Open ↗
▸Filing & Intake Forms33
▸BISADDITIONAL INFORMATION24
01/28/2021121188605Open ↗
01/28/2021121188605Open ↗
11/10/2020121188605Open ↗
Showing 3 of 24 on file for this type
▸BISEFILING COVER SHEET6
05/29/2020123542201Open ↗
07/26/2018121188605Open ↗
07/17/2018121188605Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM2
08/05/2020121188605Open ↗
08/05/2020121188605Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/20/2018140821234Open ↗
▸Other Documents9
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
02/21/2019121188605Open ↗
02/21/2019121188605Open ↗
01/30/2019121188605Open ↗
▸BISPLOT DIAGRAM2
01/23/2019121188605Open ↗
10/26/2018121188605Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
08/19/2021140821234Open ↗
▸BISBPP-DOT: SIDEWALK ENCROACHMENT1
08/19/2021140821234Open ↗
▸BISBPP: SIDEWALK & ROADWAY THICKNESS CORES1
08/19/2021140821234Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
08/19/2021140821234Open ↗