← Back
BRONX
3230 FAIRFIELD AVENUE
BRONX · BIN 2131296
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof4p · 1 filing · 13 docs
Bulkhead5p · 1 filing · 13 docs
Floor 71p · 1 filing · 13 docs
Floor 66p · 1 filing · 13 docs
Floor 52p · 1 filing · 13 docs
Floor 4
Floor 31p · 1 filing · 13 docs
Floor 25p · 1 filing · 13 docs
Floor 16p · 1 filing · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
REVAMP NYC209/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VASILIOS ARTEMIOU PE307/29/2026
R & O ENGINEERING107/29/2026
MOHAMMAD AHEAD, PE207/28/2026
Building Lifecycle
All (49)Filed (6)Objection (13)Special Inspection (30)
09/03/2026
Objection resolved — Resolved
08/05/2026
Objection resolved — Resolved
08/04/2026
Objection raised — Other
08/04/2026
Objection raised — Other
07/30/2026
Objection raised — Other
07/30/2026
Objection raised — Other
07/30/2026
Objection resolved — Addressed
07/30/2026
Objection resolved — Addressed
07/30/2026
Objection resolved — Addressed
07/29/2026
Filed — New Building
Development hub Job by Default; As Project is greater than Seven (7) stories, Per service notice Posted April 16, 2021 such Jobs shall be assigned to the Development Hub Unit - Subject building is a Seven Story Building
X01404499-S3
07/29/2026
Filed — New Building
Development hub Job by Default; As Project is greater than Seven (7) stories, Per service notice Posted April 16, 2021 such Jobs shall be assigned to the Development Hub Unit - Subject building is a Seven Story Building
X01404499-S5
07/29/2026
Objection raised — Structural
07/29/2026
Objection raised — Other
07/29/2026
Objection raised — Other
07/28/2026
Filed — Alteration
APPLICATION FILED HEREWITH FOR INSTALLATION OF A TEMPORARY CONSTRUCTION FENCE.
X01436722-I1
07/27/2026
Special inspection requirement — Concrete - Cast-In-Place
07/24/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
07/24/2026
Special inspection requirement — HVAC-R and service water heating equipment
07/24/2026
Special inspection requirement — Energy Code Compliance Inspections
07/24/2026
Special inspection requirement — Post-installed Anchors
07/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/24/2026
Special inspection requirement — Duct leakage testing, insulation and design
07/24/2026
Special inspection requirement — HVAC-R and service water heating system controls
07/24/2026
Special inspection requirement — Shutoff dampers
07/24/2026
Special inspection requirement — Ventilation and air distribution system
07/24/2026
Special inspection requirement — Permanent certificate
07/24/2026
Special inspection requirement — Maintenance information
07/22/2026
Filed — New Building
Development hub Job by Default; As Project is greater than Seven (7) stories, Per service notice Posted April 16, 2021 such Jobs shall be assigned to the Development Hub Unit - Subject building is a Seven Story Building
X01404499-S4
07/22/2026
Filed — New Building
Development hub Job by Default; As Project is greater than Seven (7) stories, Per service notice Posted April 16, 2021 such Jobs shall be assigned to the Development Hub Unit - Subject building is a Seven Story Building
X01404499-S6
07/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/22/2026
Special inspection requirement — On-Site Private Sewage Disposal Systems Installation
07/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
07/22/2026
Special inspection requirement — Maintenance information
07/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
07/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
07/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/22/2026
Special inspection requirement — Post-installed Anchors
07/21/2026
Special inspection requirement — Sprinkler Systems
07/21/2026
Special inspection requirement — Mechanical Systems
07/21/2026
Special inspection requirement — Final
06/15/2026
Special inspection requirement — Final
06/08/2026
Objection raised — Other
05/20/2026
Filed — New Building
Development hub Job by Default; As Project is greater than Seven (7) stories, Per service notice Posted April 16, 2021 such Jobs shall be assigned to the Development Hub Unit - Subject building is a Seven Story Building
X01404499-I1
05/19/2026
Special inspection requirement — Metering
05/19/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
05/19/2026
Special inspection requirement — Protection of exposed foundation insulation
05/19/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
05/19/2026
Special inspection requirement — Fenestration areas
05/19/2026
Special inspection requirement — Air barrier - visual inspection
Nothing on file for this building.
1 project · most recent 07/29/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/29/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin RXTA24AAVJU 25,000 BTU · Vrf Outdoor ×5
RXTA36AAVJU 37,000 BTU · Vrf Outdoor ×1
Ventilation
Renewaire HE07RT 250 CFM · Erv ×1
1 project · most recent 07/29/2026
Sprinkler System
FiledStatusContractorScope
07/29/2026——Sprinkler System
1 project · most recent 07/29/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/29/2026——Gas, Storm, Water/Sanitary
1 project · most recent 07/29/2026
FiledStatusContractorScope
07/29/2026——3 scope_items
1 project · most recent 07/28/2026
Fence
FiledStatusContractorScope
07/28/2026——Fence
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
07/27/2026Concrete - Cast-In-Place—special
07/24/2026HVAC-R and service water piping design and insulation—energy_progress
07/24/2026HVAC-R and service water heating equipment—energy_progress
07/24/2026Energy Code Compliance Inspections—progress
07/24/2026Post-installed Anchors—special
07/24/2026Fire-Resistant Penetrations and Joints—special
07/24/2026Duct leakage testing, insulation and design—energy_progress
07/24/2026HVAC-R and service water heating system controls—energy_progress
07/24/2026Shutoff dampers—energy_progress
07/24/2026Ventilation and air distribution system—energy_progress
07/24/2026Permanent certificate—energy_progress
07/24/2026Maintenance information—energy_progress
07/22/2026Fire-Resistant Penetrations and Joints—special
07/22/2026On-Site Private Sewage Disposal Systems Installation—special
07/22/2026HVAC-R and service water heating system controls—energy_progress
07/22/2026Maintenance information—energy_progress
07/22/2026HVAC-R and service water heating equipment—energy_progress
07/22/2026HVAC-R and service water piping design and insulation—energy_progress
07/22/2026Fire-Resistant Penetrations and Joints—special
07/22/2026Post-installed Anchors—special
07/21/2026Sprinkler Systems—special
07/21/2026Mechanical Systems—special
07/21/2026Final—progress
06/15/2026Final—progress
05/19/2026Metering—energy_progress
Latest 25 of 43.
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/26/2026X01404499-I1Request digital key ↗
08/15/2026X01404499-S4Request digital key ↗
08/15/2026X01436722-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/15/2026X01404499-I1Open ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/16/2026X01404499-S6Open ↗
08/16/2026X01404499-S5Open ↗
08/16/2026X01404499-S4Open ↗
Showing 3 of 6 on file for this type
▸Other Documents1
▸DOB NOWSite Survey: Initial1
08/15/2026X01404499-I1Open ↗