← Back
Shopping center, with or without parking
3247 RICHMOND AVENUE
STATEN ISLAND · Great Kills-Eltingville · BIN 5145047
💬 Discuss this project
1975Year Built
1Stories
K6Building Class
C4-1Zoning
11,840 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Shopping center, with or without parking · 43,200 sf lot · 0.27 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof5p · 4 filings · 20 docs
Floor 13p · 2 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KIMCO REALTY203/22/2026
GREENRIDGE PLAZA 6741203/21/2026
KIMCO GREENRIDGE 674403/21/2026
GREENRIDGE PLAZA303/21/2026
KIMCO103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ROSENBAUM DESIGN GROUP903/21/2026
BOHLER ENGINEERING203/21/2026
LOUIS STRIAR403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RETAIL PROJECT MANGEMENTGeneral Contractor307/08/2026
ELECTL CONTG SOLUTIONS COElectrical203/22/2026
L.S. SIGN CO., INCGeneral Contractor107/08/2026
RRP PLUMBING CORPPlumbing107/08/2026
L S SIGNScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOMANI INSPECTION SERVICE843404/12/2023
Building Lifecycle
All (66)Filed (13)Permit Issued (6)Signed Off (6)Violation (3)Inspection (5)Objection (3)Special Inspection (30)
01/13/2026
Violation issued (FDNY_NOV, closed)
01/10/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/21/2023
Violation issued (ECB, closed)
Unknown
07/20/2023
Signed off — Alteration
Remove existing water closet, lavatory and submeter. Cut and cap existing piping back to mains. Install relocated hand sink, dipper wells, 3 comp sink and one comp sink. Install new ADA lavatory and tank-type water closet. Installed new gas fired water
S08032111-I1
06/16/2023
Signed off — Alteration
Installation of additional structural members at roof framing; Installation of new lintels at proposed window openings
S08032095-I1
06/16/2023
Signed off — Alteration
Remove existing HVAC ductwork back to existing to remain Rooftop Unit (RTU), furnish and install new HVAC ductwork, insulation, and air terminals. Furnish and install new RTU, HVAC ductwork, insulation, and air terminals.
S08032100-I1
06/15/2023
Signed off — Alteration
S08032088-I1
06/06/2023
Filed — Alteration
Remove existing water closet, lavatory and submeter. Cut and cap existing piping back to mains. Install relocated hand sink, dipper wells, 3 comp sink and one comp sink. Install new ADA lavatory and tank-type water closet. Installed new gas fired water
S08032111-P3
05/23/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
05/23/2023
Special inspection requirement — HVAC-R and service water heating system controls
JOHN MCMONAGLE
05/23/2023
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
05/23/2023
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
05/23/2023
Special inspection requirement — HVAC-R and service water heating equipment
JOHN MCMONAGLE
05/22/2023
Signed off — Alteration
NON-ILLUMINATED NON-ADVERTISING ACCESSORY AWNING WITH DOWN LIGHTING ONLY AND NON-ILLUMINATED LETTERING - RALPH'S FAMOUS ITALIAN ICES. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
S00829234-I1
05/09/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/08/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/06/2023
Filed — Alteration
Remove existing water closet, lavatory and submeter. Cut and cap existing piping back to mains. Install relocated hand sink, dipper wells, 3 comp sink and one comp sink. Install new ADA lavatory and tank-type water closet. Installed new gas fired water
S08032111-P2
04/18/2023
Special inspection requirement — HVAC-R and service water heating equipment
JOHN MCMONAGLE
04/18/2023
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
04/18/2023
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
04/18/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
04/18/2023
Special inspection requirement — HVAC-R and service water heating system controls
JOHN MCMONAGLE
04/13/2023
Special inspection requirement — HVAC-R and service water heating equipment
JOHN MCMONAGLE
04/13/2023
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
04/13/2023
Special inspection requirement — Final
JOHN MCMONAGLE
04/13/2023
Special inspection requirement — Chimneys and vents
JOHN MCMONAGLE
04/13/2023
Special inspection requirement — Mechanical Systems
JOHN MCMONAGLE
04/13/2023
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
04/13/2023
Special inspection requirement — HVAC-R and service water heating system controls
JOHN MCMONAGLE
04/12/2023
Filed — Alteration
Remove existing water closet, lavatory and submeter. Cut and cap existing piping back to mains. Install relocated hand sink, dipper wells, 3 comp sink and one comp sink. Install new ADA lavatory and tank-type water closet. Installed new gas fired water
S08032111-P1
04/12/2023
Filed — Alteration
Remove existing HVAC ductwork back to existing to remain Rooftop Unit (RTU), furnish and install new HVAC ductwork, insulation, and air terminals. Furnish and install new RTU, HVAC ductwork, insulation, and air terminals.
S08032100-P1
04/11/2023
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
04/11/2023
Special inspection requirement — HVAC-R and service water heating equipment
JOHN MCMONAGLE
04/11/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
04/11/2023
Special inspection requirement — HVAC-R and service water heating system controls
JOHN MCMONAGLE
04/11/2023
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
02/27/2023
Signed off — Alteration
S00829233-I1
02/22/2023
Permit issued — General Construction
S00829234-I1-GC
02/22/2023
Permit issued — Sign
S00829233-I1-SG
02/22/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/17/2023
Filed — Alteration
NON-ILLUMINATED NON-ADVERTISING ACCESSORY AWNING WITH DOWN LIGHTING ONLY AND NON-ILLUMINATED LETTERING - RALPH'S FAMOUS ITALIAN ICES. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
S00829234-I1
02/17/2023
Filed — Alteration
S00829233-I1
02/17/2023
Special inspection requirement — Final
MOHAMMAD AHEAD
02/07/2023
Objection raised — Zoning
02/07/2023
Objection raised — Scope
02/07/2023
Objection resolved — Resolved
02/02/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/24/2023
Filed — Alteration
INSTALLATIION OF TEMPORARY CONSTRUCTION FENCE AS INDICATED ON PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY
S00816739-I1
01/24/2023
Filed — Alteration
SITEWORK AS INDICATED ON PLANS NO CHANGE IN USE EGRESS OR PCCUPANCY
S00816742-I1
01/23/2023
Special inspection requirement — Final
01/23/2023
Special inspection requirement — Concrete - Cast-In-Place
01/20/2023
Permit issued — Structural
S08032095-I1-ST
01/19/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
01/17/2023
Filed — Alteration
Installation of additional structural members at roof framing; Installation of new lintels at proposed window openings
S08032095-P1
01/17/2023
Special inspection requirement — Final
JOHN MCMONAGLE
01/17/2023
Special inspection requirement — Masonry
JOHN MCMONAGLE
01/17/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOHN MCMONAGLE
01/17/2023
Special inspection requirement — Structural Steel - Details
JOHN MCMONAGLE
01/17/2023
Special inspection requirement — Structural Steel - Welding
JOHN MCMONAGLE
01/13/2023
Permit issued — Mechanical Systems
S08032100-I1-MS
Latest 60 of 66 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offL.S. SIGN CO., INC02/22/2023
DOB NOWSignSigned-offWEINFELD, ELLIOT02/22/2023
DOB NOWStructuralSigned-offRETAIL PROJECT MANGEMENT01/20/2023
DOB NOWMechanical SystemsSigned-offRETAIL PROJECT MANGEMENT01/13/2023
DOB NOWPlumbingSigned-offRRP PLUMBING CORP01/13/2023
DOB NOWGeneral ConstructionSigned-offRETAIL PROJECT MANGEMENT01/12/2023
BISMHISSUEDSCARAN OIL SERVICE INC11/20/2018
BISPLISSUEDSCARAN PLUMBING INC11/20/2018
BISFPISSUEDFIRE COMMAND CO, INC09/26/2017
BIS—ISSUEDL.S. SIGN CO., INC04/11/2017
BISMHISSUEDPRESTIGIOUS MAINTENANCE I03/17/2017
BISPLISSUEDCAPITAL CONTR P&H CORP02/16/2017
BISOTISSUEDALL PERFECTION CONTRACTIN02/08/2017
BISPLISSUEDRR PLUMBING SERVICES CO12/03/2014
BISMHISSUEDDAKENNA DEVELOPMENT, INC11/24/2014
BISOTISSUEDDAKENNA DEVELOPMENT, INC11/24/2014
BISOTISSUEDDAKENNA DEVELOPMENT, INC11/24/2014
BIS—ISSUEDL.S. SIGN CO., INC11/14/2014
BIS—ISSUEDL.S. SIGN CO., INC11/14/2014
BISOTISSUEDMCR SERVICE INC09/02/2014
BISEQISSUEDMCR SERVICE INC09/02/2014
BISMHISSUEDSCARAN PLUMBING INC03/17/2011
BISPLISSUEDSCARAN PLUMBING INC03/17/2011
BISMHISSUEDCALLICO CONSTRUCTION CORP.08/12/1999
BISPLISSUEDLOUIS L. BUTTERMARK & SONS, INC.09/05/1996
BISMHISSUEDBOB MIMS HEATING & AIR CONDIT.08/28/1996
BISPLISSUEDWEST SHORE CONSULTING INC03/22/1996
BISPLISSUEDSKYLINE P & H INC08/09/1995
BISFPISSUEDSENTINEL FIRE CONTROL INC07/08/1992
BISSPISSUEDA. GALLINA SPRINKLER04/15/1992
BISMHISSUEDMARK GENERAL CONTRACTING CORP.12/19/1991
BISOTISSUEDMARK GENERAL CONTRACTING CORP.12/18/1991
BISFPISSUEDUNITED FIRE & SAFETY12/10/1991
5 projects · most recent 07/23/2024
General Wiring
FiledStatusContractorScope
07/23/2024Permit IssuedELECTL CONTG SOLUTIONS COGeneral Wiring
10/09/2023CompleteCATELLO ELEC'L CONT., INCGeneral Wiring
04/06/2023CompleteSNB ELECTRICAL CONTNG CORGeneral Wiring
03/11/2023CompleteSNB ELECTRICAL CONTNG COR—
02/27/2023CompleteECS ELEC'L CONTG SERV INCGeneral Wiring
1 project · most recent 01/24/2023
Fence
FiledStatusContractorScope
01/24/2023——Fence
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
05/09/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/08/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/22/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/02/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/19/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
05/23/2023HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
05/23/2023HVAC-R and service water heating system controlsJOHN MCMONAGLEenergy_progress
05/23/2023Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
05/23/2023Maintenance informationJOHN MCMONAGLEenergy_progress
05/23/2023HVAC-R and service water heating equipmentJOHN MCMONAGLEenergy_progress
04/18/2023HVAC-R and service water heating equipmentJOHN MCMONAGLEenergy_progress
04/18/2023Maintenance informationJOHN MCMONAGLEenergy_progress
04/18/2023Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
04/18/2023HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
04/18/2023HVAC-R and service water heating system controlsJOHN MCMONAGLEenergy_progress
04/13/2023HVAC-R and service water heating equipmentJOHN MCMONAGLEenergy_progress
04/13/2023Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
04/13/2023FinalJOHN MCMONAGLEprogress
04/13/2023Chimneys and ventsJOHN MCMONAGLEspecial
04/13/2023Mechanical SystemsJOHN MCMONAGLEspecial
04/13/2023Maintenance informationJOHN MCMONAGLEenergy_progress
04/13/2023HVAC-R and service water heating system controlsJOHN MCMONAGLEenergy_progress
04/11/2023Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
04/11/2023HVAC-R and service water heating equipmentJOHN MCMONAGLEenergy_progress
04/11/2023HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
04/11/2023HVAC-R and service water heating system controlsJOHN MCMONAGLEenergy_progress
04/11/2023Maintenance informationJOHN MCMONAGLEenergy_progress
02/17/2023FinalMOHAMMAD AHEADprogress
01/23/2023Final—progress
01/23/2023Concrete - Cast-In-Place—special
Latest 25 of 39.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Ralph's Famous Italian IcesRestaurant / Food ServiceFloors 1–5
Project S00829233 Alteration · LOC Issued · 02/17/2023
Project S00829234 Alteration · LOC Issued · 02/17/2023
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 230 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/23/2026S08032095-P1Request digital key ↗
08/23/2026S08032095-I1Request digital key ↗
08/23/2026S08032088-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits34
▸BISWORK PERMIT APPLICATION17
11/20/2018520363981Open ↗
11/20/2018520363981Open ↗
09/26/2017520279458Open ↗
Showing 3 of 17 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION17
11/20/2018520363981Open ↗
08/24/2017520207268Open ↗
05/05/2017520279458Open ↗
Showing 3 of 17 on file for this type
▸Seals & Professional Certifications71
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION20
08/12/2019520363981Open ↗
11/20/2018520363981Open ↗
05/05/2017520279458Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/23/2026S08032095-I1Open ↗
08/23/2026S08032088-I1Open ↗
08/23/2026S08032100-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026S08032111-P3Open ↗
09/01/2026S08032111-P3Open ↗
09/01/2026S08032088-I1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT11
11/20/2018520363981Open ↗
04/18/2017520278155Open ↗
03/27/2017520294690Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST10
11/20/2018520363981Open ↗
04/18/2017520278155Open ↗
03/27/2017520294690Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/27/2026S08032100-I1Open ↗
08/24/2026S08032095-P1Open ↗
08/24/2026S08032095-P1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
03/18/2011520061600Open ↗
09/16/2010520046851Open ↗
▸Trade Schedules & Equipment15
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
11/20/2018520363981Open ↗
08/24/2017520207268Open ↗
01/30/2017520207268Open ↗
Showing 3 of 5 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
01/14/2015520213812Open ↗
01/14/2015520213812Open ↗
12/22/2014520213812Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS2
08/14/2019520363981Open ↗
05/13/2011520061600Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
08/15/2019520363981Open ↗
05/13/2011520061600Open ↗
▸BISPLUMBING (PL) SIGNOFF1
03/05/2021520207268Open ↗
▸BISSCHEDULE B - PLUMBING1
03/18/2011520061600Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
02/02/2017520207268Open ↗
01/30/2017520207268Open ↗
▸Environmental & Asbestos21
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/23/2026S08032095-I1Open ↗
08/23/2026S08032088-I1Open ↗
08/23/2026S08032100-I1Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
11/20/2018520363981Open ↗
04/18/2017520278155Open ↗
03/27/2017520294690Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
03/18/2011520061600Open ↗
09/16/2010520046851Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
08/12/2019520363981Open ↗
11/20/2018520363981Open ↗
03/27/2017520294690Open ↗
Showing 3 of 10 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
03/05/2021520207268Open ↗
08/12/2019520363981Open ↗
06/26/2015520204680Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
03/05/2021520207268Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY1
03/05/2021520207268Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
08/12/2019520363981Open ↗
▸Approvals, Objections & Sign-offs20
▸BISADMINISTRATIVE OBJECTIONS11
11/20/2018520363981Open ↗
05/05/2017520279458Open ↗
04/18/2017520278155Open ↗
Showing 3 of 11 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
03/05/2021520207268Open ↗
08/15/2019520363981Open ↗
08/12/2019520363981Open ↗
Showing 3 of 9 on file for this type
▸Cost, Insurance & Ownership21
▸BISCOST AFFIDAVIT21
03/05/2021520207268Open ↗
08/12/2019520363981Open ↗
11/20/2018520363981Open ↗
Showing 3 of 21 on file for this type
▸Filing & Intake Forms17
▸BISEFILING COVER SHEET12
11/20/2018520363981Open ↗
05/05/2017520279458Open ↗
04/18/2017520278155Open ↗
Showing 3 of 12 on file for this type
▸BISADDITIONAL INFORMATION3
03/18/2015520213812Open ↗
03/18/2015520213812Open ↗
03/04/2015520213812Open ↗
▸BISBOROUGH INTAKE FORM2
08/12/2019520363981Open ↗
09/06/2017520278155Open ↗