← Back
BuildNYC
Three families
328B PRESIDENT STREET
BROOKLYN · BIN 3387629
💬 Discuss this project
1883Year Built
3Stories
C0Building Class
R6BZoning
2,940 sfGross Floor Area
3Units
Rent StabilizedFDNY Report ↗
Three families · 1,565 sf lot · 1.88 FAR built · Flood zone X
Locations of Work
Mechanical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 12p · 1 filing · 12 docs
Cellar3p · 1 filing · 12 docs
Sub-Basement2p · 1 filing · 12 docs
Site & exterior2p · 1 filing · 12 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL Engineering209/27/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H J Building Consulting403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Mr. Air NYCGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL Engineering6781209/27/2023
Building Lifecycle
12/04/2023
Signed off — Alteration
INSTALL NEW SPLIT A.C. SYSTEM AT CELLAR/BASEMENT/1ST FLOOR OF EXISTING 3 STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
B00910883-I1
10/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
10/05/2023
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
10/05/2023
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
10/05/2023
Special inspection requirement — Final
CHRISTIAN LOZADA
22 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMr. Air NYC08/07/2023
1 project · most recent 05/16/2023
General Wiring
FiledStatusContractorScope
05/16/2023CompleteAntonio Ceriello ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
10/05/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
10/05/2023Mechanical SystemsCHRISTIAN LOZADAspecial
10/05/2023Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
10/05/2023FinalCHRISTIAN LOZADAprogress
10/05/2023HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
10/05/2023HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
10/05/2023HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
10/05/2023Maintenance informationCHRISTIAN LOZADAenergy_progress
10/05/2023Permanent certificateCHRISTIAN LOZADAenergy_progress
09/26/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
09/26/2023Mechanical SystemsCHRISTIAN LOZADAspecial
09/26/2023Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
09/26/2023FinalCHRISTIAN LOZADAprogress
09/26/2023HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
09/26/2023HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
09/26/2023Permanent certificateCHRISTIAN LOZADAenergy_progress
09/26/2023Maintenance informationCHRISTIAN LOZADAenergy_progress
09/26/2023HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
12 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account