← Back
Four families
33 VERNON AVENUE
BROOKLYN · BIN 3048622
💬 Discuss this project
1931Year Built
3Stories
C3Building Class
R6BZoning
2,960 sfGross Floor Area
4Units
Rent Stabilized24 Open Violations ▸FDNY Report ↗
Four families · Owner of record: AVEN ZUHOV TRUST · 1,850 sf lot · 1.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof4p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AVEN ZUHOV TRUST103/22/2026
VERNON WILLI LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/24/2021$1.1M—— → —$372/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOHAMMAD AHEAD, PE408/03/2026
SYED ENGINEERING, P.C.101/02/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EZFILINGNYCORP303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARCO GENERAL CONTRACTOR INCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519101/02/2025
ASR ENGINEERING PC8404101/02/2025
SYED ENGINEERING, P.C.7054101/02/2025
Building Lifecycle
All (110)Filed (5)Permit Issued (1)Signed Off (1)Violation (42)Objection (33)Special Inspection (28)
08/03/2026
Filed — Alteration
HEREWITH FILING FOR A REAR EXTENSION TO FLOORS BASEMENT AND FLOOR 001. FILING FOR AND INTERIOR RENOVATION TO INCLUDE PATCH AND REPAIR DAMAGED SURFACES, FINISH FLOORS AND REPLACED DAMAGED GYPSUM BOARD AS REQUIRED. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01281606-P2
08/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/03/2026
Special inspection requirement — Lighting in dwelling units
08/03/2026
Special inspection requirement — Final
08/03/2026
Special inspection requirement — Energy Code Compliance Inspections
08/03/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
08/03/2026
Special inspection requirement — Masonry
05/06/2026
Violation issued (HPD, closed)
A
11/18/2025
Violation issued (HPD, closed)
I
11/10/2025
Special inspection requirement — Lighting in dwelling units
11/10/2025
Special inspection requirement — Masonry
11/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
11/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
11/10/2025
Special inspection requirement — Final
11/10/2025
Special inspection requirement — Energy Code Compliance Inspections
10/22/2025
Filed — Alteration
HEREWITH FILING FOR A REAR EXTENSION TO FLOORS BASEMENT AND FLOOR 001. FILING FOR AND INTERIOR RENOVATION TO INCLUDE PATCH AND REPAIR DAMAGED SURFACES, FINISH FLOORS AND REPLACED DAMAGED GYPSUM BOARD AS REQUIRED. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01281606-P1
09/12/2025
Filed — Alteration
HEREWITH FILING FOR A REAR EXTENSION TO FLOORS BASEMENT AND FLOOR 001. FILING FOR AND INTERIOR RENOVATION TO INCLUDE PATCH AND REPAIR DAMAGED SURFACES, FINISH FLOORS AND REPLACED DAMAGED GYPSUM BOARD AS REQUIRED. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01281606-I1
07/22/2025
Objection resolved — Resolved
07/22/2025
Objection resolved — Resolved
07/22/2025
Objection resolved — Resolved
07/15/2025
Objection raised — Fire_Protection
07/07/2025
Objection resolved — Addressed
07/07/2025
Objection resolved — Addressed
07/07/2025
Objection resolved — Addressed
06/11/2025
Violation issued (HPD, closed)
A
06/04/2025
Objection raised — Structural
05/05/2025
Objection raised — Structural
05/05/2025
Objection raised — Fire_Protection
04/25/2025
Objection resolved — Addressed
04/25/2025
Objection resolved — Addressed
04/25/2025
Objection resolved — Addressed
04/25/2025
Objection resolved — Addressed
03/31/2025
Violation issued (ECB, closed)
Construction
03/18/2025
Objection raised — Zoning
03/18/2025
Objection raised — Structural
03/18/2025
Objection raised — Plumbing
03/18/2025
Objection raised — Scope
03/18/2025
Objection raised — Structural
03/18/2025
Objection raised — Cost
03/18/2025
Objection raised — Structural
03/18/2025
Objection raised — Structural
03/18/2025
Objection raised — Scope
03/18/2025
Objection raised — Fire_Protection
03/18/2025
Objection raised — Admin
03/10/2025
Filed — Alteration
HEREWITH FILING FOR A REAR EXTENSION TO FLOORS BASEMENT AND FLOOR 001. FILING FOR AND INTERIOR RENOVATION TO INCLUDE PATCH AND REPAIR DAMAGED SURFACES, FINISH FLOORS AND REPLACED DAMAGED GYPSUM BOARD AS REQUIRED. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01177791-I1
02/25/2025
Special inspection requirement — Lighting in dwelling units
02/25/2025
Special inspection requirement — Masonry
02/25/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
02/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/25/2025
Special inspection requirement — Energy Code Compliance Inspections
02/24/2025
Signed off — Alteration
PROPOSED NEW RAFTERS AT ROOF AND RAISING THE WALL TO MATCH EXISTING ROOF LEVEL, NEW MASONRY BRICK TO MATCH EXISTING IN COLOR, SIZE AND TEXTURE. NO CHANGE IN USE, EGRESS OR OCCUPANCY
B01160907-I1
02/06/2025
Special inspection requirement — Final
01/23/2025
Permit issued — General Construction
B01160907-I1-GC-CX
01/14/2025
Objection resolved — Addressed
01/14/2025
Objection resolved — Addressed
01/14/2025
Objection resolved — Addressed
01/14/2025
Objection resolved — Addressed
01/09/2025
Objection raised — Zoning
01/09/2025
Objection raised — Fire_Protection
01/09/2025
Objection raised — Other
Latest 60 of 110 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offARCO GENERAL CONTRACTOR I01/23/2025
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
08/03/2026Fire-Resistant Penetrations and Joints—special
08/03/2026Lighting in dwelling units—energy_progress
08/03/2026Final—progress
08/03/2026Energy Code Compliance Inspections—progress
08/03/2026Structural Stability – Alterations of existing buildings—special
08/03/2026Masonry—special
11/10/2025Lighting in dwelling units—energy_progress
11/10/2025Masonry—special
11/10/2025Fire-Resistant Penetrations and Joints—special
11/10/2025Structural Stability – Alterations of existing buildings—special
11/10/2025Final—progress
11/10/2025Energy Code Compliance Inspections—progress
02/25/2025Lighting in dwelling units—energy_progress
02/25/2025Masonry—special
02/25/2025Structural Stability – Alterations of existing buildings—special
02/25/2025Fire-Resistant Penetrations and Joints—special
02/25/2025Energy Code Compliance Inspections—progress
02/06/2025Final—progress
01/02/2025Fenestration areasRAFI HAMIDenergy_progress
01/02/2025Insulation placement and R valuesRAFI HAMIDenergy_progress
01/02/2025Fenestration and door U-factor and product ratingsRAFI HAMIDenergy_progress
01/02/2025Wood – Seismic ResistanceYounes Abouyaalaspecial
01/02/2025Wood – Prefabricated I-JoistsAKM RAHMANspecial
01/02/2025Structural Stability – Alterations of existing buildingsRAFI HAMIDspecial
01/02/2025MasonryRAFI HAMIDspecial
Latest 25 of 28.
▾Documents — 41 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/20/2026B01281606-P2Request digital key ↗
08/20/2026B01281606-P1Request digital key ↗
08/20/2026B01281606-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram4
08/20/2026B01281606-P2Open ↗
08/13/2026B01281606-P1Open ↗
08/13/2026B01281606-I1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications15
▸DOB NOWSpecial Inspector Seal & Signature5
08/28/2026B01160907-I1Open ↗
08/28/2026B01160907-I1Open ↗
08/28/2026B01160907-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/22/2026B01177791-I1Open ↗
08/20/2026B01281606-P2Open ↗
08/20/2026B01281606-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/28/2026B01160907-I1Open ↗
08/28/2026B01160907-I1Open ↗
08/28/2026B01160907-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/20/2026B01281606-P2Open ↗
08/20/2026B01281606-P1Open ↗
08/20/2026B01281606-I1Open ↗
Showing 3 of 5 on file for this type
▸Other Documents12
▸DOB NOWSite Survey: Initial4
08/20/2026B01281606-P2Open ↗
08/13/2026B01281606-I1Open ↗
08/13/2026B01177791-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/20/2026B01281606-P2Open ↗
08/13/2026B01281606-I1Open ↗
08/13/2026B01177791-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlot Diagram4
08/20/2026B01281606-P2Open ↗
08/13/2026B01177791-I1Open ↗
08/13/2026B01281606-P1Open ↗
Showing 3 of 4 on file for this type