💬 Discuss this project
1966Year Built
3Stories
W1Building Class
PARKZoning
195,552 sfGross Floor Area
1Units
LL97 Covered27 Active Violations 0 unresolved · 27 paperwork only 3 likely answered ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC Department of Education · 133,300 sf lot · 1.47 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofP.S. 295-brooklyn2 filings · 20 docs
Floor 3P.S. 295-brooklyn2 filings · 20 docs
Floor 2P.S. 295-brooklyn2 filings · 20 docs
Floor 1P.S. 295-brooklyn2 filings · 20 docs
CellarP.S. 295-brooklyn2 filings · 20 docs
Site & exteriorP.S. 295KUnder Construction23p · 5 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority11409/13/2026
NYC Department of Education903/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Angela Rivera303/21/2026
AK Consulting Services803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A & S ElectricElectrical803/21/2026
East Coast Builders GroupScaffold407/08/2026
Kel-Tech ConstructionScaffold407/08/2026
Lit Mode Electrical ContgElectrical103/22/2026
Stanco System Electrical ContElectrical103/21/2026
E.N.E.L. ElectricalElectrical103/21/2026
Charan Electrical Enterp'sElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Twin Peaks317608/10/2026
Building Lifecycle
All (119)Filed (15)Permit Issued (7)Violation (60)Objection (18)Special Inspection (19)
08/13/2026
Special inspection requirement — Post-installed Anchors
MAXIM KORNGOLD
08/10/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD FOR PS 295K AT 330 18 STREET, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01296039-P1
08/10/2026
Filed — Alteration
INSTALLATION OF DEBRIS CHUTE FOR PS 295K AT 330 18 STREET, BROOKLYN AS PER INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01316752-P1
08/10/2026
Filed — Alteration
COVID VENTILATION- General Construction work related to COVID Ventilation project
B00576335-P2
08/10/2026
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR PS 295K AT 330 18 STREET, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01296021-P1
08/07/2026
Special inspection requirement — Post-installed Anchors
Maxim Korngold
07/08/2026
Objection resolved — Addressed
06/29/2026
Objection raised — Other
06/23/2026
Filed — Alteration
COVID VENTILATION- General Construction work related to COVID Ventilation project
B00576335-P1
06/18/2026
Violation issued (ECB, open)
Construction
06/18/2026
Violation issued (ECB, open)
Construction
06/18/2026
Violation issued (ECB, open)
Construction
06/18/2026
Violation issued (ECB, open)
Construction
06/18/2026
Violation issued (ECB, open)
Construction
06/18/2026
Violation issued (ECB, open)
Construction
02/04/2026
Permit issued — Protection and Mechanical Methods
B01316752-I1-PMM
02/02/2026
Permit issued — Supported Scaffold
B01296039-I1-SF
01/30/2026
Permit issued — Sidewalk Shed
B01296035-I1-SH
01/30/2026
Permit issued — Construction Fence
B01296021-I1-FN
12/30/2025
Objection resolved — Addressed
12/10/2025
Violation issued (FDNY_ORDER, closed)
12/10/2025
Objection resolved — Addressed
12/04/2025
Objection resolved — Addressed
11/21/2025
Objection raised — Other
11/19/2025
Filed — Alteration
INSTALLATION OF DEBRIS CHUTE FOR PS 295K AT 330 18 STREET, BROOKLYN AS PER INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01316752-I1
11/07/2025
Objection raised — Other
11/07/2025
Objection raised — Other
10/28/2025
Filed — Alteration
B01296035-I1
10/28/2025
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD FOR PS 295K AT 330 18 STREET, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01296039-I1
10/28/2025
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR PS 295K AT 330 18 STREET, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01296021-I1
10/28/2025
Permit issued — Sidewalk Shed
B00807843-I1-SH
10/24/2025
Violation issued (FDNY_ORDER, closed)
10/24/2025
Violation issued (FDNY_ORDER, closed)
10/24/2025
Violation issued (FDNY_ORDER, closed)
07/07/2025
Violation issued (ECB, open)
Construction
07/07/2025
Violation issued (ECB, open)
Construction
05/22/2025
Violation issued (ECB, open)
Construction
10/25/2024
Permit issued — Sidewalk Shed
B00807843-I1-SH
10/18/2024
Objection resolved — Addressed
10/16/2024
Objection resolved — Addressed
09/24/2024
Objection raised — Other
09/24/2024
Objection raised — Other
09/12/2024
Violation issued (ECB, open)
Construction
09/12/2024
Violation issued (ECB, open)
Construction
09/12/2024
Violation issued (ECB, open)
Construction
09/10/2024
Filed — Alteration
ROOF DRAIN RESISTANCE
B01107480-S1
09/10/2024
Filed — Alteration
ROOF DRAIN RESISTANCE
B01107480-I1
09/09/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Hakeem Alshawabkeh
09/09/2024
Special inspection requirement — Insulation placement and R values
Hakeem Alshawabkeh
09/09/2024
Special inspection requirement — Air barrier - visual inspection
Hakeem Alshawabkeh
09/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hakeem Alshawabkeh
09/06/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Hakeem Alshawabkeh
09/06/2024
Special inspection requirement — Post-installed Anchors
Hakeem Alshawabkeh
09/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hakeem Alshawabkeh
09/06/2024
Special inspection requirement — Masonry
Hakeem Alshawabkeh
09/06/2024
Special inspection requirement — Post-installed Anchors
Hakeem Alshawabkeh
09/06/2024
Special inspection requirement — Energy Code Compliance Inspections
Hakeem Alshawabkeh
08/15/2023
Permit issued — Sidewalk Shed
B00807843-I1-SH
08/09/2023
Violation issued (ECB, open)
Construction
08/08/2023
Violation issued (ECB, closed)
Construction
Latest 60 of 119 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsPermit IssuedEast Coast Builders Group02/04/2026
DOB NOWSupported ScaffoldPermit IssuedEast Coast Builders Group02/02/2026
DOB NOWSidewalk ShedPermit IssuedEast Coast Builders Group01/30/2026
DOB NOWConstruction FencePermit IssuedEast Coast Builders Group01/30/2026
DOB NOWSidewalk ShedPermit IssuedKel-Tech Construction10/28/2025
DOB NOWSidewalk ShedPermit IssuedKel-Tech Construction10/25/2024
DOB NOWSidewalk ShedPermit IssuedKel-Tech Construction08/15/2023
BISOTISSUEDCorbex12/29/2025
BISOTISSUEDCorbex12/29/2025
BISOTISSUEDCorbex12/29/2025
BISPLISSUEDMar-Sal Plumbing & Heating08/27/2025
BISOTISSUEDCorbex01/14/2025
BISOTISSUEDCorbex01/08/2025
BISOTISSUEDCorbex01/08/2025
BISOTISSUEDCorbex01/08/2024
BISOTISSUEDCorbex01/04/2024
BISOTISSUEDCorbex01/03/2024
BISOTISSUEDCorbex01/03/2024
BISOTISSUEDCorbex01/03/2024
BISOTISSUEDCorbex01/03/2024
BISOTISSUEDCorbex01/03/2024
BISOTISSUEDCorbex02/14/2023
BISOTISSUEDCorbex02/14/2023
BISPLISSUEDMar-Sal Plumbing & Heating02/10/2023
BISOTISSUEDCorbex02/10/2023
BISOTISSUEDCorbex02/10/2023
BISOTISSUEDCorbex02/10/2023
BISOTISSUEDCorbex02/10/2023
BISOTISSUEDCorbex01/06/2023
BISOTISSUEDCorbex01/10/2022
BISOTISSUEDCorbex01/10/2022
BISOTISSUEDCorbex01/10/2022
BISOTISSUEDCorbex01/10/2022
BISOTISSUEDCorbex01/10/2022
BISOTISSUEDCorbex01/10/2022
BISOTISSUEDCorbex12/02/2021
BISOTISSUEDCorbex12/02/2021
BISOTISSUEDCorbex12/02/2021
BISEQISSUEDCorbex07/15/2021
BISOTISSUEDTri-State Paving02/26/2021
+ 17 more permits on file
1 project · most recent 08/10/2026
Ventilation Systems
FiledStatusContractorScope
08/10/2026——Ventilation Systems
1 project · most recent 09/10/2024
Storm
FiledStatusContractorScope
09/10/2024——Storm
15 projects · most recent 05/26/2026
General Wiring
FiledStatusContractorScope
05/26/2026Permit IssuedLit Mode Electrical Contg—
12/17/2025Permit IssuedLit Mode Electrical Contg—
12/17/2025Permit IssuedLit Mode Electrical Contg—
11/05/2025Permit IssuedTower ElectricGeneral Wiring
06/23/2025CompleteEverest Electric—
02/11/2025CompleteJ&H Electrical Cont—
07/28/2023CompleteGemini Electric Co—
02/07/2023CompleteTower ElectricGeneral Wiring
10/03/2022Permit IssuedStanco System Electrical Cont—
05/04/2020CompleteCharan Electrical Enterp's—
03/11/2020CompleteCharan Electrical Enterp'sGeneral Wiring
11/27/2019CompleteCharan Electrical Enterp's—
03/28/2019Permit IssuedLaser Electrical Constr'gGeneral Wiring
06/04/2018CancelledLaredo ElectricGeneral Wiring
06/04/2018CompleteLaredo Electric—
1 project · most recent 08/10/2026
Steel
FiledStatusContractorScope
08/10/2026——Steel
2 projects · most recent 08/10/2026
Fence Scaffold
FiledStatusContractorScope
08/10/2026Permit IssuedEast Coast Builders GroupFence
08/10/2026Permit IssuedEast Coast Builders GroupScaffold
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
08/13/2026Post-installed AnchorsMAXIM KORNGOLDspecial
08/07/2026Post-installed AnchorsMaxim Korngoldspecial
09/09/2024Fenestration and door U-factor and product ratingsHakeem Alshawabkehenergy_progress
09/09/2024Insulation placement and R valuesHakeem Alshawabkehenergy_progress
09/09/2024Air barrier - visual inspectionHakeem Alshawabkehenergy_progress
09/06/2024Fire-Resistant Penetrations and JointsHakeem Alshawabkehspecial
09/06/2024Structural Stability – Alterations of existing buildingsHakeem Alshawabkehspecial
09/06/2024Post-installed AnchorsHakeem Alshawabkehspecial
09/06/2024Fire-Resistant Penetrations and JointsHakeem Alshawabkehspecial
09/06/2024MasonryHakeem Alshawabkehspecial
09/06/2024Post-installed AnchorsHakeem Alshawabkehspecial
09/06/2024Energy Code Compliance InspectionsHakeem Alshawabkehprogress
09/01/2021Post-installed AnchorsHakeem Alshawabkehspecial
09/01/2021Structural Steel - High Strength BoltingHakeem Alshawabkehspecial
09/01/2021Structural Steel - WeldingHakeem Alshawabkehspecial
09/01/2021Structural Steel - DetailsHakeem Alshawabkehspecial
09/01/2021PreliminaryHakeem Alshawabkehprogress
09/01/2021Structural Stability – Alterations of existing buildingsHakeem Alshawabkehspecial
08/27/2021FinalHakeem Alshawabkehprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.S. 295KEducation—
Project B01316752 Alteration · Permit Entire · 11/19/2025
Project B01296021 Alteration · Permit Entire · 10/28/2025
Project B01296035 Alteration · Permit Entire · 10/28/2025
Project B01296039 Alteration · Permit Entire · 10/28/2025
P.S. 295-brooklynEducationCellar, Floors 1–3, Roof
Project B01107480 Alteration · Approved · 09/10/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 90 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
09/01/2026B00576335-P2Request digital key ↗
08/27/2026B00807843-I1Request digital key ↗
08/20/2026B01296021-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Seals & Professional Certifications21
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/01/2026B00576335-I1Open ↗
09/01/2026B00576335-S1Open ↗
09/01/2026B00576335-S2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/03/2026B00576335-S2Open ↗
09/02/2026B01296039-P1Open ↗
08/30/2026B01296039-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/03/2026B00576335-S2Open ↗
08/23/2026B01107480-I1Open ↗
08/23/2026B01107480-I1Open ↗
▸Safety & Tenant Protection7
▸DOB NOWNYCSCA - Approved Site Safety Plans7
08/20/2026B01296021-P1Open ↗
08/20/2026B01296039-I1Open ↗
08/20/2026B01296039-P1Open ↗
Showing 3 of 7 on file for this type
▸Approvals, Objections & Sign-offs30
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)15
09/01/2026B00576335-P2Open ↗
08/20/2026B01296021-P1Open ↗
08/20/2026B01296039-P1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter13
09/01/2026B00576335-P2Open ↗
08/27/2026B00807843-I1Open ↗
08/20/2026B01296021-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)2
08/13/2026B01107480-S1Open ↗
08/13/2026B01107480-I1Open ↗
▸Other Documents19
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal19
09/01/2026B00576335-P2Open ↗
08/20/2026B01296021-I1Open ↗
08/20/2026B01296021-P1Open ↗
Showing 3 of 19 on file for this type