| Owner | Filings | Most Recent |
|---|---|---|
| 330 MADISON ASSOCIATES | 222 | 09/22/2026 |
| 700 LEXINGTON LLC | 2 | 08/29/2026 |
| ANFIELD INTERIORS INC | 5 | 03/22/2026 |
| W5 GROUP | 4 | 03/22/2026 |
| CROSS MANAGEMENT | 3 | 03/22/2026 |
| WALDORF DEMOLITION CO | 4 | 03/22/2026 |
| WALDOLF EXTERIORS LLC | 1 | 03/22/2026 |
| AKAM ASSOCIATES | 2 | 03/22/2026 |
| 330 MADISON PROEPRTY OWNE | 2 | 03/22/2026 |
| SL GREEN REALTY | 230 | 03/22/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 02/28/2020 | $900.0M | — | 330 MADISON PROPERTY OWNER LLC → 330 MADISON ASSOCIATES LLC | $1,228/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| GILSANZ MURRAY STEFICEK LLP | 12 | 08/25/2026 |
| ROBERT DERECTOR ASSOCIATES | 12 | 08/20/2026 |
| STUDIOS ARCHITECTURE | 3 | 08/17/2026 |
| BRANDON M. SOCHA, ARCHITECT | 1 | 07/29/2026 |
| WELLWORTH CONSULTING LLC | 1 | 05/13/2026 |
| LEHMAN SMITH MCLEISH | 19 | 04/24/2026 |
| GOLDMAN COPELAND ASSOCIATES | 95 | 03/11/2026 |
| AKF ENGINEERS, LLP | 10 | 11/24/2025 |
| GENSLER | 5 | 11/11/2025 |
| REAVES ARCHITECTURE LLC | 4 | 10/30/2025 |
| E4P CONSULTING ENGINEERING PLLC | 1 | 09/18/2025 |
| GRIMSHAW | 7 | 05/06/2025 |
| CFS ENGINEERING, DPC | 7 | 03/31/2025 |
| RUSSELL M. BAUMANN, ARCHITECT | 1 | 03/05/2025 |
| LOMBARDO PROFESSIONAL ENGINEERING | 1 | 08/07/2024 |
| SCHNACKEL ENGINEERS | 3 | 03/25/2024 |
| SANDER WILLIAMS ARCHITECT PC | 2 | 03/21/2024 |
| AMA CONSULTING ENGINEERS, PC | 4 | 02/13/2023 |
| FISKAA ENGINEERING | 2 | 11/04/2022 |
| SSM DESIGN LLP D/B/A SPECTOR GROUP | 1 | 10/26/2022 |
| GC ENG & ASSOCIATES, PC | 2 | 09/22/2021 |
| ROBERT T. SUTTER, AIA, PC | 1 | 09/08/2021 |
| MG ENGINEERING D.P.C. | 4 | 07/16/2021 |
| ELLIS L. MCINTOSH JR., AIA | 1 | 07/06/2021 |
| PLAN B ENGINEERING | 2 | 06/06/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| DVA Advisors | 111 | 03/21/2026 |
| WILLIAM VITACCO ASSOCIATES | 61 | 03/21/2026 |
| EMPIRE CITY CONSULTANTS, INC. | 5 | 03/21/2026 |
| LOMBARDO BUILDING CONSULTANTS | 1 | 03/21/2026 |
| OUTSOURCE CONSULTANTS, INC. | 22 | 03/21/2026 |
| METROPOLIS GROUP INC | 6 | 03/21/2026 |
| RIZZO GROUP | 4 | 03/21/2026 |
| GILLMAN CONSULTING | 6 | 03/21/2026 |
| GREEN LIGHT EXPEDITING LLC | 6 | 03/21/2026 |
| PEROTTO CONSULTING MANAGEMENT | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| CLUNE CONSTRUCTION CO LP | General Contractor | 41 | 07/08/2026 |
| OMARA ORGANIZATION INC | General Contractor | 21 | 07/08/2026 |
| GANNON CONTRACTING LLC | General Contractor | 20 | 07/08/2026 |
| SIRINA FIRE PROT CORP | Fire Protection | 10 | 07/08/2026 |
| PAR FIRE PROTECTION LLC | Fire Protection | 9 | 09/22/2026 |
| ICON INTERIORS INC | General Contractor | 8 | 07/08/2026 |
| PAR PLUMBING CO., INC | Plumbing | 8 | 07/08/2026 |
| JRM CONSTRUCTION MGMT LLC | General Contractor | 8 | 09/03/2026 |
| PSI PARTNERS, LLC | Fire Protection | 7 | 07/08/2026 |
| PLATFORM SOLUTIONS, INC | General Contractor | 6 | 07/08/2026 |
| L&K PARTNERS, INC | General Contractor | 5 | 07/08/2026 |
| JAMES E FITZGERALD INC | General Contractor | 5 | 07/08/2026 |
| CROSS MANAGEMENT CORP | General Contractor | 5 | 07/08/2026 |
| MAC FELDER INC | Plumbing | 5 | 07/08/2026 |
| LEVINE, GEORGE | Fire Protection | 5 | 03/21/2026 |
| SCHIMENTI CONSTRUCTION CO | General Contractor | 5 | 07/08/2026 |
| FULL CAPACITY FIRE CORP | Fire Protection | 5 | 07/08/2026 |
| A&A PLUMBING CORP | Plumbing | 4 | 07/08/2026 |
| DONNELLY MECHANICAL CORP | General Contractor | 4 | 03/21/2026 |
| JT MAGEN & COMPANY INC | General Contractor | 3 | 07/08/2026 |
| ANFIELD INTERIORS INC | General Contractor | 3 | 03/21/2026 |
| POWERHOUSE RETAIL SVCS LL | General Contractor | 3 | 03/21/2026 |
| AGGRESSIVE FIRE PROT LLC | Fire Protection | 3 | 07/08/2026 |
| ABCO-PEERLESS SPRKLR CORP | Fire Protection | 3 | 07/08/2026 |
| DENKO MECHANICAL INC | Fire Protection | 2 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| AK ENGINEERING PC | 678 | 22 | 08/25/2026 |
| CATALPA SPECIAL INSPECTIO | 2004 | 1 | 07/29/2026 |
| ENGINEERING BUILDING SERV | 7303 | 12 | 04/24/2026 |
| MILROSE CONSULTANTS LLC | 2003 | 4 | 11/24/2025 |
| HT ENGINEERING, PLLC | 6274 | 1 | 09/18/2025 |
| GRANT ENGINEERING | 2627 | 3 | 04/30/2025 |
| SAG ENGINEERING & CONSULT | 608 | 117 | 03/13/2025 |
| SKYLINE ENGINEERING, PLLC | 267 | 7 | 03/21/2024 |
| PSI AGENCY INC. | 254 | 3 | 11/04/2022 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Standpipe | Permit Issued | PAR FIRE PROTECTION LLC | 09/21/2026 |
| DOB NOW | Sprinklers | Permit Issued | PAR FIRE PROTECTION LLC | 09/21/2026 |
| DOB NOW | Standpipe | Permit Issued | PAR FIRE PROTECTION LLC | 09/21/2026 |
| DOB NOW | Standpipe | Permit Issued | PAR FIRE PROTECTION LLC | 09/21/2026 |
| DOB NOW | Sprinklers | Permit Issued | PAR FIRE PROTECTION LLC | 09/21/2026 |
| DOB NOW | Sprinklers | Permit Issued | PAR FIRE PROTECTION LLC | 09/21/2026 |
| DOB NOW | Structural | Permit Issued | JRM CONSTRUCTION MGMT LLC | 09/02/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JRM CONSTRUCTION MGMT LLC | 09/02/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JRM CONSTRUCTION MGMT LLC | 09/02/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JRM CONSTRUCTION MGMT LLC | 09/02/2026 |
| DOB NOW | General Construction | Permit Issued | JRM CONSTRUCTION MGMT LLC | 09/02/2026 |
| DOB NOW | General Construction | Permit Issued | JRM CONSTRUCTION MGMT LLC | 09/02/2026 |
| DOB NOW | General Construction | Permit Issued | JRM CONSTRUCTION MGMT LLC | 09/02/2026 |
| DOB NOW | Structural | Permit Issued | JRM CONSTRUCTION MGMT LLC | 09/02/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | SPRING SCAFFOLDING LLC | 08/10/2026 |
| DOB NOW | General Construction | Permit Issued | SWINERTON BUILDERS | 08/07/2026 |
| DOB NOW | General Construction | Permit Issued | OMARA ORGANIZATION INC | 06/10/2026 |
| DOB NOW | General Construction | Permit Issued | L&K PARTNERS, INC | 05/14/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | SPRING SCAFFOLDING LLC | 05/13/2026 |
| DOB NOW | General Construction | Permit Issued | L&K PARTNERS, INC | 05/12/2026 |
| DOB NOW | Plumbing | Signed-off | A & M WARSHAW PLBG & HTG | 05/07/2026 |
| DOB NOW | Mechanical Systems | Signed-off | YORK MECHANICAL CORP | 12/03/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | GANNON CONTRACTING LLC | 11/28/2025 |
| DOB NOW | Sprinklers | Permit Issued | FULL CAPACITY FIRE CORP | 11/25/2025 |
| DOB NOW | General Construction | Permit Issued | GANNON CONTRACTING LLC | 11/14/2025 |
| DOB NOW | Sprinklers | Signed-off | AMI AND ASSOCIATES INC | 08/14/2025 |
| DOB NOW | Mechanical Systems | Signed-off | CROSS MANAGEMENT CORP | 08/13/2025 |
| DOB NOW | Sprinklers | Signed-off | ARMON MECHANICAL INC | 07/22/2025 |
| DOB NOW | Sprinklers | Signed-off | ARMON MECHANICAL INC | 07/18/2025 |
| DOB NOW | Plumbing | Signed-off | ARMON MECHANICAL INC | 07/15/2025 |
| DOB NOW | Mechanical Systems | Signed-off | JAMES E FITZGERALD INC | 07/14/2025 |
| DOB NOW | Mechanical Systems | Signed-off | JAMES E FITZGERALD INC | 07/14/2025 |
| DOB NOW | Plumbing | Signed-off | ARMON MECHANICAL INC | 07/11/2025 |
| DOB NOW | General Construction | Signed-off | JAMES E FITZGERALD INC | 07/10/2025 |
| DOB NOW | General Construction | Signed-off | JAMES E FITZGERALD INC | 07/10/2025 |
| DOB NOW | General Construction | Permit Issued | ICON INTERIORS INC | 06/30/2025 |
| DOB NOW | Sprinklers | Signed-off | CMA PLUMBING & HEATING IN | 05/09/2025 |
| DOB NOW | Plumbing | Signed-off | A & M WARSHAW PLBG & HTG | 05/07/2025 |
| DOB NOW | General Construction | Signed-off | LORICH CONSTRUCTION MANAGEMENT | 05/05/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | LORICH CONSTRUCTION MANAGEMENT | 05/05/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/25/2026 | Permit Issued | JRM CONSTRUCTION MGMT LLC | Air Conditioning Systems | Cooling Above Air Technologies MCW-011B-4-E1MO 38,500 BTU · Crac Unit ×1 |
| 08/25/2026 | Permit Issued | JRM CONSTRUCTION MGMT LLC | Air Conditioning Systems | Cooling |
| 08/20/2026 | Permit Issued | JRM CONSTRUCTION MGMT LLC | Air Conditioning Systems | Cooling Above Air Technologies MCW-011B-4-E1MO 38,500 BTU · Crac Unit ×3 AMCW-011B-4-E1MO 38,500 BTU · Crac Unit ×1 |
| 03/11/2026 | Signed-off | LORICH CONSTRUCTION MANAG | Ventilation Systems | Ventilation Twin City Fan not applicable 6,500 CFM ×3 |
| 11/26/2024 | Permit Issued | GANNON CONTRACTING LLC | Associated Ducts and Piping | Ducts & Piping __Junk__ N/A 1 BTU · Ductwork ×2 |
| 09/01/2023 | Permit Issued | GANNON CONTRACTING LLC | Associated Ducts and Piping, Ventilation Systems |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/25/2026 | Permit Issued | PAR FIRE PROTECTION LLC | 1 outlets |
| 08/25/2026 | Permit Issued | PAR FIRE PROTECTION LLC | — |
| 08/20/2026 | Permit Issued | PAR FIRE PROTECTION LLC | 700 heads, 4 outlets |
| 03/11/2026 | Signed-off | CMA PLUMBING & HEATING IN | 80 heads |
| 11/24/2025 | Permit Issued | FULL CAPACITY FIRE CORP | 3 heads |
| 03/13/2025 | Signed-off | PSI PARTNERS, LLC | — |
| 11/26/2024 | Signed-off | DENKO MECHANICAL INC | Sprinkler System |
| 09/01/2023 | Permit Issued | FULL CAPACITY FIRE CORP | 89 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/25/2026 | — | — | Water/Sanitary |
| 08/25/2026 | — | — | Water/Sanitary |
| 08/20/2026 | — | — | Water/Sanitary |
| 03/11/2026 | Signed-off | A & M WARSHAW PLBG & HTG | Gas, Water/Sanitary |
| 11/24/2025 | — | — | — |
| 03/13/2025 | Signed-off | ARCO PLBG AND HTG INC | Water/Sanitary |
| 11/26/2024 | Signed-off | A&A PLUMBING CORP | Water/Sanitary |
| 09/01/2023 | Permit Issued | A&A PLUMBING CORP | Water/Sanitary |
| 08/01/2023 | — | — | Gas |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/04/2026 | Complete | POLO ELECTRIC CORP. D/B/A | — |
| 05/11/2026 | Complete | PATRIOT ELECTRIC CORP | General Wiring |
| 04/21/2026 | Permit Issued | TOP SHELF ELECTRIC CORP | — |
| 01/27/2026 | Complete | SPECTRUM ON BROADWAY-ELEC | — |
| 01/27/2026 | Complete | SPECTRUM ON BROADWAY-ELEC | — |
| 07/10/2025 | Complete | A2K ELECTRIC CORP | General Wiring |
| 05/16/2025 | Permit Issued | ELECTRIC ESSENTIALS CORP | General Wiring |
| 11/19/2024 | Permit Issued | ENNELL GRP ELECTRIC CORP | — |
| 06/03/2024 | Permit Issued | M&T ELECTRICAL LLC | General Wiring |
| 02/21/2024 | Complete | JAM ELECTRICAL CORP | — |
| 02/21/2024 | Complete | JAM ELECTRICAL CORP | — |
| 02/21/2024 | Complete | JAM ELECTRICAL CORP | — |
| 02/21/2024 | Complete | JAM ELECTRICAL CORP | — |
| 02/08/2024 | Complete | CAMPBELL & DAWES LTD ELEC | General Wiring |
| 11/01/2023 | Complete | CREGGAN ELECTRIAL CORP | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/25/2026 | Permit Issued | PAR FIRE PROTECTION LLC | Steel, Concrete |
| 08/25/2026 | Permit Issued | PAR FIRE PROTECTION LLC | Steel, Concrete |
| 08/20/2026 | Permit Issued | PAR FIRE PROTECTION LLC | 2 scope_items |
| 03/13/2025 | Permit Issued | OMARA ORGANIZATION INC | Steel, Concrete |
| 11/26/2024 | Permit Issued | GANNON CONTRACTING LLC | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/13/2026 | Permit Issued | SPRING SCAFFOLDING LLC | Sidewalk Shed |
| Date | Type | Result | Report |
|---|---|---|---|
| 05/08/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/13/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 03/31/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 03/23/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/04/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 02/17/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 02/10/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/06/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 01/15/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 01/12/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/09/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 11/25/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/27/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 09/29/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/25/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/25/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/25/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/05/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/02/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/27/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/22/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/13/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/09/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/25/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 02/07/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/20/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 08/20/2026 | Structural Steel - High Strength Bolting | Ari Kamo | special |
| 08/20/2026 | Sprayed fire-resistant materials | Ari Kamo | special |
| 08/20/2026 | Structural Steel - Welding | Ari Kamo | special |
| 08/20/2026 | Post-installed Anchors | Ari Kamo | special |
| 08/20/2026 | Post-installed Anchors | Ari Kamo | special |
| 08/20/2026 | Post-installed Anchors | Ari Kamo | special |
| 08/20/2026 | Structural Steel - Details | Ari Kamo | special |
| 08/20/2026 | Post-installed Anchors | Ari Kamo | special |
| 08/20/2026 | Structural Stability – Alterations of existing buildings | Ari Kamo | special |
| 08/20/2026 | Concrete - Cast-In-Place | Ari Kamo | special |
| 08/20/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 08/20/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 08/18/2026 | Interior lighting power | Ari Kamo | energy_progress |
| 08/18/2026 | HVAC-R and service water heating equipment | Ari Kamo | energy_progress |
| 08/18/2026 | Post-installed Anchors | Ari Kamo | special |
| 08/18/2026 | Post-installed Anchors | Ari Kamo | special |
| 08/18/2026 | Post-installed Anchors | Ari Kamo | special |
| 08/18/2026 | HVAC-R and service water heating equipment | Ari Kamo | energy_progress |
| 08/18/2026 | Exterior lighting power | Ari Kamo | energy_progress |
| 08/18/2026 | Shutoff dampers | Ari Kamo | energy_progress |
| 08/18/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 08/18/2026 | Maintenance information | Ari Kamo | energy_progress |
| 08/18/2026 | Lighting controls | Ari Kamo | energy_progress |
| 08/18/2026 | Duct leakage testing, insulation and design | Ari Kamo | energy_progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| JLL | Office | Floor 6 | Project M01430969 |
| MunichRe | Office | Floors 12, 13 | Project M01267321 Project M01127044 Project M00807193 Project M00760018 Project M00760022 Project M00760026 Project M00760001 |
| The Granola Bar | Restaurant / Food Service | Cellar, Ground | Project M01286615 |
| Eton | Retail | Floor 1 | Project M01007995 |
| Gulf International Bank | Office | Floor 37 | Project M00548161 Project M00548191 |