Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsResolution Real Estate Partners16 filings
REMOVAL OF INTERIOR NON-BEARING PARTITIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
18 documents · 2 drawing sheets
Removal and installation of HVAC Ductwork in BAS,1-33 Floors
On file for this project
14 documents · 1 drawing sheet
Infill of existing slab opening, new structural support for MEP openings and equipment as per plans filed herewith.
On file for this project
46 documents · 2 drawing sheets
Latest 3 of 16 filings on this floor.
RoofFil-euroUnder Construction15p · 11 filings · 20 docs
ArchitectureCivilDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
ROOF PROTECTION PROPOSED INSTALLATION OF ROOF PROTECTION AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
On file for this project
4 documents
Filing for Alt 2 -D2 Non Directive - Removal and renovation of non-bearing partitions on 33-34th Floors, 34M and Roof.
On file for this project
4 documents · 3 drawing sheets
Modification to HVAC systems
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 11 filings on this floor.
BulkheadResolution Real Estate Partners9p · 4 filings · 4 docs
ArchitectureCivilFire ProtectionMechanicalPlumbingStructural
Filing for Alt 2 -D2 Non Directive - Removal and renovation of non-bearing partitions on 33-34th Floors, 34M and Roof.
On file for this project
4 documents · 2 drawing sheets
Modification to HVAC systems
On file for this project
6 documents · 2 drawing sheets
Subsequent filing to incorporated (2) additional boilers on roof. Fees paid under main application.
On file for this project
19 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 34Fil-euro14p · 11 filings · 14 docs
ArchitectureDMFire ProtectionGeneralLandscapeMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Filing for Alt 2 -D2 Non Directive - Removal and renovation of non-bearing partitions on 33-34th Floors, 34M and Roof.
On file for this project
4 documents · 2 drawing sheets
Modification to HVAC systems
On file for this project
6 documents · 1 drawing sheet
Filing for Exterior Work as per plans filed herewith.
On file for this project
12 documents · 6 drawing sheets
Latest 3 of 11 filings on this floor.
Floor 33Resolution Real Estate Partners4p · 7 filings
ArchitectureCivilDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Filing for Alt 2 -D2 Non Directive - Removal and renovation of non-bearing partitions on 33-34th Floors, 34M and Roof.
On file for this project
4 documents · 3 drawing sheets
Modification to existing plumbing/sprinkler/standpipe fixtures and systems
On file for this project
24 documents
Filing for Structural modifications and including partial demo as per plans filed herewith
On file for this project
11 documents
Latest 3 of 7 filings on this floor.
Floor 32Fil-euro4p · 8 filings · 12 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Filing for Exterior Work as per plans filed herewith.
On file for this project
12 documents · 3 drawing sheets
REMOVAL OF INTERIOR NON-BEARING PARTITIONS AS PER PLANS FILEDHEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THISAPPLICATION.
On file for this project
10 documents
Existing slab opening infill, framing for new slab openings, approx.125 linear feet of new steel
On file for this project
11 documents
Latest 3 of 8 filings on this floor.
Floor 31Resolution Real Estate Partners6p · 8 filings
ArchitectureCivilDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
REMOVAL OF INTERIOR NON-BEARING PARTITIONS AS PER PLANS FILEDHEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THISAPPLICATION.
On file for this project
10 documents · 5 drawing sheets
Existing slab opening infill, framing for new slab openings, approx.125 linear feet of new steel
On file for this project
11 documents
Project M00441354Permit Issued · 07/01/2021
Modification to existing plumbing systems and fixtures
On file for this project
7 documents
Latest 3 of 8 filings on this floor.
Floor 30Herald Square Properties5p · 4 filings
ArchitectureCivilDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
INSTALLATION OF SINGLE 7000 # CAPACITY PERSONNEL/MATERIAL HOIST DURING BLDG ALTERATION, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
On file for this project
12 documents · 4 drawing sheets
DEMO OF EXISTING SPRINKLER SYSTEMS AND INSTALLATION OF TEMP LOOP SYSTEM
On file for this project
4 documents · 1 drawing sheet
Removal of HVAC and ductwork on 28-34 floors
On file for this project
12 documents
Latest 3 of 4 filings on this floor.
Floor 29Herald Square Properties3p · 4 filings
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
INSTALLATION OF SINGLE 7000 # CAPACITY PERSONNEL/MATERIAL HOIST DURING BLDG ALTERATION, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
On file for this project
12 documents · 2 drawing sheets
DEMO OF EXISTING SPRINKLER SYSTEMS AND INSTALLATION OF TEMP LOOP SYSTEM
On file for this project
4 documents · 1 drawing sheet
Removal of HVAC and ductwork on 28-34 floors
On file for this project
12 documents
Latest 3 of 4 filings on this floor.
Floor 28Herald Square Properties1p · 3 filings
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
DEMO OF EXISTING SPRINKLER SYSTEMS AND INSTALLATION OF TEMP LOOP SYSTEM
On file for this project
4 documents · 1 drawing sheet
Removal of HVAC and ductwork on 28-34 floors
On file for this project
12 documents
Removal of plumbing fixtures on 28-34 floor
On file for this project
4 documents
Floor 27McGraw Hill Education4p · 3 filings
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
DEMO OF EXISTING SPRINKLER SYSTEMS AND INSTALLATION OF TEMP LOOP SYSTEM
On file for this project
3 documents · 1 drawing sheet
Removal of plumbing fixtures on 21-27 floors
On file for this project
4 documents · 1 drawing sheet
Removal of HVAC system and ductwork on 21-27 floors
On file for this project
6 documents · 3 drawing sheets
Floor 26McGraw Hill Education4p · 3 filings
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
DEMO OF EXISTING SPRINKLER SYSTEMS AND INSTALLATION OF TEMP LOOP SYSTEM
On file for this project
3 documents · 1 drawing sheet
Removal of plumbing fixtures on 21-27 floors
On file for this project
4 documents · 1 drawing sheet
Removal of HVAC system and ductwork on 21-27 floors
On file for this project
6 documents · 3 drawing sheets
Floor 25McGraw Hill Education4p · 3 filings
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
DEMO OF EXISTING SPRINKLER SYSTEMS AND INSTALLATION OF TEMP LOOP SYSTEM
On file for this project
3 documents · 1 drawing sheet
Removal of plumbing fixtures on 21-27 floors
On file for this project
4 documents · 1 drawing sheet
Removal of HVAC system and ductwork on 21-27 floors
On file for this project
6 documents · 3 drawing sheets
Floor 24McGraw Hill Education4p · 3 filings
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
DEMO OF EXISTING SPRINKLER SYSTEMS AND INSTALLATION OF TEMP LOOP SYSTEM
On file for this project
3 documents · 1 drawing sheet
Removal of plumbing fixtures on 21-27 floors
On file for this project
4 documents · 1 drawing sheet
Removal of HVAC system and ductwork on 21-27 floors
On file for this project
6 documents · 3 drawing sheets
Floor 23McGraw Hill Education4p · 3 filings
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
DEMO OF EXISTING SPRINKLER SYSTEMS AND INSTALLATION OF TEMP LOOP SYSTEM
On file for this project
3 documents · 1 drawing sheet
Removal of plumbing fixtures on 21-27 floors
On file for this project
4 documents · 1 drawing sheet
Removal of HVAC system and ductwork on 21-27 floors
On file for this project
6 documents · 3 drawing sheets
Floor 22McGraw Hill Education4p · 3 filings
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
DEMO OF EXISTING SPRINKLER SYSTEMS AND INSTALLATION OF TEMP LOOP SYSTEM
On file for this project
3 documents · 1 drawing sheet
Removal of plumbing fixtures on 21-27 floors
On file for this project
4 documents · 1 drawing sheet
Removal of HVAC system and ductwork on 21-27 floors
On file for this project
6 documents · 3 drawing sheets
Floor 21McGraw Hill Education4p · 3 filings
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
DEMO OF EXISTING SPRINKLER SYSTEMS AND INSTALLATION OF TEMP LOOP SYSTEM
On file for this project
3 documents · 1 drawing sheet
Removal of plumbing fixtures on 21-27 floors
On file for this project
4 documents · 1 drawing sheet
Removal of HVAC system and ductwork on 21-27 floors
On file for this project
6 documents · 3 drawing sheets
Floor 20Herald Square Properties3p · 3 filings
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
DEMO OF EXISTING SPRINKLER SYSTEMS AND INSTALLATION OF TEMP LOOP SYSTEM
On file for this project
4 documents · 1 drawing sheet
Removal of plumbing fixtures on 14-20 floors.
On file for this project
4 documents · 1 drawing sheet
Removal of HVAC system and ductwork on 14-20 floors
On file for this project
6 documents · 1 drawing sheet
Floor 19Herald Square Properties3p · 3 filings
ArchitectureCivilDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
DEMO OF EXISTING SPRINKLER SYSTEMS AND INSTALLATION OF TEMP LOOP SYSTEM
On file for this project
4 documents · 1 drawing sheet
Removal of plumbing fixtures on 14-20 floors.
On file for this project
4 documents · 1 drawing sheet
Removal of HVAC system and ductwork on 14-20 floors
On file for this project
6 documents · 1 drawing sheet
Floor 18Herald Square Properties3p · 3 filings
ArchitectureCivilDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
DEMO OF EXISTING SPRINKLER SYSTEMS AND INSTALLATION OF TEMP LOOP SYSTEM
On file for this project
4 documents · 1 drawing sheet
Removal of plumbing fixtures on 14-20 floors.
On file for this project
4 documents · 1 drawing sheet
Removal of HVAC system and ductwork on 14-20 floors
On file for this project
6 documents · 1 drawing sheet
Floor 17Herald Square Properties3p · 3 filings
ArchitectureCivilDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
DEMO OF EXISTING SPRINKLER SYSTEMS AND INSTALLATION OF TEMP LOOP SYSTEM
On file for this project
4 documents · 1 drawing sheet
Removal of plumbing fixtures on 14-20 floors.
On file for this project
4 documents · 1 drawing sheet
Removal of HVAC system and ductwork on 14-20 floors
On file for this project
6 documents · 1 drawing sheet
Floor 16Fil-euro6p · 4 filings · 12 docs
ArchitectureCivilDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Filing for Exterior Work as per plans filed herewith.
On file for this project
12 documents · 3 drawing sheets
DEMO OF EXISTING SPRINKLER SYSTEMS AND INSTALLATION OF TEMP LOOP SYSTEM
On file for this project
4 documents · 1 drawing sheet
Removal of plumbing fixtures on 14-20 floors.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 15Herald Square Properties3p · 3 filings
ArchitectureCivilDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
DEMO OF EXISTING SPRINKLER SYSTEMS AND INSTALLATION OF TEMP LOOP SYSTEM
On file for this project
4 documents · 1 drawing sheet
Removal of plumbing fixtures on 14-20 floors.
On file for this project
4 documents · 1 drawing sheet
Removal of HVAC system and ductwork on 14-20 floors
On file for this project
6 documents · 1 drawing sheet
Floor 14McGraw Hill Education4p · 6 filings
ArchitectureCivilDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
DEMO OF EXISTING SPRINKLER SYSTEMS AND INSTALLATION OF TEMP LOOP SYSTEM
On file for this project
4 documents · 1 drawing sheet
Removal of plumbing fixtures on 14-20 floors.
On file for this project
4 documents · 1 drawing sheet
Removal of HVAC system and ductwork on 14-20 floors
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 13Herald Square Properties3p · 3 filings
ArchitectureCivilDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
DEMO OF EXISTING SPRINKLER SYSTEM AND INSTALLATION OF TEMP LOOP SYSTEM
On file for this project
3 documents · 1 drawing sheet
Removal of HVAC system and ductwork on 7-13 floors
On file for this project
6 documents · 1 drawing sheet
Removal of plumbing fixtures on 7-13 floors
On file for this project
4 documents · 1 drawing sheet
Floor 12Herald Square Properties3p · 3 filings
ArchitectureCivilDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
DEMO OF EXISTING SPRINKLER SYSTEM AND INSTALLATION OF TEMP LOOP SYSTEM
On file for this project
3 documents · 1 drawing sheet
Removal of HVAC system and ductwork on 7-13 floors
On file for this project
6 documents · 1 drawing sheet
Removal of plumbing fixtures on 7-13 floors
On file for this project
4 documents · 1 drawing sheet
Floor 11Fil-euro6p · 4 filings · 12 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Filing for Exterior Work as per plans filed herewith.
On file for this project
12 documents · 3 drawing sheets
DEMO OF EXISTING SPRINKLER SYSTEM AND INSTALLATION OF TEMP LOOP SYSTEM
On file for this project
3 documents · 1 drawing sheet
Removal of HVAC system and ductwork on 7-13 floors
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 10Herald Square Properties3p · 3 filings
ArchitectureCivilDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
DEMO OF EXISTING SPRINKLER SYSTEM AND INSTALLATION OF TEMP LOOP SYSTEM
On file for this project
3 documents · 1 drawing sheet
Removal of HVAC system and ductwork on 7-13 floors
On file for this project
6 documents · 1 drawing sheet
Removal of plumbing fixtures on 7-13 floors
On file for this project
4 documents · 1 drawing sheet
Floor 9Deco Tower Associates5p · 7 filings
ArchitectureCivilDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Existing slab opening infill, framing for new slab openings, approx.125 linear feet of new steel
On file for this project
12 documents
REMOVAL OF INTERIOR NON-BEARING PARTITIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
6 documents · 1 drawing sheet
INSTALLATION OF SINGLE 7000 # CAPACITY PERSONNEL/MATERIAL HOIST DURING BLDG ALTERATION, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
On file for this project
12 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 8Deco Tower Associates7p · 6 filings
ArchitectureCivilDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Existing slab opening infill, framing for new slab openings, approx.125 linear feet of new steel
On file for this project
12 documents
REMOVAL OF INTERIOR NON-BEARING PARTITIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
6 documents · 3 drawing sheets
Modification to existing plumbing fixtures on 8-9 floors
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 7Fil-euro5p · 7 filings · 12 docs
ArchitectureCivilDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Filing for Exterior Work as per plans filed herewith.
On file for this project
12 documents · 2 drawing sheets
Existing slab opening infill, framing for new slab openings, approx.125 linear feet of new steel
On file for this project
11 documents
Project M00441354Permit Issued · 07/01/2021
Modification to existing plumbing systems and fixtures
On file for this project
7 documents
Latest 3 of 7 filings on this floor.
Floor 6Herald Square Properties3p · 6 filings
ArchitectureCivilDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Existing slab opening infill, framing for new slab openings, approx.125 linear feet of new steel
On file for this project
11 documents
Project M00441354Permit Issued · 07/01/2021
Modification to existing plumbing systems and fixtures
On file for this project
7 documents
Project M00441340Permit Issued · 05/19/2021
Removal of HVAC Ductwork on 6-7, 31-32 floors.
Latest 3 of 6 filings on this floor.
Floor 5Herald Square Properties3p · 3 filings
ArchitectureCivilDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
DEMO OF EXISTING SPRINKLER SYSTEMS & INSTALLATION OF TEMP LOOP SYSTEM
On file for this project
3 documents · 1 drawing sheet
Modification to existing Mechanical system
On file for this project
7 documents · 1 drawing sheet
Demo of plumbing fixtures on 002-006
On file for this project
4 documents · 1 drawing sheet
Floor 4Herald Square Properties3p · 3 filings
ArchitectureCivilDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
DEMO OF EXISTING SPRINKLER SYSTEMS & INSTALLATION OF TEMP LOOP SYSTEM
On file for this project
3 documents · 1 drawing sheet
Modification to existing Mechanical system
On file for this project
7 documents · 1 drawing sheet
Demo of plumbing fixtures on 002-006
On file for this project
4 documents · 1 drawing sheet
Floor 3Herald Square Properties3p · 3 filings
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
DEMO OF EXISTING SPRINKLER SYSTEMS & INSTALLATION OF TEMP LOOP SYSTEM
On file for this project
3 documents · 1 drawing sheet
Modification to existing Mechanical system
On file for this project
7 documents · 1 drawing sheet
Demo of plumbing fixtures on 002-006
On file for this project
4 documents · 1 drawing sheet
Floor 2Fil-euro4p · 4 filings · 12 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Filing for Exterior Work as per plans filed herewith.
On file for this project
12 documents · 1 drawing sheet
DEMO OF EXISTING SPRINKLER SYSTEMS & INSTALLATION OF TEMP LOOP SYSTEM
On file for this project
3 documents · 1 drawing sheet
Modification to existing Mechanical system
On file for this project
7 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 1Deco Tower Associates6p · 7 filings · 13 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sidewalk Shed · Sprinklers · Standpipe · Structural
INSTALLATION OF SIDEWALK SHED FOR PEDESTRIAN SAFETY DURING CONSTRUCTION. SIDEWALK SHED SHALL COMPLY WITH NYCC 2014 CHAPTER 33 . NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
4 documents
Installation of sprinkler temp loop as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
4 documents · 1 drawing sheet
Modification to existing Sprinkler Systems on 1st Floor (Temporary Tenant Entrance)
On file for this project
5 documents
Latest 3 of 7 filings on this floor.
MezzanineResolution Real Estate Partners1p · 2 filings · 10 docs
ArchitectureMechanical
Issued Permit Scope
General Construction · Mechanical Systems
Filing for Alt 2 -D2 Non Directive - Removal and renovation of non-bearing partitions on 33-34th Floors, 34M and Roof.
On file for this project
4 documents · 1 drawing sheet
Modification to HVAC systems
On file for this project
6 documents
CellarTemporary crash deck installationUnder Construction2 filings · 2 docs
ArchitectureCivilGeneralMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Supported Scaffold
INSTALLATION OF TEMPORARY CRASH DECK AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY
On file for this project
2 documents
PIPE SCAFFOLD PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
On file for this project
6 documents
BasementResolution Real Estate Partners5p · 3 filings
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Installation of Emergency Generator and related Fuel Storage as per plans filed herewith.
On file for this project
8 documents · 3 drawing sheets
Removal and renovation of interior partitions related to Emergency Generator & Fuel Storage filing as per plans filed herewith.
On file for this project
7 documents · 1 drawing sheet
INSTALLATION OF THE GENERATOR EXHAUST FLUE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
7 documents · 1 drawing sheet
Sub-BasementResolution Real Estate Partners3 filings
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Installation of Emergency Generator and related Fuel Storage as per plans filed herewith.
On file for this project
8 documents
Removal and renovation of interior partitions related to Emergency Generator & Fuel Storage filing as per plans filed herewith.
On file for this project
7 documents
INSTALLATION OF THE GENERATOR EXHAUST FLUE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
7 documents
Site & exteriorPort Authority Bus Terminal, Fil-euroUnder Construction9 filings · 20 docs
ArchitectureCivilElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · General Construction · Protection and Mechanical Methods · Sidewalk Shed · Supported Scaffold
SIDEWALK SHED PROPOSED INSTALLATION OF SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
On file for this project
4 documents · 4 drawing sheets
INSTALLATION OF TEMPORARY SIDEWALK SHED & PLYWOOD FENCE &BARRIER AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY
On file for this project
2 documents · 3 drawing sheets
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
2 documents · 3 drawing sheets
Latest 3 of 9 filings on this floor.
Filed — no permit issuedResolution Real Estate Partners4 filings · 19 docs
ArchitectureGeneralStructuralOther
No filed description on record for this project.
On file for this project
5 documents · 12 drawing sheets
Repairs to steel supporting facade as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
4 documents · 12 drawing sheets
Filing for Exterior Work as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
10 documents · 9 drawing sheets
Latest 3 of 4 filings on this floor.