← Back
BuildNYC
Elevator apt, fireproof without stores
Hope Gardens
330 WILSON AVENUE · BIN 3076116
💬 Discuss this project
1982Year Built
14Stories
D3Building Class
R7-2Zoning
112,500 sfGross Floor Area
130Units
LL97 CoveredRent Stabilized2 Active Violations 6 likely answered 2 old, status unconfirmed ▸FISP: SWARMPFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: Hope Gardens 1 · 46,500 sf lot · 2.42 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofExterior RestorationUnder Construction1p · 2 filings · 8 docs
Floor 1Sprint site antenna and equipment removal2 filings · 7 docs
Site & exteriorProposed heavy duty sidewalk shedUnder Construction17p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority2403/21/2026
Pennrose810/13/2026
Hope Gardens 1203/22/2026
Hope Gardens Senior Center103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Always Fast Services107/08/2026
Lingineering Consulting108/06/2025
Grant112/16/2022
Mohammad Ahead, PE212/11/2019
Scalar Architecture110/29/2019
Matthew Rezkallo, Architect108/06/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Green Studio403/21/2026
AE Design Solution203/21/2026
Construction Permit Services103/21/2026
Quick Filing of NY103/21/2026
Quick Filing103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Rock Group NYScaffold807/08/2026
J-J PlumbingGeneral Contractor403/22/2026
Watch Hill Wireless SoluGeneral Contractor303/21/2026
Sasco BuildersScaffold209/23/2026
Procida ConstructionScaffold107/08/2026
Sasco BuildersGeneral Contractor107/14/2026
Gary ElectricElectrical103/21/2026
Approved ElectricElectrical103/21/2026
Pappas & Fodera Elect'lElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Lingineering Consulting E5666108/06/2025
Grant Engineering Consulting3512112/16/2022
Building Lifecycle
All (113)Filed (8)Permit Issued (11)Signed Off (2)Facade (FISP) (15)Violation (60)Objection (12)Special Inspection (5)
09/22/2026
Permit issued — Sidewalk Shed
B01423005-I1-SH
08/31/2026
Permit issued — Suspended Scaffold
B01424318-I1-SC
07/13/2026
Permit issued — Structural
B01232710-I1-ST
07/10/2026
Permit issued — Suspended Scaffold
B01424318-I1-SC
07/08/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01423005-I1
07/08/2026
Permit issued — Sidewalk Shed
B01423005-I1-SH
06/30/2026
Filed — Alteration
INSTALLATION OF OUTRIGGERS FOR THE FACADE REPAIR WORK AS PER THE SUBMITTED PLAN
B01424318-I1
05/18/2026
Violation issued (HPD, closed)
B
05/18/2026
Violation issued (HPD, closed)
C
03/09/2026
Violation issued (ECB, closed)
Elevators
03/09/2026
Violation issued (ECB, closed)
Elevators
12/19/2025
Violation issued (FDNY_ORDER, closed)
12/19/2025
Violation issued (FDNY_ORDER, closed)
12/19/2025
Violation issued (FDNY_ORDER, closed)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/18/2025
Violation issued (HPD, closed)
C
09/23/2025
Violation issued (HPD, closed)
A
09/23/2025
Violation issued (HPD, closed)
B
09/23/2025
Violation issued (HPD, closed)
C
09/22/2025
Objection resolved — Addressed
09/22/2025
Objection resolved — Addressed
09/22/2025
Objection resolved — Addressed
09/22/2025
Objection resolved — Addressed
09/22/2025
Objection resolved — Addressed
08/28/2025
Objection raised — Scope
08/28/2025
Objection raised — Scope
08/28/2025
Objection raised — Cost
08/28/2025
Objection raised — Structural
08/28/2025
Objection raised — Admin
08/06/2025
Filed — Alteration
Lintel Replacement/Refurbishment, Sill replacement/Capping, Masonry repointing, Selective brick replacement, Concrete Patching. Install new/ reinstall loose thru-wall ac cover, and sealant replacement. site safety measures to be provided as required.
B01232710-I1
05/28/2025
Special inspection requirement — Masonry
Chingyuan Lin
05/28/2025
Special inspection requirement — Concrete - Cast-In-Place
Chingyuan Lin
05/28/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Chingyuan Lin
05/28/2025
Special inspection requirement — Tenant Protection Plan Compliance
Chingyuan Lin
05/28/2025
Special inspection requirement — Final
Chingyuan Lin
06/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/10/2024
Violation issued (HPD, closed)
C
04/30/2024
Violation issued (HPD, closed)
C
04/30/2024
Violation issued (HPD, closed)
B
04/30/2024
Violation issued (HPD, closed)
C
04/23/2024
Violation issued (HPD, closed)
C
04/23/2024
Violation issued (HPD, closed)
C
10/24/2023
Signed off — Alteration
Decommission of existing Sprint site. Remove 10 antennas and equipment from the roof. Service connection on ground floor. Initial installation approved under application #302233410
B08035627-I1
10/16/2023
Cycle 9 facade report signed — SWARMP
08/31/2023
Violation issued (HPD, closed)
C
08/31/2023
Violation issued (HPD, closed)
C
08/31/2023
Violation issued (HPD, closed)
C
08/31/2023
Violation issued (HPD, closed)
C
08/21/2023
Cycle 9 facade report submitted
08/18/2023
Cycle 9 facade inspection completed
08/11/2023
Violation issued (HPD, closed)
C
08/11/2023
Violation issued (HPD, closed)
C
08/11/2023
Violation issued (HPD, closed)
C
08/04/2023
Violation issued (HPD, closed)
C
08/04/2023
Violation issued (HPD, closed)
C
08/04/2023
Violation issued (HPD, closed)
C
08/04/2023
Violation issued (HPD, closed)
C
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 113 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedSasco Builders09/22/2026
DOB NOWSuspended ScaffoldPermit IssuedSasco Builders08/31/2026
DOB NOWStructuralPermit IssuedSasco Builders07/13/2026
DOB NOWSuspended ScaffoldPermit IssuedSasco Builders07/10/2026
DOB NOWSidewalk ShedPermit IssuedSasco Builders07/08/2026
DOB NOWAntennaSigned-offWatch Hill Wireless Solu01/09/2023
DOB NOWSidewalk ShedPermit IssuedRock Group NY10/02/2020
DOB NOWSupported ScaffoldPermit IssuedRock Group NY09/25/2020
DOB NOWSupported ScaffoldPermit IssuedRock Group NY12/12/2019
DOB NOWSidewalk ShedPermit IssuedRock Group NY11/21/2019
DOB NOWConstruction FenceSigned-offProcida Construction10/30/2019
BISMHISSUEDProcida Construction12/28/2021
BISOTISSUEDProcida Construction12/28/2021
BISPLISSUEDJ-J Plumbing08/26/2021
BISBLISSUEDJ-J Plumbing02/11/2021
BISOTISSUEDProcida Construction12/11/2020
BISMHISSUEDProcida Construction12/11/2020
BISMHISSUEDProcida Construction05/05/2020
BISOTISSUEDProcida Construction05/05/2020
BISPLISSUEDJ-J Plumbing01/08/2020
BISSPISSUEDJ-J Plumbing01/08/2020
BISPLISSUEDBelco Associates09/07/2018
BISFPISSUEDAllied Fire Control Services05/03/2018
BISEQISSUEDS & N Builders08/30/2017
BISPLISSUEDBelco Associates07/24/2017
BISOTISSUEDS & N Builders06/08/2017
BISEQISSUEDS & N Builders06/02/2017
BISEQISSUEDS & N Builders06/02/2017
BISPLISSUEDBelco Associates07/28/2016
BISEQISSUEDS & N Builders07/26/2016
BISEQISSUEDS & N Builders07/18/2016
BISEQISSUEDS & N Builders07/31/2015
BISEQISSUEDS & N Builders07/15/2015
BISFPISSUEDAllied Fire Control Services07/02/2015
BISOTISSUEDVertical Solutions01/06/2014
BISOTISSUEDSba Communications Group11/05/2007
BISPLISSUEDMcKibbin Quality Plumbing02/15/1996
BISMHISSUEDMcKibbin Quality Plumbing02/15/1996
BISOTISSUEDMcKibbin Quality Plumbing02/15/1996
BISEQISSUEDAllstate Specialty Service06/06/1991
5 projects · most recent 07/03/2026
General Wiring
FiledStatusContractorScope
07/03/2026Permit IssuedRichard Neu—
03/22/2021Permit IssuedMonte Electric Co—
04/08/2020Permit IssuedRamdeen's Electric ContractingGeneral Wiring
04/08/2020Permit IssuedRamdeen's Electric ContractingGeneral Wiring
11/18/2019CompleteIlluminous Electric—
1 project · most recent 08/06/2025
Concrete Masonry
FiledStatusContractorScope
08/06/2025Permit IssuedSasco BuildersConcrete, Masonry
1 project · most recent 06/30/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
06/30/2026Permit IssuedSasco BuildersSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/28/2025MasonryChingyuan Linspecial
05/28/2025Concrete - Cast-In-PlaceChingyuan Linspecial
05/28/2025Structural Stability – Alterations of existing buildingsChingyuan Linspecial
05/28/2025Tenant Protection Plan ComplianceChingyuan Linspecial
05/28/2025FinalChingyuan Linprogress
▾Documents — 313 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch4
08/21/2026B01232710-I1Request digital key ↗
08/16/2026B01424318-I1Request digital key ↗
08/16/2026B01423005-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
09/02/2026B00138463-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00248971-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00266452-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/02/2026B00279717-I1Request digital key ↗
▸Applications & Permits64
▸BISPLAN / WORK APPROVAL APPLICATION46
11/02/2022321204834Open ↗
07/26/2022321204834Open ↗
02/16/2022322060121Open ↗
Showing 3 of 46 on file for this type
▸BISWORK PERMIT APPLICATION18
02/11/2021322060648Open ↗
01/09/2020322060121Open ↗
01/09/2020322060121Open ↗
Showing 3 of 18 on file for this type
▸Seals & Professional Certifications44
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION23
12/17/2019322060121Open ↗
12/17/2019322060121Open ↗
06/28/2019322060121Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/02/2026B00138463-I1Open ↗
08/21/2026B01232710-I1Open ↗
08/16/2026B01423005-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
08/29/2017340537994Open ↗
Showing 1 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
08/29/2017340537994Open ↗
Showing 1 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
08/29/2017340537994Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026B01232710-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/25/2026B01232710-I1Open ↗
▸Trade Schedules & Equipment30
▸BISSCHEDULE B - PLUMBING18
02/16/2022322060121Open ↗
02/15/2022322060121Open ↗
02/14/2022322060121Open ↗
Showing 3 of 18 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
06/17/2019322060121Open ↗
06/17/2019322060121Open ↗
Showing 2 of 3 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT2
06/08/2022322060648Open ↗
05/02/2022322060121Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS2
06/08/2022322060648Open ↗
05/02/2022322060121Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
04/29/2019322060648Open ↗
01/15/2019322060648Open ↗
▸BISHEATING SYSTEMS1
06/08/2022322060648Open ↗
▸BISEQUIPMENT USE PERMITS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection8
▸BISTenant Protection Plan and Notes5
06/21/2019322060121Open ↗
04/26/2019322060648Open ↗
01/15/2019322060648Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTenant Protection Plan3
08/13/2026B00248971-I1Open ↗
08/13/2026B00266452-I1Open ↗
08/13/2026B00279717-I1Open ↗
▸Environmental & Asbestos12
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
02/11/2021322060648Open ↗
08/15/2018340340544Open ↗
08/29/2017340537994Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/21/2026B01232710-I1Open ↗
08/13/2026B08035627-I1Open ↗
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU1888BK191
05/10/2022322060121Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance31
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS11
12/17/2019322060121Open ↗
12/17/2019322060121Open ↗
06/28/2019322060121Open ↗
Showing 3 of 11 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
06/08/2022322060648Open ↗
05/02/2022322060121Open ↗
▸BIS* HVAC INSULATION AND SEALING2
06/08/2022322060648Open ↗
05/02/2022322060121Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
02/11/2021322060648Open ↗
Showing 1 of 2 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
04/30/2021302233410Open ↗
08/15/2018340340544Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
06/08/2022322060648Open ↗
05/02/2022322060121Open ↗
▸BISFENESTRATION AREAS1
05/02/2022322060121Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISELECTRICAL ENERGY CONSUMPTION1
05/02/2022322060121Open ↗
▸BISEXTERIOR LIGHTING POWER1
05/02/2022322060121Open ↗
▸BISFENESTRATION AIR LEAKAGE1
05/02/2022322060121Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
05/02/2022322060121Open ↗
▸BISINTERIOR LIGHTING POWER1
05/02/2022322060121Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
05/02/2022322060121Open ↗
▸BISNYCECC ANALYSIS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports22
▸BISTECHNICAL REPORT: RESPONSIBILITY10
04/30/2021302233410Open ↗
04/30/2021302233410Open ↗
02/11/2021322060648Open ↗
Showing 3 of 10 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)4
08/29/2017340537994Open ↗
Showing 1 of 4 on file for this type
▸BISMECHANICAL SYSTEMS2
06/08/2022322060648Open ↗
05/02/2022322060121Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
06/08/2022322060648Open ↗
05/02/2022322060121Open ↗
▸BISHIGH TEMPERATURE HOT WATER PIPING (WELDING)1
06/08/2022322060648Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
05/02/2022322060121Open ↗
▸BISMECHANICAL DEMOLITION1
06/08/2022322060648Open ↗
▸BISMASONRY1
05/02/2022322060121Open ↗
▸Approvals, Objections & Sign-offs24
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
06/15/2022322060648Open ↗
05/10/2022322060121Open ↗
04/30/2021302233410Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
09/02/2026B00138463-I1Open ↗
08/16/2026B01423005-I1Open ↗
08/13/2026B00248971-I1Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)3
08/13/2026B00248971-I1Open ↗
08/13/2026B00266452-I1Open ↗
08/13/2026B00279717-I1Open ↗
▸BISSHED LETTER2
06/07/2017340280261Open ↗
Showing 1 of 2 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
06/28/2019322060121Open ↗
Showing 1 of 2 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
06/26/2019322060121Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026B00248971-I1Open ↗
▸Cost, Insurance & Ownership20
▸BISCOST AFFIDAVIT18
04/30/2021302233410Open ↗
06/28/2019322060121Open ↗
06/28/2019322060121Open ↗
Showing 3 of 18 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
06/14/2022322060648Open ↗
05/03/2022322060121Open ↗
▸Filing & Intake Forms33
▸BISADDITIONAL INFORMATION17
10/13/2021322060121Open ↗
10/13/2021322060121Open ↗
03/02/2021322060121Open ↗
Showing 3 of 17 on file for this type
▸BISEFILING COVER SHEET8
06/17/2019322060121Open ↗
06/17/2019322060121Open ↗
01/15/2019322060648Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM4
08/15/2018340340544Open ↗
12/14/2017340280261Open ↗
11/29/2017340284846Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
08/29/2017340537994Open ↗
Showing 1 of 4 on file for this type
▸Other Documents12
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
12/17/2019322060121Open ↗
12/17/2019322060121Open ↗
12/17/2019322060121Open ↗
Showing 3 of 4 on file for this type
▸BISSHUTOFF DAMPERS2
06/08/2022322060648Open ↗
05/02/2022322060121Open ↗
▸BISFEE EXEMPTION DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCHIMNEYS1
06/08/2022322060648Open ↗
▸DOB NOWManufacturer's Specifications1
08/16/2026B01424318-I1Open ↗
▸DOB NOWCalculations1
08/16/2026B01424318-I1Open ↗
▸DOB NOWAlternate Plan 11
09/02/2026B00138463-I1Open ↗