ECB09/15/2026Failure to comply with the commissioner's order to file a certificate of correction with the dept. Of buildings for violation #39139865Z, file a certificate of correction$1K due
ECB09/15/2026Failure to comply with the commissioner's orders to file a certificate of correction with the dept of buildings for vio# 39103679K, file a certificate of correction$1K due
ECB08/27/20261 rcny-104-20(k)-certificate of fitness-at the time of inspection i observed workers denis carrillos and hector d punina using/working on suspended scaffold -upon asking workers for certificate of fitness issue$2K due
ECB08/27/2026At the time of my inspection i observed storage/work zone at exp#1 ,observed chute installed from sidewalk shed to street exp#1-upon reviewing site safety plan it was not specified/shown on ssp as required-stop$1K due
ECB08/27/2026At the time of my inspection i observed worker denis carrillos -using/working on suspended scaffold -upon asking worker for suspended scaffold training card-none was provided/available at the time of inspection$1K due
ECB08/27/2026Observed suspended scaffold installed and in use at exp#1,2,3-upon checking approved plans for installation of tiebacks/lifelines-attached lines to double wrapped wire rope with shackle shall have 2 jbolts on e$1K due
ECB08/27/2026Upon asking foreman /qssp for pre shift meeting-,orientation log book,daily maintenance log books for supported/suspended scaffolds/sws, (last done 8/19/26)pre/post installation letters for suspended scaffold,$1K due
ECB10/03/2025Failure to comply with commissioner's order to file a certificate of correction with department of building for summons 39139862N., file a certificate of correction$6K due
ECB10/03/2025Failure to comply with commissioner's order to file a certificate of correction with department of building for summons 39139858K., file a certificate of correction$6K due
ECB10/03/2025Failure to comply with commissioner's order to file a certificate of correction with department of building for summons 39139865Z., file a certificate of correction$6K due
ECB02/27/2025Dept records reveal no inspections or tests on the new or altered plumbing system consisting of water,waste,vent and gas piping in apt 3J were performed or filed for pc*107.4.1 & the fgc, perform test$2K due
ECB02/21/2025Unsafe unsuitable electrical wiring obseved in apt 3J consisting of connecting wires from 2 bx cables without a 1900 box the wires were left exposed creating a risk for shock & or fire, comply with ec$2K due
ECB02/21/2025Respondent facilitated unlicensed electrical work to take place in apt 3J. Power lighting and switching installed by workers with unknown qualifications ec 27-3017**no person shall cause**, comply with ec code$5K due
DOB02/19/2025Cycle 9C unsafe report filed
DOB02/22/2024Failed to file FISP cycle 9C technical report by 2/21/2024
HPD01/22/2024§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SOUTH 1 AND SOUTH 2 WINDOW FRAME AT SOUTH WALL.. IN THE 2nd ROOM FROM NORTH LOCATED AT APT 6A, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST
HPD01/22/2024§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 6A, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST
HPD01/22/2024§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 6A, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST
DOB11/22/2023Failure to certify correction on immediately hazardous (class 1) ECB violationIssued 2023; DOB's record still lists it as active
ECB07/28/2023Replace worn gibs where needed. Secure gibs where needed. Inoperative pit light. Misaligned cab miror. Machine room ventilation by passed. Main line can be opened when power on.$625 due
ECB07/28/2023Cease use item: right brake pad not lifting rendering disc brake monitor inoperative. 125% brake test and seal required for reinspection as per 8.6.4.20.4 class 2 items: replace worn gibs where needed. Secure g$1K due
ECB10/03/2025Failure to comply with commissioner's order to file a certificate of correction with department of building for summons 39103679K., file a certificate of correctionNothing owed — awaiting certificate of correction
ECB01/18/2024Failure to maintain building walls. Observed water from exterior of building causing interior damage to walls and ceiling in apt#6A. Paint bubbling and bricks are cracked., maintain exterior building wallNothing owed — awaiting certificate of correction
ECB05/10/2017Altered/changed bldg occupied w/o a valid certificate of occupancy as per BC28-118.3.2OBSERVED occupied bldg w/residential apts and music equipment store w/expired cert of occupancy.cert#301092706T028 expd 7/15Nothing owed — awaiting certificate of correction
Old · issued 3+ years ago and still listed by DOB; nothing on the city's records either way
DOB04/30/2019Failed to file FISP cycle 8C technical report by 02/21/2019Issued 2019; DOB's record still lists it as active
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 24,250 sf lot · 4.95 FAR built · Flood zone X