← Back
Special Inspection Agency
CALIBER CONTROL INSPECTIO
Special Inspection Agency
7 projects with open permitsBROOKLYN · 20QUEENS · 10MANHATTAN · 6
34 buildings
56
Total Filings
40
Projects on File
34
Buildings Worked
7
Projects w/ Open Permits
Special Inspection Agency
Primary Trade
Activity
Projects by first filing month40 projects all-time
0257Nov '18 · 1Sep '19 · 1Oct '19 · 1Nov '19 · 1Dec '19 · 3Jan '20 · 3Feb '20 · 6Mar '20 · 4Apr '20 · 2May '20 · 4Jun '20 · 2Jul '20 · 3Aug '20 · 1Sep '20 · 1Oct '20 · 1Nov '20 · 5Dec '20 · 1Nov '18Feb '19May '19Aug '19Nov '19Feb '20May '20Aug '20Nov '20Dec '20
bars = month · line = 3-mo average
Portfolio status
Browse projects →
Open permit718%
Signed off3178%
Filed only25%
By project type
Alteration40
Most active buildings
All buildings →
462 BROADWAYMANHATTAN · latest 07/14/2020
2 projects
38 WEST 9 STREETMANHATTAN · latest 06/24/2022
2 projects
16 GRACE COURT ALLEYBROOKLYN · 1 open · latest 11/15/2022
2 projects
286 DEGRAW STREETBROOKLYN · latest 11/10/2020
2 projects
252 PRESIDENT STREETBROOKLYN · latest 03/06/2023
2 projects
282 GARFIELD PLACEBROOKLYN · latest 10/10/2022
2 projects
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
Q00265033 ↗116-16 130 STREET
QUEENS
AlterationPermit Issued02/19/202012/19/2025@CELLAR REMOVE PROPOSED WASHER & DRYER AND DRYER VENT FROM DOB NOW JOB # Q00265033-I1, NO PHYSICAL WORK TO BE PERFORMED
B00330693 ↗252 PRESIDENT STREET
BROOKLYN
AlterationSigned-off05/11/202003/06/2023
Contractor AMOK INC
PLUMBING AND SPRINKLER WORK IN CONJUNCTION WITH BIS JOB 321597973. NEW FIXTURES AND ROUGHING THROUGHOUT. NEW SPRINKLER SYSTEM.
B00269316 ↗16 GRACE COURT ALLEY
BROOKLYN
AlterationPermit Issued02/26/202011/15/2022STRUCTURAL WORK IN CONJUCTION WITH ALT-1 #322012932.
B00283400 ↗16 GRACE COURT ALLEY
BROOKLYN
AlterationSigned-off03/02/202010/13/2022
Contractor DONATO, INC
PLUMBING WORK AND FIRE SPRINKLER SYSTEM IN CONJUNCTION WITH ALT-1 #322012932.
B00307880 ↗282 GARFIELD PLACE
BROOKLYN
AlterationSigned-off06/02/202010/10/2022Reframing of interior floors, enlarged masonry openings on rear facade and vertical penthouse addition.
B00342627 ↗282 GARFIELD PLACE
BROOKLYN
AlterationSigned-off06/01/202009/08/2022Herewith filing mechanical work in conjunction with Alt1 #321595074. No change to use, occupancy, egress.
Counts cover all 40 projects (40 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
BAXT INGUI ARCHITECTS607/20/2022
CS ENGINEERING, PC611/10/2020
CHANDA ENGINEERING CONSULTANT PC403/28/2021
ANGELO F. LIARIKOS, ARCHITECT309/29/2020
RJD ENGINEERING LLC308/22/2022
ABS ENGINEERING, PLLC205/07/2020
GT CONSULTING ENGINEERS212/09/2022
JSPECS, INC205/27/2022
TAREK M. ZEID, PE, PLLC210/28/2020
5D ARCHITECTURE & ENGINEERING PLLC.107/25/2020
A&D ENGINEERING, PLLC106/16/2022
ASR ENGINEERING PC103/28/2021
BLUE SKY DESIGN, INC.109/08/2022
CHOSHIELDS STUDIO101/20/2021
D'HUY ENGINEERING, INC.105/18/2021
HRM ENGINEERING SERVICES, PC102/03/2020
JMV ARCHITECT, PLLC112/10/2020
PRUDIGM ENGINEERING LLC102/21/2020
ROSENBAUM DESIGN GROUP101/08/2020
TYLin108/25/2020
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
OCS BUILDERS GROUP LLC407/12/2020
BLACK SQUARE BUILDERS COR209/08/2022
HUNZA GC CORPORATION202/21/2020
L.J.S. PIPING AND HEATING203/28/2021
AMOK INC112/09/2022
AQUEDUCT MECHANICAL CORP112/26/2019
AUSTIN PLBG & HTG CO.INC103/28/2021
BENT MECHANICAL CORP101/27/2022
DONATO PLUMBING, INC107/15/2022
DONATO, INC108/22/2022
F-INT LLC101/28/2020
FIRE SPRINKLER ASSOC INC102/03/2020
FIVE STAR P AND H CO, INC110/28/2020
GENESIS PLBG AND HTG CORP106/10/2021
GO PRO FIRE PROTECTION C110/04/2021
GREEN AGE RENOVATIONS LLC108/25/2020
HIGHLAND PLUMBING LLC103/28/2021
ICE AGE MECHANICAL CORP112/10/2020
JABBIE INDUSTRIES INCORP*107/25/2020
JVS RESTORATION INC110/24/2019
KATAN P & H INC101/20/2021
KG SPRINKLER CORP108/22/2022
MACRO CONSTRUCTION INC111/01/2021
NEW AMSTERDAM PLBG & HTG110/04/2021
PASQUALE QUARATINO INC109/29/2020
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
MERINGOFF PROPERTIES, INC.205/07/2020
RED BRICK PROPERTIES209/08/2022
154-17 15 AVENUE WHITESTONE INC110/28/2020
BANLED ASSOCIATES LLC105/09/2020
GLOWBEX INC.105/27/2022
MIDDLE VILLAGE ASSOCIATE, LLC107/09/2020
PARISI BAY STREET LLC110/24/2019
PARK TYSEN ASSOCIATES LLC107/12/2020
PERGAMENT MALL OF SI, LLC101/08/2020
SAWYER ö BERSON111/01/2021
Sheradel Associates, LP111/10/2020
THE STOP AND SHOP SUPERMARKET COMPA112/28/2019
TICKET BUSTERS INC.105/27/2022
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
HAOTIAN & ASSOCIATES INC.103/28/2021
JM ZONING, LLC.107/15/2022
TICKET BUSTERS, INC.105/27/2022
40 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 40Open permit 7Signed off 31Filed only 2
40 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
Q00265033 ↗116-16 130 STREET
QUEENS
AlterationPermit Issued02/19/202012/19/2025@CELLAR REMOVE PROPOSED WASHER & DRYER AND DRYER VENT FROM DOB NOW JOB # Q00265033-I1, NO PHYSICAL WORK TO BE PERFORMED
B00330693 ↗252 PRESIDENT STREET
BROOKLYN
AlterationSigned-off05/11/202003/06/2023
Contractor AMOK INC
PLUMBING AND SPRINKLER WORK IN CONJUNCTION WITH BIS JOB 321597973. NEW FIXTURES AND ROUGHING THROUGHOUT. NEW SPRINKLER SYSTEM.
B00269316 ↗16 GRACE COURT ALLEY
BROOKLYN
AlterationPermit Issued02/26/202011/15/2022STRUCTURAL WORK IN CONJUCTION WITH ALT-1 #322012932.
B00283400 ↗16 GRACE COURT ALLEY
BROOKLYN
AlterationSigned-off03/02/202010/13/2022
Contractor DONATO, INC
PLUMBING WORK AND FIRE SPRINKLER SYSTEM IN CONJUNCTION WITH ALT-1 #322012932.
B00307880 ↗282 GARFIELD PLACE
BROOKLYN
AlterationSigned-off06/02/202010/10/2022Reframing of interior floors, enlarged masonry openings on rear facade and vertical penthouse addition.
B00342627 ↗282 GARFIELD PLACE
BROOKLYN
AlterationSigned-off06/01/202009/08/2022Herewith filing mechanical work in conjunction with Alt1 #321595074. No change to use, occupancy, egress.
M00381288 ↗38 WEST 9 STREET
MANHATTAN
AlterationSigned-off11/13/202006/24/2022This Alteration Type II application is being filed for the combination of apartments 5D & 5E. There are no change in use, egress or occupanc…
B00423379 ↗48 SIDNEY PLACE
BROOKLYN
AlterationSigned-off11/09/202001/20/2022PLUMBING AND SPRINKLER WORK IN CONJUNCTION WITH ALT-2 #340757014. NEW/RELOCATED PLUMBING FIXTURES AS SHOWN ON PLANS, FIRE SPRINKLER SYSTEM T…
M00349625 ↗12 WEST 72 STREET
MANHATTAN
AlterationSigned-off08/03/202012/03/2021Modification to existing plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.
X00247526 ↗356 SOUNDVIEW AVENUE
BRONX
AlterationSigned-off03/16/202010/29/2021@BSMT, REMOVE& CAP 1 SH, 1 KS W/ ASSOCIATED WATER & WASTE LINE, REMOVE & CAP 1 GAS RANGE W/ ASSOCIATED GAS LINE, INSTALL 1 GAS BOILER & 1 HW…
M00422113 ↗38 WEST 9 STREET
MANHATTAN
AlterationSigned-off11/19/202007/30/2021Combination of 2 existing apartments (5E & 5D) into 1 on the 5th floor. Two new thru wall condenser/compressor units. Two new air handlers a…
B00330700 ↗252 PRESIDENT STREET
BROOKLYN
AlterationSigned-off05/11/202003/17/2021MECHANICAL SYSTEMS IN CONJUNCTION WITH BIS ALT 1 JOB 321597973
B00439334 ↗363 HENRY STREET
BROOKLYN
AlterationPermit Issued12/10/202001/11/2021Proposed installation of ductless electric air conditioners in units 1, 2 & 3, and rooftop heat pump compressors on existing dunnage.
Q00377008 ↗31-06 FARRINGTON STREET
QUEENS
AlterationSigned-off11/10/202011/17/2020Stop & Shop- Installation of new above ceiling exhaust fan with associated ducts. No change in use, egress, occupancy, zoning computation an…
M00403596 ↗142 WEST 95 STREET
MANHATTAN
AlterationFiled — no permit on record11/12/2020——
B00303496 ↗286 DEGRAW STREET
BROOKLYN
AlterationSigned-off04/13/202011/10/2020MECHANICAL WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION FILED UNDER APPLICATION #322022208. NEW ROOFTOP CONDENSERS AND BATHROOM EXHAUST FAN…
B00316035 ↗218 CARROLL STREET
BROOKLYN
AlterationSigned-off10/12/202011/06/2020PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION WORK FILED UNDER JOB #322030459.
Q00347212 ↗163-03 HORACE HARDING EXPWY
QUEENS
AlterationPermit Issued05/09/202010/30/2020INSTALLATION OF NEW HVAC SYSTEM INCLUDING ONE 7.5 TON CONDENSER UNIT, ONE AIR HANDLER UNIT, DUCTWORK ETC.
B00398191 ↗137 JORALEMON STREET
BROOKLYN
AlterationSigned-off09/29/202010/22/2020LEGALIZE EXISTING (1) LAVATORY, (1) WATER CLOSET AND (1) SHOWER.
B00365667 ↗330 WYTHE AVENUE
BROOKLYN
AlterationSigned-off07/22/202009/21/2020
Contractor KATAN P & H INC
Filing for minor PL work associated with interior reno of Apt 5E as per plans submitted herewith. No change to use, egress, or occupancy.
Q00255705 ↗117-07 ROCKAWAY BEACH BLVD
QUEENS
AlterationPermit Issued05/28/202009/08/2020AT 1ST FLOOR LEGALIZE TO REPLACE 1 WB, 1WC, 1 BATH TUB, RELOCATE 1 KS, REMOVE & CAP 2 SH, 2 WC, 2 WB WITH ASSOC. WATER & WASTE LINES TO COM…
S00361875 ↗2795 RICHMOND AVENUE
STATEN ISLAND
AlterationSigned-off07/09/202008/21/2020Stop & Shop - Relocate diffusers and provide a new roof mounted split system for the click and collect area. No change in use, egress, occup…
B00303377 ↗286 DEGRAW STREET
BROOKLYN
AlterationSigned-off04/13/202008/05/2020PLUMBING WORK IN CONJUCTION WITH GENERAL CONSTRUCTION FILED UNDER APPLICATION #322022208.
S00361708 ↗2754 HYLAN BOULEVARD
STATEN ISLAND
AlterationSigned-off07/12/202007/15/2020Stop & Shop - Relocate diffusers and provide a new roof mounted split system. No change in use, egress, occupancy, zoning computation and/o…
M00266778 ↗462 BROADWAY
MANHATTAN
AlterationSigned-off01/28/202007/14/2020
Contractor FINT LLC
INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE ON CELLAR AND FIRST FLOOR. MECHANICAL WORK. NO CHANGE TO USE, OCCUPANCY AND EGRESS.
B00245270 ↗1071 59 STREET
BROOKLYN
AlterationSigned-off12/11/201907/06/2020@CELLAR, REMOVE 3-FIX BATH(1 SH, 1 WB, 1 WC)1KS, 1 STOVE; @001, REMOVE 1 STOVE TO COMPLY WITH ECB VIOLAITON# 35445614Y, 35445615X
B00323326 ↗604 FLATBUSH AVENUE
BROOKLYN
AlterationPermit Issued03/06/202007/01/2020FILING PAA FOR STRUCTURAL DRAWINGS TO REMOVE AND REPLACE DETERIORATED FRONT FACADE (EXPOSURE 1) IN CONJUNCTION WITH APPLICATION B00322905. N…
Q00243004 ↗154-17 CROSS ISLAND PARKWAY
QUEENS
AlterationSigned-off03/13/202006/11/2020PROPOSED WORK ON CELLAR TO REMOVE & CAP SINK, TOILET & LAVATORY. RENOVATION OF EXISTING TOILET & LAVATORY. NEW WASHER AND DRYER. (ELECTRIC…
Q00311575 ↗63-38 SAUNDERS STREET
QUEENS
AlterationSigned-off02/10/202002/28/2020Install angle bracing to temporarily shore front extension west wall. No change in use, occupancy or egress
B00267134 ↗1702 AVENUE Y
BROOKLYN
AlterationSigned-off02/26/202002/27/2020Stop & Shop; Installation of new deli exhaust hood, associated duct and roof mounted exhaust fan. No change in use, egress, occupancy, zonin…
M00272119 ↗462 BROADWAY
MANHATTAN
AlterationSigned-off01/28/202002/26/2020
Contractor MEGA PLBG CORP
INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE ON CELLAR AND FIRST FLOOR. PLUMBING AND SPRINKLER WORK. NO CHANGE TO USE, OCCUPANCY AND EGR…
B00295331 ↗8701 SHORE ROAD
BROOKLYN
AlterationFiled — no permit on record02/21/2020——
B00270478 ↗425 FULTON STREET
BROOKLYN
AlterationSigned-off02/03/202002/14/2020Relocation of (5) existing sprinklers and installation of (11) new heads. No change in use, egress, occupancy, zoning computation and/or squ…
S00258967 ↗2795 RICHMOND AVENUE
STATEN ISLAND
AlterationSigned-off01/08/202001/10/2020Pergament Mall- Building E: Installation of split unit system. No change in use, egress, occupancy, zoning computation and/or square footage…
Q00272674 ↗64-45 MYRTLE AVENUE
QUEENS
AlterationSigned-off12/28/201901/06/2020Stop & Shop; New Exhaust hood, associated duct, and roof mounted exhaust fan for new fryer and oven. No change in use, egress, occupancy, zo…
Q00272741 ↗184-04 MERRICK BOULEVARD
QUEENS
AlterationSigned-off12/16/201901/06/2020Stop & Shop; Installation of new Exhaust hood in Deli, with associated Duct, and roof mounted exhaust fan for new fryer. No change in use, e…
Q00206033 ↗48-23 55TH AVENUE
QUEENS
AlterationPermit Issued10/24/201912/23/2019STRUCTURAL REPAIRS TO DAMAGED MASONRY PIERS INCLUDING THE REQUIRED SHORING. ALL AS PER PLANS FILED HEREWITH.
B00239715 ↗127 CONGRESS STREET
BROOKLYN
AlterationSigned-off11/05/201911/20/2019
Design TYLin
Renovation of the existing foundation and interior framing.
B00196370 ↗147 SENATOR STREET
BROOKLYN
AlterationSigned-off09/04/201909/23/2019REPAIR EXISTING CONCRETE FOUNDATION FOR EXISTING, REAR 1 STORY PORTION OF BUILDING, REINFORCE EXISTING WOOD FLOOR JOISTS AND NEW BUILT-UP-RO…
Q00095150 ↗31-16 38 STREET
QUEENS
AlterationSigned-off11/26/201809/10/2019Installation of sprinklers filed in conjunction with new building.
▾Special Inspection Requirements — 141
DateRequirementBuildingInspectorRole
11/21/2022Fire-Resistant Penetrations and Joints252 PRESIDENT STREETJeffrey Stonesspecial
11/21/2022Mechanical Systems252 PRESIDENT STREETJeffrey Stonesspecial
11/21/2022Final252 PRESIDENT STREETDARRIN KRUMPUSprogress
11/21/2022Maintenance information252 PRESIDENT STREETDARRIN KRUMPUSenergy_progress
11/21/2022HVAC and service water heating equipment 252 PRESIDENT STREETDARRIN KRUMPUSenergy_progress
11/21/2022Permanent certificate252 PRESIDENT STREETDARRIN KRUMPUSenergy_progress
11/21/2022HVAC insulation and sealing 252 PRESIDENT STREETDARRIN KRUMPUSenergy_progress
11/21/2022HVAC and service water heating system controls 252 PRESIDENT STREETDARRIN KRUMPUSenergy_progress
11/21/2022Shutoff dampers252 PRESIDENT STREETDARRIN KRUMPUSenergy_progress
11/21/2022HVAC and service water heating equipment 252 PRESIDENT STREETDARRIN KRUMPUSenergy_progress
11/21/2022Fire-Resistant Penetrations and Joints252 PRESIDENT STREETJeffrey Stonesspecial
11/21/2022Sprinkler Systems252 PRESIDENT STREETJeffrey Stonesspecial
11/21/2022Maintenance information252 PRESIDENT STREETDARRIN KRUMPUSenergy_progress
11/21/2022HVAC and service water heating system controls 252 PRESIDENT STREETDARRIN KRUMPUSenergy_progress
08/22/2022Fire-Resistant Penetrations and Joints16 GRACE COURT ALLEYJeffrey Stonesspecial
08/22/2022Sprinkler Systems16 GRACE COURT ALLEYJeffrey Stonesspecial
08/22/2022HVAC and service water heating equipment 16 GRACE COURT ALLEYJeffrey Stonesenergy_progress
05/06/2022Fire-Resistant Penetrations and Joints16 GRACE COURT ALLEYJeffrey Stonesspecial
05/06/2022Sprinkler Systems16 GRACE COURT ALLEYJeffrey Stonesspecial
05/06/2022HVAC and service water heating equipment 16 GRACE COURT ALLEYJeffrey Stonesenergy_progress
04/11/2022Fire-Resistance Rated Construction282 GARFIELD PLACEJeffrey Stonesprogress
04/11/2022Final282 GARFIELD PLACEJeffrey Stonesprogress
04/11/2022Mechanical Systems282 GARFIELD PLACEJeffrey Stonesspecial
04/11/2022Heating Systems282 GARFIELD PLACEJeffrey Stonesspecial
04/11/2022Fire-Resistant Penetrations and Joints282 GARFIELD PLACEJeffrey Stonesspecial
10/15/2021Fire-Resistant Penetrations and Joints38 WEST 9 STREETJeffrey Stonesspecial
10/12/2021HVAC and service water heating equipment 16 GRACE COURT ALLEYJeffrey Stonesenergy_progress
10/12/2021Sprinkler Systems16 GRACE COURT ALLEYJeffrey Stonesspecial
10/12/2021Fire-Resistant Penetrations and Joints16 GRACE COURT ALLEYJeffrey Stonesspecial
10/06/2021Mechanical Systems286 DEGRAW STREETJeffrey Stonesspecial
10/06/2021Energy Code Compliance Inspections286 DEGRAW STREETJeffrey Stonesprogress
10/06/2021Final286 DEGRAW STREETJeffrey Stonesprogress
10/06/2021Duct leakage testing 286 DEGRAW STREETJeffrey Stonesenergy_progress
10/06/2021HVAC and service water heating equipment 286 DEGRAW STREETJeffrey Stonesenergy_progress
10/06/2021HVAC and service water heating system controls 286 DEGRAW STREETJeffrey Stonesenergy_progress
10/06/2021HVAC insulation and sealing 286 DEGRAW STREETJeffrey Stonesenergy_progress
08/31/2021HVAC insulation and sealing 286 DEGRAW STREETJeffrey Stonesenergy_progress
08/31/2021Fire-Resistant Penetrations and Joints286 DEGRAW STREETJeffrey Stonesspecial
08/31/2021Energy Code Compliance Inspections286 DEGRAW STREETJeffrey Stonesprogress
06/10/2021Fire-Resistant Penetrations and Joints218 CARROLL STREETJeffrey Stonesspecial
06/10/2021HVAC insulation and sealing 218 CARROLL STREETJeffrey Stonesenergy_progress
05/19/2021Fire-Resistant Penetrations and Joints252 PRESIDENT STREETJeffrey Stonesspecial
05/19/2021Sprinkler Systems252 PRESIDENT STREETJeffrey Stonesspecial
05/19/2021HVAC and service water heating equipment 252 PRESIDENT STREETDARRIN KRUMPUSenergy_progress
05/19/2021HVAC and service water heating system controls 252 PRESIDENT STREETDARRIN KRUMPUSenergy_progress
05/19/2021Maintenance information252 PRESIDENT STREETDARRIN KRUMPUSenergy_progress
05/03/2021Fire-Resistant Penetrations and Joints218 CARROLL STREETJeffrey Stonesspecial
05/03/2021HVAC insulation and sealing 218 CARROLL STREETJeffrey Stonesenergy_progress
02/02/2021Fire-Resistant Penetrations and Joints252 PRESIDENT STREETJeffrey Stonesspecial
02/02/2021Sprinkler Systems252 PRESIDENT STREETJeffrey Stonesspecial
Latest 50 of 141.
▾Documents — 479 on file (BIS + DOB NOW)
▸Plans & Drawings98
▸DOB NOWPlans/Sketch - Plumbing34
09/05/2026M00272119-I1 · 462 BROADWAYRequest digital key ↗
09/05/2026M00272119-P2 · 462 BROADWAYRequest digital key ↗
09/05/2026M00272119-P1 · 462 BROADWAYRequest digital key ↗
Showing 3 of 34 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler21
09/05/2026M00272119-I1 · 462 BROADWAYRequest digital key ↗
09/05/2026M00272119-P1 · 462 BROADWAYRequest digital key ↗
09/05/2026M00272119-P2 · 462 BROADWAYRequest digital key ↗
Showing 3 of 21 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems19
09/05/2026M00266778-I1 · 462 BROADWAYRequest digital key ↗
09/04/2026M00422113-P1 · 38 WEST 9 STREETRequest digital key ↗
09/02/2026B00267134-I1 · 1702 AVENUE YRequest digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Structural16
Showing 3 of 16 on file for this type
▸DOB NOWPlans/Sketch - Plumbing Legalization5
09/02/2026B00245270-I1 · 1071 59 STREETRequest digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch3
▸Applications & Permits30
▸DOB NOWLPC Approval/Permit30
09/05/2026M00272119-P1 · 462 BROADWAYOpen ↗
09/05/2026M00272119-I1 · 462 BROADWAYOpen ↗
09/05/2026M00272119-P2 · 462 BROADWAYOpen ↗
Showing 3 of 30 on file for this type
▸Seals & Professional Certifications260
▸DOB NOWSpecial Inspector Seal & Signature104
09/29/2026Q00347212-I1 · 163-03 HORACE HARDING EXPWYOpen ↗
09/19/2026M00349625-I1 · 12 WEST 72 STREETOpen ↗
09/08/2026B00307880-P1 · 282 GARFIELD PLACEOpen ↗
Showing 3 of 104 on file for this type
▸DOB NOWProgress Inspector Seal & Signature80
09/29/2026Q00347212-I1 · 163-03 HORACE HARDING EXPWYOpen ↗
09/29/2026Q00347212-I1 · 163-03 HORACE HARDING EXPWYOpen ↗
09/29/2026Q00347212-I1 · 163-03 HORACE HARDING EXPWYOpen ↗
Showing 3 of 80 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature76
09/05/2026M00272119-P2 · 462 BROADWAYOpen ↗
09/05/2026M00272119-I1 · 462 BROADWAYOpen ↗
09/05/2026M00272119-P1 · 462 BROADWAYOpen ↗
Showing 3 of 76 on file for this type
▸Safety & Tenant Protection32
▸DOB NOWTenant Protection Plan29
09/04/2026M00349625-I1 · 12 WEST 72 STREETOpen ↗
09/04/2026M00381288-P2 · 38 WEST 9 STREETOpen ↗
09/04/2026M00422113-P1 · 38 WEST 9 STREETOpen ↗
Showing 3 of 29 on file for this type
▸DOB NOWHPD-1: Anti-Harassment Area Checklist2
08/13/2026B00365667-P1 · 330 WYTHE AVENUEOpen ↗
08/13/2026B00365667-I1 · 330 WYTHE AVENUEOpen ↗
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist1
08/13/2026Q00255705-I1 · 117-07 ROCKAWAY BEACH BLVDOpen ↗
▸Environmental & Asbestos54
▸DOB NOWDEP ACP-5: Asbestos Assessment Report46
09/05/2026M00272119-P2 · 462 BROADWAYOpen ↗
09/05/2026M00272119-I1 · 462 BROADWAYOpen ↗
09/05/2026M00272119-P1 · 462 BROADWAYOpen ↗
Showing 3 of 46 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form7
09/04/2026M00403596-I1 · 142 WEST 95 STREETOpen ↗
08/14/2026B00423379-I1 · 48 SIDNEY PLACEOpen ↗
08/13/2026B00342627-I1 · 282 GARFIELD PLACEOpen ↗
Showing 3 of 7 on file for this type
▸DOB NOWOER: Notice to Proceed1
08/13/2026B00270478-I1 · 425 FULTON STREETOpen ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00342627-I1 · 282 GARFIELD PLACEOpen ↗
▸Approvals, Objections & Sign-offs2
▸DOB NOWLandmark Approval2
09/01/2026M00381288-I1 · 38 WEST 9 STREETOpen ↗
09/01/2026B00269316-I1 · 16 GRACE COURT ALLEYOpen ↗
▸Cost, Insurance & Ownership1
▸DOB NOWPW3: Cost Affidavit (Before Sign Off)1
08/13/2026Q00095150-I1 · 31-16 38 STREETOpen ↗
▸Other Documents1
▸DOB NOWWaiver Document1
08/13/2026Q00265033-S1 · 116-16 130 STREETOpen ↗