1926Year Built
8Stories
M9Building Class
C1-6AZoning
32,000 sfGross Floor Area
1Units
LL97 CoveredRent Stabilized27 Open Violations 26 unresolved · 1 paperwork only ▸FISP: SAFE
Miscellaneous religious facility · 4,950 sf lot · 6.46 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GSR CONTRACTOR607/08/2026
BK CONSTRUCTIONDBA SRT CONSTRUCTION403/22/2026
PHOENIX BRIDGING INC DBA PHOENI103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHRAF CORP203/18/2024
SCOPE ENGINEERING CONSULTANTS PC206/06/2023
ASR ENGINEERING PC105/22/2023
ACHESON DOYLE PARTNERS ARCHITECTS204/24/2023
KZ ENGINEERING, P.C109/27/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GILLMAN CONSULTING403/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
MUNICIPAL BUILDING CONSULTANTS203/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CS BRIDGE CORPGeneral Contractor403/21/2026
GSR CONTRACTOR INCGeneral Contractor407/08/2026
BK CONSTRUCTION SVCS INCGeneral Contractor303/21/2026
BELLET CONSTRUCTION CO.INGeneral Contractor203/21/2026
ALEXANDER EUGENEElectrical103/21/2026
I.M.P. PLBG. & HTG. CORPPlumbing107/08/2026
NASH ELECTRIC SERVICES INElectrical103/22/2026
VAN VASSELLElectrical103/21/2026
IVAS FACILITIES SERVICESGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SCOPE ENGINEERING CONSULT7894206/06/2023
AK ENGINEERING PC678204/24/2023
SITE SAFETY LLC8555102/06/2023
Building Lifecycle
All (103)Filed (8)Permit Issued (9)Signed Off (4)Facade (FISP) (22)Violation (52)Inspection (4)Special Inspection (4)
05/07/2026
Violation issued (HPD, open)
A
07/18/2025
Cycle 10 facade report signed — SWARMP
07/14/2025
Cycle 10 facade report submitted
06/12/2025
Violation issued (HPD, open)
A
05/18/2025
Cycle 10 facade inspection completed
07/26/2024
Cycle 9 facade report signed — SAFE
06/27/2024
Cycle 9 facade report submitted
05/20/2024
Cycle 9 facade inspection completed
05/17/2024
Signed off — Alteration
M00818434-I1
04/16/2024
Violation issued (HPD, open)
A
03/19/2024
Permit issued — Sidewalk Shed
M01021480-I1-SH
03/19/2024
Permit issued — Supported Scaffold
M01021480-S1-SF
03/18/2024
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01021480-S1
03/18/2024
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01021480-I1
11/27/2023
Signed off — Alteration
Remove and install new plumbing fixtures and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
M00849757-I1
10/09/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/09/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/20/2023
Signed off — Alteration
Interior renovation of guestroom and ADA bathroom as shown on drawings filed herewith. No change in use, egress or occupancy.
M00849732-I1
08/09/2023
Permit issued — Sidewalk Shed
M00875530-I1-SH
08/01/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/13/2023
Permit issued — General Construction
M00818434-I1-GC
07/11/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/06/2023
Filed — Alteration
M00818434-P1
05/22/2023
Filed — Alteration
M00875530-I1
05/22/2023
Permit issued — Sidewalk Shed
M00875530-I1-SH
05/11/2023
Permit issued — Plumbing
M00849757-I1-PL
05/05/2023
Permit issued — General Construction
M00849732-I1-GC
04/24/2023
Filed — Alteration
Remove and install new plumbing fixtures and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
M00849757-I1
04/24/2023
Filed — Alteration
Interior renovation of guestroom and ADA bathroom as shown on drawings filed herewith. No change in use, egress or occupancy.
M00849732-I1
04/06/2023
Special inspection requirement — Tenant Protection Plan Compliance
Ari Kamo
03/29/2023
Violation issued (HPD, open)
A
03/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
03/28/2023
Special inspection requirement — Fire-Resistance Rated Construction
Ari Kamo
03/24/2023
Special inspection requirement — Final
Ari Kamo
02/06/2023
Filed — Alteration
M00818434-I1
12/07/2022
Violation issued (ECB, open)
Construction
03/08/2022
Violation issued (HPD, open)
A
03/08/2022
Violation issued (HPD, closed)
I
01/18/2022
Cycle 9 facade report signed — SWARMP
12/01/2021
Cycle 9 facade report submitted
10/19/2021
Cycle 9 facade inspection completed
04/16/2021
Violation issued (HPD, closed)
A
07/06/2020
Cycle 8 facade report submitted
06/27/2020
Cycle 8 facade report signed — SAFE
05/19/2020
Cycle 8 facade inspection completed
01/28/2020
Signed off — Alteration
M00081848-I1
09/06/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/06/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/20/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/20/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/19/2019
Permit issued — Sidewalk Shed
M00081848-I1-SH
01/31/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/31/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/28/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/28/2018
Permit issued — Sidewalk Shed
M00081848-I1-SH
09/27/2018
Filed — Alteration
M00081848-I1
09/05/2018
Cycle 8 facade report submitted
09/05/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/03/2018
Cycle 8 facade report signed — UNSAFE
08/30/2018
Violation issued (ECB, closed)
Construction
Latest 60 of 103 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedKNG CONSTRUCTION CO INC03/19/2024
DOB NOWSupported ScaffoldPermit IssuedBK CONSTRUCTION SVCS INC03/19/2024
DOB NOWSidewalk ShedPermit IssuedGSR CONTRACTOR INC08/09/2023
DOB NOWGeneral ConstructionSigned-offBELLET CONSTRUCTION CO.IN07/13/2023
DOB NOWSidewalk ShedPermit IssuedGSR CONTRACTOR INC05/22/2023
DOB NOWPlumbingSigned-offI.M.P. PLBG. & HTG. CORP05/11/2023
DOB NOWGeneral ConstructionSigned-offIVAS FACILITIES SERVICES05/05/2023
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP03/19/2019
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP09/28/2018
BISOTISSUEDSTRUCTURAL PRESERV SYSTEM06/16/2020
BISOTISSUEDSTRUCTURAL PRESERV SYSTEM06/21/2019
BISOTISSUEDSTRUCTURAL PRESERV SYSTEM06/03/2019
BISOTISSUEDACTIVE SIGNS INC10/27/2017
BISOTISSUEDACTIVE SIGNS INC10/27/2017
BISEQISSUEDCONSOLIDATED SCAFFOLD & BRIDGE11/23/2015
BISPLISSUEDN.PAGANO P&H CONTR LTD07/28/2015
BISOTISSUEDPARISH PROPERTY MANAGEMENT04/13/2015
BISEQISSUEDCONSOLIDATED SCAFFOLD & BRIDGE11/19/2014
BISEQISSUEDCOLGATE ENTERPRISE CORP04/14/2014
BISEQISSUEDCOLGATE ENTERPRISE CORP04/11/2014
BISPLISSUEDN.PAGANO P&H CONTR LTD03/19/2014
BISPLISSUEDLATTY'S GEN PLBG CONT COR02/28/2014
BISEQISSUEDPHOENIX BRIDGING INC05/25/2012
BISPLISSUEDDUO PLUMBING & HTG CORP.05/18/2012
BISOTISSUEDS. DIGIACOMO & SON INC05/04/2012
BISEQISSUEDARSENAL SCAFFOLD INC02/27/2012
BISOTISSUEDS. DIGIACOMO & SON INC05/05/2011
BISPLISSUEDDUO PLUMBING & HTG CORP.02/17/2011
BISOTISSUEDS. DI GIACOMO & SON INC01/12/2011
BISFPISSUEDACTIVE FIRE EXTING. CO.IN01/20/2009
BISEQISSUEDEVEREST SCAFFOLDING INC02/04/2008
BISOTISSUEDJADE RESTORATION CORP01/25/2008
BISOTISSUEDJADE RESTORATION CORP10/15/2007
BISEQISSUEDEVEREST SCAFFOLDING INC10/11/2007
BISOTISSUEDSUMMIT DEVELOPMENT CORP04/22/2005
BISEQISSUEDSPRING SCAFFOLDING INC07/25/1997
5 projects · most recent 04/15/2024
General Wiring
FiledStatusContractorScope
04/15/2024Permit IssuedHIGH QUALITY ELECTRIC OF—
05/23/2023Permit IssuedRICHARD NEU—
01/15/2020CompleteVERDE ELECTRIC CORP.General Wiring
09/24/2018CompleteNASH ELECTRIC SERVICES IN—
01/18/2018CompleteACP ELECTRICAL CONTRACTIN—
1 project · most recent 03/18/2024
Scaffold
FiledStatusContractorScope
03/18/2024Permit IssuedBK CONSTRUCTION SVCS INCScaffold
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/09/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/09/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/01/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/11/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
04/06/2023Tenant Protection Plan ComplianceAri Kamospecial
03/28/2023Fire-Resistant Penetrations and JointsAri Kamospecial
03/28/2023Fire-Resistance Rated ConstructionAri Kamoprogress
03/24/2023FinalAri Kamoprogress
▾Documents — 256 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
09/06/2026M00081848-I1Request digital key ↗
08/31/2026M00849732-I1Request digital key ↗
08/31/2026M00849757-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits50
▸BISPLAN / WORK APPROVAL APPLICATION31
11/15/2018123535282Open ↗
10/20/2017123172128Open ↗
10/20/2017123172119Open ↗
Showing 3 of 31 on file for this type
▸BISWORK PERMIT APPLICATION19
06/24/2019123535282Open ↗
06/04/2019123535282Open ↗
10/27/2017123172128Open ↗
Showing 3 of 19 on file for this type
▸Seals & Professional Certifications50
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION21
02/19/2020123172119Open ↗
02/19/2020123172128Open ↗
02/05/2019123535282Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/31/2026M00875530-I1Open ↗
08/31/2026M00818434-I1Open ↗
08/31/2026M00818434-P1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
10/20/2017123172128Open ↗
10/20/2017123172119Open ↗
11/18/2014122193795Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
10/20/2017123172128Open ↗
10/20/2017123172119Open ↗
11/18/2014122193795Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
04/10/2014140184299Open ↗
04/10/2014140184244Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
02/28/2012120982838Open ↗
Showing 1 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
04/10/2014140184299Open ↗
04/10/2014140184244Open ↗
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026M00849732-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026M00849732-I1Open ↗
▸Trade Schedules & Equipment17
▸BISSCHEDULE B - PLUMBING10
01/07/2014121748519Open ↗
08/19/2013121748519Open ↗
12/21/2012120534350Open ↗
Showing 3 of 10 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
09/17/2015121748519Open ↗
04/14/2011120534350Open ↗
03/18/2011120534350Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
01/20/2016121748519Open ↗
01/07/2014121748519Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
07/06/2011120748682Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
07/09/2013121050110Open ↗
▸Safety & Tenant Protection25
▸BISSRO MD ANTI-HARASSMENT CHECKLIST8
02/05/2019123535282Open ↗
10/27/2017123172119Open ↗
10/27/2017123172128Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist8
08/13/2026M01021480-S1Open ↗
08/13/2026M00081848-I1Open ↗
08/13/2026M00818434-P1Open ↗
Showing 3 of 8 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE6
06/04/2019123535282Open ↗
06/04/2019123535282Open ↗
06/04/2019123535282Open ↗
Showing 3 of 6 on file for this type
▸BISTenant Protection Plan and Notes1
11/15/2018123535282Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
02/05/2019123535282Open ↗
▸BISHPD-1 - Anti-Harassment Area Checklist1
02/20/2014121748519Open ↗
▸Environmental & Asbestos18
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'7
04/23/2012121050110Open ↗
02/28/2012120982838Open ↗
02/28/2012120982838Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
11/15/2018123535282Open ↗
10/20/2017123172128Open ↗
10/20/2017123172119Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/31/2026M00818434-I1Open ↗
08/31/2026M00818434-P1Open ↗
08/13/2026M00849732-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
02/20/2014121748519Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
02/05/2019123535282Open ↗
11/15/2018123535282Open ↗
01/07/2016122176554Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
07/06/2020123535282Open ↗
01/07/2016122176554Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/06/2020123535282Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
04/10/2014140184299Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
01/07/2022122193795Open ↗
07/06/2020123535282Open ↗
07/06/2020123535282Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs24
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
07/06/2020123535282Open ↗
02/19/2020123172119Open ↗
02/19/2020123172128Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
08/19/2013121748519Open ↗
05/25/2012121091157Open ↗
04/23/2012121050110Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
08/31/2026M00818434-I1Open ↗
08/31/2026M00818434-P1Open ↗
08/13/2026M00081848-I1Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
12/15/2015122193795Open ↗
08/13/2014140184299Open ↗
03/27/2014121748519Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership15
▸BISCOST AFFIDAVIT15
07/06/2020123535282Open ↗
02/19/2020123172119Open ↗
02/19/2020123172128Open ↗
Showing 3 of 15 on file for this type
▸Filing & Intake Forms24
▸BISEFILING COVER SHEET12
11/15/2018123535282Open ↗
10/20/2017123172128Open ↗
10/20/2017123172119Open ↗
Showing 3 of 12 on file for this type
▸BISADDITIONAL INFORMATION4
01/14/2015122193795Open ↗
09/06/2012120534350Open ↗
06/24/2011120534350Open ↗
Showing 3 of 4 on file for this type
▸BISHPD-3 - SRO MD ANTI-HARASSEMENT CHECKLIST3
11/20/2014122193795Open ↗
10/04/2011120748682Open ↗
01/04/2011120534350Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET3
04/10/2014140184299Open ↗
04/10/2014140184244Open ↗
Showing 2 of 3 on file for this type
▸BISBOROUGH INTAKE FORM2
02/19/2020123172119Open ↗
02/19/2020123172128Open ↗
▸Other Documents12
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION9
06/04/2019123535282Open ↗
03/29/2019123535282Open ↗
11/14/2018123535282Open ↗
Showing 3 of 9 on file for this type
▸BISFEE EXEMPTION DOCUMENTATION2
04/10/2014140184299Open ↗
04/10/2014140184244Open ↗
▸BISSupporting Document: Fee Exempt1
04/22/2015122176554Open ↗