← Back
Elevator apt, semi-fireproof with stores
3327 WHITE PLAINS ROAD
BRONX · Williamsbridge-Olinville · BIN 2130528
💬 Discuss this project
2022Year Built
8Stories
D7Building Class
R6Zoning
20,559 sfGross Floor Area
23Units
Rent Stabilized8 Open Violations ▸FDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: 3327 WHITE PLAINS LLC · 5,218 sf lot · 3.94 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneralOther
Roof59p · 4 filings · 20 docs
Floor 657p · 4 filings · 20 docs
Floor 554p · 4 filings · 20 docs
Floor 454p · 4 filings · 20 docs
Floor 355p · 4 filings · 20 docs
Floor 257p · 4 filings · 20 docs
Floor 166p · 6 filings · 20 docs
Cellar59p · 4 filings · 20 docs
Site & exterior12p · 3 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Gjonaj Management5407/08/2026
TOPLINE NYC CONTRACTING607/08/2026
ROCK GROUP NY203/21/2026
3327 WHITE PLAINS LLC103/22/2026
70 UNION VALLEY RD103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/11/2018$728K—Private party → 3327 WHITE PLAINS LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BADALY ARCHITECTS1509/05/2023
CNS INSPECTION SERVICES LLC306/06/2022
ASIF JAMIL, RA102/27/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GREEN STUDIO203/21/2026
ADVANCED BUILDERS SERVICES303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZEFI & CO. LLCGeneral Contractor1007/08/2026
A & A RESTORATION INCGeneral Contractor507/08/2026
TOPLINE NYC CONTRACTINGGeneral Contractor407/08/2026
DNA PLUMBING CONTR. INCPlumbing307/08/2026
DNA PLUMBING CONTR. INCFire Protection207/08/2026
A.M. SAGE PLG & HTG LLCPlumbing207/08/2026
JOHN KARALISElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BADALY ARCHITECT PLLC71371309/05/2023
Building Lifecycle
All (132)Filed (19)Permit Issued (16)Signed Off (9)Violation (33)Inspection (11)Objection (14)Special Inspection (30)
07/31/2026
Violation issued (HPD, open)
C
07/31/2026
Violation issued (HPD, open)
C
07/31/2026
Violation issued (HPD, open)
C
12/01/2025
Violation issued (HPD, open)
C
12/01/2025
Violation issued (HPD, open)
C
11/18/2025
Violation issued (HPD, closed)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/26/2025
Violation issued (HPD, closed)
C
06/24/2025
Violation issued (HPD, open)
C
06/24/2025
Violation issued (HPD, closed)
B
06/16/2025
Violation issued (HPD, closed)
A
09/13/2024
Signed off — Alteration
X00285550-I1
07/15/2024
Signed off — Alteration
Provide new curb cut in conjunction with NB# 220715304.
X00348560-I1
05/03/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/01/2024
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
03/20/2024
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
03/15/2024
Permit issued — Curb Cut
X00348560-I1-CC
03/11/2024
Signed off — Alteration
Provide new boiler in conjunction with NB application #220715304.
X00585512-I1
03/07/2024
Signed off — Alteration
Provide new fire sprinkler and plumbing system in conjunction with NB application #220715304
X00279132-I1
02/15/2024
Signed off — Alteration
Provide new ventilation and HVAC system in conjunction with New Building NB220715304
X00248789-I1
11/28/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/03/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/03/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMMAD BADALY
10/03/2023
Special inspection requirement — Post-installed Anchors
MOHAMMAD BADALY
10/03/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MOHAMMAD BADALY
10/03/2023
Special inspection requirement — Sprinkler Systems
MOHAMMAD BADALY
10/03/2023
Special inspection requirement — HVAC insulation and sealing
MOHAMMAD BADALY
09/20/2023
Objection resolved — Addressed
09/08/2023
Objection raised — Other
09/05/2023
Filed — Alteration
Provide new fire sprinkler and plumbing system in conjunction with NB application #220715304
X00279132-P5
08/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMMAD BADALY
08/09/2023
Special inspection requirement — Post-installed Anchors
MOHAMMAD BADALY
08/09/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MOHAMMAD BADALY
08/09/2023
Special inspection requirement — Sprinkler Systems
MOHAMMAD BADALY
08/09/2023
Special inspection requirement — HVAC insulation and sealing
MOHAMMAD BADALY
07/28/2023
Permit issued — Plumbing
X00279132-I1-EW-SP
07/28/2023
Permit issued — Sprinklers
X00279132-I1-PL
07/28/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/22/2023
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X00702224-I1
06/22/2023
Signed off — Alteration
X00750613-I1
05/09/2023
Filed — Alteration
Provide new boiler in conjunction with NB application #220715304.
X00585512-P1
05/09/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
05/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMMAD BADALY
05/09/2023
Special inspection requirement — Heating Systems
MOHAMMAD BADALY
05/09/2023
Special inspection requirement — Maintenance information
MOHAMMAD BADALY
05/09/2023
Special inspection requirement — HVAC-R and service water heating system controls
MOHAMMAD BADALY
05/09/2023
Special inspection requirement — HVAC-R and service water heating equipment
MOHAMMAD BADALY
04/28/2023
Permit issued — Boiler Equipment
X00585512-I1-BE
03/30/2023
Signed off — Alteration
FILE STRUCTURAL SCOPE OF WORK IN CONJUNCTION WITH NB#220715304.
X00348524-I1
11/09/2022
Permit issued — Construction Fence
X00285550-I1-FN
11/04/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/17/2022
Permit issued — Boiler Equipment
X00585512-I1-BE
09/29/2022
Filed — Alteration
Provide new fire sprinkler and plumbing system in conjunction with NB application #220715304
X00279132-P4
08/26/2022
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/15/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/29/2022
Violation issued (ECB, closed)
Construction
06/29/2022
Violation issued (ECB, closed)
Construction
06/29/2022
Violation issued (ECB, closed)
Construction
Latest 60 of 132 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offZEFI & CO. LLC03/15/2024
DOB NOWPlumbingSigned-offDNA PLUMBING CONTR. INC07/28/2023
DOB NOWSprinklersSigned-offDNA PLUMBING CONTR. INC07/28/2023
DOB NOWBoiler EquipmentSigned-offA.M. SAGE PLG & HTG LLC04/28/2023
DOB NOWConstruction FenceSigned-offZEFI & CO. LLC11/09/2022
DOB NOWBoiler EquipmentSigned-offA.M. SAGE PLG & HTG LLC10/17/2022
DOB NOWSupported ScaffoldSigned-offTOPLINE NYC CONTRACTING06/07/2022
DOB NOWSprinklersSigned-offDNA PLUMBING CONTR. INC06/07/2022
DOB NOWMechanical SystemsSigned-offZEFI & CO. LLC05/13/2022
DOB NOWStructuralSigned-offZEFI & CO. LLC04/19/2022
DOB NOWSidewalk ShedSigned-offTOPLINE NYC CONTRACTING03/30/2022
DOB NOWPlumbingSigned-offDNA PLUMBING CONTR. INC02/25/2022
DOB NOWConstruction FenceSigned-offZEFI & CO. LLC12/07/2021
DOB NOWConstruction FenceSigned-offA & A RESTORATION INC11/19/2021
DOB NOWConstruction FenceSigned-offA & A RESTORATION INC12/14/2020
DOB NOWConstruction FenceSigned-offA & A RESTORATION INC02/14/2020
BIS—ISSUEDZEFI & CO. LLC01/12/2024
BIS—ISSUEDZEFI & CO. LLC07/29/2022
BIS—ISSUEDZEFI & CO. LLC08/16/2021
BIS—ISSUEDZEFI & CO. LLC01/08/2021
BIS—ISSUEDA2Z CONSTRUCTION GROUP INC.07/24/2020
4 projects · most recent 03/12/2024
General Wiring
FiledStatusContractorScope
03/12/2024CompleteTRIBORO ELEC'L CONTR'G COGeneral Wiring
01/12/2023CancelledAV GROUP ELECTRICAL LLCGeneral Wiring
03/22/2022CompleteRICHARD NEU—
02/24/2020CompleteILLUMINOUS ELECTRIC CORP.—
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
05/03/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
04/01/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
03/20/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
11/28/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/03/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/03/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/28/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/09/2023Pass-Final Boiler Equipment InspectionPassView ↗
11/04/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/26/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/15/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 57
DateRequirementInspectorRole
10/03/2023Fire-Resistant Penetrations and JointsMOHAMMAD BADALYspecial
10/03/2023Post-installed AnchorsMOHAMMAD BADALYspecial
10/03/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMOHAMMAD BADALYspecial
10/03/2023Sprinkler SystemsMOHAMMAD BADALYspecial
10/03/2023HVAC insulation and sealing MOHAMMAD BADALYenergy_progress
08/09/2023Fire-Resistant Penetrations and JointsMOHAMMAD BADALYspecial
08/09/2023Post-installed AnchorsMOHAMMAD BADALYspecial
08/09/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMOHAMMAD BADALYspecial
08/09/2023Sprinkler SystemsMOHAMMAD BADALYspecial
08/09/2023HVAC insulation and sealing MOHAMMAD BADALYenergy_progress
05/09/2023Fire-Resistant Penetrations and JointsMOHAMMAD BADALYspecial
05/09/2023Heating SystemsMOHAMMAD BADALYspecial
05/09/2023Maintenance informationMOHAMMAD BADALYenergy_progress
05/09/2023HVAC-R and service water heating system controlsMOHAMMAD BADALYenergy_progress
05/09/2023HVAC-R and service water heating equipmentMOHAMMAD BADALYenergy_progress
05/30/2022FinalMOHAMMAD BADALYprogress
05/30/2022Mechanical SystemsMOHAMMAD BADALYspecial
05/30/2022Duct leakage testing MOHAMMAD BADALYenergy_progress
05/30/2022Maintenance informationMOHAMMAD BADALYenergy_progress
05/30/2022Electrical motorsMOHAMMAD BADALYenergy_progress
05/30/2022HVAC and service water heating system controls MOHAMMAD BADALYenergy_progress
05/30/2022Permanent certificateMOHAMMAD BADALYenergy_progress
05/30/2022HVAC insulation and sealing MOHAMMAD BADALYenergy_progress
05/30/2022HVAC and service water heating equipment MOHAMMAD BADALYenergy_progress
05/16/2022Mechanical SystemsMOHAMMAD BADALYspecial
Latest 25 of 57.
▾Documents — 190 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch - Sprinkler6
08/26/2026X00279132-P2Request digital key ↗
08/26/2026X00279132-P4Request digital key ↗
08/15/2026X00279132-P3Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
08/26/2026X00279132-P4Request digital key ↗
08/15/2026X00279132-P3Request digital key ↗
08/15/2026X00279132-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch4
08/25/2026X00585512-P1Request digital key ↗
08/25/2026X00585512-I1Request digital key ↗
08/24/2026X00702224-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
08/24/2026X00248789-I1Request digital key ↗
08/15/2026X00248789-P2Request digital key ↗
08/15/2026X00248789-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Curb Cut1
08/15/2026X00348560-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/26/2026X00285550-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/26/2026X00321226-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/15/2026X00348524-I1Request digital key ↗
▸Applications & Permits14
▸BISPLAN / WORK APPROVAL APPLICATION11
07/29/2024200942908Open ↗
05/31/2024220715304Open ↗
03/29/2023220715304Open ↗
Showing 3 of 11 on file for this type
▸BISWORK PERMIT APPLICATION2
01/11/2021220715304Open ↗
07/24/2020220715304Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
09/19/2022220724839Open ↗
▸Zoning, Tax Lot & Property Records6
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
04/27/2020220715304Open ↗
▸BISVERIFY TAX LOT1
06/06/2024220715304Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
04/27/2020220715304Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
06/06/2024220715304Open ↗
▸BISZONING DIAGRAM1
04/27/2020220715304Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
04/27/2020220715304Open ↗
▸Seals & Professional Certifications55
▸DOB NOWProgress Inspector Seal & Signature29
09/18/2026X00279132-P3Open ↗
08/31/2026X00279132-P5Open ↗
08/29/2026X00248789-P1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/26/2026X00285550-I1Open ↗
08/26/2026X00279132-I1Open ↗
08/26/2026X00279132-P4Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/18/2026X00279132-P3Open ↗
08/31/2026X00279132-P5Open ↗
08/29/2026X00248789-P1Open ↗
Showing 3 of 7 on file for this type
▸Trade Schedules & Equipment6
▸BISFA - FDNY APPROVAL : FD-FAA1
05/14/2024220715304Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
03/15/2024220715304Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
03/15/2024220715304Open ↗
▸BISDEP STORMWATER/SEWER CERTIFICATION (HCP/SCP)1
04/27/2020220715304Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
11/02/2023220715304Open ↗
▸BISECC REVIEW AND COMPLAINCE OF DOB NOW BOILER APPLICATION1
10/03/2024220715304Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST2
09/27/2022220724839Open ↗
04/27/2020220715304Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
07/21/2020220715304Open ↗
▸BISBPP: STREET TREES SITE PLAN1
09/19/2022220724839Open ↗
▸BISSTREET TREE SIGNOFF1
03/15/2024220715304Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026X00321226-I1Open ↗
▸Energy Compliance21
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
03/08/2024220715304Open ↗
07/22/2020220715304Open ↗
07/21/2020220715304Open ↗
Showing 3 of 4 on file for this type
▸BISAIR SEALING AND INSULATION - VISUAL1
03/15/2024220715304Open ↗
▸BISINTERIOR LIGHTING POWER1
03/15/2024220715304Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/15/2024220715304Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
03/15/2024220715304Open ↗
▸BISFENESTRATION AREAS1
03/15/2024220715304Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
03/15/2024220715304Open ↗
▸BISLIGHTING IN DWELLING UNITS1
03/15/2024220715304Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/15/2024220715304Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/08/2024220715304Open ↗
▸BISELECTRIC MOTORS1
03/15/2024220715304Open ↗
▸BISLIGHTING CONTROLS1
03/15/2024220715304Open ↗
▸BIS* HVAC INSULATION AND SEALING1
03/15/2024220715304Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
03/15/2024220715304Open ↗
▸BISEXTERIOR LIGHTING POWER1
03/15/2024220715304Open ↗
▸BISFENESTRATION AIR LEAKAGE1
03/15/2024220715304Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00585512-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X00585512-I1Open ↗
▸Inspections & Test Reports19
▸BISTECHNICAL REPORT: RESPONSIBILITY6
03/08/2024220715304Open ↗
07/22/2020220715304Open ↗
07/21/2020220715304Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
07/03/2024220715304Open ↗
07/23/2020220715304Open ↗
07/21/2020220715304Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
07/23/2020220715304Open ↗
07/21/2020220715304Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF2
06/06/2024220715304Open ↗
07/22/2020220715304Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
03/21/2024220715304Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
07/03/2024220715304Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
03/15/2024220715304Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
03/15/2024220715304Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
03/15/2024220715304Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
04/27/2020220715304Open ↗
▸Approvals, Objections & Sign-offs8
▸BISSCHEDULE A - OCCUPANCY / USE5
12/16/2022220715304Open ↗
09/28/2021220715304Open ↗
03/05/2020220715304Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
07/21/2020220715304Open ↗
04/27/2020220715304Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM (SIGNOFF)1
04/08/2024220715304Open ↗
▸Cost, Insurance & Ownership3
▸BISPROJECT-SPECIFIC GL INSURANCE3
01/11/2021220715304Open ↗
07/23/2020220715304Open ↗
07/21/2020220715304Open ↗
▸Filing & Intake Forms14
▸BISADDITIONAL INFORMATION10
06/06/2024220715304Open ↗
02/16/2024220724839Open ↗
03/30/2023220715304Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING COVER SHEET3
02/10/2020220724839Open ↗
12/18/2019220715304Open ↗
10/17/2019220715304Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
02/10/2020220724839Open ↗
▸Other Documents9
▸BISBPP - SUPPORTING DOCUMENTATION2
09/19/2022220724839Open ↗
09/19/2022220724839Open ↗
▸BISSITE SURVEY: INITIAL1
—220715304Open ↗
▸BISSHUTOFF DAMPERS1
03/15/2024220715304Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
09/19/2022220724839Open ↗
▸BISMAINTENANCE INFORMATION1
03/15/2024220715304Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
09/27/2022220724839Open ↗
▸BISPLOT DIAGRAM1
04/27/2020220715304Open ↗
▸BISSITE SURVEY: FINAL1
—220715304Open ↗