Elevator apt, fireproof without stores
Hope Gardens
333 CENTRAL AVENUE · BIN 3394310
💬 Discuss this project
1962Year Built
7Stories
D3Building Class
R7-2Zoning
355,000 sfGross Floor Area
306Units
LL97 CoveredRent Stabilized26 Open Violations 25 unresolved · 1 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: HOPE GARDENS 1 LLC · 156,000 sf lot · 2.28 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalGeneral
Roof2p · 1 filing · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ROCK GROUP NY607/08/2026
PENNROSE1107/08/2026
HOPE GARDENS 1 LLC PINNAC203/22/2026
NEW YORK CITY HOUSING AUTHORITY803/22/2026
NYC HOUSING AUTH103/22/2026
N.Y.C. HOUSING AUTHORITY103/22/2026
NYCHA 99203/22/2026
PROCIDA CONSTRUCTION103/22/2026
HOPE GARDENS I403/21/2026
NYCHA1203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LINGINEERING CONSULTING312/02/2024
MSM ENGINEERING SERVICES, PLLC209/17/2024
MOHAMMAD AHEAD, PE103/02/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GREEN STUDIO203/21/2026
QUICK FILING OF NY INC303/21/2026
AE DESIGN SOLUTION203/21/2026
QUICK FILING303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SASCO BUILDERS INCGeneral Contractor603/21/2026
ROCK GROUP NY CORPGeneral Contractor407/08/2026
RAMDEEN'S ELEC. CONTR.CORElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LINGINEERING CONSULTING E5666312/02/2024
LEO Y LEE ASSOCIATES2481103/21/2024
Building Lifecycle
All (93)Filed (7)Permit Issued (6)Signed Off (3)Facade (FISP) (17)Violation (44)Objection (2)Special Inspection (14)
07/17/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01014211-I1
07/08/2025
Cycle 10 facade report submitted
07/01/2025
Cycle 10 facade report signed — SAFE
06/12/2025
Cycle 10 facade inspection completed
03/03/2025
Permit issued — Sidewalk Shed
B01014211-I1-SH
01/25/2025
Violation issued (HPD, closed)
C
01/25/2025
Violation issued (HPD, closed)
B
01/25/2025
Violation issued (HPD, closed)
B
01/25/2025
Violation issued (HPD, closed)
C
12/23/2024
Cycle 9 facade report signed — SAFE
12/09/2024
Cycle 9 facade inspection completed
12/04/2024
Signed off — Alteration
lintel replacement, windowsill replacement, repoint open and deteriorated mortar joints, selective brick replacement, install new/reinstall loose thru-wall A/C covers and sealant replacement around A/C sleeves.
B00994604-I1
12/03/2024
Special inspection requirement — Masonry
Chingyuan Lin
12/03/2024
Special inspection requirement — Tenant Protection Plan Compliance
Chingyuan Lin
12/03/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Chingyuan Lin
12/03/2024
Special inspection requirement — Final
Chingyuan Lin
12/02/2024
Filed — Alteration
lintel replacement, windowsill replacement, repoint open and deteriorated mortar joints, selective brick replacement, install new/reinstall loose thru-wall A/C covers and sealant replacement around A/C sleeves.
B00994604-P2
11/15/2024
Special inspection requirement — Final
Chingyuan Lin
11/15/2024
Special inspection requirement — Masonry
Chingyuan Lin
11/15/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Chingyuan Lin
11/15/2024
Special inspection requirement — Tenant Protection Plan Compliance
Chingyuan Lin
11/13/2024
Filed — Alteration
lintel replacement, windowsill replacement, repoint open and deteriorated mortar joints, selective brick replacement, install new/reinstall loose thru-wall A/C covers and sealant replacement around A/C sleeves.
B00994604-P1
11/05/2024
Cycle 9 facade report submitted
10/31/2024
Special inspection requirement — Masonry
Chingyuan Lin
10/31/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Chingyuan Lin
10/31/2024
Special inspection requirement — Tenant Protection Plan Compliance
Chingyuan Lin
10/31/2024
Special inspection requirement — Final
Chingyuan Lin
09/17/2024
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01014211-P1
08/22/2024
Violation issued (ECB, closed)
Elevators
06/13/2024
Violation issued (ECB, closed)
Elevators
04/04/2024
Permit issued — Suspended Scaffold
B01020842-I1-SC
04/03/2024
Objection raised — Other
04/03/2024
Objection resolved — Addressed
03/21/2024
Filed — Alteration
Installation of suspended scaffold for facade work or inspection
B01020842-I1
03/15/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Leo Lee
03/15/2024
Special inspection requirement — Post-installed Anchors
Leo Lee
03/07/2024
Permit issued — Sidewalk Shed
B01014211-I1-SH
03/06/2024
Permit issued — Structural
B00994604-I1-ST
03/05/2024
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01014211-I1
02/27/2024
Filed — Alteration
lintel replacement, windowsill replacement, repoint open and deteriorated mortar joints, selective brick replacement, install new/reinstall loose thru-wall A/C covers and sealant replacement around A/C sleeves.
B00994604-I1
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/31/2023
Violation issued (HPD, closed)
A
12/02/2022
Violation issued (ECB, closed)
Local Law
11/10/2022
Violation issued (HPD, closed)
I
04/21/2022
Violation issued (HPD, closed)
B
03/22/2022
Signed off — Alteration
B00322726-I1
03/10/2022
Violation issued (HPD, closed)
A
02/22/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/23/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/08/2021
Violation issued (HPD, closed)
A
09/08/2021
Violation issued (HPD, closed)
C
09/08/2021
Violation issued (HPD, closed)
A
09/08/2021
Violation issued (HPD, closed)
C
10/20/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/01/2020
Permit issued — Sidewalk Shed
B00322726-I1-SH
03/06/2020
Permit issued — Sidewalk Shed
B00322726-I1-SH
Latest 60 of 93 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offSASCO BUILDERS INC03/03/2025
DOB NOWSuspended ScaffoldPermit IssuedSASCO BUILDERS INC04/04/2024
DOB NOWSidewalk ShedSigned-offSASCO BUILDERS INC03/07/2024
DOB NOWStructuralSigned-offSASCO BUILDERS INC03/06/2024
DOB NOWSidewalk ShedSigned-offROCK GROUP NY CORP10/01/2020
DOB NOWSidewalk ShedSigned-offROCK GROUP NY CORP03/06/2020
BISOTISSUEDPROCIDA CONSTRUCTION CORP.12/30/2021
BISMHISSUEDPROCIDA CONSTRUCTION CORP.12/30/2021
BIS—ISSUEDPROCIDA CONSTRUCTION CORP.12/29/2021
BISPLISSUEDJ-J PLUMBING CORP06/29/2021
BISMHISSUEDPROCIDA CONSTRUCTION CORP.04/27/2021
BISOTISSUEDPROCIDA CONSTRUCTION CORP.04/27/2021
BIS—ISSUEDPROCIDA CONSTRUCTION CORP.04/26/2021
BIS—ISSUEDPROCIDA CONSTRUCTION CORP.07/13/2020
BISPLISSUEDJ-J PLUMBING CORP06/27/2020
BISPLISSUEDMYRTO PLUMBING & HVAC COR06/17/2020
BISMHISSUEDPROCIDA CONSTRUCTION CORP.05/05/2020
BISOTISSUEDPROCIDA CONSTRUCTION CORP.05/05/2020
BISOTISSUEDPROCIDA CONSTRUCTION CORP.03/19/2020
BISMHISSUEDPROCIDA CONSTRUCTION CORP.03/19/2020
BISBLISSUEDMYRTO PLUMBING & HVAC COR03/12/2019
BISPLISSUEDMYRTO PLUMBING & HVAC COR03/06/2019
BISPLISSUEDMYRTO PLUMBING & HVAC COR12/05/2017
BISBLISSUEDMYRTO PLUMBING & HVAC COR01/16/2017
BISPLISSUEDMYRTO PLUMBING & HVAC COR05/06/2016
BISBLISSUEDMYRTO PLUMBING & HVAC COR05/06/2016
BISOTISSUEDZORIA HOUSING, LLC04/21/2015
BISEQISSUEDZORIA HOUSING, LLC03/10/2015
BISEQISSUEDVIKRANT CONTRACTING & BUILDER03/09/2015
BISOTISSUEDSTEVENS TECHNICAL SERVI02/09/2015
BISBLISSUEDMYRTO PLUMBING & HVAC COR11/19/2014
BISPLISSUEDMYRTO PLUMBING & HVAC COR11/19/2014
BISEQISSUEDMETRO. BRIDGE & SCAF. COR09/11/2014
BISOTISSUEDSTEVENS TECHNICAL SERVI01/21/2014
BISOTISSUEDSTEVENS TECHNICAL SERVI10/11/2013
BISBLISSUEDMYRTO PLUMBING & HVAC COR09/26/2013
BISOTISSUEDSTEVENS TECHNICAL SERVI10/15/2012
BISEQISSUEDMETRO. BRIDGE & SCAF. COR09/20/2012
BISPLISSUEDMYRTO PLUMBING & HVAC COR09/12/2012
BISBLISSUEDMYRTO PLUMBING & HVAC COR09/12/2012
+ 2 more permits on file
6 projects · most recent 06/10/2024
General Wiring
FiledStatusContractorScope
06/10/2024CompleteRICHARD NEU—
09/28/2022CompleteRAMDEEN'S ELEC. CONTR.COR—
05/13/2022CompleteRAMDEEN'S ELEC. CONTR.COR—
11/30/2021CompleteRAMDEEN'S ELEC. CONTR.CORGeneral Wiring
04/08/2020CompleteRAMDEEN'S ELEC. CONTR.CORGeneral Wiring
02/26/2020CompleteILLUMINOUS ELECTRIC CORP.—
1 project · most recent 03/21/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
03/21/2024Permit Issued—Suspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
12/03/2024MasonryChingyuan Linspecial
12/03/2024Tenant Protection Plan ComplianceChingyuan Linspecial
12/03/2024Structural Stability – Alterations of existing buildingsChingyuan Linspecial
12/03/2024FinalChingyuan Linprogress
11/15/2024FinalChingyuan Linprogress
11/15/2024MasonryChingyuan Linspecial
11/15/2024Structural Stability – Alterations of existing buildingsChingyuan Linspecial
11/15/2024Tenant Protection Plan ComplianceChingyuan Linspecial
10/31/2024MasonryChingyuan Linspecial
10/31/2024Structural Stability – Alterations of existing buildingsChingyuan Linspecial
10/31/2024Tenant Protection Plan ComplianceChingyuan Linspecial
10/31/2024FinalChingyuan Linprogress
03/15/2024Alternative Materials - OTCR Buildings Bulletin NumberLeo Leespecial
03/15/2024Post-installed AnchorsLeo Leespecial
▾Documents — 235 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch6
08/25/2026B01014211-I1Request digital key ↗
08/25/2026B01014211-P1Request digital key ↗
08/25/2026B01020842-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00322726-I1Request digital key ↗
▸Applications & Permits56
▸BISPLAN / WORK APPROVAL APPLICATION28
09/06/2023321589330Open ↗
07/26/2023321589330Open ↗
07/18/2023321589330Open ↗
Showing 3 of 28 on file for this type
▸BISWORK PERMIT APPLICATION22
07/13/2020321589330Open ↗
06/29/2020322059570Open ↗
03/24/2020322059570Open ↗
Showing 3 of 22 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION4
09/04/2019322059570Open ↗
05/29/2019320473634Open ↗
09/27/2018320473634Open ↗
Showing 3 of 4 on file for this type
▸BISRequest for Certificate of Occupancy with Open Application(s) Cover Letter1
08/08/2024321589330Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
09/10/2021321589330Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
07/24/2024321589330Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
08/22/2024321589330Open ↗
▸Seals & Professional Certifications37
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
03/24/2020322059570Open ↗
09/30/2019322059570Open ↗
09/30/2019322059570Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/25/2026B01014211-I1Open ↗
08/23/2026B00994604-P2Open ↗
08/23/2026B00994604-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026B00994604-P1Open ↗
08/28/2026B00994604-P2Open ↗
08/27/2026B00994604-I1Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
04/02/2015340237728Open ↗
03/09/2015340237746Open ↗
03/05/2015340236694Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
04/02/2015340237728Open ↗
03/09/2015340237746Open ↗
03/05/2015340236694Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
04/02/2015340237728Open ↗
03/09/2015340237746Open ↗
03/05/2015340236694Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026B00994604-P1Open ↗
08/28/2026B00994604-P2Open ↗
08/27/2026B00994604-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/17/2011320305816Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment18
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
05/31/2019322059570Open ↗
12/26/2018322059570Open ↗
10/02/2018320473634Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT5
05/08/2017320473634Open ↗
05/03/2017320473634Open ↗
05/08/2015320473634Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING4
09/20/2021322059570Open ↗
09/15/2021322059570Open ↗
04/29/2020320473634Open ↗
Showing 3 of 4 on file for this type
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
03/07/2022322059570Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
09/04/2024321589330Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
09/04/2024321589330Open ↗
▸BISHEATING SYSTEMS1
03/07/2022322059570Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST1
06/04/2020321589330Open ↗
▸BISTenant Protection Plan and Notes1
05/30/2019322059570Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026B00322726-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/23/2026B00994604-P1Open ↗
08/23/2026B00994604-P2Open ↗
08/23/2026B00994604-I1Open ↗
▸BISAPPICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU0389BK201
03/10/2022322059570Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
09/29/2015340237728Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
05/08/2012320473634Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
05/17/2011320305816Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
04/02/2015340237728Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
09/30/2019322059570Open ↗
09/30/2019322059570Open ↗
07/08/2019322059570Open ↗
Showing 3 of 6 on file for this type
▸BISINSULATION PLACEMENT & R VALUES1
03/07/2022322059570Open ↗
▸BISLIGHTING IN DWELLING UNITS1
03/07/2022322059570Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/07/2022322059570Open ↗
▸BISLIGHTING CONTROLS1
03/07/2022322059570Open ↗
▸BISTECHNICAL REPORT: ENERGY1
05/08/2012320473634Open ↗
▸BIS* HVAC INSULATION AND SEALING1
03/07/2022322059570Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/07/2022322059570Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
03/07/2022322059570Open ↗
▸BISEXTERIOR LIGHTING POWER1
03/07/2022322059570Open ↗
▸BISFENESTRATION AIR LEAKAGE1
03/07/2022322059570Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY3
04/02/2015340237728Open ↗
03/09/2015340237746Open ↗
03/05/2015340236694Open ↗
▸BISMASONRY1
03/07/2022322059570Open ↗
▸BISMECHANICAL SYSTEMS1
03/07/2022322059570Open ↗
▸BISHIGH TEMPERATURE HOT WATER PIPING (WELDING)1
03/07/2022322059570Open ↗
▸Approvals, Objections & Sign-offs38
▸BISLETTERS - SUPPORTING DOCUMENTATION16
06/04/2020321589330Open ↗
06/04/2020321589330Open ↗
06/04/2020321589330Open ↗
Showing 3 of 16 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
07/26/2023321589330Open ↗
04/06/2023321589330Open ↗
04/05/2023321589330Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
03/10/2022322059570Open ↗
09/29/2015340237746Open ↗
09/29/2015340236694Open ↗
Showing 3 of 5 on file for this type
▸BISSUPERSEDING LETTER3
09/29/2015340237746Open ↗
03/05/2015320473634Open ↗
03/05/2015320473634Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
05/08/2012320473634Open ↗
05/17/2011320305816Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/25/2026B01014211-I1Open ↗
08/13/2026B01014211-P1Open ↗
▸BISFINAL1
03/07/2022322059570Open ↗
▸BISOK TO ISSUE FINAL COFO W/VIOLATIONS &OPEN APPS LISTED PER-20. CYCLE 9A WASFILED IN DOBNOW. ALL MAJOR SIGNOFFS WERE COMPLETED AS PER PA J. CHOI 7/01/241
09/04/2024321589330Open ↗
▸BISSHED LETTER1
10/08/2013320305816Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026B00322726-I1Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)1
08/13/2026B00322726-I1Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT5
12/26/2018322059570Open ↗
12/26/2018322059570Open ↗
09/29/2015340237728Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
07/18/2024321589330Open ↗
03/08/2022322059570Open ↗
▸Filing & Intake Forms23
▸BISADDITIONAL INFORMATION16
10/30/2023321589330Open ↗
01/27/2023321589330Open ↗
08/22/2022321589330Open ↗
Showing 3 of 16 on file for this type
▸BISEFILING COVER SHEET4
12/26/2018322059570Open ↗
12/26/2018322059570Open ↗
05/08/2012320473634Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
04/02/2015340237728Open ↗
03/09/2015340237746Open ↗
03/05/2015340236694Open ↗
▸Other Documents5
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS)1
03/07/2022322059570Open ↗
▸BISTCO - Supporting Documents1
08/29/2024321589330Open ↗
▸BISPLOT DIAGRAM1
06/04/2020321589330Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B01020842-I1Open ↗
▸DOB NOWCalculations1
08/13/2026B01020842-I1Open ↗