Elevator cooperative
333 EAST 69 STREET
💬 Discuss this project
1963Year Built
13Stories
D4Building Class
R8BZoning
160,311 sfGross Floor Area
117Units
LL97 CoveredRent Stabilized13 Open Violations ▸FISP: SAFE
Elevator cooperative · Owner of record: 333 TENANTS CORP · 20,167 sf lot · 7.95 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneralOther
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 3 docs
Floor 122p · 1 filing · 5 docs
Floor 11Under Construction6p · 1 filing · 13 docs
Floor 103p · 1 filing · 9 docs
Floor 9
Floor 813p · 1 filing · 6 docs
Floor 7
Floor 6
Floor 5
Floor 4
Floor 323p · 5 filings · 20 docs
Floor 2Under Construction31p · 4 filings · 20 docs
Floor 1Under Construction12p · 1 filing · 12 docs
Cellar6p · 2 filings · 17 docs
Site & exterior7p · 2 filings · 9 docs
Filed — no permit issued1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
333 TENANTS7903/22/2026
AKAM ASSOCIATES, INC.2409/12/2026
KINGS GROUP NY607/08/2026
333 TENANTS GROUP103/21/2026
INSPECO103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MICHAEL ZENREICH ARCHITECT203/21/2026
CHRISTOPHER TEETER RA403/21/2026
RELIABLE EXPEDITING103/21/2026
LMS-ACE SERVICES303/21/2026
JENNY FLORES EXPEDITING503/21/2026
AK CONSULTING SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CRAFTED INTERIORS DESIGNGeneral Contractor707/08/2026
KINGS GROUP NY CORPGeneral Contractor407/08/2026
LOD CONSTRUCTION LLCGeneral Contractor303/21/2026
CREATIVE HOME BUILDER LLCGeneral Contractor203/21/2026
A.G.S IMPROVEMENTS INCGeneral Contractor207/08/2026
CASTCAPA CONSTRUCTION LLCGeneral Contractor203/21/2026
LEONARD KRITZElectrical103/21/2026
NATIONAL MAINTENANCE INCElectrical103/21/2026
GAUDIOSO CONTRACTING INCGeneral Contractor104/09/2026
HELLO CHAPTER LLCGeneral Contractor104/09/2026
HP BUILDING MANAGEMENT INGeneral Contractor107/08/2026
MODERN CITI GROUP INCGeneral Contractor107/08/2026
ASPECT PLBNG&HTNG CO LLCPlumbing107/08/2026
ASTORIA P & H CORPPlumbing107/08/2026
CERTIFIED SERVICES ANDPlumbing106/27/2026
EH PLUMBING & HEATING CORPlumbing107/08/2026
ANDREW CHARNOWElectrical103/21/2026
GREGG NY PLUMBING, INCPlumbing107/08/2026
BASS ELECTRICAL CORP.Electrical103/22/2026
CARMINE LIPPOLISElectrical103/21/2026
GREGORY PAPANTONIOUElectrical103/21/2026
IRVING BAPTISTEElectrical103/21/2026
JOSEPH ADAMOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ERIK SUN, ARCHITECT, PLLC3010109/04/2025
ACE STRUCTURAL ENGINEERIN496107/22/2025
EDG2578305/06/2025
MARCO GIARDINA ARCHITECTU7882211/05/2024
AG ENGINEERING PLLC8899107/28/2024
GREEN RIVER ENVIRONMENTAL7841105/02/2024
CRAFTED ARCHITECTURE PLLC6642210/19/2023
LAUFSED2618310/19/2023
CITISCAPE CONSULTING LTD762101/27/2023
SPECIAL TESTING & CONSULT1688109/07/2021
Building Lifecycle
All (197)Filed (25)Permit Issued (21)Signed Off (12)Facade (FISP) (17)Violation (57)Inspection (14)Objection (21)Special Inspection (30)
07/02/2026
Filed — Alteration
RENOVATION OF (2) 3-PIECE BATHROOMS, A POWDER ROOM AND A KITCHEN. NO CHANGE OF USE EGRESS OR OCCUPANCY.
M01263430-P1
06/03/2026
Signed off — Alteration
M01038497-I1
06/03/2026
Signed off — Alteration
PROPOSED GARAGE REPAIRS AND MISCELLANEOUS FACADE REPAIRS AS INDICATED ON PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01062194-I1
04/28/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/19/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/16/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/16/2026
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
01/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/08/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/09/2025
Signed off — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR INSPECTION AND EXTERIOR REPAIR WORK AT 333 EAST 69 STREET, MANHATTAN, NY 10021.
M01161684-I1
12/07/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/04/2025
Permit issued — Plumbing
M01245827-S1-PL
12/03/2025
Objection resolved — Resolved
11/25/2025
Objection raised — Mechanical
11/25/2025
Objection raised — Cost
11/13/2025
Permit issued — Plumbing
M01263430-S1-PL
11/06/2025
Filed — Alteration
Interior renovation of unit 11E, including new finishes and fixtures, minor changes to partition walls, new bathroom ceilings. Replacement of appliances and fan coil units. No change in use egress or occupancy.
M01245827-S2
11/06/2025
Filed — Alteration
Interior renovation of unit 11E, including new finishes and fixtures, minor changes to partition walls, new bathroom ceilings. Replacement of appliances and fan coil units. No change in use egress or occupancy.
M01245827-S1
11/05/2025
Signed off — Alteration
INTERIOR BATHROOM RENOVATION AS INDICATED ON DRAWINGS.
M01238505-I1
11/05/2025
Permit issued — General Construction
M01263430-I1-GC
10/30/2025
Permit issued — General Construction
M01245827-I1-GC
09/04/2025
Filed — Alteration
RENOVATION OF (2) 3-PIECE BATHROOMS, A POWDER ROOM AND A KITCHEN. NO CHANGE OF USE EGRESS OR OCCUPANCY.
M01263430-S1
09/04/2025
Filed — Alteration
RENOVATION OF (2) 3-PIECE BATHROOMS, A POWDER ROOM AND A KITCHEN. NO CHANGE OF USE EGRESS OR OCCUPANCY.
M01263430-I1
08/11/2025
Permit issued — Suspended Scaffold
M01161684-I1-SC
08/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIK SUN
08/05/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/31/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/29/2025
Special inspection requirement — Final
ERIK SUN
07/23/2025
Permit issued — Plumbing
M01238505-S1-PL
07/22/2025
Filed — Alteration
Interior renovation of unit 11E, including new finishes and fixtures, minor changes to partition walls, new bathroom ceilings. Replacement of appliances and fan coil units. No change in use egress or occupancy.
M01245827-I1
07/22/2025
Permit issued — General Construction
M01238505-I1-GC
07/16/2025
Objection resolved — Addressed
07/14/2025
Objection raised — Cost
07/08/2025
Filed — Alteration
INTERIOR BATHROOM RENOVATION AS INDICATED ON DRAWINGS.
M01238505-I1
07/08/2025
Filed — Alteration
INTERIOR BATHROOM RENOVATION AS INDICATED ON DRAWINGS.
M01238505-S1
07/08/2025
Special inspection requirement — Energy Code Compliance Inspections
ANTHONY UGBEBOR
06/25/2025
Special inspection requirement — Post-installed Anchors
ANTHONY UGBEBOR
06/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANTHONY UGBEBOR
06/24/2025
Special inspection requirement — Final
ANTHONY UGBEBOR
06/09/2025
Special inspection requirement — Interior lighting power
Christopher Teeter
06/09/2025
Special inspection requirement — Final
ROMAN MARDAREWICH
06/09/2025
Special inspection requirement — Lighting controls
Christopher Teeter
06/02/2025
Special inspection requirement — Concrete - Cast-In-Place
Anthony Stasio
06/02/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Stasio
06/02/2025
Special inspection requirement — Final
Anthony Stasio
06/02/2025
Special inspection requirement — Masonry
Anthony Stasio
06/02/2025
Special inspection requirement — Tenant Protection Plan Compliance
ARIEL GOLSHAN
05/16/2025
Objection resolved — Addressed
05/16/2025
Objection resolved — Addressed
05/08/2025
Objection raised — Other
05/08/2025
Objection raised — Cost
05/06/2025
Filed — Alteration
PROPOSED GARAGE REPAIRS AND MISCELLANEOUS FACADE REPAIRS AS INDICATED ON PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01062194-P1
04/11/2025
Special inspection requirement — Masonry
Anthony Stasio
03/27/2025
Signed off — Alteration
FILING TO COMBINE APARTMENTS WHICH COMPLY WITH TPPN 03/97. REMOVAL AND BUILD OUT OF NON-LOAD BEARING PARTITIONS, FLOORS AND FINISHES AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00822617-I1
02/27/2025
Objection resolved — Addressed
02/27/2025
Objection resolved — Addressed
02/27/2025
Objection resolved — Addressed
02/25/2025
Objection raised — Cost
02/25/2025
Objection raised — Structural
02/25/2025
Objection raised — Structural
Latest 60 of 197 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCERTIFIED SERVICES AND12/04/2025
DOB NOWPlumbingPermit IssuedASPECT PLBNG&HTNG CO LLC11/13/2025
DOB NOWGeneral ConstructionPermit IssuedGAUDIOSO CONTRACTING11/05/2025
DOB NOWGeneral ConstructionPermit IssuedHELLO CHAPTER LLC10/30/2025
DOB NOWSuspended ScaffoldSigned-offKMM CONSTRUCTION OF NY IN08/11/2025
DOB NOWPlumbingSigned-offGREGG NY PLUMBING, INC07/23/2025
DOB NOWGeneral ConstructionSigned-offCREATIVE HOME BUILDER07/22/2025
DOB NOWSuspended ScaffoldSigned-offKMM CONSTRUCTION OF NY IN01/07/2025
DOB NOWStructuralSigned-offA.G.S IMPROVEMENTS INC08/30/2024
DOB NOWStructuralSigned-offA.G.S IMPROVEMENTS INC05/20/2024
DOB NOWGeneral ConstructionSigned-offCRAFTED INTERIORS DESIGN01/18/2024
DOB NOWStructuralSigned-offCRAFTED INTERIORS DESIGN07/11/2023
DOB NOWGeneral ConstructionSigned-offCRAFTED INTERIORS DESIGN07/10/2023
DOB NOWPlumbingSigned-offASTORIA P & H CORP07/05/2023
DOB NOWGeneral ConstructionSigned-offLOD CONSTRUCTION LLC03/10/2023
DOB NOWGeneral ConstructionSigned-offANGELINE PENA-LEVI02/28/2023
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP04/02/2022
DOB NOWPlumbingSigned-offEH PLUMBING & HEATING COR01/31/2022
DOB NOWGeneral ConstructionSigned-offMODERN CITI GROUP INC01/27/2022
DOB NOWGeneral ConstructionPermit IssuedCASTCAPA CONSTRUCTION11/08/2021
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP04/09/2021
BISOTISSUEDASA BUILDING MAINT INC06/27/2022
BISOTISSUEDASA BUILDING MAINT INC02/23/2022
BISMHISSUEDG.BASSOLINO PLUMBING LTD10/14/2021
BISPLISSUEDJODOM MECHANICAL, INC04/21/2021
BISOTISSUEDASA BUILDING MAINT INC11/17/2020
BISOTISSUEDRVM PLUMBING CORP06/13/2020
BISPLISSUEDJODOM MECHANICAL, INC03/16/2020
BISOTISSUEDCRYSTAL COMFORT INC02/06/2020
BISOTISSUEDSUNSHINE RENOVATIONS MAN*01/31/2020
BISOTISSUEDASA BUILDING MAINT INC11/29/2019
BISOTISSUEDRVM PLUMBING CORP11/20/2019
BISOTISSUEDASA BUILDING MAINT INC09/13/2019
BISOTISSUEDARROYO CONTRACTING CORP02/27/2019
BISMHISSUEDCRYSTAL COMFORT INC02/11/2019
BISOTISSUEDCRYSTAL COMFORT INC01/08/2019
BISPLISSUEDG.BASSOLINO PLUMBING LTD01/08/2019
BISPLISSUEDJODOM MECHANICAL, INC09/20/2018
BISPLISSUEDORBIT PLBG & HTG INC09/19/2018
BISOTISSUEDNY LOFT LLC09/14/2018
+ 31 more permits on file
1 project · most recent 11/06/2025
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/06/2025Permit IssuedHELLO CHAPTER LLCVentilation Systems
Ventilation
Ice Air 5FCVC03 300 CFM · Fan Coil Indoor ×2
5FCHU04 400 CFM · Fan Coil Indoor ×1
5FCVC02 200 CFM · Fan Coil Indoor ×1
2 projects · most recent 07/02/2026
Water/Sanitary Gas
FiledStatusContractorScope
07/02/2026Permit IssuedASPECT PLBNG&HTNG CO LLCGas, Water/Sanitary
11/06/2025Signed-offCERTIFIED SERVICES ANDWater/Sanitary
16 projects · most recent 04/06/2026
General Wiring
FiledStatusContractorScope
04/06/2026CompleteNGM ELECTRIC INC—
02/19/2026CancelledEMPIRE LIC ELECL CONTRSGeneral Wiring
12/04/2025CompleteSUNBIRD ELECTRICAL CONTRGeneral Wiring
10/31/2025CompleteASCUATECH ELECTRICAL CORP—
04/11/2024CompleteDENMAR ELECTRIC CORPGeneral Wiring
03/20/2023CompleteELPO ELECTRICAL CONTG INCGeneral Wiring
10/24/2022CompleteADAM ELECL CONTRNG LLC—
08/05/2022CompleteROBERT CHIMENTI—
03/09/2022CompleteLIPPOLIS ELECTRIC, INC.General Wiring
02/03/2022Permit IssuedA&E ELECTRICAL SYSTEMS COGeneral Wiring
12/02/2021Permit IssuedHIGH QUALITY ELECTRIC OF—
11/13/2020CompleteY.S ELECTRICGeneral Wiring
10/18/2020Permit IssuedJ.G.C. ELECTRIC, LLCGeneral Wiring
01/31/2019Permit IssuedNEW PHASE ELEC'L CONTR'SGeneral Wiring
01/08/2019Permit IssuedBASS ELECTRICAL CORP.General Wiring
1 project · most recent 05/06/2025
Concrete
FiledStatusContractorScope
05/06/2025Signed-offA.G.S IMPROVEMENTS INCConcrete
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
04/28/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/19/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/16/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/16/2026Certified Sprinkler - SP - RoughingCertifiedView ↗
01/13/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/08/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/07/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/31/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/02/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/11/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/06/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/22/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/12/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
08/08/2025Fire-Resistant Penetrations and JointsERIK SUNspecial
07/29/2025FinalERIK SUNprogress
07/08/2025Energy Code Compliance InspectionsANTHONY UGBEBORprogress
06/25/2025Post-installed AnchorsANTHONY UGBEBORspecial
06/25/2025Fire-Resistant Penetrations and JointsANTHONY UGBEBORspecial
06/24/2025FinalANTHONY UGBEBORprogress
06/09/2025Interior lighting powerChristopher Teeterenergy_progress
06/09/2025FinalROMAN MARDAREWICHprogress
06/09/2025Lighting controlsChristopher Teeterenergy_progress
06/02/2025Concrete - Cast-In-PlaceAnthony Stasiospecial
06/02/2025Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
06/02/2025FinalAnthony Stasioprogress
06/02/2025MasonryAnthony Stasiospecial
06/02/2025Tenant Protection Plan ComplianceARIEL GOLSHANspecial
04/11/2025MasonryAnthony Stasiospecial
01/29/2025FinalBojidar Kadievprogress
11/08/2024FinalAnthony Stasioprogress
11/08/2024Tenant Protection Plan Compliance—special
11/08/2024Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
11/08/2024Concrete - Cast-In-PlaceAnthony Stasiospecial
10/19/2023Lighting controlsMegan Przywaraenergy_progress
10/19/2023Post-installed AnchorsWilfried Laufsspecial
10/19/2023Fire-Resistant Penetrations and JointsMegan Przywaraspecial
10/19/2023Energy Code Compliance InspectionsMegan Przywaraprogress
10/19/2023FinalMegan Przywaraprogress
Latest 25 of 43.
▾Documents — 491 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch25
09/03/2026M00499852-I1Request digital key ↗
09/03/2026M00581673-I1Request digital key ↗
09/03/2026M00635068-I1Request digital key ↗
Showing 3 of 25 on file for this type
▸Applications & Permits82
▸BISWORK PERMIT APPLICATION42
10/14/2021140857712Open ↗
03/18/2020122714848Open ↗
02/07/2020140825016Open ↗
Showing 3 of 42 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION39
04/02/2021122714848Open ↗
02/04/2021122714848Open ↗
01/24/2020122714848Open ↗
Showing 3 of 39 on file for this type
▸BISRESCISSION OF INTENT TO REVOKE APPROVAL/PERMIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISZONING EXHIBIT I: CERTIFICATION1
10/09/2019140825016Open ↗
▸Seals & Professional Certifications121
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION36
10/31/2019140825846Open ↗
05/22/2019123133297Open ↗
05/22/2019123133297Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature25
09/03/2026M00499852-I1Open ↗
09/03/2026M00581673-I1Open ↗
09/03/2026M00635068-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWProgress Inspector Seal & Signature20
09/02/2026M01263430-I1Open ↗
09/01/2026M00808608-I1Open ↗
09/01/2026M01062194-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/02/2026M01263430-I1Open ↗
09/01/2026M00808608-I1Open ↗
09/01/2026M01062194-I1Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
06/27/2019140857712Open ↗
01/07/2019140825016Open ↗
04/23/2018140759579Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
06/27/2019140857712Open ↗
01/07/2019140825016Open ↗
04/23/2018140759579Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
06/27/2019140857712Open ↗
01/07/2019140825016Open ↗
04/23/2018140759579Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPC FULL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
01/11/2019140825846Open ↗
▸Trade Schedules & Equipment41
▸BISEQUIPMENT USE PERMITS12
01/06/2021140825016Open ↗
01/06/2021140825016Open ↗
01/06/2021140825016Open ↗
Showing 3 of 12 on file for this type
▸BISSCHEDULE B - PLUMBING8
04/02/2021122714848Open ↗
02/04/2021122714848Open ↗
01/07/2019140825016Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
01/24/2020122714848Open ↗
01/06/2020122714848Open ↗
11/30/2018123567951Open ↗
Showing 3 of 8 on file for this type
▸BISSELF-CERT PLUMBING NOTICE7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
01/06/2021140825016Open ↗
01/06/2021140825016Open ↗
01/06/2021140825016Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
12/20/2019140825016Open ↗
01/07/2019140825016Open ↗
▸Safety & Tenant Protection15
▸BISTenant Protection Plan and Notes15
10/04/2019140857712Open ↗
03/27/2019140825016Open ↗
03/26/2019140825016Open ↗
Showing 3 of 15 on file for this type
▸Environmental & Asbestos42
▸DOB NOWDEP ACP-5: Asbestos Assessment Report19
09/03/2026M00581673-I1Open ↗
09/03/2026M00635068-I1Open ↗
09/03/2026M00635072-I1Open ↗
Showing 3 of 19 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)12
06/27/2019140857712Open ↗
01/11/2019140825846Open ↗
01/07/2019140825016Open ↗
Showing 3 of 12 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/21/2026M01245827-S1Open ↗
08/21/2026M01245827-I1Open ↗
08/14/2026M01245827-S2Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance42
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS13
10/31/2019140825846Open ↗
05/22/2019123133297Open ↗
05/22/2019123133297Open ↗
Showing 3 of 13 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
05/07/2021122714848Open ↗
12/08/2020140825016Open ↗
10/31/2019140825846Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
05/10/2021122714848Open ↗
05/07/2021122714848Open ↗
12/08/2020140825016Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS4
06/27/2019140857712Open ↗
01/07/2019140825016Open ↗
04/23/2018140759579Open ↗
Showing 3 of 4 on file for this type
▸BISNYCECC ANALYSIS2
06/27/2019140857712Open ↗
01/07/2019140825016Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
02/15/2023140857712Open ↗
04/23/2018140759579Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/15/2023140857712Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BIS* HVAC INSULATION AND SEALING1
02/15/2023140857712Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY10
05/10/2021122714848Open ↗
05/07/2021122714848Open ↗
05/07/2021122714848Open ↗
Showing 3 of 10 on file for this type
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
02/15/2023140857712Open ↗
▸Approvals, Objections & Sign-offs31
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST14
02/16/2023140857712Open ↗
05/10/2021122714848Open ↗
12/08/2020140825016Open ↗
Showing 3 of 14 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
02/03/2020122714848Open ↗
Showing 1 of 3 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION3
10/09/2019140825016Open ↗
10/08/2019140825016Open ↗
10/08/2019140825016Open ↗
▸BISFINAL1
02/15/2023140857712Open ↗
▸BISLETTERS - APPRVD FAB CERT-INTENT1
02/03/2020122714848Open ↗
▸BISACPE Objection Review Request1
03/14/2019123125322Open ↗
▸Cost, Insurance & Ownership39
▸BISCOST AFFIDAVIT32
05/07/2021122714848Open ↗
12/08/2020140825016Open ↗
01/24/2020122714848Open ↗
Showing 3 of 32 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT6
11/21/2019123567951Open ↗
09/07/2018123125322Open ↗
Showing 2 of 6 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
02/15/2023140857712Open ↗
▸Filing & Intake Forms38
▸BISBOROUGH INTAKE FORM11
10/14/2021140857712Open ↗
01/06/2020122714848Open ↗
10/31/2019140825846Open ↗
Showing 3 of 11 on file for this type
▸BISADDITIONAL INFORMATION11
12/17/2020122714848Open ↗
01/24/2020122714848Open ↗
11/25/2019140825016Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET9
11/30/2018123567951Open ↗
08/16/2018123125322Open ↗
08/15/2018123133297Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
06/27/2019140857712Open ↗
01/11/2019140825846Open ↗
01/07/2019140825016Open ↗
Showing 3 of 7 on file for this type
▸Other Documents3
▸BISMAINTENANCE INFORMATION1
02/15/2023140857712Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01161684-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01161684-I1Open ↗