← Back
Special Inspection Agency
CRAFTED ARCHITECTURE PLLC
Special Inspection Agency
4 projects with open permitsMANHATTAN · 14
13 buildings
25
Total Filings
14
Projects on File
13
Buildings Worked
4
Projects w/ Open Permits
Special Inspection Agency
Primary Trade
Activity
Projects by first filing month14 projects all-time
0123Sep '19 · 2Dec '20 · 1Jun '21 · 1Jul '21 · 1Apr '22 · 1Mar '23 · 1Jun '23 · 2Oct '23 · 1Sep '24 · 1Apr '25 · 1Jul '25 · 1May '26 · 12020202120222023202420252026
bars = month · line = 3-mo average
Portfolio status
Browse projects →
Open permit429%
Signed off1071%
By project type
Alteration14
Most active buildings
All buildings →
2360 BROADWAYMANHATTAN · latest 06/17/2021
2 projects
261 BROADWAYMANHATTAN · latest 05/26/2022
1 projects
40 WEST 77 STREETMANHATTAN · latest 03/01/2021
1 projects
35 WEST 92 STREETMANHATTAN · 1 open · latest 03/16/2023
1 projects
333 EAST 69 STREETMANHATTAN · latest 01/18/2024
1 projects
35 EAST 85 STREETMANHATTAN · 1 open · latest 09/11/2026
1 projects
Key relationships
Everyone →
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M01377577 ↗35 EAST 85 STREET
MANHATTAN
AlterationPermit Issued05/21/202609/11/2026INTERIOR RENOVATION AND COMBINATION OF APARTMENTS 11A AND 12AG. WORK TO INCLUDE MODIFICATIONS TO INTERIOR NONBEARING PARTITIONS, NEW FINISHE…
M01247541 ↗305 WEST 106 STREET
MANHATTAN
AlterationPermit Issued07/07/202509/09/2026HEREBY FILING FOR THE RELOCATION, REMOVAL AND INSTALLATION OF PLUMING FIXTURES. NO CHANGE TO USE OCCUPANCY OR EGRESS.
M01048160 ↗421 WEST 54 STREET
MANHATTAN
AlterationPermit Issued09/14/202407/20/2026REPLACEMENT OF EXISTING SIDEWALL HEADS AND CONFIRMATION OF ADEQUATE COVERAGE.
M01112660 ↗534 EAST 84 STREET
MANHATTAN
AlterationSigned-off04/03/202504/24/2025PLUMBING IN CONJUNCTION WITH THE INTERIOR RENOVATION OF AN EXISTING APARTMENT 5A ON THE 5TH FLOOR. AS PER PLANS FILED HEREWITH. NO CHANGE OF…
M00872972 ↗205 WEST END AVENUE
MANHATTAN
AlterationSigned-off06/28/202303/11/2024APPLICATION FILED FOR PLUMBING WORK AS PER PLANS HEREWITH IN. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
M00879037 ↗333 EAST 69 STREET
MANHATTAN
AlterationSigned-off06/27/202301/18/2024HEREBY FILING FOR THE INTERIOR RENOVATION AND COMBINATION OF UNITS TH8 AND 3E. NO CHANGE TOUSE OCCUPANCY OR EGRESS.
Counts cover all 14 projects (14 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
AZA ENGINEERING LLC407/08/2025
PLUS GROUP CONSULTING ENGG, PLLC202/17/2022
C2B ARCHITECTS PC102/07/2025
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
CRAFTED INTERIORS DESIGN1105/22/2026
ASTORIA P & H CORP604/23/2026
TMS & SON PLUMBING LLC107/08/2025
VIP FIRE SPRINKLER INC104/23/2026
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
AKAM ASSOCIATES, INC.102/07/2025
GUMLEY HAFT107/19/2022
JMA CONSULTANTS & ENGINEERS, P.C.107/07/2021
THE RUSHMORE CONDOMINIUM110/24/2023
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
GC EXPEDITING204/20/2022
JENNY FLORES EXPEDITING207/08/2025
BOUTIQKEY LLC104/03/2025
14 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 14Open permit 4Signed off 10
14 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M01377577 ↗35 EAST 85 STREET
MANHATTAN
AlterationPermit Issued05/21/202609/11/2026INTERIOR RENOVATION AND COMBINATION OF APARTMENTS 11A AND 12AG. WORK TO INCLUDE MODIFICATIONS TO INTERIOR NONBEARING PARTITIONS, NEW FINISHE…
M01247541 ↗305 WEST 106 STREET
MANHATTAN
AlterationPermit Issued07/07/202509/09/2026HEREBY FILING FOR THE RELOCATION, REMOVAL AND INSTALLATION OF PLUMING FIXTURES. NO CHANGE TO USE OCCUPANCY OR EGRESS.
M01048160 ↗421 WEST 54 STREET
MANHATTAN
AlterationPermit Issued09/14/202407/20/2026REPLACEMENT OF EXISTING SIDEWALL HEADS AND CONFIRMATION OF ADEQUATE COVERAGE.
M01112660 ↗534 EAST 84 STREET
MANHATTAN
AlterationSigned-off04/03/202504/24/2025PLUMBING IN CONJUNCTION WITH THE INTERIOR RENOVATION OF AN EXISTING APARTMENT 5A ON THE 5TH FLOOR. AS PER PLANS FILED HEREWITH. NO CHANGE OF…
M00872972 ↗205 WEST END AVENUE
MANHATTAN
AlterationSigned-off06/28/202303/11/2024APPLICATION FILED FOR PLUMBING WORK AS PER PLANS HEREWITH IN. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
M00879037 ↗333 EAST 69 STREET
MANHATTAN
AlterationSigned-off06/27/202301/18/2024HEREBY FILING FOR THE INTERIOR RENOVATION AND COMBINATION OF UNITS TH8 AND 3E. NO CHANGE TOUSE OCCUPANCY OR EGRESS.
M00951950 ↗80 RIVERSIDE BOULEVARD
MANHATTAN
AlterationSigned-off10/24/202301/18/2024General construction work to move kitchen wall to accommodate new cabinetry. New interior finishes. No change to use, occupancy or egress.
M00835586 ↗35 WEST 92 STREET
MANHATTAN
AlterationPermit Issued03/03/202303/16/2023HEREBY FILING FOR THE INSTALLATION OF MECHANICAL EQUIPMENT IN CONJUNCTION WITH RENOVATION OF APARTMENT #3FG. NO CHANGE TO USE, OCCUPANCY OR…
M00715758 ↗261 BROADWAY
MANHATTAN
AlterationSigned-off04/20/202205/26/2022Installation of AC system in Apt. 9D in conjunction with job nos. M00714561 & M00714620. No change in use, occupancy, or means of egress.
M00547646 ↗504 EAST 90 STREET
MANHATTAN
AlterationSigned-off07/07/202108/24/2021PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION WORK BEING DONE UNDER JOB #M00547585. NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS…
M00524788 ↗1150 5 AVENUE
MANHATTAN
AlterationSigned-off06/28/202107/19/2021INSTALLATION OF NEW SPLIT AIR CONDITIONING SYSTEM AND ASSOCIATED DUCTWORK AS PER THE SUBMITTED DRAWINGS
M00210726 ↗2360 BROADWAY
MANHATTAN
AlterationSigned-off09/27/201906/17/2021Plumbing work for apartment 115 as shown on plans filed herewith. No change to use, egress, or occupancy. (2nd fl construction/1st floor mar…
M00439840 ↗40 WEST 77 STREET
MANHATTAN
AlterationSigned-off12/18/202003/01/2021PLUMBING WORK IN CONJUNCTION WITH JOB #140989633.
M00210718 ↗2360 BROADWAY
MANHATTAN
AlterationSigned-off09/27/201904/24/2020Mechanical work for renovation of apartment 115 as shown on plans filed herewith. No change to use, egress, or occupancy.
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
35 EAST 85 STREET ↗305/22/2026
305 WEST 106 STREET ↗307/08/2025
534 EAST 84 STREET ↗204/03/2025
421 WEST 54 STREET ↗309/18/2024
80 RIVERSIDE BOULEVARD ↗110/24/2023
333 EAST 69 STREET ↗210/19/2023
205 WEST END AVENUE ↗106/28/2023
35 WEST 92 STREET ↗103/03/2023
1150 5 AVENUE ↗207/19/2022
261 BROADWAY ↗104/20/2022
2360 BROADWAY ↗302/17/2022
40 WEST 77 STREET ↗211/29/2021
504 EAST 90 STREET ↗107/07/2021
▾Special Inspection Requirements — 73
DateRequirementBuildingInspectorRole
06/22/2026Fire-Resistant Penetrations and Joints35 EAST 85 STREETMegan Przywaraspecial
04/02/2026Structural Wood Frame35 EAST 85 STREETMegan Przywaraprogress
04/02/2026Final35 EAST 85 STREETMegan Przywaraprogress
04/02/2026Structural Steel - Welding35 EAST 85 STREET—special
04/02/2026Structural Steel - Details35 EAST 85 STREET—special
04/02/2026Structural Stability – Alterations of existing buildings35 EAST 85 STREET—special
04/02/2026Structural Cold-Formed Steel35 EAST 85 STREET—special
04/02/2026Post-installed Anchors35 EAST 85 STREETMegan Przywaraspecial
03/26/2026Energy Code Compliance Inspections35 EAST 85 STREETMegan Przywaraprogress
07/07/2025HVAC-R and service water piping design and insulation305 WEST 106 STREETMegan Przywaraenergy_progress
07/07/2025HVAC-R and service water heating system controls305 WEST 106 STREETMegan Przywaraenergy_progress
07/07/2025HVAC-R and service water heating equipment305 WEST 106 STREETMegan Przywaraenergy_progress
07/07/2025Maintenance information305 WEST 106 STREETMegan Przywaraenergy_progress
07/07/2025Energy Code Compliance Inspections305 WEST 106 STREETMegan Przywaraprogress
07/01/2025Tenant Protection Plan Compliance305 WEST 106 STREETMegan Przywaraspecial
07/01/2025Tenant Protection Plan Compliance305 WEST 106 STREETMegan Przywaraspecial
07/01/2025Tenant Protection Plan Compliance305 WEST 106 STREETMegan Przywaraspecial
06/27/2025Mechanical Systems305 WEST 106 STREETMegan Przywaraspecial
06/27/2025Fire-Resistant Penetrations and Joints305 WEST 106 STREETMegan Przywaraspecial
06/27/2025Final305 WEST 106 STREETMegan Przywaraprogress
06/26/2025Energy Code Compliance Inspections305 WEST 106 STREETMegan Przywaraprogress
06/26/2025Final305 WEST 106 STREETMegan Przywaraprogress
06/26/2025Lighting controls305 WEST 106 STREETMegan Przywaraenergy_progress
06/26/2025Lighting in dwelling units305 WEST 106 STREETMegan Przywaraenergy_progress
03/31/2025Fire-Resistant Penetrations and Joints534 EAST 84 STREETMegan Przywaraspecial
09/18/2024Tenant Protection Plan Compliance534 EAST 84 STREETARIEL GOLSHANspecial
09/17/2024Shutoff dampers421 WEST 54 STREETMegan Przywaraenergy_progress
09/17/2024Maintenance information421 WEST 54 STREETMegan Przywaraenergy_progress
09/17/2024Post-installed Anchors421 WEST 54 STREETMegan Przywaraspecial
09/17/2024Fire-Resistant Penetrations and Joints421 WEST 54 STREETMegan Przywaraspecial
09/17/2024Fireplaces421 WEST 54 STREETMegan Przywaraenergy_progress
09/17/2024HVAC-R and service water piping design and insulation421 WEST 54 STREETMegan Przywaraenergy_progress
09/17/2024Duct leakage testing, insulation and design421 WEST 54 STREETMegan Przywaraenergy_progress
09/17/2024HVAC-R and service water heating system controls421 WEST 54 STREETMegan Przywaraenergy_progress
09/17/2024HVAC-R and service water heating equipment421 WEST 54 STREETMegan Przywaraenergy_progress
09/17/2024Energy Code Compliance Inspections421 WEST 54 STREETMegan Przywaraprogress
09/10/2024Mechanical Systems421 WEST 54 STREETMegan Przywaraspecial
09/10/2024Final421 WEST 54 STREETMegan Przywaraprogress
10/23/2023Post-installed Anchors80 RIVERSIDE BOULEVARDMegan Przywaraspecial
10/23/2023Energy Code Compliance Inspections80 RIVERSIDE BOULEVARDMegan Przywaraprogress
10/23/2023Final80 RIVERSIDE BOULEVARDMegan Przywaraprogress
10/19/2023Post-installed Anchors333 EAST 69 STREETWilfried Laufsspecial
10/19/2023Fire-Resistant Penetrations and Joints333 EAST 69 STREETMegan Przywaraspecial
10/19/2023Energy Code Compliance Inspections333 EAST 69 STREETMegan Przywaraprogress
10/19/2023Final333 EAST 69 STREETMegan Przywaraprogress
10/19/2023Lighting controls333 EAST 69 STREETMegan Przywaraenergy_progress
10/19/2023Lighting in dwelling units333 EAST 69 STREETMegan Przywaraenergy_progress
10/17/2023Lighting controls333 EAST 69 STREETMegan Przywaraenergy_progress
10/17/2023Lighting in dwelling units333 EAST 69 STREETMegan Przywaraenergy_progress
10/17/2023Post-installed Anchors333 EAST 69 STREETWilfried Laufsspecial
Latest 50 of 73.
▾Documents — 191 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch26
09/02/2026M00715758-I1 · 261 BROADWAYRequest digital key ↗
09/02/2026M00524788-P1 · 1150 5 AVENUERequest digital key ↗
Showing 3 of 26 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
08/15/2026M00210726-I1 · 2360 BROADWAYRequest digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026M00210718-I1 · 2360 BROADWAYRequest digital key ↗
08/15/2026M00210718-P1 · 2360 BROADWAYRequest digital key ↗
▸Applications & Permits11
▸DOB NOWLPC Approval/Permit11
09/03/2026M00439840-P1 · 40 WEST 77 STREETOpen ↗
08/14/2026M00524788-I1 · 1150 5 AVENUEOpen ↗
08/14/2026M00439840-I1 · 40 WEST 77 STREETOpen ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications107
▸DOB NOWProgress Inspector Seal & Signature50
09/02/2026M00872972-S1 · 205 WEST END AVENUEOpen ↗
09/02/2026M00872972-S1 · 205 WEST END AVENUEOpen ↗
09/02/2026M00439840-P1 · 40 WEST 77 STREETOpen ↗
Showing 3 of 50 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature31
09/03/2026M00439840-P1 · 40 WEST 77 STREETOpen ↗
09/03/2026M00439840-I1 · 40 WEST 77 STREETOpen ↗
09/02/2026M00715758-I1 · 261 BROADWAYOpen ↗
Showing 3 of 31 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature26
09/02/2026M00439840-P1 · 40 WEST 77 STREETOpen ↗
09/01/2026M01377577-S1 · 35 EAST 85 STREETOpen ↗
08/31/2026M01377577-S3 · 35 EAST 85 STREETOpen ↗
Showing 3 of 26 on file for this type
▸Safety & Tenant Protection10
▸DOB NOWTenant Protection Plan5
09/03/2026M00439840-P1 · 40 WEST 77 STREETOpen ↗
08/14/2026M00439840-I1 · 40 WEST 77 STREETOpen ↗
08/13/2026M00210718-P1 · 2360 BROADWAYOpen ↗
Showing 3 of 5 on file for this type
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Environmental & Asbestos30
▸DOB NOWDEP ACP-5: Asbestos Assessment Report30
09/03/2026M00439840-P1 · 40 WEST 77 STREETOpen ↗
09/02/2026M00715758-I1 · 261 BROADWAYOpen ↗
08/31/2026M00835586-I1 · 35 WEST 92 STREETOpen ↗
Showing 3 of 30 on file for this type
▸Other Documents2
▸DOB NOWWaiver Document2
08/13/2026M01112660-I1 · 534 EAST 84 STREETOpen ↗
08/13/2026M01112660-S1 · 534 EAST 84 STREETOpen ↗