← Back
BuildNYC
Elevator cooperative
333 WEST END AVENUE
MANHATTAN · BIN 1031028
💬 Discuss this project
1925Year Built
16Stories
D4Building Class
R10AZoning
100,772 sfGross Floor Area
50Units
LL97 CoveredRent Stabilized3 Active Violations 2 unresolved · 1 paperwork only 1 likely answered 1 old, status unconfirmed ▸FISP: SAFE
Elevator cooperative · Owner of record: 333 West End Tenants · 7,658 sf lot · 13.16 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofOverhead protection installation3p · 1 filing · 2 docs
Floor 15Unit 15A13p · 3 filings · 20 docs
Floor 14
Floor 13
Floor 12
Floor 11Unit 11B2p · 1 filing · 8 docs
Floor 10
Floor 9
Floor 8Unit 8B7p · 3 filings · 20 docs
Floor 7
Floor 6Unit 6C9p · 1 filing · 20 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Unit 1A, Unit 1F15p · 6 filings · 20 docs
Site & exteriorHeavy duty sidewalk shedUnder Construction34p · 4 filings · 20 docs
Filed — no permit issuedSuspended scaffold for facade repairs and inspections6p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
333 West End Tenant6303/22/2026
Penmark Realty603/21/2026
William B May Co103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Outsource Consultants803/21/2026
Kma Designs203/21/2026
MK Associates803/21/2026
Clarke Construction Consultants303/21/2026
Nexus Consulting NYC403/21/2026
PS Engineers403/21/2026
Haider Engineering, P.E303/21/2026
Dezignplus103/21/2026
Haider Engineering P E303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY Fine Interiors & WoodwGeneral Contractor1203/21/2026
Phoenix Sutton STRScaffold1007/08/2026
Tribute RestorationScaffold607/08/2026
Watters ConstructionGeneral Contractor603/21/2026
BrenmacScaffold603/21/2026
K&N Tiling & Home ImproveGeneral Contractor303/21/2026
R.J.C. MechanicalPlumbing307/08/2026
Hampton ElectricalElectrical103/21/2026
Power Surge ElectricElectrical103/22/2026
Omas ElectricElectrical103/21/2026
Clover AirGeneral Contractor107/08/2026
Hamilton Air CompanyGeneral Contractor107/08/2026
McCormack ContractingGeneral Contractor107/08/2026
Kings Group NYScaffold104/09/2026
J&M Plumbing of WestchesterPlumbing107/08/2026
Orbit Plumbing & HeatingPlumbing107/08/2026
High Quality Electric ofElectrical103/21/2026
Xpress Plumbing and HeatingPlumbing107/08/2026
Accurate ElectricalElectrical103/21/2026
Falco Electrical ServicesElectrical103/21/2026
High Quality Electric of NYCElectrical103/22/2026
Mistretta ElectricElectrical103/21/2026
Omas ElectricElectrical103/22/2026
Madison ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Cowley Engineering186110/23/2026
AG Engineering8899110/23/2026
Katz Engineering238206/13/2023
Jack Green Associates422209/29/2022
CES Engineering1277308/25/2022
Vincent J. Liotta P. E1974105/25/2021
S&S Architecturtal Design2840203/11/2021
Jarek Tresko Architect1086112/10/2019
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 10, sub-cycle A)
The filing window opened 02/21/2025. 1 Cycle 10 filing on record, latest 10/22/2025, status Unsafe
10/28/2026
Filed — Alteration
SUSPENDED SCAFFOLD PLANS FOR FACADE REPAIRS AND INSPECTIONS
M01424432-S1
10/23/2026
Filed — Alteration
SUSPENDED SCAFFOLD PLANS FOR FACADE REPAIRS AND INSPECTIONS
M01424432-I1
09/23/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
George Xerakias
09/23/2026
Special inspection requirement — Post-installed anchors in masonry
George Xerakias
252 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedKings Group NY12/16/2025
DOB NOWGeneral ConstructionSigned-offWatters Construction04/22/2025
DOB NOWPlumbingSigned-offR.J.C. Mechanical04/22/2025
DOB NOWGeneral ConstructionPermit IssuedNY Fine Interiors & Woodw06/28/2023
DOB NOWMechanical SystemsPermit IssuedNY Fine Interiors & Woodw06/28/2023
DOB NOWPlumbingSigned-offXpress Plumbing and Heating05/02/2023
DOB NOWGeneral ConstructionSigned-offK&N Tiling & Home Improve04/27/2023
DOB NOWMechanical SystemsPermit IssuedNY Fine Interiors & Woodw03/17/2023
DOB NOWGeneral ConstructionPermit IssuedNY Fine Interiors & Woodw03/17/2023
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating03/16/2023
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR10/11/2022
DOB NOWSupported ScaffoldSigned-offTribute Restoration09/27/2022
DOB NOWGeneral ConstructionSigned-offWatters Construction07/11/2022
DOB NOWPlumbingSigned-offR.J.C. Mechanical06/09/2022
DOB NOWGeneral ConstructionSigned-offWatters Construction06/02/2022
DOB NOWProtection and Mechanical MethodsSigned-offPhoenix Sutton STR03/22/2022
DOB NOWSupported ScaffoldSigned-offPhoenix Sutton STR03/22/2022
DOB NOWMechanical SystemsSigned-offClover Air12/16/2021
DOB NOWGeneral ConstructionSigned-offMcCormack Contracting12/02/2021
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR10/12/2021
DOB NOWSupported ScaffoldSigned-offTribute Restoration10/01/2021
DOB NOWPlumbingPermit IssuedJ&M Plumbing of Westchest08/10/2021
DOB NOWSupported ScaffoldSigned-offPhoenix Sutton STR03/25/2021
DOB NOWSupported ScaffoldSigned-offTribute Restoration03/25/2021
DOB NOWProtection and Mechanical MethodsSigned-offPhoenix Sutton STR03/23/2021
DOB NOWMechanical SystemsPermit IssuedHamilton Air Company01/20/2021
DOB NOWPlumbingSigned-offR.J.C. Mechanical01/08/2021
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR10/15/2020
DOB NOWSupported ScaffoldSigned-offTribute Restoration10/05/2020
DOB NOWSupported ScaffoldSigned-offTribute Restoration07/30/2020
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR10/17/2019
DOB NOWSidewalk ShedSigned-offBrenmac03/04/2019
DOB NOWSupported ScaffoldSigned-offBrenmac02/25/2019
BISOTISSUEDTribute Restoration10/12/2022
BISOTISSUEDMcCormack Contracting05/19/2022
BISOTISSUEDMcCormack Contracting05/13/2022
BISOTISSUEDTribute Restoration03/28/2022
BISOTISSUEDTribute Restoration09/29/2021
BISOTISSUEDMcCormack Contracting08/06/2021
BISOTISSUEDP & P Construction & Painting07/29/2021
+ 43 more permits on file
2 projects · most recent 09/29/2022
Air Conditioning Systems
FiledStatusContractorScope
09/29/2022Permit IssuedNY Fine Interiors & WoodwAir Conditioning Systems
12/10/2019Permit IssuedHamilton Air CompanyAir Conditioning Systems
24 projects · most recent 05/21/2026
General Wiring
FiledStatusContractorScope
05/21/2026CompletePK Electric—
12/17/2025Permit IssuedHigh Quality Electric of NYC—
09/12/2025CompletePower Surge ElectricGeneral Wiring
07/07/2025CompleteOmas ElectricGeneral Wiring
04/05/2025CompletePower Surge ElectricGeneral Wiring
06/25/2024CompletePower Surge ElectricGeneral Wiring
05/19/2024CompleteLano Electric CompanyGeneral Wiring
03/28/2024CompleteGlendale Electl ContngGeneral Wiring
07/27/2022CompletePower Surge ElectricGeneral Wiring
05/12/2022CompleteT. McCaffrey-T. McGovern—
12/14/2021CompleteT. McCaffrey-T. McGovern—
01/05/2021CompletePower Surge ElectricGeneral Wiring
02/22/2020CompleteAll City ElectricalGeneral Wiring
02/11/2020CancelledLina ElectricGeneral Wiring
10/11/2019CompleteElpo Electrical Contg—
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
06/24/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/24/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/11/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/29/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/28/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/15/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/30/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/28/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/25/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/03/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/18/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/09/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/15/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
09/23/2026Alternative Materials - OTCR Buildings Bulletin NumberGeorge Xerakiasspecial
09/23/2026Post-installed anchors in masonryGeorge Xerakiasspecial
09/22/2026Tenant Protection Plan ComplianceARIEL GOLSHANspecial
08/25/2026Structural Stability – Alterations of existing buildingsEric Cowleyspecial
08/25/2026MasonryEric Cowleyspecial
08/25/2026Post-installed AnchorsEric Cowleyspecial
06/30/2026FinalEric Cowleyprogress
03/06/2025FinalWalter Radtkeprogress
06/16/2023Fire-Resistant Penetrations and JointsYURI KATZspecial
06/16/2023FinalAndrew Fethesprogress
06/16/2023Energy Code Compliance InspectionsAndrew Fethesprogress
06/16/2023Lighting in dwelling unitsAndrew Fethesenergy_progress
06/16/2023Interior lighting powerAndrew Fethesenergy_progress
06/09/2023Interior lighting powerAndrew Fethesenergy_progress
06/09/2023FinalAndrew Fethesprogress
06/09/2023Energy Code Compliance InspectionsAndrew Fethesprogress
06/09/2023Fire-Resistant Penetrations and JointsYURI KATZspecial
06/09/2023Lighting in dwelling unitsAndrew Fethesenergy_progress
09/22/2022Fire-Resistant Penetrations and JointsDelbert Smithspecial
06/08/2022HVAC-R and service water heating equipmentJACK GREENenergy_progress
06/08/2022Fire-Resistant Penetrations and JointsJACK GREENspecial
06/08/2022FinalRonnette Rileyprogress
06/08/2022Lighting in dwelling unitsRonnette Rileyenergy_progress
06/08/2022Mechanical SystemsJACK GREENspecial
06/08/2022FinalJACK GREENprogress
Latest 25 of 37.
719 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account