Office with commercial, 1-6 stories
34 ELDRIDGE STREET
MANHATTAN · BIN 1079647
💬 Discuss this project
1925Year Built
6Stories
O5Building Class
C6-1GZoning
40,860 sfGross Floor Area
27Units
12 Open Violations 10 unresolved · 2 paperwork only ▸FISP: SWARMP
Office with commercial, 1-6 stories · Owner of record: AMICUS ASSOCIATES LIMITED PARTNERSHIP · 7,925 sf lot · 5.16 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Roof2p · 1 filing · 4 docs
Cellar3p · 2 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GUL G CONTRACTING807/08/2026
AMICUS ASSOCIATES LIMITED PART2103/22/2026
SJS ASSOC LLC203/22/2026
FRIEMAN MANAGEMENT CORP103/22/2026
OWNER OF ER ELDRIDGE S103/22/2026
SUNNY SIGN INC.203/22/2026
C & R FASHION CO103/22/2026
AMICUS ASSOCIATES LIMINED103/22/2026
AMIUMS ASSOCIATES LP103/22/2026
3941 ELDRIDGE ST103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PVE ENGINEERING306/08/2026
KMB DESIGN GROUP, LLC111/09/2022
NEW YORK ENGINEERING ASSOC., P.C.107/26/2022
KNF SERVICES CROP107/10/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES P203/21/2026
NORTHEAST EXPEDITING403/21/2026
DANICO SERVICES203/21/2026
CONSTRUCTION PERMIT SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GUL & G CONTRACTING INCGeneral Contractor407/08/2026
QUALITY GENERAL CONSTRUCTIONGeneral Contractor307/08/2026
COMCELL CONSTRUCTION CORP.General Contractor203/21/2026
JOHN FITZGERALD PLBG &HTGPlumbing203/22/2026
IRVING BAPTISTEElectrical103/21/2026
JUAN MOLINAElectrical103/21/2026
BECKER, CHARLESElectrical103/21/2026
VIALVA, JOSEPHElectrical103/21/2026
ZORIA CONSTRUCTION NY INC.General Contractor107/04/2026
ROMA IRON WORKERS INCElectrical103/21/2026
CHARLES DWYERElectrical103/21/2026
CHEUNG, KEUNGElectrical103/21/2026
FILARDI, JAMESElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LEO Y LEE ASSOCIATES2481106/08/2026
ASE ENGINEERING PLLC5785205/10/2024
KMB DESIGN GROUP, LLC513111/09/2022
NEW YORK ENGINEERING ASSO851107/26/2022
Building Lifecycle
All (111)Filed (6)Permit Issued (8)Signed Off (4)Facade (FISP) (15)Violation (60)Inspection (1)Objection (4)Special Inspection (13)
07/02/2026
Permit issued — General Construction
M01391526-I1-GC
06/08/2026
Filed — Alteration
PROPOSED EXTERIOR FACADE RESTORATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01391526-I1
04/22/2026
Special inspection requirement — Tenant Protection Plan Compliance
Leo Lee
04/22/2026
Special inspection requirement — Air barrier - visual inspection
Leo Lee
04/22/2026
Special inspection requirement — Energy Code Compliance Inspections
Leo Lee
04/22/2026
Special inspection requirement — Final
Leo Lee
04/10/2025
Signed off — Alteration
REPLACEMENT OF DEFECTIVE FLOOR JOIST WITH NEW IN-FLOOR WOOD JOISTS AT 1ST FLOOR COMMERCIAL SPACE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00906449-I1
03/27/2025
Permit issued — Structural
M00906449-I1-ST
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/17/2024
Permit issued — Structural
M00906449-I1-ST
05/10/2024
Filed — Alteration
REPLACEMENT OF DEFECTIVE FLOOR JOIST WITH NEW IN-FLOOR WOOD JOISTS AT 1ST FLOOR COMMERCIAL SPACE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00906449-P1
05/06/2024
Special inspection requirement — Tenant Protection Plan Compliance
alon egozi
05/06/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
alon egozi
05/06/2024
Special inspection requirement — Final
alon egozi
05/06/2024
Special inspection requirement — Structural Wood Frame
alon egozi
02/21/2024
Permit issued — Structural
M00906449-I1-ST
10/20/2023
Violation issued (ECB, closed)
Elevators
10/10/2023
Signed off — Alteration
REGISTER EXISTING BOILER/BURNER AND CHANGE GRADE OF OIL FROM #4 TO #2.
M00750941-I1
09/18/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/13/2023
Cycle 9 facade report signed — SWARMP
09/08/2023
Cycle 9 facade inspection completed
08/31/2023
Signed off — Alteration
M00308595-I1
08/01/2023
Filed — Alteration
REPLACEMENT OF DEFECTIVE FLOOR JOIST WITH NEW IN-FLOOR WOOD JOISTS AT 1ST FLOOR COMMERCIAL SPACE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00906449-I1
04/20/2023
Signed off — Alteration
Installation of DISH telecom site Install 2 new antennas sectors, 4 RRH units and 1 GPS antenna on roof.. Install 1 wall mounted cabinet on roof. Related service connection from cellar to roof. All in conformance with TPPN 5/98.
M08032963-I1
03/21/2023
Cycle 9 facade report submitted
02/24/2023
Permit issued — Antenna
M08032963-I1-AN
02/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/16/2022
Objection raised — Scope
11/16/2022
Objection resolved — Addressed
11/16/2022
Objection raised — Zoning
11/16/2022
Objection resolved — Addressed
11/09/2022
Filed — Alteration
Installation of DISH telecom site Install 2 new antennas sectors, 4 RRH units and 1 GPS antenna on roof.. Install 1 wall mounted cabinet on roof. Related service connection from cellar to roof. All in conformance with TPPN 5/98.
M08032963-I1
08/19/2022
Permit issued — Boiler Equipment
M00750941-I1-BE
07/26/2022
Filed — Alteration
REGISTER EXISTING BOILER/BURNER AND CHANGE GRADE OF OIL FROM #4 TO #2.
M00750941-I1
06/03/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
06/03/2022
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
06/03/2022
Special inspection requirement — Maintenance information
LOUIS ARENA
06/03/2022
Special inspection requirement — Heating Systems
LOUIS ARENA
06/03/2022
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
05/09/2022
Cycle 8 facade report signed — SWARMP
04/22/2022
Cycle 8 facade inspection completed
01/04/2022
Violation issued (ECB, closed)
Construction
12/27/2021
Violation issued (ECB, closed)
Construction
12/22/2021
Cycle 8 facade report submitted
08/25/2021
Permit issued — Sidewalk Shed
M00308595-I1-SH
07/06/2021
Violation issued (ECB, closed)
Construction
06/22/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/02/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/25/2021
Violation issued (ECB, closed)
Construction
07/10/2020
Filed — Alteration
M00308595-I1
07/10/2020
Permit issued — Sidewalk Shed
M00308595-I1-SH
02/20/2020
Cycle 8 facade report submitted
02/15/2020
Cycle 8 facade report signed — UNSAFE
02/03/2020
Cycle 8 facade inspection completed
01/22/2019
Violation issued (ECB, closed)
Local Law
07/31/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/05/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/07/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/18/2017
Violation issued (ECB, closed)
Construction
11/02/2016
Violation issued (ECB, closed)
Elevators
Latest 60 of 111 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedZORIA CONSTRUCTION NY INC.07/02/2026
DOB NOWStructuralSigned-offQUALITY GENERAL CONSTRUCT03/27/2025
DOB NOWStructuralSigned-offQUALITY GENERAL CONSTRUCT09/17/2024
DOB NOWStructuralSigned-offQUALITY GENERAL CONSTRUCT02/21/2024
DOB NOWAntennaSigned-offCOMCELL CONSTRUCTION CORP02/24/2023
DOB NOWBoiler EquipmentSigned-offAPPROVED OIL CO OF BKLYN08/19/2022
DOB NOWSidewalk ShedSigned-offGUL & G CONTRACTING INC08/25/2021
DOB NOWSidewalk ShedSigned-offGUL & G CONTRACTING INC07/10/2020
BIS—ISSUEDQUALITY GENERAL CONSTRUCTION11/06/2025
BISPLISSUEDJOHN FITZGERALD PLBG &HTG02/05/2025
BIS—ISSUEDQUALITY GENERAL CONSTRUCTION11/20/2024
BIS—ISSUEDQUALITY GENERAL CONSTRUCTION03/19/2024
BISPLISSUEDJOHN FITZGERALD PLBG &HTG08/04/2023
BIS—ISSUEDQUALITY GENERAL CONSTRUCTION04/06/2023
BIS—ISSUEDQUALITY GENERAL CONSTRUCTION03/16/2023
BIS—ISSUEDQUALITY GENERAL CONSTRUCTION01/04/2023
BISPLISSUEDJOHN FITZGERALD PLBG &HTG04/13/2022
BIS—ISSUEDQUALITY GENERAL CONSTRUCTION03/30/2022
BISOTISSUEDZORIA CONSTRUCTION NY INC.09/01/2021
BISOTISSUEDZORIA CONSTRUCTION NY INC.09/17/2020
BISPLISSUEDVILLAGE P & H NY INC08/06/2020
BIS—ISSUEDCONSTRUCTION XPERT INC06/17/2020
BISFPISSUEDNY FIRETECH INC12/28/2017
BISOTISSUEDJ.A. LEE ELECTRIC INC08/28/2017
BISOTISSUEDHONGTAI CONSTRUCTION INC08/28/2017
BISPLISSUEDSO PLUMBING & HEATING INC08/28/2017
BISPLISSUEDDYCKMAN PLBG AND HTG INC10/28/2014
BISOTISSUEDPONDOSA INC10/16/2014
BISOTISSUEDMSS GOLDEN EAGLE CONSTRUC06/18/2014
BISOTISSUEDMSS GOLDEN EAGLE CONSTRUC06/07/2012
BISEQISSUEDMSS GOLDEN EAGLE CONSTRUC05/30/2012
BISOTISSUEDUD GENERAL CONTRACTOR INC04/01/2009
BISEQISSUEDUD GENERAL CONTRACTOR INC04/01/2009
BISOTISSUEDASN CONSTRUCTION CO05/13/2008
BISOTISSUEDBERLINER COMM INC02/05/2004
BISOTISSUEDIMPERIAL CONSTRUCTION AND ROOFIN11/03/1995
8 projects · most recent 02/26/2024
General Wiring
FiledStatusContractorScope
02/26/2024Permit IssuedROBIN ELECTRICAL CO., INCGeneral Wiring
02/14/2024CompleteOM ELECTRIC, INCGeneral Wiring
12/22/2022CompleteCHARLES M. DWYER ELECTL16 meters, 1 new_meters
09/22/2022Permit IssuedROBIN ELECTRICAL CO., INC51 meters
04/14/2022Permit IssuedROBIN ELECTRICAL CO., INCGeneral Wiring
04/14/2022CancelledROBIN ELECTRICAL CO., INCGeneral Wiring
10/23/2020CompleteOM ELECTRIC, INC—
03/03/2020Permit IssuedWCK ELECTRIC CORP.—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
09/18/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
04/22/2026Tenant Protection Plan ComplianceLeo Leespecial
04/22/2026Air barrier - visual inspectionLeo Leeenergy_progress
04/22/2026Energy Code Compliance InspectionsLeo Leeprogress
04/22/2026FinalLeo Leeprogress
05/06/2024Tenant Protection Plan Compliancealon egozispecial
05/06/2024Structural Stability – Alterations of existing buildingsalon egozispecial
05/06/2024Finalalon egoziprogress
05/06/2024Structural Wood Framealon egoziprogress
06/03/2022HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
06/03/2022HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
06/03/2022Maintenance informationLOUIS ARENAenergy_progress
06/03/2022Heating SystemsLOUIS ARENAspecial
06/03/2022HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
▾Documents — 339 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch5
09/02/2026M00750941-I1Request digital key ↗
08/29/2026M00906449-I1Request digital key ↗
08/29/2026M00906449-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00308595-I1Request digital key ↗
▸Applications & Permits64
▸BISPLAN / WORK APPROVAL APPLICATION34
10/17/2025123140421Open ↗
10/14/2025123140421Open ↗
07/18/2025123140421Open ↗
Showing 3 of 34 on file for this type
▸BISWORK PERMIT APPLICATION28
08/04/2023123140421Open ↗
04/07/2023123140421Open ↗
03/17/2023123140421Open ↗
Showing 3 of 28 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
06/17/2020123140421Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
01/24/2018122850619Open ↗
▸Seals & Professional Certifications58
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION22
03/20/2020123140421Open ↗
04/30/2018122388843Open ↗
04/02/2018122850619Open ↗
Showing 3 of 22 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
06/01/2017122850619Open ↗
04/11/2017122706358Open ↗
Showing 2 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/23/2026M00750941-I1Open ↗
09/23/2026M00750941-I1Open ↗
09/23/2026M00750941-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/04/2026M00308595-I1Open ↗
09/02/2026M00750941-I1Open ↗
09/01/2026M08032963-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026M00750941-I1Open ↗
08/31/2026M01391526-I1Open ↗
08/24/2026M00906449-P1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISProfessional and Owner Certification (POC3)1
06/01/2017122850619Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
09/09/2020140901040Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment15
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
10/18/2017123140421Open ↗
06/01/2017122850619Open ↗
04/11/2017122706358Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING4
10/17/2025123140421Open ↗
10/14/2025123140421Open ↗
04/08/2025123140421Open ↗
Showing 3 of 4 on file for this type
▸BISSELF-CERT PLUMBING NOTICE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE PERMITS1
01/24/2018122850619Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
03/21/2018123186630Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
01/24/2018122850619Open ↗
▸Safety & Tenant Protection8
▸BISTenant Protection Plan and Notes4
09/09/2020140901040Open ↗
01/12/2018123186630Open ↗
06/01/2017122850619Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST2
10/18/2017123140421Open ↗
Showing 1 of 2 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026M00308595-I1Open ↗
▸Environmental & Asbestos19
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
09/09/2020140901040Open ↗
03/20/2020123140421Open ↗
01/12/2018123186630Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/02/2026M00750941-I1Open ↗
08/29/2026M00906449-P1Open ↗
08/29/2026M00906449-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
03/20/2020123140421Open ↗
▸Energy Compliance29
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS13
03/20/2020123140421Open ↗
04/30/2018122388843Open ↗
04/25/2018122850619Open ↗
Showing 3 of 13 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
04/30/2018122388843Open ↗
04/25/2018122850619Open ↗
03/05/2018122388843Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
06/16/2022140901040Open ↗
05/11/2022140901040Open ↗
09/09/2020140901040Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/11/2022140901040Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00750941-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00750941-I1Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY7
06/16/2022140901040Open ↗
06/16/2022140901040Open ↗
05/11/2022140901040Open ↗
Showing 3 of 7 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION2
05/15/2018122850619Open ↗
04/02/2018122850619Open ↗
▸Approvals, Objections & Sign-offs49
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST19
06/17/2022140901040Open ↗
05/15/2018122850619Open ↗
05/15/2018122850619Open ↗
Showing 3 of 19 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION14
05/06/2022140901040Open ↗
04/13/2022123140421Open ↗
04/13/2022123140421Open ↗
Showing 3 of 14 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE10
11/12/2025123140421Open ↗
10/17/2025123140421Open ↗
10/14/2025123140421Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSUPERSEDING LETTER1
04/13/2022123140421Open ↗
▸Cost, Insurance & Ownership26
▸BISCOST AFFIDAVIT24
06/16/2022140901040Open ↗
04/20/2022140901040Open ↗
09/09/2020140901040Open ↗
Showing 3 of 24 on file for this type
▸BISCIVIL PENALTY AFFIDAVIT/REQUEST1
01/04/2023123140421Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
06/16/2022140901040Open ↗
▸Filing & Intake Forms46
▸BISBOROUGH INTAKE FORM28
08/04/2023123140421Open ↗
08/02/2023123140421Open ↗
04/07/2023123140421Open ↗
Showing 3 of 28 on file for this type
▸BISEFILING COVER SHEET10
10/18/2017123140421Open ↗
10/03/2017123186630Open ↗
06/01/2017122850619Open ↗
Showing 3 of 10 on file for this type
▸BISADDITIONAL INFORMATION6
05/06/2022140901040Open ↗
11/12/2020123140421Open ↗
10/28/2020123140421Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
09/09/2020140901040Open ↗
Showing 1 of 2 on file for this type
▸Other Documents10
▸DOB NOWLoft Board Certificate5
08/13/2026M00308595-I1Open ↗
08/13/2026M00906449-P1Open ↗
08/13/2026M00750941-I1Open ↗
Showing 3 of 5 on file for this type
▸BISLOFT BOARD CERTIFICATE3
09/09/2020140901040Open ↗
01/13/2020123140421Open ↗
08/11/2017122850619Open ↗
▸BISPLOT DIAGRAM1
10/18/2017123140421Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
01/04/2023123140421Open ↗