← Back
BuildNYC
Bungalow colony - cooperatively owned land
Breezy Point Cooperative
34 JAMAICA WALK · BIN 4466756
💬 Discuss this project
1938Year Built
1Stories
A8Building Class
R4Zoning
1,600,000 sfGross Floor Area
1,906Units
LL97 Covered59 Active Violations 1 unresolved · 58 paperwork only ▸FDNY Report ↗
Bungalow colony - cooperatively owned land · Owner of record: Breezy Point Cooperative · 12,253,428 sf lot · 0.13 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralElectricalPlumbingFire ProtectionCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPhotovoltaic solar panel installation3p · 2 filings · 20 docs
Floor 25p · 1 filing · 20 docs
Floor 116p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Breezy Point Cooperative1907/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Parker and West Engineering109/05/2024
CMC Design Architect407/05/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sunrun103/21/2026
AC Building Consultants803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sand-Bar ContractorsGeneral Contractor203/21/2026
Sunrun Installation ServiceGeneral Contractor107/08/2026
Sand-Bar ContractorsScaffold107/08/2026
Joseph O'Grady P & HPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Parker and West Engineering5272109/05/2024
CMC Design Architect2984307/05/2023
FP Villano Consulting Engineering8575109/21/2021
Building Lifecycle
All (77)Filed (5)Permit Issued (4)Signed Off (3)Violation (2)Inspection (5)Objection (28)Special Inspection (30)
01/22/2025
Signed off — Alteration
Q01106065-I1
09/09/2024
Permit issued — Solar
Q01106065-I1-SL
09/05/2024
Filed — Alteration
Q01106065-I1
09/05/2024
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Walid Abdulla
09/04/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
09/04/2024
Special inspection requirement — Final
Walid Abdulla
09/04/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
09/04/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
09/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
03/01/2024
Signed off — New Building
New 2 story, 1 family dwelling.
Q00545971-S2
01/16/2024
Signed off — New Building
New 2 story, 1 family dwelling.
Q00545971-S1
07/13/2023
Special inspection requirement — On-Site Private Sewage Disposal Systems Installation
Gary Lenhart
07/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gary Lenhart
07/13/2023
Special inspection requirement — HVAC-R and service water heating system controls
Gary Lenhart
07/13/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Gary Lenhart
07/13/2023
Special inspection requirement — HVAC-R and service water heating equipment
Gary Lenhart
07/13/2023
Special inspection requirement — Energy Code Compliance Inspections
Gary Lenhart
07/13/2023
Special inspection requirement — Sprinkler Systems
Gary Lenhart
07/05/2023
Filed — New Building
New 2 story, 1 family dwelling.
Q00545971-P1
06/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gary Lenhart
06/29/2023
Special inspection requirement — On-Site Private Sewage Disposal Systems Installation
Gary Lenhart
06/29/2023
Special inspection requirement — Sprinkler Systems
Gary Lenhart
06/29/2023
Special inspection requirement — Energy Code Compliance Inspections
Gary Lenhart
06/29/2023
Special inspection requirement — HVAC-R and service water heating equipment
Gary Lenhart
06/29/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Gary Lenhart
06/29/2023
Special inspection requirement — HVAC-R and service water heating system controls
Gary Lenhart
06/22/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/02/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/02/2023
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
03/02/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/02/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/29/2022
Permit issued — Plumbing
Q00545971-S2-PL
11/25/2022
Violation issued (ECB, closed)
Construction
11/25/2022
Violation issued (ECB, closed)
Construction
11/17/2022
Permit issued — Earth Work
Q00545971-I1-GC-CX
09/28/2022
Permit issued — Construction Fence
Q00545971-S1-FN
02/19/2022
Filed — New Building
New 2 story, 1 family dwelling.
Q00545971-S2
02/19/2022
Filed — New Building
New 2 story, 1 family dwelling.
Q00545971-S1
10/19/2021
Objection resolved — Addressed
10/19/2021
Objection resolved — Addressed
10/19/2021
Objection resolved — Addressed
10/19/2021
Objection resolved — Addressed
10/19/2021
Objection resolved — Addressed
10/19/2021
Objection resolved — Addressed
10/19/2021
Objection resolved — Addressed
10/19/2021
Objection resolved — Addressed
10/19/2021
Objection resolved — Addressed
10/19/2021
Objection resolved — Addressed
10/19/2021
Objection resolved — Addressed
10/19/2021
Objection resolved — Addressed
10/19/2021
Objection resolved — Addressed
10/19/2021
Objection resolved — Addressed
09/29/2021
Objection raised — Other
09/29/2021
Objection raised — Zoning
09/29/2021
Objection raised — Scope
09/27/2021
Objection raised — Energy
09/27/2021
Objection raised — Energy
09/27/2021
Objection raised — Energy
09/27/2021
Objection raised — Energy
09/27/2021
Objection raised — Energy
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSunrun Installation Service09/09/2024
DOB NOWPlumbingSigned-offJoseph O'Grady P & H12/29/2022
DOB NOWEarth WorkPermit IssuedSand-Bar Contractors11/17/2022
DOB NOWConstruction FenceSigned-offSand-Bar Contractors09/28/2022
BIS—ISSUEDMalbro Construction Services10/11/2022
1 project · most recent 07/05/2023
Gas Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
07/05/2023Signed-offJoseph O'Grady P & HGas, Plumbing-Sprinkler, Water/Sanitary
2 projects · most recent 09/05/2024
General Wiring
FiledStatusContractorScope
09/05/2024CompleteSunrun Solar Electl—
01/25/2023CompleteG.E.O. ElectricGeneral Wiring
1 project · most recent 07/05/2023
FiledStatusContractorScope
07/05/2023Signed-offJoseph O'Grady P & H1 scope_items
1 project · most recent 07/05/2023
Earthwork
FiledStatusContractorScope
07/05/2023Signed-offJoseph O'Grady P & HEarthwork
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
06/22/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/02/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/02/2023Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
03/02/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/02/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
09/05/2024Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Walid Abdullaspecial
09/04/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
09/04/2024FinalWalid Abdullaprogress
09/04/2024Energy Code Compliance InspectionsWalid Abdullaprogress
09/04/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
09/04/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
07/13/2023On-Site Private Sewage Disposal Systems InstallationGary Lenhartspecial
07/13/2023Fire-Resistant Penetrations and JointsGary Lenhartspecial
07/13/2023HVAC-R and service water heating system controlsGary Lenhartenergy_progress
07/13/2023HVAC-R and service water piping design and insulationGary Lenhartenergy_progress
07/13/2023HVAC-R and service water heating equipmentGary Lenhartenergy_progress
07/13/2023Energy Code Compliance InspectionsGary Lenhartprogress
07/13/2023Sprinkler SystemsGary Lenhartspecial
06/29/2023Fire-Resistant Penetrations and JointsGary Lenhartspecial
06/29/2023On-Site Private Sewage Disposal Systems InstallationGary Lenhartspecial
06/29/2023Sprinkler SystemsGary Lenhartspecial
06/29/2023Energy Code Compliance InspectionsGary Lenhartprogress
06/29/2023HVAC-R and service water heating equipmentGary Lenhartenergy_progress
06/29/2023HVAC-R and service water piping design and insulationGary Lenhartenergy_progress
06/29/2023HVAC-R and service water heating system controlsGary Lenhartenergy_progress
09/21/2021Fenestration areasGary Lenhartenergy_progress
09/21/2021Insulation placement and R valuesGary Lenhartenergy_progress
09/21/2021Air barrier - visual inspectionGary Lenhartenergy_progress
09/21/2021HVAC-R and service water piping design and insulationGary Lenhartenergy_progress
09/21/2021Concrete - Cast-In-PlaceGary Lenhartspecial
Latest 25 of 43.
▾Documents — 56 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/26/2026Q00545971-P1Request digital key ↗
08/26/2026Q00545971-S2Request digital key ↗
08/26/2026Q00545971-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
11/14/2022421766592Open ↗
▸BISWORK PERMIT APPLICATION1
12/02/2022421766592Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q00545971-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00545971-I1Open ↗
▸Seals & Professional Certifications25
▸DOB NOWSpecial Inspector Seal & Signature11
09/02/2026Q01106065-I1Open ↗
09/02/2026Q01106065-I1Open ↗
09/02/2026Q01106065-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/02/2026Q01106065-I1Open ↗
09/02/2026Q01106065-I1Open ↗
09/02/2026Q01106065-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/26/2026Q00545971-P1Open ↗
08/26/2026Q00545971-S2Open ↗
08/26/2026Q00545971-S1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection2
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
12/02/2022421766592Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
12/02/2022421766592Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/02/2022421766592Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00545971-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00545971-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026Q00545971-I1Open ↗
▸Approvals, Objections & Sign-offs7
▸BISLETTERS - SUPPORTING DOCUMENTATION6
12/02/2022421766592Open ↗
12/02/2022421766592Open ↗
12/02/2022421766592Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01106065-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
12/02/2022421766592Open ↗
▸Filing & Intake Forms4
▸BISBOROUGH INTAKE FORM2
12/02/2022421766592Open ↗
11/14/2022421766592Open ↗
▸BISADDITIONAL INFORMATION1
12/02/2022421766592Open ↗
▸BISEFILING COVER SHEET1
11/14/2022421766592Open ↗
▸Other Documents4
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)2
08/13/2026Q00545971-I1Open ↗
08/13/2026Q00545971-S2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q00545971-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00545971-I1Open ↗