← Back
BuildNYC
Extended stay / suite - apartment-like amenities
Delta Hotels by Marriott
340 WEST 40TH STREET · Name © OpenStreetMap contributors · BIN 1013693
💬 Discuss this project
2010Year Built
32Stories
HSBuilding Class
C6-4Zoning
131,921 sfGross Floor Area
1Units
LL97 CoveredRent Stabilized2 Active Violations 0 unresolved · 2 paperwork only 4 old, status unconfirmed ▸FISP: SAFEFDNY Report ↗
Extended stay / suite - apartment-like amenities · Owner of record: 340-344 Realty · 6,583 sf lot · 20.04 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projects334-340 Hotel Management4 filings
Floor 2334-340 Hotel Management3p · 2 filings · 7 docs
Floor 1334-340 Hotel Management4p · 3 filings · 10 docs
Cellar334-340 Hotel Management3p · 2 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Mehta FMY LLC 340-344 Realty4003/21/2026
340-344 LLC303/21/2026
340-344 Realty103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Lu Ning Architecture402/01/2024
Raad508/16/2023
Z&T Engineering101/29/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Lu Ning Architecture1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
247 Construction GroupGeneral Contractor1203/21/2026
PipestylistsPlumbing607/08/2026
Atmos Electric SvceElectrical103/22/2026
E-J Electric Installation CoElectrical103/22/2026
Jem Fire PreventionPlumbing103/22/2026
Jem Fire PreventionFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Lu Ning Architecture, PLL1155409/19/2023
Raad7727408/16/2023
Z & T Engineering591101/29/2021
Building Lifecycle
All (135)Filed (10)Permit Issued (7)Signed Off (5)Facade (FISP) (5)Violation (60)Inspection (4)Objection (14)Special Inspection (30)
11/17/2025
Violation issued (HPD, closed)
I
04/04/2024
Objection resolved — Addressed
04/04/2024
Objection resolved — Addressed
04/04/2024
Special inspection requirement — Final
02/08/2024
Objection raised — Admin
02/08/2024
Objection raised — Zoning
02/08/2024
Objection raised — Zoning
02/02/2024
Objection raised — Energy
02/02/2024
Objection raised — Zoning
02/02/2024
Objection raised — Structural
02/01/2024
Filed — Alteration
SIGN APPLICATION FILED FOR THE EXISTING HOTEL TO REPLACE THE EXISTING STAYBRIDGE HOTEL NAME TO MEET BRAND STANDARD OF THE DELTA MARRIOT HOTEL.
M00974864-I1
01/08/2024
Signed off — Alteration
PLUMBING WORK IN CONJUNCTION WITH INTERIOR ALTERATION
M00913286-I1
01/03/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/02/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/29/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/20/2023
Signed off — Alteration
M00449905-I1
12/13/2023
Permit issued — Plumbing
M00913286-I1-PL
11/13/2023
Signed off — Alteration
PLUMBING WORK IN CONJUNCTION WITH INTERIOR ALTERATION.
M00348235-I1
10/25/2023
Signed off — Alteration
MECHANICAL WORK FOR INTERIOR FIT OUT INCLUDING INSTALLATION OF MECHANICAL HOODS AND DUCTS FOR THE ACCESSORY KITCHEN TO HOTEL USING THE VENTLESS HOOD ON 1ST FLOOR, INSTALLATION OF STAIR PRESSURIZATION SYSTEM FOR THE HOTEL.
M00449889-I1
09/28/2023
Special inspection requirement — HVAC insulation and sealing
NING LU
09/28/2023
Special inspection requirement — Fire-Resistance Rated Construction
NING LU
09/28/2023
Special inspection requirement — Energy Code Compliance Inspections
NING LU
09/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NING LU
09/21/2023
Permit issued — Structural
M00449905-I1-ST
09/19/2023
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH INTERIOR ALTERATION.
M00348235-P1
09/19/2023
Signed off — Alteration
Interior renovation for the cellar, first and second floor of the existing hotel. Work includes partition changes, doors. No change to use egress or occupancy.
M00761538-I1
09/08/2023
Permit issued — Sprinklers
M00358791-I1-EW-SP
09/06/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/05/2023
Permit issued — Plumbing
M00348235-I1-PL
08/16/2023
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH INTERIOR ALTERATION
M00913286-I1
08/07/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
NICHOLAS AZADIAN
08/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NICHOLAS AZADIAN
08/07/2023
Special inspection requirement — Energy Code Compliance Inspections
NICHOLAS AZADIAN
08/07/2023
Special inspection requirement — HVAC-R and service water heating equipment
NICHOLAS AZADIAN
08/03/2023
Special inspection requirement — HVAC-R and service water heating system controls
NICHOLAS AZADIAN
08/03/2023
Special inspection requirement — Energy Code Compliance Inspections
NICHOLAS AZADIAN
08/03/2023
Special inspection requirement — Final
NICHOLAS AZADIAN
08/03/2023
Special inspection requirement — Mechanical Systems
NICHOLAS AZADIAN
08/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NICHOLAS AZADIAN
08/03/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
NICHOLAS AZADIAN
08/03/2023
Special inspection requirement — HVAC-R and service water heating equipment
NICHOLAS AZADIAN
07/31/2023
Filed — Alteration
MECHANICAL WORK FOR INTERIOR FIT OUT INCLUDING INSTALLATION OF MECHANICAL HOODS AND DUCTS FOR THE ACCESSORY KITCHEN TO HOTEL USING THE VENTLESS HOOD ON 1ST FLOOR, INSTALLATION OF STAIR PRESSURIZATION SYSTEM FOR THE HOTEL.
M00449889-P2
07/11/2023
Cycle 9 facade report signed — SAFE
06/02/2023
Cycle 9 facade report submitted
05/19/2023
Filed — Alteration
MECHANICAL WORK FOR INTERIOR FIT OUT INCLUDING INSTALLATION OF MECHANICAL HOODS AND DUCTS FOR THE ACCESSORY KITCHEN TO HOTEL USING THE VENTLESS HOOD ON 1ST FLOOR, INSTALLATION OF STAIR PRESSURIZATION SYSTEM FOR THE HOTEL.
M00449889-P1
05/19/2023
Filed — Alteration
M00358791-I1
05/12/2023
Cycle 9 facade inspection completed
05/05/2023
Violation issued (FDNY_NOV, closed)
05/05/2023
Special inspection requirement — Fire-Resistance Rated Construction
NING LU
05/05/2023
Special inspection requirement — HVAC insulation and sealing
NING LU
05/05/2023
Special inspection requirement — Mechanical Systems
NICHOLAS AZADIAN
05/05/2023
Special inspection requirement — Final
NICHOLAS AZADIAN
05/05/2023
Special inspection requirement — HVAC-R and service water heating system controls
NICHOLAS AZADIAN
05/05/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
NICHOLAS AZADIAN
05/05/2023
Special inspection requirement — HVAC-R and service water heating equipment
NICHOLAS AZADIAN
05/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NING LU
05/05/2023
Special inspection requirement — Energy Code Compliance Inspections
NING LU
05/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NICHOLAS AZADIAN
05/05/2023
Special inspection requirement — Energy Code Compliance Inspections
NICHOLAS AZADIAN
11/10/2022
Violation issued (ECB, open)
Local Law
Latest 60 of 135 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offT & T Plumbing12/13/2023
DOB NOWStructuralSigned-off247 Construction Group09/21/2023
DOB NOWSprinklersPermit IssuedJem Fire Prevention09/08/2023
DOB NOWPlumbingSigned-offT & T Plumbing09/05/2023
DOB NOWGeneral ConstructionSigned-off247 Construction Group10/27/2022
DOB NOWMechanical SystemsSigned-off247 Construction Group10/24/2022
DOB NOWStructuralSigned-off247 Construction Group09/08/2021
BISOTISSUED247 Construction Group10/31/2022
BISOTISSUED247 Construction Group10/19/2021
BISOTISSUED247 Construction Group07/07/2021
BISOTISSUEDPCCM Management10/19/2020
BISOTISSUEDMarte Development11/17/2017
BISEQISSUEDTri Borough Scaffolding06/10/2015
BIS—ISSUEDCad Signs NYC04/01/2011
BIS—ISSUEDCad Signs NYC03/14/2011
BISBLISSUEDRRP Plumbing02/17/2010
BISSPISSUEDRRP Plumbing02/15/2010
BISOTISSUEDNorth Shore Neon Sign01/25/2010
BISOTISSUEDFlintlock Construction Service01/07/2010
BIS—ISSUEDFlintlock Construction Service01/07/2010
BISOTISSUEDFlintlock Construction Service12/28/2009
BISEQISSUEDFlintlock Construction Service12/24/2009
BISFSISSUEDEdward Levinson12/11/2009
BIS—ISSUEDNorth Shore Neon Sign Co12/10/2009
BISEQISSUEDRockledge Scaffold10/09/2009
BISFSISSUEDEdward Levinson08/25/2009
BIS—ISSUEDNorth Shore Neon Sign Co08/21/2009
BISBLISSUEDRRP Plumbing08/17/2009
BISSDISSUEDRRP Plumbing07/14/2009
BISEQISSUEDEverest Scaffolding05/22/2009
BISOTISSUEDFlintlock Construction Service05/20/2009
BIS—ISSUEDFlintlock Construction Service04/29/2009
BISPLISSUEDRRP Plumbing04/09/2009
BISMHISSUEDFlintlock Construction Service04/02/2009
BISFSISSUEDFlintlock Construction Service02/19/2009
BISSPISSUEDRRP Plumbing02/02/2009
BISEQISSUEDFlintlock Construction Service09/12/2008
BISSDISSUEDRRP Plumbing07/11/2008
BISPLISSUEDRRP Plumbing04/11/2008
BISEQISSUEDFlintlock Construction Service02/07/2008
+ 15 more permits on file
2 projects · most recent 10/12/2023
General Wiring
FiledStatusContractorScope
10/12/2023CompleteAtmos Electric SvceGeneral Wiring
04/29/2020CompleteE-J Electric Installation CoGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
01/03/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/02/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/29/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/06/2023Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
04/04/2024Final—progress
09/28/2023HVAC insulation and sealing NING LUenergy_progress
09/28/2023Fire-Resistance Rated ConstructionNING LUprogress
09/28/2023Energy Code Compliance InspectionsNING LUprogress
09/28/2023Fire-Resistant Penetrations and JointsNING LUspecial
08/07/2023HVAC-R and service water piping design and insulationNICHOLAS AZADIANenergy_progress
08/07/2023Fire-Resistant Penetrations and JointsNICHOLAS AZADIANspecial
08/07/2023Energy Code Compliance InspectionsNICHOLAS AZADIANprogress
08/07/2023HVAC-R and service water heating equipmentNICHOLAS AZADIANenergy_progress
08/03/2023HVAC-R and service water heating system controlsNICHOLAS AZADIANenergy_progress
08/03/2023Energy Code Compliance InspectionsNICHOLAS AZADIANprogress
08/03/2023FinalNICHOLAS AZADIANprogress
08/03/2023Mechanical SystemsNICHOLAS AZADIANspecial
08/03/2023Fire-Resistant Penetrations and JointsNICHOLAS AZADIANspecial
08/03/2023HVAC-R and service water piping design and insulationNICHOLAS AZADIANenergy_progress
08/03/2023HVAC-R and service water heating equipmentNICHOLAS AZADIANenergy_progress
05/05/2023Fire-Resistance Rated ConstructionNING LUprogress
05/05/2023HVAC insulation and sealing NING LUenergy_progress
05/05/2023Mechanical SystemsNICHOLAS AZADIANspecial
05/05/2023FinalNICHOLAS AZADIANprogress
05/05/2023HVAC-R and service water heating system controlsNICHOLAS AZADIANenergy_progress
05/05/2023HVAC-R and service water piping design and insulationNICHOLAS AZADIANenergy_progress
05/05/2023HVAC-R and service water heating equipmentNICHOLAS AZADIANenergy_progress
05/05/2023Fire-Resistant Penetrations and JointsNING LUspecial
05/05/2023Energy Code Compliance InspectionsNING LUprogress
Latest 25 of 33.
▾Documents — 373 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch3
09/02/2026M00761538-I1Request digital key ↗
08/29/2026M00913286-I1Request digital key ↗
08/15/2026M00974864-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems3
08/29/2026M00449889-P2Request digital key ↗
08/29/2026M00449889-P1Request digital key ↗
08/29/2026M00449889-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
08/29/2026M00348235-P1Request digital key ↗
08/15/2026M00348235-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/04/2026M00449905-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
08/31/2026M00358791-I1Request digital key ↗
▸Applications & Permits65
▸BISPLAN / WORK APPROVAL APPLICATION36
05/14/2020140902085Open ↗
11/09/2016122773221Open ↗
06/09/2015140358609Open ↗
Showing 3 of 36 on file for this type
▸BISWORK PERMIT APPLICATION28
07/09/2021140902085Open ↗
10/19/2020140902085Open ↗
11/20/2017122773221Open ↗
Showing 3 of 28 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
09/23/2010120048732Open ↗
▸Seals & Professional Certifications105
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION37
02/22/2018122773221Open ↗
11/20/2017122773221Open ↗
11/09/2016122773221Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWProgress Inspector Seal & Signature24
09/02/2026M00449889-P1Open ↗
09/02/2026M00449889-P1Open ↗
09/02/2026M00449889-P1Open ↗
Showing 3 of 24 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST11
08/20/2009120135291Open ↗
08/20/2009120135308Open ↗
06/11/2009120057384Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM11
08/20/2009120135291Open ↗
08/20/2009120135308Open ↗
06/11/2009120057384Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/04/2026M00449905-I1Open ↗
08/31/2026M00358791-I1Open ↗
08/29/2026M00449889-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/02/2026M00449889-P1Open ↗
09/02/2026M00449889-P1Open ↗
09/01/2026M00348235-I1Open ↗
Showing 3 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/09/2015140358609Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/09/2015140358609Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
05/14/2020140902085Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/09/2015140358609Open ↗
▸Trade Schedules & Equipment19
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT8
11/07/2009110246671Open ↗
10/29/2009110479205Open ↗
10/27/2009110479205Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING8
06/19/2010110126168Open ↗
11/25/2009110126168Open ↗
11/23/2009110126168Open ↗
Showing 3 of 8 on file for this type
▸BISSELF-CERT PLUMBING NOTICE2
07/02/2010110126168Open ↗
03/05/2010110126168Open ↗
▸BISSTANDPIPE INSP REPORT : FP-841
07/26/2010110126168Open ↗
▸Safety & Tenant Protection18
▸DOB NOWHPD-1: Anti-Harassment Area Checklist9
08/13/2026M00449889-P1Open ↗
08/13/2026M00449889-P2Open ↗
08/13/2026M00348235-P1Open ↗
Showing 3 of 9 on file for this type
▸BISANTI-HARASSMENT CHECKLIST4
05/14/2020140902085Open ↗
11/06/2017122773221Open ↗
06/10/2009120057393Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTenant Protection Plan2
08/13/2026M00348235-I1Open ↗
08/13/2026M00348235-P1Open ↗
▸BISTenant Protection Plan and Notes1
10/24/2017122773221Open ↗
▸BISHPD: CERTIFICATE OF NO HARASSMENT1
06/11/2009120072544Open ↗
▸BISSTREET TREE CHECKLIST1
11/09/2016122773221Open ↗
▸Environmental & Asbestos34
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER19
12/08/2009120220108Open ↗
10/22/2009120175434Open ↗
08/20/2009120135291Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWOER: Notice to Proceed7
08/13/2026M00761538-I1Open ↗
08/13/2026M00348235-I1Open ↗
08/13/2026M00348235-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWOER: Notice of Satisfaction4
08/13/2026M00348235-I1Open ↗
08/13/2026M00449889-I1Open ↗
08/13/2026M00761538-I1Open ↗
Showing 3 of 4 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED3
05/14/2020140902085Open ↗
05/23/2017122773221Open ↗
06/09/2015140358609Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
06/09/2020140902085Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
12/21/2023140902085Open ↗
09/24/2021140902085Open ↗
05/14/2020140902085Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
02/22/2018122773221Open ↗
11/20/2017122773221Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026M00449889-I1Open ↗
08/13/2026M00761538-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/21/2023140902085Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
02/22/2018122773221Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
12/21/2023140902085Open ↗
09/24/2021140902085Open ↗
05/14/2020140902085Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs44
▸BISADMINISTRATIVE OBJECTIONS19
12/08/2009120220108Open ↗
10/22/2009120175434Open ↗
08/20/2009120135308Open ↗
Showing 3 of 19 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST19
01/04/2024140902085Open ↗
02/22/2018122773221Open ↗
06/14/2011120018417Open ↗
Showing 3 of 19 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
02/05/2018122773221Open ↗
07/07/2017122773221Open ↗
04/11/2011110323196Open ↗
Showing 3 of 5 on file for this type
▸BISSUPERSEDING LETTER1
07/09/2021140902085Open ↗
▸Cost, Insurance & Ownership18
▸BISCOST AFFIDAVIT17
01/04/2024140902085Open ↗
09/10/2020140902085Open ↗
09/09/2020140902085Open ↗
Showing 3 of 17 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
12/21/2023140902085Open ↗
▸Filing & Intake Forms28
▸BISEFILING COVER SHEET10
11/09/2016122773221Open ↗
12/08/2009120220108Open ↗
10/22/2009120175434Open ↗
Showing 3 of 10 on file for this type
▸BISADDITIONAL INFORMATION10
09/10/2020140902085Open ↗
09/09/2020140902085Open ↗
09/02/2020140902085Open ↗
Showing 3 of 10 on file for this type
▸BISeFiling Job Application Cover Sheet6
06/11/2009120057384Open ↗
06/11/2009120072544Open ↗
05/14/2020140902085Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM2
07/09/2021140902085Open ↗
02/22/2018122773221Open ↗
▸Other Documents19
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION15
09/10/2020140902085Open ↗
09/09/2020140902085Open ↗
09/02/2020140902085Open ↗
Showing 3 of 15 on file for this type
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS1
11/24/2010110247055Open ↗
▸BISENVIRONMENTAL "E" DEP NOTICE TO PROCEED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISUnknown1
08/20/2009120135308Open ↗
▸BISENVIRONMENTAL -E- DEP NOTICE OF SATIS1
07/19/2010110246671Open ↗