ECB08/20/2026Failure to maintain exterior building and appurtenances. Noted: observed at exp 1(e. Elev) at top floor on 254 ralph ave entrance. Observed cracked bricks and missing mortar. Remedy: maintain exterior facade. TNothing owed — awaiting certificate of correction
ECB11/24/2025Failure to maintain exterior facade and appurtenances. Note: at time of inspection, i observed exp #1 east-cracked/spalling brick/mortar joints at window spandrels and top floor window lintel line.-exp #2 southNothing owed — awaiting certificate of correction
ECB04/11/2024Failure to submit an acceptable required cycle 9B report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #909379. Remedy: submit acceptable requNothing owed — awaiting certificate of correction
ECB04/11/2024Failure to submit an acceptable required cycle 9B report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #909373. Remedy: submit acceptable requNothing owed — awaiting certificate of correction
ECB04/11/2024Failure to submit an acceptable required cycle 9B report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #909377. Remedy: submit acceptable requNothing owed — awaiting certificate of correction
ECB04/11/2024Failure to submit an acceptable required cycle 9B report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #909376. Remedy: submit acceptable requNothing owed — awaiting certificate of correction
ECB04/11/2024Failure to submit an acceptable required cycle 9B report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #909381. Remedy: submit acceptable requNothing owed — awaiting certificate of correction
ECB04/11/2024Failure to submit an acceptable required cycle 9B report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #909380. Remedy: submit acceptable requNothing owed — awaiting certificate of correction
ECB04/11/2024Failure to submit an acceptable required cycle 9B report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #909371. Remedy: submit acceptable requNothing owed — awaiting certificate of correction
ECB04/11/2024Failure to submit an acceptable required cycle 9B report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #909382. Remedy: submit acceptable requNothing owed — awaiting certificate of correction
ECB04/11/2024Failure to submit an acceptable required cycle 9B report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #909372. Remedy: submit acceptable requNothing owed — awaiting certificate of correction
ECB02/22/2020Failure to maintain exterior facade & appurtenances.note:all exposuresdisplay multiple(10)total window air conditioner units installed w/improper support,i.e,tin cans,loose bricks,wood.rem:maintain exterior facNothing owed — awaiting certificate of correction
Old · issued 3+ years ago and still listed by DOB; nothing on the city's records either way
DOB02/22/2023Failed to file FISP cycle 9B technical report by 2/21/2023Issued 2023; DOB's record still lists it as active