Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsBoston PropertiesUnder Construction16 filings
Project M00615380Permit Issued · 10/20/2026
PROVIDE SITEWORK AS PER PLANS FILED IN CONJUNCTION WITH NB# M00615380-I1
On file for this project
113 documents
Project M01474474Permit Issued · 10/15/2026
INSTALLATION OF INTERIOR ACCESS STAIR SYSTEM AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ACCESS STAIR SYSTEM SHALL COMPLY WITH CHAPTER 33 OF 2022 NYC BUILDING CODE.
Project M01455342Permit Issued · 09/08/2026
INSTALLATION OF TEMPORARY SCAFFOLD STAIR TOWER # 1 (FLOORS: 005 THRU 013) AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD STAIR TOWER SHALL COMPLY WITH CHAPTER 33 OF 2022 NYC BUILDING CODE.
On file for this project
1 document
Latest 3 of 16 filings on this floor.
RoofMetropolitan Transportation AuthorityUnder Construction4p · 2 filings
ArchitectureCivilDMElectricalEquipmentFire ProtectionGeneralLandscapeMechanicalPlumbingStructuralOtherZ
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Project M01431546Permit Issued · 07/16/2026
INSTALLATION OF TEMPORARY ROOF PROTECTION PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
On file for this project
3 documents
Project M00947028Permit Issued · 01/28/2026
Filed herewith for Interior & Exterior renovation for the MTA Box. Construction of an entrance to the LIRR Grand Central Madison concourse. Installation of non load bearing partitions, ceilings, floors & doors as per plans. Filed in conjunction w/NB
On file for this project
33 documents
Floor 47Boston Properties1p · 1 filing
ArchitectureCivilElectricalEquipmentFire ProtectionGeneralLandscapeMechanicalPlumbingStructuralOtherZ
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Project M01332219Approved
FILING HEREWITH FOR MECHANICAL MODIFICATIONS TO THE EXISTING SYSTEM AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
14 documents
Floor 46Boston Properties1 filing
ArchitectureCivilElectricalEquipmentFire ProtectionGeneralLandscapeMechanicalPlumbingStructuralOtherZ
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Project M01332219Approved
FILING HEREWITH FOR MECHANICAL MODIFICATIONS TO THE EXISTING SYSTEM AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
14 documents
Floor 45Boston Properties1p · 1 filing
ArchitectureCivilElectricalEquipmentFire ProtectionGeneralLandscapeMechanicalPlumbingStructuralOtherZ
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Project M01332219Approved
FILING HEREWITH FOR MECHANICAL MODIFICATIONS TO THE EXISTING SYSTEM AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
14 documents
Floor 44
Floor 43
Floor 42
Floor 41
Floor 40
Floor 39
Floor 38
Floor 37
Floor 36
Floor 35
Floor 34
Floor 33
Floor 32
Floor 31
Floor 30
Floor 29
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16Under Construction1 filing
ArchitectureCivilDMElectricalEquipmentFire ProtectionGeneralLandscapeMechanicalPlumbingStructuralOtherZ
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
Project M01455418Permit Issued · 09/08/2026
INSTALLATION OF A TEMPORARY SCAFFOLD STAIR TOWER # 1 (FLOORS: 013 THRU 016) AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD STAIR TOWER SHALL COMPLY WITH CHAPTER 33 OF 2022 NYC BUILDING CODE.
On file for this project
1 document
Floor 15Under Construction1 filing
ArchitectureCivilDMElectricalEquipmentFire ProtectionGeneralLandscapeMechanicalPlumbingStructuralOtherZ
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
Project M01455418Permit Issued · 09/08/2026
INSTALLATION OF A TEMPORARY SCAFFOLD STAIR TOWER # 1 (FLOORS: 013 THRU 016) AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD STAIR TOWER SHALL COMPLY WITH CHAPTER 33 OF 2022 NYC BUILDING CODE.
On file for this project
1 document
Floor 14Under Construction1 filing
ArchitectureCivilDMElectricalEquipmentFire ProtectionGeneralLandscapeMechanicalPlumbingStructuralOtherZ
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
Project M01455418Permit Issued · 09/08/2026
INSTALLATION OF A TEMPORARY SCAFFOLD STAIR TOWER # 1 (FLOORS: 013 THRU 016) AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD STAIR TOWER SHALL COMPLY WITH CHAPTER 33 OF 2022 NYC BUILDING CODE.
On file for this project
1 document
Floor 13Under Construction1 filing
ArchitectureCivilDMElectricalEquipmentFire ProtectionGeneralLandscapeMechanicalPlumbingStructuralOtherZ
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
Project M01455418Permit Issued · 09/08/2026
INSTALLATION OF A TEMPORARY SCAFFOLD STAIR TOWER # 1 (FLOORS: 013 THRU 016) AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD STAIR TOWER SHALL COMPLY WITH CHAPTER 33 OF 2022 NYC BUILDING CODE.
On file for this project
1 document
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5Temporary scaffold stair tower installationUnder Construction2 filings
ArchitectureCivilDMElectricalEquipmentFire ProtectionGeneralLandscapeMechanicalPlumbingStructuralOtherZ
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
Project M01452590Permit Issued · 09/08/2026
INSTALLATION OF TEMPORARY SCAFFOLD STAIR TOWER # 2 (FLOORS: 002 THRU 005) AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD STAIR TOWER SHALL COMPLY WITH CHAPTER 33 OF 2022 NYC BUILDING CODE.
On file for this project
1 document
Project M01450361Permit Issued · 08/26/2026
INSTALLATION OF TEMPORARY SCAFFOLD STAIR TOWER # 1 (FLOORS: 002 THRU 005) AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD STAIR TOWER SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
On file for this project
1 document
Floor 4Temporary scaffold stair tower installationUnder Construction1p · 3 filings
ArchitectureCivilDMElectricalEquipmentFire ProtectionGeneralLandscapeMechanicalPlumbingStructuralOtherZ
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
Project M01452590Permit Issued · 09/08/2026
INSTALLATION OF TEMPORARY SCAFFOLD STAIR TOWER # 2 (FLOORS: 002 THRU 005) AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD STAIR TOWER SHALL COMPLY WITH CHAPTER 33 OF 2022 NYC BUILDING CODE.
On file for this project
1 document
Project M01450361Permit Issued · 08/26/2026
INSTALLATION OF TEMPORARY SCAFFOLD STAIR TOWER # 1 (FLOORS: 002 THRU 005) AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD STAIR TOWER SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
On file for this project
1 document
Project M00450435Permit Issued · 02/08/2024
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
10 documents
Floor 3Temporary scaffold stair tower installationUnder Construction3 filings
ArchitectureCivilDMElectricalEquipmentFire ProtectionGeneralLandscapeMechanicalPlumbingStructuralOtherZ
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
Project M01452590Permit Issued · 09/08/2026
INSTALLATION OF TEMPORARY SCAFFOLD STAIR TOWER # 2 (FLOORS: 002 THRU 005) AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD STAIR TOWER SHALL COMPLY WITH CHAPTER 33 OF 2022 NYC BUILDING CODE.
On file for this project
1 document
Project M01450361Permit Issued · 08/26/2026
INSTALLATION OF TEMPORARY SCAFFOLD STAIR TOWER # 1 (FLOORS: 002 THRU 005) AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD STAIR TOWER SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
On file for this project
1 document
Project M01475031Permit Entire
INSTALLATION OF TEMPORARY SCAFFOLD STAIR TOWER # 3 (FLOORS: 002 THRU 003) AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD STAIR TOWER SHALL COMPLY WITH CHAPTER 33 OF 2022 NYC BUILDING CODE.
Floor 2Temporary scaffold stair tower installationUnder Construction8 filings
ArchitectureCivilDMElectricalEquipmentFire ProtectionGeneralLandscapeMechanicalPlumbingStructuralOtherZ
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
Project M01462954Permit Issued · 10/07/2026
INSTALLATION OF TEMPORARY SCAFFOLD STAIR TOWER # 3 (FLOORS: 001 THRU 002) AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD STAIR TOWER SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
On file for this project
1 document
Project M01450920Permit Issued · 09/08/2026
INSTALLATION OF TEMPORARY SCAFFOLD STAIR TOWER # 1 (FLOORS: 001 & 002) AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD STAIR TOWER SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
On file for this project
1 document
Project M01452590Permit Issued · 09/08/2026
INSTALLATION OF TEMPORARY SCAFFOLD STAIR TOWER # 2 (FLOORS: 002 THRU 005) AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD STAIR TOWER SHALL COMPLY WITH CHAPTER 33 OF 2022 NYC BUILDING CODE.
On file for this project
1 document
Latest 3 of 8 filings on this floor.
Floor 1Metropolitan Transportation AuthorityUnder Construction4p · 12 filings
ArchitectureCivilDMElectricalEquipmentFire ProtectionGeneralLandscapeMechanicalPlumbingStructuralOtherZ
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
Project M01462954Permit Issued · 10/07/2026
INSTALLATION OF TEMPORARY SCAFFOLD STAIR TOWER # 3 (FLOORS: 001 THRU 002) AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD STAIR TOWER SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
On file for this project
1 document
Project M01450920Permit Issued · 09/08/2026
INSTALLATION OF TEMPORARY SCAFFOLD STAIR TOWER # 1 (FLOORS: 001 & 002) AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD STAIR TOWER SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
On file for this project
1 document
Project M01455443Permit Issued · 09/08/2026
INSTALLATION OF A TEMPORARY SCAFFOLD STAIR TOWER # 2 (FLOORS: Sub-Cellar#1 THRU 001 EAST) AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD STAIR TOWER SHALL COMPLY WITH CHAPTER 33 OF 2022 NYC BUILDING CODE.
On file for this project
1 document
Latest 3 of 12 filings on this floor.
CellarMetropolitan Transportation AuthorityUnder Construction9p · 7 filings
ArchitectureCivilDMElectricalEquipmentFire ProtectionGeneralLandscapeMechanicalPlumbingStructuralOtherZ
Issued Permit Scope
Earth Work · Foundation · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold · Support of Excavation
Project M01455418Permit Issued · 09/08/2026
INSTALLATION OF A TEMPORARY SCAFFOLD STAIR TOWER # 1 (FLOORS: 013 THRU 016) AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD STAIR TOWER SHALL COMPLY WITH CHAPTER 33 OF 2022 NYC BUILDING CODE.
On file for this project
1 document
Project M01450342Permit Issued · 08/26/2026
INSTALLATION OF TEMPORARY SCAFFOLD STAIR TOWER # 1 (FLOORS: CELLAR & 001) AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD STAIR TOWER SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
On file for this project
1 document
Project M01431386Signed-off · 07/17/2026
EQUIPMENT USE: INSTALLATION OF A TEMPORARY PERSONNEL HOIST COMPLEX AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION . NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST INSTALLED IN ACCORDANCE WITH CHAPTER 33 OF 2022 NYC BUILDING CODE.
On file for this project
1 document
Latest 3 of 7 filings on this floor.
Sub-CellarMetropolitan Transportation AuthorityUnder Construction2p · 5 filings
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructuralZ
Issued Permit Scope
Foundation · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold · Support of Excavation
Project M01455443Permit Issued · 09/08/2026
INSTALLATION OF A TEMPORARY SCAFFOLD STAIR TOWER # 2 (FLOORS: Sub-Cellar#1 THRU 001 EAST) AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD STAIR TOWER SHALL COMPLY WITH CHAPTER 33 OF 2022 NYC BUILDING CODE.
On file for this project
1 document
Project M01437944Permit Issued · 07/30/2026
EQUIPMENT USE: INSTALLATION OF A TEMPORARY PERSONNEL HOIST COMPLEX AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. HOIST INSTALLED IN ACCORDANCE WITH CHAPTER 33 OF 2022 NYC BUILDING CODE.
On file for this project
1 document
Project M01431386Signed-off · 07/17/2026
EQUIPMENT USE: INSTALLATION OF A TEMPORARY PERSONNEL HOIST COMPLEX AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION . NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST INSTALLED IN ACCORDANCE WITH CHAPTER 33 OF 2022 NYC BUILDING CODE.
On file for this project
1 document
Latest 3 of 5 filings on this floor.
Site & exteriorBp 347 Madison Associates, LLC C/OUnder Construction11 filings · 14 docs
ArchitectureCivilElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · Protection and Mechanical Methods · Sidewalk Shed · Supported Scaffold
Project M01456808Permit Issued · 10/19/2026
INSTALLATION OF TEMPORARY NORTH POD PLATFORM AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. POD PLATFORM SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
Project M01457805Permit Issued · 09/28/2026
Installation of temporary storage of material on top of existing sidewalk shed (Filed under M01396143-I1-SH) per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
1 document
Project M01396143Permit Issued · 08/05/2026
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
2 documents
Latest 3 of 11 filings on this floor.
Filed — no permit issuedScaffold installation1 filing · 6 docs
Project M00450434Approved
No filed description on record for this project.
On file for this project
6 documents