Predominantly retail with other uses
Yeshivat Magen Abraham
345 AVENUE U · BIN 3427376
💬 Discuss this project
1952Year Built
2Stories
K4Building Class
R6AZoning
5,720 sfGross Floor Area
2Units
4 Active Violations ▸FDNY Report ↗
Predominantly retail with other uses · Owner of record: Magen Abraham Yeshiva · 4,000 sf lot · 1.43 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofYeshivat Magen AbrahamUnder Construction39p · 3 filings · 20 docs
BulkheadUnder Construction3p · 1 filing · 20 docs
Floor 3Under Construction108p · 2 filings · 20 docs
Floor 2Yeshivat Magen AbrahamUnder Construction102p · 3 filings · 20 docs
Floor 1Unit 1ZUnder Construction108p · 4 filings · 20 docs
MezzanineUnder Construction1p · 1 filing · 20 docs
CellarYeshivat Magen AbrahamUnder Construction109p · 4 filings · 20 docs
Site & exteriorYeshivat Magen Abraham26p · 4 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Magen Abraham Yeshiva103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/13/2026$3.5M—— → —$612/sf building
03/31/2022$10.1M—— → —$1,774/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Associates1407/23/2025
MGM Creations Architecture1304/25/2025
Ashraf601/20/2025
Gilsanz Murray Steficek409/01/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Metropolis Group1803/21/2026
Core Consultants NYC1203/21/2026
Rennon Construction503/21/2026
A2ZCM1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MJM Associates ConstructionGeneral Contractor2407/08/2026
MJM Associates ConstructionScaffold707/08/2026
Platinum Services NYScaffold604/09/2026
Rennon ConstructionScaffold504/09/2026
Pal-Mar Plumbing & HeatingPlumbing407/08/2026
MJM Construction AssociatesGeneral Contractor304/09/2026
Mill Brook Fire ProtectionFire Protection207/08/2026
MJM Construction AssociatesScaffold104/09/2026
BK Construction ServicesScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Steel Core Engineering PL10982206/05/2024
Gilsanz Murray Steficek240409/01/2023
Building Lifecycle
All (267)Filed (37)Permit Issued (41)Signed Off (7)Violation (60)Inspection (12)Objection (80)Special Inspection (30)
08/17/2026
Signed off — Alteration
B01168743-I1
07/31/2026
Signed off — Alteration
B00710239-I1
02/05/2026
Signed off — Alteration
INSTALLATION OF 256' NEW SIDEWALK SHED AT 345 AVE U, AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
B08002910-I1
01/12/2026
Permit issued — Supported Scaffold
B01168743-I1-SH
01/12/2026
Permit issued — Construction Fence
B01168743-I1-SF
01/12/2026
Permit issued — Sidewalk Shed
B01168743-I1-FN
12/03/2025
Permit issued — General Construction
B00731187-I1-GC
12/01/2025
Permit issued — General Construction
B00731187-I1-GC
11/19/2025
Permit issued — Construction Fence
B00710239-I1-FN
11/19/2025
Permit issued — General Construction
B00731187-I1-GC
11/19/2025
Permit issued — Mechanical Systems
B00731187-S3-MS
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/11/2025
Violation issued (ECB, closed)
Unknown
08/11/2025
Violation issued (ECB, closed)
Unknown
08/11/2025
Violation issued (ECB, closed)
Unknown
07/23/2025
Filed — Alteration CO
Sprinkler in conjunction with Architectural-CO # B00731187-I1. Modification of existing sprinkler system as per new tenant layout on partial 1st and 2nd floor.
B00731187-S6
07/22/2025
Special inspection requirement — Post-installed Anchors
07/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/10/2025
Objection raised — Inspections
06/10/2025
Objection resolved — Addressed
05/22/2025
Objection resolved — Addressed
05/16/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/13/2025
Permit issued — Plumbing
B00731187-S2-PL
05/01/2025
Special inspection requirement — Public Assembly Emergency Lighting
Alexander Sheyman
04/29/2025
Objection raised — Admin
04/25/2025
Filed — No Work
B08036411-P2
04/24/2025
Special inspection requirement — Public Assembly Emergency Lighting
Alexander Sheyman
04/22/2025
Filed — No Work
B01214062-I1
02/27/2025
Permit issued — General Construction
B00731187-I1-GC
02/26/2025
Permit issued — Mechanical Systems
B00731187-S3-MS
02/26/2025
Permit issued — Construction Fence
B00710239-I1-FN
02/18/2025
Special inspection requirement — Sprinkler Systems
02/11/2025
Signed off — Alteration
Structural work including reinforcing of existing main roof, new floor opening at second floor and demolition of existing low roof framing.
B00769274-I1
01/21/2025
Permit issued — Supported Scaffold
B01168743-I1-SH
01/21/2025
Permit issued — Construction Fence
B01168743-I1-SF
01/21/2025
Permit issued — Sidewalk Shed
B01168743-I1-FN
01/20/2025
Filed — Alteration
B01168743-I1
01/14/2025
Signed off — Alteration CO
Sprinkler in conjunction with Architectural-CO # B00731187-I1. Modification of existing sprinkler system as per new tenant layout on partial 1st and 2nd floor.
B00731187-S1
01/08/2025
Permit issued — General Construction
B00731187-I1-GC
01/07/2025
Signed off — Alteration CO
Sprinkler in conjunction with Architectural-CO # B00731187-I1. Modification of existing sprinkler system as per new tenant layout on partial 1st and 2nd floor.
B00731187-S5
10/10/2024
Permit issued — Structural
B00769274-I1-ST
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Sheyman
07/09/2024
Special inspection requirement — Mechanical Systems
Alexander Sheyman
07/09/2024
Special inspection requirement — Heating Systems
Alexander Sheyman
07/09/2024
Special inspection requirement — HVAC-R and service water heating equipment
Alexander Sheyman
07/09/2024
Special inspection requirement — Maintenance information
Alexander Sheyman
07/09/2024
Special inspection requirement — Energy Code Compliance Inspections
Alexander Sheyman
07/09/2024
Special inspection requirement — Final
Alexander Sheyman
07/09/2024
Special inspection requirement — Fire-Resistance Rated Construction
Alexander Sheyman
07/09/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Alexander Sheyman
07/09/2024
Special inspection requirement — HVAC-R and service water heating system controls
Alexander Sheyman
07/09/2024
Special inspection requirement — Shutoff dampers
Alexander Sheyman
07/09/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Alexander Sheyman
06/24/2024
Objection resolved — Addressed
06/24/2024
Special inspection requirement — HVAC-R and service water heating system controls
Alexander Sheyman
06/24/2024
Special inspection requirement — Maintenance information
Alexander Sheyman
06/24/2024
Special inspection requirement — HVAC-R and service water heating equipment
Alexander Sheyman
Latest 60 of 267 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offPlatinum Services NY01/12/2026
DOB NOWConstruction FenceSigned-offPlatinum Services NY01/12/2026
DOB NOWSidewalk ShedSigned-offPlatinum Services NY01/12/2026
DOB NOWGeneral ConstructionPermit IssuedMJM Construction Associates12/03/2025
DOB NOWGeneral ConstructionPermit IssuedMJM Construction Associates12/01/2025
DOB NOWConstruction FenceSigned-offMJM Construction Associates11/19/2025
DOB NOWGeneral ConstructionPermit IssuedMJM Associates Construction11/19/2025
DOB NOWMechanical SystemsPermit IssuedMJM Construction Associates11/19/2025
DOB NOWPlumbingPermit IssuedPal-Mar Plumbing & Heating05/13/2025
DOB NOWGeneral ConstructionPermit IssuedMJM Associates Construction02/27/2025
DOB NOWMechanical SystemsPermit IssuedMJM Associates Construction02/26/2025
DOB NOWConstruction FenceSigned-offMJM Associates Construction02/26/2025
DOB NOWSupported ScaffoldSigned-offPlatinum Services NY01/21/2025
DOB NOWConstruction FenceSigned-offPlatinum Services NY01/21/2025
DOB NOWSidewalk ShedSigned-offPlatinum Services NY01/21/2025
DOB NOWGeneral ConstructionPermit IssuedMJM Associates Construction01/08/2025
DOB NOWStructuralSigned-offMJM Associates Construction10/10/2024
DOB NOWGeneral ConstructionPermit IssuedMJM Associates Construction04/30/2024
DOB NOWConstruction FenceSigned-offMJM Associates Construction04/09/2024
DOB NOWStructuralSigned-offMJM Associates Construction04/08/2024
DOB NOWPlumbingPermit IssuedPal-Mar Plumbing & Heating03/11/2024
DOB NOWMechanical SystemsPermit IssuedMJM Associates Construction03/06/2024
DOB NOWStandpipeSigned-offLeguci Piping & Heating02/16/2024
DOB NOWSprinklersSigned-offLeguci Piping & Heating02/15/2024
DOB NOWConstruction FenceSigned-offRennon Construction11/08/2023
DOB NOWSidewalk ShedSigned-offRennon Construction11/06/2023
DOB NOWStructuralSigned-offMJM Associates Construction11/06/2023
DOB NOWGeneral ConstructionPermit IssuedMJM Associates Construction05/23/2023
DOB NOWConstruction FenceSigned-offMJM Associates Construction05/19/2023
DOB NOWSupported ScaffoldSigned-offBK Construction Services05/04/2023
DOB NOWStructuralSigned-offMJM Associates Construction05/03/2023
DOB NOWStructuralSigned-offMJM Associates Construction03/29/2023
DOB NOWPlumbingPermit IssuedPal-Mar Plumbing & Heating03/14/2023
DOB NOWMechanical SystemsPermit IssuedMJM Associates Construction03/14/2023
DOB NOWPlumbingPermit IssuedPal-Mar Plumbing & Heating01/19/2023
DOB NOWGeneral ConstructionPermit IssuedMJM Associates Construction11/19/2022
DOB NOWStructuralSigned-offMJM Associates Construction11/09/2022
DOB NOWSidewalk ShedSigned-offRennon Construction09/19/2022
DOB NOWSidewalk ShedSigned-offRennon Construction09/19/2022
DOB NOWGeneral ConstructionPermit IssuedMJM Associates Construction05/25/2022
+ 3 more permits on file
1 project · most recent 07/23/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/23/2025Permit IssuedMJM Construction AssociatesHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Lg ARUM121BTE5 10 tons · Vrf Outdoor ×6
ARUM096BTE5 8 tons · Vrf Outdoor ×3
ARUM192BTE5 16 tons · Vrf Outdoor ×3
ARUN038GSS4 3 tons · Vrf Outdoor ×3
ARUN048GSS4 4 tons · Vrf Outdoor ×2
LAU150HYV3 15,000 BTU · Vrf Outdoor ×3
LSU120HSV5 1 tons · Heat Pump Outdoor ×3
Trane RGV120HE2A0AAAA 10 tons · Rooftop Unit ×3
RGV180HE2ADAAAA 15 tons · Rooftop Unit ×3
1 project · most recent 07/23/2025
Sprinkler System
FiledStatusContractorScope
07/23/2025Signed-offLeguci Piping & HeatingSprinkler System
1 project · most recent 07/23/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/23/2025Permit IssuedPal-Mar Plumbing & HeatingGas, Storm, Water/Sanitary
4 projects · most recent 01/20/2025
General Wiring
FiledStatusContractorScope
01/20/2025CompleteRichard Neu—
02/02/2023Permit IssuedV-Mar ElectricGeneral Wiring
09/20/2022Permit IssuedHigh Quality Electric of—
08/11/2022CompleteStar Electrical Contractors—
1 project · most recent 07/23/2025
Steel Concrete Masonry
FiledStatusContractorScope
07/23/2025Permit IssuedMJM Construction AssociatesSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
05/16/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/11/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/11/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
03/08/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/05/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
02/28/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/29/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/07/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/07/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/07/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/24/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/18/2022Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
07/22/2025Fire-Resistant Penetrations and Joints—special
07/22/2025Post-installed Anchors—special
05/01/2025Public Assembly Emergency LightingAlexander Sheymanprogress
04/24/2025Public Assembly Emergency LightingAlexander Sheymanprogress
02/18/2025Sprinkler Systems—special
07/09/2024Fire-Resistant Penetrations and JointsAlexander Sheymanspecial
07/09/2024Heating SystemsAlexander Sheymanspecial
07/09/2024HVAC-R and service water piping design and insulationAlexander Sheymanenergy_progress
07/09/2024HVAC-R and service water heating equipmentAlexander Sheymanenergy_progress
07/09/2024Shutoff dampersAlexander Sheymanenergy_progress
07/09/2024Maintenance informationAlexander Sheymanenergy_progress
07/09/2024FinalAlexander Sheymanprogress
07/09/2024HVAC-R and service water heating system controlsAlexander Sheymanenergy_progress
07/09/2024Energy Code Compliance InspectionsAlexander Sheymanprogress
07/09/2024Fire-Resistance Rated ConstructionAlexander Sheymanprogress
07/09/2024Structural Stability – Alterations of existing buildingsAlexander Sheymanspecial
07/09/2024Mechanical SystemsAlexander Sheymanspecial
06/24/2024Energy Code Compliance InspectionsAlexander Sheymanprogress
06/24/2024HVAC-R and service water piping design and insulationAlexander Sheymanenergy_progress
06/24/2024Maintenance informationAlexander Sheymanenergy_progress
06/24/2024HVAC-R and service water heating equipmentAlexander Sheymanenergy_progress
06/24/2024Fire-Resistant Penetrations and JointsAlexander Sheymanspecial
06/24/2024HVAC-R and service water heating system controlsAlexander Sheymanenergy_progress
06/21/2024Sprinkler SystemsAlexander Sheymanspecial
06/21/2024Standpipe SystemsAlexander Sheymanspecial
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Yeshivat Magen AbrahamEducation—
Project B00710239 Alteration · LOC Issued · 03/31/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 307 on file (BIS + DOB NOW)
▸Plans & Drawings38
▸DOB NOWPlans/Sketch33
08/30/2026B00710239-I1Request digital key ↗
08/29/2026B00769274-I1Request digital key ↗
08/28/2026B08002910-I1Request digital key ↗
Showing 3 of 33 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly5
08/28/2026B00753988-I1Request digital key ↗
08/28/2026B08036411-P2Request digital key ↗
08/21/2026B01214062-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits11
▸BISPLAN / WORK APPROVAL APPLICATION10
02/10/2026322123518Open ↗
12/01/2023340865362Open ↗
11/08/2023340865362Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION1
01/17/2024340899807Open ↗
▸Zoning, Tax Lot & Property Records18
▸DOB NOWZD1: DOB Zoning Diagram7
08/26/2026B00731187-B2Open ↗
Showing 1 of 7 on file for this type
▸DOB NOWZoning Exhibit form (1-5)7
08/26/2026B00731187-B2Open ↗
Showing 1 of 7 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
02/28/2023322158990Open ↗
12/14/2022322110194Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
04/14/2023322158990Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
04/14/2023322158990Open ↗
▸Seals & Professional Certifications124
▸DOB NOWSpecial Inspector Seal & Signature43
08/22/2026B00731187-A3Open ↗
08/22/2026B00731187-A4Open ↗
08/22/2026B00731187-A5Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWProgress Inspector Seal & Signature41
09/02/2026B08036411-P2Open ↗
08/27/2026B08036411-I1Open ↗
08/22/2026B00731187-A1Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature38
08/28/2026B00753988-I1Open ↗
08/28/2026B08036411-I1Open ↗
08/28/2026B08036411-P2Open ↗
Showing 3 of 38 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/12/2023340899807Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/12/2023340899807Open ↗
▸Safety & Tenant Protection10
▸DOB NOWStreet Tree Checklist7
08/26/2026B00731187-B2Open ↗
08/13/2026B00731187-A5Open ↗
08/13/2026B00731187-A7Open ↗
Showing 3 of 7 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN1
10/17/2023340899807Open ↗
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos28
▸DOB NOWDEP ACP-5: Asbestos Assessment Report26
08/26/2026B00731187-B2Open ↗
08/26/2026B00731187-B1Open ↗
08/26/2026B00731187-A5Open ↗
Showing 3 of 26 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
11/08/2023340865362Open ↗
09/12/2023340899807Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
10/12/2023340899807Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
09/12/2023340899807Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/12/2023340899807Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
10/12/2023340899807Open ↗
▸Approvals, Objections & Sign-offs31
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter29
08/28/2026B00753988-I1Open ↗
08/26/2026B00731187-B2Open ↗
Showing 2 of 29 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
01/04/2023322158990Open ↗
12/14/2022322110194Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
10/12/2023340899807Open ↗
▸Filing & Intake Forms9
▸BISADDITIONAL INFORMATION4
10/12/2023340899807Open ↗
04/14/2023322158990Open ↗
01/04/2023322158990Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET3
02/10/2026322123518Open ↗
12/28/2022322158990Open ↗
10/04/2022322110194Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/12/2023340899807Open ↗
▸BISBOROUGH INTAKE FORM1
02/10/2026322123518Open ↗
▸Other Documents32
▸DOB NOWSite Survey: Initial7
08/26/2026B00731187-B2Open ↗
08/13/2026B00731187-A7Open ↗
08/13/2026B00731187-A5Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone7
08/26/2026B00731187-B2Open ↗
Showing 1 of 7 on file for this type
▸DOB NOWPlot Diagram7
08/26/2026B00731187-B2Open ↗
08/13/2026B00731187-A1Open ↗
08/13/2026B00731187-A5Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProperty Ownership Certification7
08/26/2026B00731187-A5Open ↗
08/26/2026B00731187-B2Open ↗
08/26/2026B00731187-A7Open ↗
Showing 3 of 7 on file for this type
▸BISRECORDS MGMT FEE PAYMENT RECEIPT3
11/08/2023340865362Open ↗
03/02/2023322158990Open ↗
02/10/2023322158990Open ↗
▸BISVERIFY DOB PLAN NAMING STANDARD IS MET1
02/28/2023322158990Open ↗