Elevator cooperative
The Morad Diplomat
345 EAST 73 STREET · Name © OpenStreetMap contributors · Upper East Side-Lenox Hill-Roosevelt Island · BIN 1044904
💬 Discuss this project
1961Year Built
13Stories
D4Building Class
R8BZoning
154,506 sfGross Floor Area
143Units
LL97 CoveredRent Stabilized8 Open Violations ▸FISP: SWARMP
Elevator cooperative · Owner of record: 345 EAST 73RD OWNERS CORP · 17,753 sf lot · 8.7 FAR built · Flood zone X
Locations of Work
ArchitectureOther
Roof1 filing · 2 docs
Floor 121p · 2 filings · 6 docs
Floor 11
Floor 10
Floor 9
Floor 81p · 1 filing · 19 docs
Floor 7
Floor 6
Floor 5
Floor 4
Floor 31p · 1 filing · 19 docs
Floor 22p · 1 filing · 19 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
345 EAST 73RD STREET507/08/2026
FIRSTSERVICE RESIDENTIAL1303/22/2026
345 EAST 73RD OWNER'S CORP.3903/22/2026
345 E73 OWNERS303/22/2026
345 E 73 ST OWNERS803/22/2026
345 EAST 73 OWNERS3303/22/2026
345 EAST 73 ST OWNER C203/22/2026
FIRST SERVICE RESIDENTIAL303/21/2026
GOLDSTEIN MANAGEMENT103/21/2026
RESIDENCE103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J A EXPEDITING403/21/2026
AE DESIGN SOLUTION603/21/2026
KX CONSULTING403/21/2026
D D EXPEDITORS403/21/2026
HAQUE ASSOCIATES203/21/2026
PROFESSIONAL SOLUTIONS103/21/2026
MK ARCHITECTURE PC203/21/2026
DYNAMIC BUILDING CONSULTANTS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EMPIRE NY INSTALLATIONS INCGeneral Contractor707/08/2026
SCHNELLBACHER-SENDON GRO*General Contractor507/08/2026
LYNX BUILDERS, INCGeneral Contractor303/21/2026
ELRAY CONSTRUCTION CORPGeneral Contractor303/21/2026
NYC DESIGN & RENO LLCGeneral Contractor303/21/2026
JAROSLAW KURACHElectrical103/21/2026
MOTTES, STEVEElectrical103/21/2026
NELSON & TOM MAINT INC DBElectrical103/22/2026
RICHARD GRIMAElectrical103/21/2026
ROBINSON, PHILIPElectrical103/21/2026
SANDHA GENERAL CONTRACTINElectrical103/21/2026
SIMENEH SEMEAElectrical103/21/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor107/08/2026
NUZA HOME IMPROVEMENT CORGeneral Contractor107/08/2026
TOP NOTCH REMODELING CORPGeneral Contractor104/09/2026
AUTHENTIC PLBG CORPPlumbing107/08/2026
HYDROKINETIC PLBG & HTG IPlumbing107/08/2026
CLEMENT CHAMBERSElectrical103/21/2026
RVM PLUMBING CORPPlumbing107/08/2026
DA SILVA, JAMESElectrical103/21/2026
DUNCAN, JAMESElectrical103/21/2026
FRANK LA GREGAElectrical103/21/2026
GLEICH, BERNARDElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A2 ARCHITECT, PC2504205/05/2025
R. MORGAN ROLONTZ ARCHITE8541107/09/2024
ACCARDO ENGINEERING, PLLC1247211/30/2023
SAG ENGINEERING & CONSULT608211/30/2023
JON LIBASCI3068108/06/2021
MK ARCHITECTURE, PC476106/22/2021
Building Lifecycle
All (172)Filed (15)Permit Issued (17)Signed Off (11)Facade (FISP) (12)Violation (60)Inspection (13)Objection (16)Special Inspection (28)
04/06/2026
Signed off — Alteration
INTERIOR RENOVATION AND COMBINATION OF APARTMENTS 1J & 1K ON THE 1ST FLOOR AS PER TPPN 3/97. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01206977-I1
04/06/2026
Signed off — Alteration
INTERIOR RENOVATION AND COMBINATION OF APARTMENTS 1J & 1K ON THE 1ST FLOOR AS PER TPPN 3/97. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01206977-S1
03/24/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/19/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/15/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/07/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/05/2025
Permit issued — Plumbing
M01206977-S1-PL
05/29/2025
Permit issued — General Construction
M01206977-I1-GC
05/28/2025
Signed off — Alteration
COMBINATION OF TWO APT (#10A & 10B). PARTITION DEMOLITION & CONSTRUCTION IN CONJUNCTION WITH APT #10A & #10B RENOVATION. REMOVE KITCHEN IN APT #10A AND ADD A LAUNDRY ROOM. APPLICATION TO COMPLY WITH TPP#3/97. NO CHANGE TO USE, EGRESS, OCCUPANCY.
M01070225-I1
05/19/2025
Signed off — Alteration
M01070242-I1
05/05/2025
Filed — Alteration
INTERIOR RENOVATION AND COMBINATION OF APARTMENTS 1J & 1K ON THE 1ST FLOOR AS PER TPPN 3/97. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01206977-I1
05/05/2025
Filed — Alteration
INTERIOR RENOVATION AND COMBINATION OF APARTMENTS 1J & 1K ON THE 1ST FLOOR AS PER TPPN 3/97. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01206977-S1
04/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ann Macklin
04/07/2025
Special inspection requirement — Final
Ann Macklin
04/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ann Macklin
04/07/2025
Special inspection requirement — Lighting in dwelling units
Ann Macklin
04/07/2025
Special inspection requirement — Energy Code Compliance Inspections
Ann Macklin
02/07/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/07/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/08/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/20/2024
Permit issued — Plumbing
M01070242-I1-PL
09/18/2024
Permit issued — General Construction
M01070225-I1-GC
08/30/2024
Signed off — Alteration
M01072235-I1
08/29/2024
Signed off — Alteration
Concrete patching of garage surfaces to include columns, reporting, crack repairs, stucco replacement. Facade repairs to include masonry, pointing, and caulking.
M00900086-I1
08/02/2024
Permit issued — General Construction
M01072235-I1-GC
07/24/2024
Objection resolved — Addressed
07/24/2024
Objection resolved — Addressed
07/24/2024
Objection resolved — Addressed
07/11/2024
Objection raised — Other
07/11/2024
Objection raised — Other
07/11/2024
Objection raised — Accessibility
07/09/2024
Filed — Alteration
COMBINATION OF TWO APT (#10A & 10B). PARTITION DEMOLITION & CONSTRUCTION IN CONJUNCTION WITH APT #10A & #10B RENOVATION. REMOVE KITCHEN IN APT #10A AND ADD A LAUNDRY ROOM. APPLICATION TO COMPLY WITH TPP#3/97. NO CHANGE TO USE, EGRESS, OCCUPANCY.
M01070225-I1
07/09/2024
Filed — Alteration
M01070242-I1
07/03/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00954350-I1
06/27/2024
Filed — Alteration
M01072235-I1
06/21/2024
Special inspection requirement — Fire-Resistance Rated Construction
Morgan Rolontz
06/21/2024
Special inspection requirement — Final
Morgan Rolontz
06/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Morgan Rolontz
06/21/2024
Special inspection requirement — Lighting in dwelling units
Morgan Rolontz
06/21/2024
Special inspection requirement — Energy Code Compliance Inspections
Morgan Rolontz
05/21/2024
Permit issued — General Construction
M00900086-I1-GC
05/21/2024
Permit issued — Suspended Scaffold
M00980183-I1-SC
01/11/2024
Permit issued — Suspended Scaffold
M00980183-I1-SC
01/08/2024
Objection raised — Other
01/08/2024
Objection resolved — Addressed
01/08/2024
Objection raised — Other
01/08/2024
Objection resolved — Addressed
12/20/2023
Filed — Alteration
Installation of suspended scaffold for facade work.
M00980183-I1
12/01/2023
Special inspection requirement — Tenant Protection Plan Compliance
Chester Kowalski
12/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chester Kowalski
12/01/2023
Special inspection requirement — Concrete - Cast-In-Place
Anthony Accardo
12/01/2023
Special inspection requirement — Masonry
Anthony Accardo
12/01/2023
Special inspection requirement — Energy Code Compliance Inspections
Anthony Accardo
12/01/2023
Special inspection requirement — Final
Anthony Accardo
12/01/2023
Special inspection requirement — Air barrier - visual inspection
Anthony Accardo
11/30/2023
Filed — Alteration
Concrete patching of garage surfaces to include columns, reporting, crack repairs, stucco replacement. Facade repairs to include masonry, pointing, and caulking.
M00900086-P1
11/28/2023
Special inspection requirement — Air barrier - visual inspection
Anthony Accardo
10/27/2023
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00954350-I1
10/27/2023
Permit issued — Sidewalk Shed
M00954350-I1-SH
Latest 60 of 172 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHYDROKINETIC PLBG & HTG I06/05/2025
DOB NOWGeneral ConstructionSigned-offTOP NOTCH REMODELING CORP05/29/2025
DOB NOWPlumbingSigned-offAUTHENTIC PLBG CORP09/20/2024
DOB NOWGeneral ConstructionSigned-offNYC DESIGN & RENO LLC09/18/2024
DOB NOWGeneral ConstructionSigned-offNUZA HOME IMPROVEMENT COR08/02/2024
DOB NOWGeneral ConstructionSigned-offSCHNELLBACHER-SENDON GRO*05/21/2024
DOB NOWSuspended ScaffoldPermit IssuedSCHNELLBACHER-SENDON GROU05/21/2024
DOB NOWSuspended ScaffoldPermit IssuedSCHNELLBACHER-SENDON GROU01/11/2024
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC10/27/2023
DOB NOWGeneral ConstructionSigned-offSCHNELLBACHER-SENDON GRO*07/27/2023
DOB NOWGeneral ConstructionSigned-offLYNX BUILDERS, INC04/20/2022
DOB NOWGeneral ConstructionSigned-offELRAY CONSTRUCTION CORP10/04/2021
DOB NOWSupported ScaffoldPermit IssuedSCHNELLBACHER-SENDON GRO*08/10/2021
DOB NOWPlumbingSigned-offRVM PLUMBING CORP07/06/2021
DOB NOWSidewalk ShedSigned-offEMPIRE NY INSTALLATIONS I02/16/2021
DOB NOWSidewalk ShedSigned-offEMPIRE NY INSTALLATIONS I02/13/2020
DOB NOWSidewalk ShedSigned-offEMPIRE NY INSTALLATIONS I08/07/2019
BISOTISSUEDTANIR INC12/03/2020
BISOTISSUEDSCHNELLBACHER-SENDON GRO*10/20/2020
BISOTISSUEDTANIR INC02/11/2020
BISOTISSUEDMILLENIUM RESTORATION CORP01/24/2020
BISOTISSUEDGABRIEL MIHALCEA07/29/2019
BISOTISSUEDMILLENIUM RESTORATION CORP06/24/2019
BISOTISSUEDKAY WATERPROOFING CORP02/28/2019
BISPLISSUEDADRIANO PLMBG & HTG CORP10/29/2018
BISOTISSUEDGA INDUSTRIES INC09/13/2018
BISPLISSUEDZFM INC10/30/2017
BISOTISSUEDMBQ CONTRACTING CORP09/25/2017
BISOTISSUEDROTH BUILT CONSTRUCTION I07/26/2017
BISPLISSUEDAMERICAN STANDARD P&H CORORP.03/29/2017
BISOTISSUEDNUTECH INTERIORS INC03/21/2017
BISPLISSUEDPRACTICAL PLBG & HTG INC12/28/2016
BISOTISSUEDNEW YORK FLOORMAN, LLC09/01/2016
BISPLISSUEDMARCO POLO PLBG & HTG INC06/30/2016
BISOTISSUEDBONILLA & SONS INC06/29/2016
BISOTISSUEDPRATT CONSTRUCTION & REST05/25/2016
BISOTISSUEDCASELLA CONSTRUCTION CORP.01/22/2016
BISOTISSUEDPRATT CONSTRUCTION & REST01/14/2016
BISPLISSUEDAUTHENTIC PLBG CORP01/07/2016
BISMHISSUEDN.Y. LANDMARK CONSTRUCTIO12/24/2015
+ 27 more permits on file
10 projects · most recent 09/17/2026
General Wiring
FiledStatusContractorScope
09/17/2026CompleteAMPACITY ELECTRICAL INC—
02/15/2025CompleteNELSON & TOM MAINT INC DBGeneral Wiring
11/07/2023CompleteBOROWIDE ELECT'L CONTR'S—
06/21/2022CompleteGOTHAM WIRING LICENSED—
10/11/2021Permit IssuedBRANDL ELECTRIC INC.General Wiring
10/29/2020CompleteJUMPER ELECTRIC CORPGeneral Wiring
09/23/2020Permit IssuedROBERT CHIMENTIGeneral Wiring
12/12/2019CompleteJUMPER ELECTRIC CORPGeneral Wiring
07/12/2019CompleteMEGA ELEC'L CONTR'G, INC—
11/05/2018CompleteELECTRIC ESSENTIALS CORPGeneral Wiring
1 project · most recent 08/09/2021
Scaffold
FiledStatusContractorScope
08/09/2021Permit IssuedSCHNELLBACHER-SENDON GRO*Scaffold
1 project · most recent 12/20/2023
Suspended Scaffold (SC)
FiledStatusContractorScope
12/20/2023Permit IssuedSCHNELLBACHER-SENDON GROUSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
03/24/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/19/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/15/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/09/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/07/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/07/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/07/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/26/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/07/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/13/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/13/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/12/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
04/07/2025Fire-Resistant Penetrations and JointsAnn Macklinspecial
04/07/2025FinalAnn Macklinprogress
04/07/2025Fire-Resistant Penetrations and JointsAnn Macklinspecial
04/07/2025Lighting in dwelling unitsAnn Macklinenergy_progress
04/07/2025Energy Code Compliance InspectionsAnn Macklinprogress
06/21/2024Fire-Resistance Rated ConstructionMorgan Rolontzprogress
06/21/2024FinalMorgan Rolontzprogress
06/21/2024Fire-Resistant Penetrations and JointsMorgan Rolontzspecial
06/21/2024Lighting in dwelling unitsMorgan Rolontzenergy_progress
06/21/2024Energy Code Compliance InspectionsMorgan Rolontzprogress
12/01/2023Tenant Protection Plan ComplianceChester Kowalskispecial
12/01/2023Fire-Resistant Penetrations and JointsChester Kowalskispecial
12/01/2023Concrete - Cast-In-PlaceAnthony Accardospecial
12/01/2023MasonryAnthony Accardospecial
12/01/2023Energy Code Compliance InspectionsAnthony Accardoprogress
12/01/2023FinalAnthony Accardoprogress
12/01/2023Air barrier - visual inspectionAnthony Accardoenergy_progress
11/28/2023Air barrier - visual inspectionAnthony Accardoenergy_progress
10/20/2023Energy Code Compliance InspectionsAnthony Accardoprogress
08/31/2023Concrete - Cast-In-PlaceAnthony Accardospecial
08/31/2023FinalAnthony Accardoprogress
08/31/2023Tenant Protection Plan ComplianceChester Kowalskispecial
08/31/2023MasonryAnthony Accardospecial
08/31/2023Fire-Resistant Penetrations and JointsChester Kowalskispecial
04/01/2022Fire-Resistance Rated ConstructionBALDEMIRO LEONprogress
Latest 25 of 28.
▾Documents — 670 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch14
09/03/2026M00547819-I1Request digital key ↗
09/03/2026M00547827-I1Request digital key ↗
09/03/2026M00571688-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00192758-I1Request digital key ↗
▸Applications & Permits118
▸BISPLAN / WORK APPROVAL APPLICATION59
07/01/2021120286136Open ↗
06/29/2021120286136Open ↗
06/24/2021120286136Open ↗
Showing 3 of 59 on file for this type
▸BISWORK PERMIT APPLICATION59
10/21/2020123720072Open ↗
02/10/2020140885790Open ↗
01/27/2020123720072Open ↗
Showing 3 of 59 on file for this type
▸Seals & Professional Certifications133
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION63
09/19/2019123532613Open ↗
09/19/2019123532613Open ↗
09/17/2019140859827Open ↗
Showing 3 of 63 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/03/2026M00544237-I1Open ↗
09/03/2026M00547819-I1Open ↗
09/03/2026M00571688-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/01/2026M00900086-P1Open ↗
08/30/2026M00900086-I1Open ↗
08/30/2026M00900086-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/01/2026M00900086-P1Open ↗
09/01/2026M00900086-P1Open ↗
09/01/2026M00900086-P1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT9
02/10/2020140885790Open ↗
07/14/2019140859827Open ↗
09/26/2017123291071Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
09/26/2017123291071Open ↗
Showing 1 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
02/10/2020140885790Open ↗
07/14/2019140859827Open ↗
Showing 2 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
02/10/2020140885790Open ↗
07/14/2019140859827Open ↗
Showing 2 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment46
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE15
06/12/2018123455055Open ↗
11/28/2017123291071Open ↗
11/17/2017123291071Open ↗
Showing 3 of 15 on file for this type
▸BISSELF-CERT PLUMBING NOTICE14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISSCHEDULE B - PLUMBING9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBOILER APPROVAL : 900A1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE B - PLUMBING SCHEDULE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEQUIPMENT USE PERMITS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection16
▸BISTenant Protection Plan and Notes15
10/02/2018123532613Open ↗
08/20/2018123455055Open ↗
08/14/2018123532613Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026M00192758-I1Open ↗
▸Environmental & Asbestos48
▸BISASBESTOS: CERTIFICATION (DEP ACP5)26
05/12/2021123720072Open ↗
02/10/2020140885790Open ↗
05/15/2019123720072Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/03/2026M00547819-I1Open ↗
08/28/2026M00900086-I1Open ↗
08/28/2026M00900086-P1Open ↗
Showing 3 of 10 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS INSPECTION REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/28/2026M00900086-I1Open ↗
▸Energy Compliance78
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS38
09/19/2019123532613Open ↗
09/17/2019140859827Open ↗
06/06/2019123720072Open ↗
Showing 3 of 38 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS23
10/14/2021123720072Open ↗
06/22/2021140885790Open ↗
10/01/2020122538174Open ↗
Showing 3 of 23 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY11
10/14/2021123720072Open ↗
06/22/2021140885790Open ↗
10/14/2020122538174Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS4
02/10/2020140885790Open ↗
07/14/2019140859827Open ↗
Showing 2 of 4 on file for this type
▸BISNYCECC ANALYSIS1
07/14/2019140859827Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00547827-I1Open ↗
▸Inspections & Test Reports25
▸BISTECHNICAL REPORT: RESPONSIBILITY24
10/14/2021123720072Open ↗
10/14/2021123720072Open ↗
09/07/2021120286136Open ↗
Showing 3 of 24 on file for this type
▸BIS2008 CODE TR1 REQUIRED1
07/14/2019140859827Open ↗
▸Approvals, Objections & Sign-offs53
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST30
10/14/2021123720072Open ↗
09/07/2021120286136Open ↗
06/22/2021140885790Open ↗
Showing 3 of 30 on file for this type
▸BISADMINISTRATIVE OBJECTIONS11
06/28/2017122911019Open ↗
Showing 1 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
06/29/2021120286136Open ↗
04/26/2018122735442Open ↗
04/24/2018122735442Open ↗
Showing 3 of 10 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSUPERSEDING LETTER1
10/21/2020123720072Open ↗
▸Cost, Insurance & Ownership73
▸BISCOST AFFIDAVIT65
10/14/2021123720072Open ↗
09/07/2021120286136Open ↗
07/01/2021123720072Open ↗
Showing 3 of 65 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT7
10/21/2020123720072Open ↗
06/24/2019123720072Open ↗
Showing 2 of 7 on file for this type
▸BISWELDERS AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms60
▸BISEFILING COVER SHEET28
05/15/2019123720072Open ↗
08/14/2018123532613Open ↗
06/12/2018123455055Open ↗
Showing 3 of 28 on file for this type
▸BISADDITIONAL INFORMATION18
07/01/2021123720072Open ↗
05/13/2021123720072Open ↗
10/21/2020123720072Open ↗
Showing 3 of 18 on file for this type
▸BISBOROUGH INTAKE FORM9
03/27/2020123455055Open ↗
09/19/2019123532613Open ↗
09/17/2019140859827Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
02/10/2020140885790Open ↗
07/14/2019140859827Open ↗
Showing 2 of 5 on file for this type
▸Other Documents5
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
10/02/2018123532613Open ↗
08/03/2017122911019Open ↗
▸BISSupporting Document: Fee Deferment1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
08/13/2026M00980183-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M00980183-I1Open ↗