← Back
Special Inspection Agency
R. MORGAN ROLONTZ ARCHITE
Special Inspection Agency
5 projects with open permitsMANHATTAN · 9BROOKLYN · 4
9 buildings
20
Total Filings
13
Projects on File
9
Buildings Worked
5
Projects w/ Open Permits
Special Inspection Agency
Primary Trade
Activity
Projects by first filing month13 projects all-time
0123Apr '23 · 2Nov '23 · 1Dec '23 · 2Jul '24 · 1Feb '25 · 2Jun '25 · 1Aug '25 · 1Oct '25 · 2Feb '26 · 1202420252026
bars = month · line = 3-mo average
Portfolio status
Browse projects →
Open permit538%
Signed off646%
Filed only215%
By project type
Alteration13
Most active buildings
All buildings →
440 RIVERSIDE DRIVEMANHATTAN · latest 08/04/2025
3 projects
278 HENRY STREETBROOKLYN · 1 open · latest 10/17/2025
2 projects
600 MADISON STREETBROOKLYN · 2 open · latest 05/07/2024
2 projects
13 WEST 38 STREETMANHATTAN · latest 10/23/2025
1 projects
119 EAST 78 STREETMANHATTAN · 1 open · latest 01/20/2026
1 projects
345 EAST 73 STREETMANHATTAN · latest 09/18/2024
1 projects
Key relationships
Everyone →
Filing representatives
Owners
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M01355091 ↗975 PARK AVENUE
MANHATTAN
AlterationPermit Issued02/09/202604/10/2026PERFORM INTERIOR PARTITION, HUNG CEILING DEMOLITION & CONSTRUCTION IN CONJUNCTION WITH APARTMENT RENOVATION #6A. REPLACE EXISTING PTAC UNI…
M01286491 ↗119 EAST 78 STREET
MANHATTAN
AlterationPermit Issued10/09/202501/20/2026PERFORM MINOR INTERIOR PARTITION DEMOLITION & CONSTRUCTION. RECONFIGURE ENTRY VESTIBULE & SITTING ROOM. REPLACE ENTRY DOOR AND FRAME TO MATC…
M01304153 ↗13 WEST 38 STREET
MANHATTAN
AlterationFiled — no permit on record10/23/2025——
B01180075 ↗278 HENRY STREET
BROOKLYN
AlterationPermit Issued02/14/202510/17/2025Remove and construct partitions and finishes.. Replace windows in kind. Replace existing 2nd floor roof deck. Install new lighting modificat…
M01226940 ↗34 HUDSON YARDS
MANHATTAN
AlterationSigned-off06/19/202508/21/2025PERFORM MINOR DEMOLITION INTERIOR WALLS AND GYPSUM BOARD DROPPED SOFFIT. INSTALL NEW LIGHTING MODIFICATIONS. ALL AS PER PLANS. NO CHANGE TO…
M01248850 ↗440 RIVERSIDE DRIVE
MANHATTAN
AlterationFiled — no permit on record08/04/2025——
Counts cover all 13 projects (13 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
R. MORGAN ROLONTZ ARCHITECTURE P.C.1304/21/2026
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
DARTOM CABINETRY CORP206/19/2025
HIBERNIA CONSTRUCTION COR202/09/2026
M C M PLBG & HTG, INC204/21/2026
ALTAIR PLUMBING AND HEAT112/06/2024
ARIANA CONTRACTING INC111/15/2024
BROOKE CONSTRUCTION OF NY104/03/2023
HIGHLINE CONSTRUCTION GR110/09/2025
MKA 25 INC103/05/2025
NYC DESIGN & RENO LLC107/09/2024
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
SURFACE DEVELOPMENT203/05/2025
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
KX CONSULTING INC804/21/2026
13 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 13Open permit 5Signed off 6Filed only 2
13 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M01355091 ↗975 PARK AVENUE
MANHATTAN
AlterationPermit Issued02/09/202604/10/2026PERFORM INTERIOR PARTITION, HUNG CEILING DEMOLITION & CONSTRUCTION IN CONJUNCTION WITH APARTMENT RENOVATION #6A. REPLACE EXISTING PTAC UNI…
M01286491 ↗119 EAST 78 STREET
MANHATTAN
AlterationPermit Issued10/09/202501/20/2026PERFORM MINOR INTERIOR PARTITION DEMOLITION & CONSTRUCTION. RECONFIGURE ENTRY VESTIBULE & SITTING ROOM. REPLACE ENTRY DOOR AND FRAME TO MATC…
M01304153 ↗13 WEST 38 STREET
MANHATTAN
AlterationFiled — no permit on record10/23/2025——
B01180075 ↗278 HENRY STREET
BROOKLYN
AlterationPermit Issued02/14/202510/17/2025Remove and construct partitions and finishes.. Replace windows in kind. Replace existing 2nd floor roof deck. Install new lighting modificat…
M01226940 ↗34 HUDSON YARDS
MANHATTAN
AlterationSigned-off06/19/202508/21/2025PERFORM MINOR DEMOLITION INTERIOR WALLS AND GYPSUM BOARD DROPPED SOFFIT. INSTALL NEW LIGHTING MODIFICATIONS. ALL AS PER PLANS. NO CHANGE TO…
M01248850 ↗440 RIVERSIDE DRIVE
MANHATTAN
AlterationFiled — no permit on record08/04/2025——
B01180090 ↗278 HENRY STREET
BROOKLYN
AlterationSigned-off02/19/202505/14/2025REMOVE AND INSTALL PLUMBING FIXTURES AS PER PLANS SUBMITTED HEREWITH.
M01070225 ↗345 EAST 73 STREET
MANHATTAN
AlterationSigned-off07/09/202409/18/2024COMBINATION OF TWO APT (#10A & 10B). PARTITION DEMOLITION & CONSTRUCTION IN CONJUNCTION WITH APT #10A & #10B RENOVATION. REMOVE KITCHEN IN A…
M00830962 ↗440 RIVERSIDE DRIVE
MANHATTAN
AlterationSigned-off04/03/202306/21/2024PERFORM PLUMBING MODIFICATION WORK IN CONJUNCTION WITH APARTMENT #95 RENOVATION. NO CHANGE TO USE, EGRESS, OCCUPANCY OR FIRE PROTECTION.
B00968119 ↗600 MADISON STREET
BROOKLYN
AlterationPermit Issued12/05/202305/07/2024
Contractor MKA 25 INC
RENOVATION TO EXISTING 2 FAMILY HOUSE. REMOVE AND CONSTRUCT NEW PARTITIONS. REMOVE & REPLACE TWO (2) WINDOWS. REMOVE ONE (1) WINDOW AND REPL…
B00968130 ↗600 MADISON STREET
BROOKLYN
AlterationPermit Issued12/05/202305/07/2024REMOVE AND INSTALL PLUMBING FIXTURES AS PER PLANS SUBMITTED HEREWITH.
M00958716 ↗508 EAST 78 STREET
MANHATTAN
AlterationSigned-off11/27/202312/15/2023PERFORM PARTITION, FLOORING AND HUNG CEILING DEMOLITION & CONSTRUCTION IN CONJUNCTION WITH APT #1H RENOVATION.. INSTALL NEW LIGHTING & PLUMB…
M00830955 ↗440 RIVERSIDE DRIVE
MANHATTAN
AlterationSigned-off04/03/202309/21/2023PERFORM PARTITION, FLOORING AND HUNG CEILING DEMOLITION & CONSTRUCTION IN CONJUNCTION WITH APT #95 RENOVATION. RECONFIGURE KITCHEN & BATHROO…
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
278 HENRY STREET ↗504/21/2026
975 PARK AVENUE ↗102/09/2026
13 WEST 38 STREET ↗110/23/2025
119 EAST 78 STREET ↗110/09/2025
440 RIVERSIDE DRIVE ↗408/04/2025
34 HUDSON YARDS ↗106/19/2025
600 MADISON STREET ↗503/05/2025
345 EAST 73 STREET ↗107/09/2024
508 EAST 78 STREET ↗111/27/2023
▾Special Inspection Requirements — 47
DateRequirementBuildingInspectorRole
04/21/2026Fire-Resistant Penetrations and Joints278 HENRY STREETMorgan Rolontzspecial
04/16/2026Fire-Resistant Penetrations and Joints278 HENRY STREETMorgan Rolontzspecial
02/02/2026Fire-Resistant Penetrations and Joints278 HENRY STREETMorgan Rolontzspecial
11/26/2025Energy Code Compliance Inspections119 EAST 78 STREETMorgan Rolontzprogress
11/26/2025Interior lighting power119 EAST 78 STREETMorgan Rolontzenergy_progress
10/16/2025Fire-Resistant Penetrations and Joints13 WEST 38 STREETMorgan Rolontzspecial
10/16/2025Final13 WEST 38 STREETMorgan Rolontzprogress
10/16/2025Energy Code Compliance Inspections13 WEST 38 STREETMorgan Rolontzprogress
10/16/2025Interior lighting power13 WEST 38 STREETMorgan Rolontzenergy_progress
10/16/2025Lighting controls13 WEST 38 STREETMorgan Rolontzenergy_progress
09/12/2025Fire-Resistant Penetrations and Joints119 EAST 78 STREETMorgan Rolontzspecial
09/12/2025Final119 EAST 78 STREETMorgan Rolontzprogress
05/16/2025Lighting in dwelling units34 HUDSON YARDSMorgan Rolontzenergy_progress
05/16/2025Final34 HUDSON YARDSMorgan Rolontzprogress
05/16/2025Energy Code Compliance Inspections34 HUDSON YARDSMorgan Rolontzprogress
05/16/2025Post-installed Anchors34 HUDSON YARDSANGEL ROJASspecial
05/16/2025Fire-Resistant Penetrations and Joints34 HUDSON YARDSMorgan Rolontzspecial
04/08/2025Fire-Resistant Penetrations and Joints600 MADISON STREETMorgan Rolontzspecial
03/31/2025Final600 MADISON STREETMorgan Rolontzprogress
03/31/2025Fenestration and door U-factor and product ratings600 MADISON STREETMorgan Rolontzenergy_progress
03/31/2025Air barrier - visual inspection600 MADISON STREETMorgan Rolontzenergy_progress
03/31/2025Lighting in dwelling units600 MADISON STREETMorgan Rolontzenergy_progress
03/31/2025Fenestration areas600 MADISON STREETMorgan Rolontzenergy_progress
03/31/2025Fenestration air leakage600 MADISON STREETMorgan Rolontzenergy_progress
03/31/2025Energy Code Compliance Inspections600 MADISON STREETMorgan Rolontzprogress
03/31/2025Fire-Resistant Penetrations and Joints600 MADISON STREETMorgan Rolontzspecial
01/24/2025Fire-Resistant Penetrations and Joints600 MADISON STREETMorgan Rolontzspecial
01/24/2025Energy Code Compliance Inspections600 MADISON STREETMorgan Rolontzprogress
01/24/2025Final600 MADISON STREETMorgan Rolontzprogress
01/24/2025Air barrier - visual inspection600 MADISON STREETMorgan Rolontzenergy_progress
01/24/2025Lighting in dwelling units600 MADISON STREETMorgan Rolontzenergy_progress
01/24/2025Fenestration air leakage600 MADISON STREETMorgan Rolontzenergy_progress
01/24/2025Fenestration and door U-factor and product ratings600 MADISON STREETMorgan Rolontzenergy_progress
01/24/2025Fenestration areas600 MADISON STREETMorgan Rolontzenergy_progress
11/15/2024Fire-Resistant Penetrations and Joints440 RIVERSIDE DRIVEMorgan Rolontzspecial
11/14/2024Fire-Resistant Penetrations and Joints600 MADISON STREETMorgan Rolontzspecial
06/21/2024Fire-Resistant Penetrations and Joints345 EAST 73 STREETMorgan Rolontzspecial
06/21/2024Final345 EAST 73 STREETMorgan Rolontzprogress
06/21/2024Energy Code Compliance Inspections345 EAST 73 STREETMorgan Rolontzprogress
06/21/2024Fire-Resistance Rated Construction345 EAST 73 STREETMorgan Rolontzprogress
06/21/2024Lighting in dwelling units345 EAST 73 STREETMorgan Rolontzenergy_progress
04/02/2024Fire-Resistant Penetrations and Joints600 MADISON STREETMorgan Rolontzspecial
11/06/2023Lighting in dwelling units508 EAST 78 STREETMorgan Rolontzenergy_progress
11/06/2023Final508 EAST 78 STREETMorgan Rolontzprogress
11/06/2023Fire-Resistance Rated Construction508 EAST 78 STREETMorgan Rolontzprogress
11/06/2023Energy Code Compliance Inspections508 EAST 78 STREETMorgan Rolontzprogress
11/06/2023Fire-Resistant Penetrations and Joints508 EAST 78 STREETMorgan Rolontzspecial
▾Documents — 124 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch22
Showing 3 of 22 on file for this type
▸Applications & Permits13
▸DOB NOWLPC Approval/Permit13
08/18/2026B01180090-P3 · 278 HENRY STREETOpen ↗
08/13/2026M01355091-S1 · 975 PARK AVENUEOpen ↗
08/13/2026B01180075-I1 · 278 HENRY STREETOpen ↗
Showing 3 of 13 on file for this type
▸Seals & Professional Certifications68
▸DOB NOWProgress Inspector Seal & Signature32
09/23/2026B00968119-P2 · 600 MADISON STREETOpen ↗
09/23/2026B00968119-P2 · 600 MADISON STREETOpen ↗
09/23/2026B00968119-P2 · 600 MADISON STREETOpen ↗
Showing 3 of 32 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
08/31/2026M00830962-I1 · 440 RIVERSIDE DRIVEOpen ↗
08/31/2026M00830962-P1 · 440 RIVERSIDE DRIVEOpen ↗
08/26/2026M01070225-I1 · 345 EAST 73 STREETOpen ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/23/2026B00968119-P2 · 600 MADISON STREETOpen ↗
09/01/2026B01180090-P2 · 278 HENRY STREETOpen ↗
09/01/2026B00968119-I1 · 600 MADISON STREETOpen ↗
Showing 3 of 15 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWHPD-1: Anti-Harassment Area Checklist1
08/13/2026M01226940-I1 · 34 HUDSON YARDSOpen ↗
▸Environmental & Asbestos19
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
08/26/2026M01070225-I1 · 345 EAST 73 STREETOpen ↗
08/23/2026B00968130-P2 · 600 MADISON STREETOpen ↗
08/23/2026B00968130-I1 · 600 MADISON STREETOpen ↗
Showing 3 of 17 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/31/2026M00830962-I1 · 440 RIVERSIDE DRIVEOpen ↗
08/13/2026M00830955-I1 · 440 RIVERSIDE DRIVEOpen ↗
▸Other Documents1
▸DOB NOWProof of Historic Building1
08/13/2026B01180075-I1 · 278 HENRY STREETOpen ↗