The Morad Diplomat
345 EAST 73RD STREET · Name © OpenStreetMap contributors · BIN 1044904
💬 Discuss this project
1961Year Built
13Stories
D4Building Class
R8BZoning
154,506 sfGross Floor Area
143Units
LL97 CoveredRent Stabilized5 Active Violations ▸FISP: SWARMP
Elevator cooperative · Owner of record: 345 East 73rd Owners · 17,753 sf lot · 8.7 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofTemporary pipe scaffold installation4p · 1 filing · 2 docs
PenthouseUnit PHH1p · 1 filing · 4 docs
Floor 12Fire resistant penetrations and joints7p · 2 filings · 6 docs
Floor 11
Floor 10Unit 10A, Unit 10B6p · 2 filings · 11 docs
Floor 9
Floor 8Garage floor, walls and columns repair1p · 1 filing · 19 docs
Floor 7Unit 7H1p · 1 filing · 3 docs
Floor 6
Floor 5
Floor 4
Floor 3Unit 3L2p · 2 filings · 20 docs
Floor 2Garage floor, walls and columns repair2p · 1 filing · 19 docs
Floor 1Unit 1J, Unit 1K5p · 1 filing · 10 docs
Sub-CellarGarage floor, walls and columns repair12p · 1 filing · 19 docs
Site & exteriorGarage floor, walls and columns repair22p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
345 East 73rd Owner's8103/22/2026
345 East 73rd Street507/08/2026
D+DG Architects P C203/21/2026
345 East 7203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J A Expediting403/21/2026
AE Design Solution603/21/2026
KX Consulting403/21/2026
D D Expeditors403/21/2026
Haque Associates203/21/2026
Professional Solutions103/21/2026
MK Associates203/21/2026
Dynamic Building Consultants403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Empire NY InstallationsScaffold707/08/2026
Elray ConstructionGeneral Contractor303/21/2026
NYC Design & RenoGeneral Contractor303/21/2026
Schnellbacher-Sendon Group*General Contractor307/08/2026
LYNX BuildersGeneral Contractor303/21/2026
Schnellbacher-Sendon Group*Scaffold203/21/2026
Nelson & Tom Maintenance Inc DBElectrical103/22/2026
P.S. Marcato Elev. CoElectrical103/21/2026
Philip A. RobinsonElectrical103/21/2026
E G ElectricElectrical103/21/2026
Nuza Home ImprovementGeneral Contractor107/08/2026
Top Notch RemodelingGeneral Contractor104/09/2026
Andamio ScaffoldingScaffold107/08/2026
Authentic PlumbingPlumbing107/08/2026
Hydrokinetic Plumbing & Heating IPlumbing107/08/2026
K.N.C. ElectricElectrical103/21/2026
RVM PlumbingPlumbing107/08/2026
Lower Manhattan ElectricElectrical103/21/2026
Inner City Electrical ContractorsElectrical103/21/2026
AL-Wes Electric ServicesElectrical103/21/2026
Belmont ElectricalElectrical103/21/2026
Gsa ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A2 Architect2504205/05/2025
R. Morgan Rolontz Architects8541107/09/2024
Accardo Engineering1247211/30/2023
Sag Engineering & Consulting608211/30/2023
Jon Libasci3068108/06/2021
MK Architecture476106/22/2021
Building Lifecycle
All (164)Filed (15)Permit Issued (17)Signed Off (11)Facade (FISP) (12)Violation (57)Inspection (8)Objection (16)Special Inspection (28)
04/06/2026
Signed off — Alteration
INTERIOR RENOVATION AND COMBINATION OF APARTMENTS 1J & 1K ON THE 1ST FLOOR AS PER TPPN 3/97. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01206977-I1
04/06/2026
Signed off — Alteration
INTERIOR RENOVATION AND COMBINATION OF APARTMENTS 1J & 1K ON THE 1ST FLOOR AS PER TPPN 3/97. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01206977-S1
03/24/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/19/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/15/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/07/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/05/2025
Permit issued — Plumbing
M01206977-S1-PL
05/29/2025
Permit issued — General Construction
M01206977-I1-GC
05/28/2025
Signed off — Alteration
COMBINATION OF TWO APT (#10A & 10B). PARTITION DEMOLITION & CONSTRUCTION IN CONJUNCTION WITH APT #10A & #10B RENOVATION. REMOVE KITCHEN IN APT #10A AND ADD A LAUNDRY ROOM. APPLICATION TO COMPLY WITH TPP#3/97. NO CHANGE TO USE, EGRESS, OCCUPANCY.
M01070225-I1
05/19/2025
Signed off — Alteration
M01070242-I1
05/05/2025
Filed — Alteration
INTERIOR RENOVATION AND COMBINATION OF APARTMENTS 1J & 1K ON THE 1ST FLOOR AS PER TPPN 3/97. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01206977-I1
05/05/2025
Filed — Alteration
INTERIOR RENOVATION AND COMBINATION OF APARTMENTS 1J & 1K ON THE 1ST FLOOR AS PER TPPN 3/97. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01206977-S1
04/07/2025
Special inspection requirement — Final
Ann Macklin
04/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ann Macklin
04/07/2025
Special inspection requirement — Lighting in dwelling units
Ann Macklin
04/07/2025
Special inspection requirement — Energy Code Compliance Inspections
Ann Macklin
04/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ann Macklin
02/07/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/07/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/08/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/20/2024
Permit issued — Plumbing
M01070242-I1-PL
09/18/2024
Permit issued — General Construction
M01070225-I1-GC
08/30/2024
Signed off — Alteration
M01072235-I1
08/29/2024
Signed off — Alteration
Concrete patching of garage surfaces to include columns, reporting, crack repairs, stucco replacement. Facade repairs to include masonry, pointing, and caulking.
M00900086-I1
08/02/2024
Permit issued — General Construction
M01072235-I1-GC
07/24/2024
Objection resolved — Addressed
07/24/2024
Objection resolved — Addressed
07/24/2024
Objection resolved — Addressed
07/11/2024
Objection raised — Other
07/11/2024
Objection raised — Other
07/11/2024
Objection raised — Accessibility
07/09/2024
Filed — Alteration
COMBINATION OF TWO APT (#10A & 10B). PARTITION DEMOLITION & CONSTRUCTION IN CONJUNCTION WITH APT #10A & #10B RENOVATION. REMOVE KITCHEN IN APT #10A AND ADD A LAUNDRY ROOM. APPLICATION TO COMPLY WITH TPP#3/97. NO CHANGE TO USE, EGRESS, OCCUPANCY.
M01070225-I1
07/09/2024
Filed — Alteration
M01070242-I1
07/03/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00954350-I1
06/27/2024
Filed — Alteration
M01072235-I1
06/21/2024
Special inspection requirement — Energy Code Compliance Inspections
Morgan Rolontz
06/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Morgan Rolontz
06/21/2024
Special inspection requirement — Lighting in dwelling units
Morgan Rolontz
06/21/2024
Special inspection requirement — Fire-Resistance Rated Construction
Morgan Rolontz
06/21/2024
Special inspection requirement — Final
Morgan Rolontz
05/21/2024
Permit issued — Suspended Scaffold
M00980183-I1-SC
05/21/2024
Permit issued — General Construction
M00900086-I1-GC
01/11/2024
Permit issued — Suspended Scaffold
M00980183-I1-SC
01/08/2024
Objection raised — Other
01/08/2024
Objection resolved — Addressed
01/08/2024
Objection raised — Other
01/08/2024
Objection resolved — Addressed
12/20/2023
Filed — Alteration
Installation of suspended scaffold for facade work.
M00980183-I1
12/01/2023
Special inspection requirement — Tenant Protection Plan Compliance
Chester Kowalski
12/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chester Kowalski
12/01/2023
Special inspection requirement — Concrete - Cast-In-Place
Anthony Accardo
12/01/2023
Special inspection requirement — Masonry
Anthony Accardo
12/01/2023
Special inspection requirement — Energy Code Compliance Inspections
Anthony Accardo
12/01/2023
Special inspection requirement — Final
Anthony Accardo
12/01/2023
Special inspection requirement — Air barrier - visual inspection
Anthony Accardo
11/30/2023
Filed — Alteration
Concrete patching of garage surfaces to include columns, reporting, crack repairs, stucco replacement. Facade repairs to include masonry, pointing, and caulking.
M00900086-P1
11/28/2023
Special inspection requirement — Air barrier - visual inspection
Anthony Accardo
10/27/2023
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00954350-I1
10/27/2023
Permit issued — Sidewalk Shed
M00954350-I1-SH
Latest 60 of 164 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHydrokinetic Plumbing & Heating I06/05/2025
DOB NOWGeneral ConstructionSigned-offTop Notch Remodeling05/29/2025
DOB NOWPlumbingSigned-offAuthentic Plumbing09/20/2024
DOB NOWGeneral ConstructionSigned-offNYC Design & Reno09/18/2024
DOB NOWGeneral ConstructionSigned-offNuza Home Improvement08/02/2024
DOB NOWSuspended ScaffoldPermit IssuedSchnellbacher-Sendon Group05/21/2024
DOB NOWGeneral ConstructionSigned-offSchnellbacher-Sendon Group*05/21/2024
DOB NOWSuspended ScaffoldPermit IssuedSchnellbacher-Sendon Group01/11/2024
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding10/27/2023
DOB NOWGeneral ConstructionSigned-offSchnellbacher-Sendon Group*07/27/2023
DOB NOWGeneral ConstructionSigned-offLYNX Builders04/20/2022
DOB NOWGeneral ConstructionSigned-offElray Construction10/04/2021
DOB NOWSupported ScaffoldPermit IssuedSchnellbacher-Sendon Group*08/10/2021
DOB NOWPlumbingSigned-offRVM Plumbing07/06/2021
DOB NOWSidewalk ShedSigned-offEmpire NY Installations I02/16/2021
DOB NOWSidewalk ShedSigned-offEmpire NY Installations I02/13/2020
DOB NOWSidewalk ShedSigned-offEmpire NY Installations I08/07/2019
BISOTISSUEDTanir12/03/2020
BISOTISSUEDSchnellbacher-Sendon Group*10/20/2020
BISOTISSUEDTanir02/11/2020
BISOTISSUEDMillenium Restoration01/24/2020
BISOTISSUEDGabriel Mihalcea07/29/2019
BISOTISSUEDMillenium Restoration06/24/2019
BISOTISSUEDKay Waterproofing02/28/2019
BISPLISSUEDAdriano Plumbing & Heating10/29/2018
BISOTISSUEDGA Industries09/13/2018
BISPLISSUEDZFM10/30/2017
BISOTISSUEDMBQ Contracting09/25/2017
BISOTISSUEDRoth Built Construction I07/26/2017
BISPLISSUEDAmerican Standard P&H Cororp03/29/2017
BISOTISSUEDNutech Interiors03/21/2017
BISPLISSUEDPractical Plumbing & Heating12/28/2016
BISOTISSUEDNew York Floorman09/01/2016
BISPLISSUEDMarco Polo Plumbing & Heating06/30/2016
BISOTISSUEDBonilla & Sons06/29/2016
BISOTISSUEDPratt Construction & Restoration05/25/2016
BISOTISSUEDCasella Construction01/22/2016
BISOTISSUEDPratt Construction & Restoration01/14/2016
BISPLISSUEDAuthentic Plumbing01/07/2016
BISMHISSUEDN.Y. Landmark Construction12/24/2015
+ 27 more permits on file
10 projects · most recent 09/17/2026
General Wiring
FiledStatusContractorScope
09/17/2026CompleteAmpacity Electrical—
02/15/2025CompleteNelson & Tom Maintenance Inc DBGeneral Wiring
11/07/2023CompleteBorowide Elect'l Contractors—
06/21/2022CompleteGotham Wiring Licensed—
10/11/2021Permit IssuedBrandl ElectricGeneral Wiring
10/29/2020CompleteJumper ElectricGeneral Wiring
09/23/2020Permit IssuedRobert ChimentiGeneral Wiring
12/12/2019CompleteJumper ElectricGeneral Wiring
07/12/2019CompleteMega Electrical Contracting—
11/05/2018CompleteElectric EssentialsGeneral Wiring
1 project · most recent 08/09/2021
Scaffold
FiledStatusContractorScope
08/09/2021Permit IssuedSchnellbacher-Sendon Group*Scaffold
1 project · most recent 12/20/2023
Suspended Scaffold (SC)
FiledStatusContractorScope
12/20/2023Permit IssuedSchnellbacher-Sendon GroupSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
03/24/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/19/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/15/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/09/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/07/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/07/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/07/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
04/07/2025FinalAnn Macklinprogress
04/07/2025Fire-Resistant Penetrations and JointsAnn Macklinspecial
04/07/2025Lighting in dwelling unitsAnn Macklinenergy_progress
04/07/2025Energy Code Compliance InspectionsAnn Macklinprogress
04/07/2025Fire-Resistant Penetrations and JointsAnn Macklinspecial
06/21/2024Energy Code Compliance InspectionsMorgan Rolontzprogress
06/21/2024Fire-Resistant Penetrations and JointsMorgan Rolontzspecial
06/21/2024Lighting in dwelling unitsMorgan Rolontzenergy_progress
06/21/2024Fire-Resistance Rated ConstructionMorgan Rolontzprogress
06/21/2024FinalMorgan Rolontzprogress
12/01/2023Tenant Protection Plan ComplianceChester Kowalskispecial
12/01/2023Fire-Resistant Penetrations and JointsChester Kowalskispecial
12/01/2023Concrete - Cast-In-PlaceAnthony Accardospecial
12/01/2023MasonryAnthony Accardospecial
12/01/2023Energy Code Compliance InspectionsAnthony Accardoprogress
12/01/2023FinalAnthony Accardoprogress
12/01/2023Air barrier - visual inspectionAnthony Accardoenergy_progress
11/28/2023Air barrier - visual inspectionAnthony Accardoenergy_progress
10/20/2023Energy Code Compliance InspectionsAnthony Accardoprogress
08/31/2023Fire-Resistant Penetrations and JointsChester Kowalskispecial
08/31/2023MasonryAnthony Accardospecial
08/31/2023Concrete - Cast-In-PlaceAnthony Accardospecial
08/31/2023FinalAnthony Accardoprogress
08/31/2023Tenant Protection Plan ComplianceChester Kowalskispecial
04/01/2022Energy Code Compliance InspectionsBALDEMIRO LEONprogress
Latest 25 of 28.
▾Documents — 670 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch14
09/03/2026M00547819-I1Request digital key ↗
09/03/2026M00547827-I1Request digital key ↗
09/03/2026M00571688-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00192758-I1Request digital key ↗
▸Applications & Permits118
▸BISPLAN / WORK APPROVAL APPLICATION59
07/01/2021120286136Open ↗
06/29/2021120286136Open ↗
06/24/2021120286136Open ↗
Showing 3 of 59 on file for this type
▸BISWORK PERMIT APPLICATION59
10/21/2020123720072Open ↗
02/10/2020140885790Open ↗
01/27/2020123720072Open ↗
Showing 3 of 59 on file for this type
▸Seals & Professional Certifications133
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION63
09/19/2019123532613Open ↗
09/19/2019123532613Open ↗
09/17/2019140859827Open ↗
Showing 3 of 63 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/03/2026M00544237-I1Open ↗
09/03/2026M00547819-I1Open ↗
09/03/2026M00571688-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/01/2026M00900086-P1Open ↗
08/30/2026M00900086-I1Open ↗
08/30/2026M00900086-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/01/2026M00900086-P1Open ↗
09/01/2026M00900086-P1Open ↗
09/01/2026M00900086-P1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT9
02/10/2020140885790Open ↗
07/14/2019140859827Open ↗
09/26/2017123291071Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
09/26/2017123291071Open ↗
Showing 1 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
02/10/2020140885790Open ↗
07/14/2019140859827Open ↗
Showing 2 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
02/10/2020140885790Open ↗
07/14/2019140859827Open ↗
Showing 2 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment46
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE15
06/12/2018123455055Open ↗
11/28/2017123291071Open ↗
11/17/2017123291071Open ↗
Showing 3 of 15 on file for this type
▸BISSELF-CERT PLUMBING NOTICE14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISSCHEDULE B - PLUMBING9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBOILER APPROVAL : 900A1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE B - PLUMBING SCHEDULE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEQUIPMENT USE PERMITS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection16
▸BISTenant Protection Plan and Notes15
10/02/2018123532613Open ↗
08/20/2018123455055Open ↗
08/14/2018123532613Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026M00192758-I1Open ↗
▸Environmental & Asbestos48
▸BISASBESTOS: CERTIFICATION (DEP ACP5)26
05/12/2021123720072Open ↗
02/10/2020140885790Open ↗
05/15/2019123720072Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/03/2026M00547819-I1Open ↗
08/28/2026M00900086-I1Open ↗
08/28/2026M00900086-P1Open ↗
Showing 3 of 10 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS INSPECTION REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/28/2026M00900086-I1Open ↗
▸Energy Compliance78
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS38
09/19/2019123532613Open ↗
09/17/2019140859827Open ↗
06/06/2019123720072Open ↗
Showing 3 of 38 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS23
10/14/2021123720072Open ↗
06/22/2021140885790Open ↗
10/01/2020122538174Open ↗
Showing 3 of 23 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY11
10/14/2021123720072Open ↗
06/22/2021140885790Open ↗
10/14/2020122538174Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS4
02/10/2020140885790Open ↗
07/14/2019140859827Open ↗
Showing 2 of 4 on file for this type
▸BISNYCECC ANALYSIS1
07/14/2019140859827Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00547827-I1Open ↗
▸Inspections & Test Reports25
▸BISTECHNICAL REPORT: RESPONSIBILITY24
10/14/2021123720072Open ↗
10/14/2021123720072Open ↗
09/07/2021120286136Open ↗
Showing 3 of 24 on file for this type
▸BIS2008 CODE TR1 REQUIRED1
07/14/2019140859827Open ↗
▸Approvals, Objections & Sign-offs53
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST30
10/14/2021123720072Open ↗
09/07/2021120286136Open ↗
06/22/2021140885790Open ↗
Showing 3 of 30 on file for this type
▸BISADMINISTRATIVE OBJECTIONS11
06/28/2017122911019Open ↗
Showing 1 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
06/29/2021120286136Open ↗
04/26/2018122735442Open ↗
04/24/2018122735442Open ↗
Showing 3 of 10 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSUPERSEDING LETTER1
10/21/2020123720072Open ↗
▸Cost, Insurance & Ownership73
▸BISCOST AFFIDAVIT65
10/14/2021123720072Open ↗
09/07/2021120286136Open ↗
07/01/2021123720072Open ↗
Showing 3 of 65 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT7
10/21/2020123720072Open ↗
06/24/2019123720072Open ↗
Showing 2 of 7 on file for this type
▸BISWELDERS AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms60
▸BISEFILING COVER SHEET28
05/15/2019123720072Open ↗
08/14/2018123532613Open ↗
06/12/2018123455055Open ↗
Showing 3 of 28 on file for this type
▸BISADDITIONAL INFORMATION18
07/01/2021123720072Open ↗
05/13/2021123720072Open ↗
10/21/2020123720072Open ↗
Showing 3 of 18 on file for this type
▸BISBOROUGH INTAKE FORM9
03/27/2020123455055Open ↗
09/19/2019123532613Open ↗
09/17/2019140859827Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
02/10/2020140885790Open ↗
07/14/2019140859827Open ↗
Showing 2 of 5 on file for this type
▸Other Documents5
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
10/02/2018123532613Open ↗
08/03/2017122911019Open ↗
▸BISSupporting Document: Fee Deferment1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
08/13/2026M00980183-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M00980183-I1Open ↗