Roof8p · 4 filings · 14 docs
ArchitectureElectricalStructural
Issued Permit Scope
Antenna · General Construction
Modifications to the existing HVAC system; removal of (4) existing HVAC units and associated duct work as per plans (Wafra - Early Demo Phase.) No change to use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
VERIZON - Remove existing GPS units on roof & install 2 new GPS units on roof. Install related equipment in new head room in sub-cellar 1/2. Fiber run from cellar through roof.
On file for this project
3 documents · 1 drawing sheet
Removal of existing equipment at sub-cellar 2 and 29th floor. Install new head end room at sub-cellar 2, remove stairs at sub-cellar 1 and install new partitions. Related conduit run through cellar to roof.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Penthouse4p · 1 filing · 3 docs
Mechanical
APPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS ON THE 16TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 4 drawing sheets
Floor 4428p · 6 filings · 20 docs
ArchitectureCivilDMElectricalFire ProtectionGeneralMechanicalOther
Issued Permit Scope
Antenna · General Construction · Mechanical Systems
Removal and installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
7 documents · 5 drawing sheets
Sprinkler work in conjunction with renovation of existing 44th floor office space.
On file for this project
8 documents · 1 drawing sheet
Mechanical work in conjunction with renovation of existing 44th floor office space.
On file for this project
10 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 43Under Construction28p · 10 filings · 20 docs
ArchitectureElectricalFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
Antenna · General Construction · Mechanical Systems · Plumbing · Sprinklers
Modification to existing plumbing & sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
3 documents · 3 drawing sheets
Modification to existing HVAC system as per plans filed herewith. NO change in use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Removal of interior non-bearing partitions and related finishes as per plans filed herewith
On file for this project
3 documents
Latest 3 of 8 filings on this floor.
Floor 4210p · 4 filings · 20 docs
ArchitectureCivilElectricalFire Protection
Issued Permit Scope
Antenna · General Construction
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
14 documents · 5 drawing sheets
VERIZON - Remove existing GPS units on roof & install 2 new GPS units on roof. Install related equipment in new head room in sub-cellar 1/2. Fiber run from cellar through roof.
On file for this project
3 documents
Removal of existing equipment at sub-cellar 2 and 29th floor. Install new head end room at sub-cellar 2, remove stairs at sub-cellar 1 and install new partitions. Related conduit run through cellar to roof.
On file for this project
3 documents
Latest 3 of 4 filings on this floor.
Floor 4113p · 11 filings · 20 docs
ArchitectureElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Antenna · General Construction · Mechanical Systems
Modifications to the existing HVAC system; removal of (4) existing HVAC units and associated duct work as per plans (Wafra - Early Demo Phase.) No change to use, egress or occupancy.
On file for this project
5 documents
Modifications to the existing Sprinkler System; Removal of (14) concealed sprinkler heads and associated piping on the 41st Floor as per plans (Wafra - Early Demo Phase.) No change to use, egress or occupancy.
On file for this project
12 documents · 2 drawing sheets
Modifications to the existing HVAC System; Installation of two new AC Units and associated ductwork and piping to facilitate partial layout change as per plans (Wafra/ Buildout Phase.) No change to use, egress or occupancy.
On file for this project
23 documents · 3 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 4032p · 10 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbing
Issued Permit Scope
Antenna · General Construction · Mechanical Systems · Sprinklers
Installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
10 documents · 3 drawing sheets
Filing removal of plumbing and sprinkler, and installation of a temp loop per plans filed herewith. No change in use, egress or occupancy.
On file for this project
4 documents · 3 drawing sheets
Demolition of all existing office space including elevator lobby and core restrooms. No change in use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 39Under Construction13p · 4 filings · 20 docs
ArchitectureDMElectricalFire ProtectionPlumbingStructural
Issued Permit Scope
Antenna · General Construction · Plumbing
FILING FOR SPRINKLER WORK ASSOCIATED WITH INTERIOR DEMO OF 35TH THROUGH 39TH FLOORS AS PER PLANS.
On file for this project
26 documents · 5 drawing sheets
Structural modifications as per plans filed herewith. NO change in use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
VERIZON - Remove existing GPS units on roof & install 2 new GPS units on roof. Install related equipment in new head room in sub-cellar 1/2. Fiber run from cellar through roof.
On file for this project
3 documents
Latest 3 of 4 filings on this floor.
Floor 38Under Construction12p · 3 filings · 20 docs
ArchitectureDMElectricalFire ProtectionPlumbing
Issued Permit Scope
Antenna · General Construction · Plumbing
FILING FOR SPRINKLER WORK ASSOCIATED WITH INTERIOR DEMO OF 35TH THROUGH 39TH FLOORS AS PER PLANS.
On file for this project
26 documents · 5 drawing sheets
VERIZON - Remove existing GPS units on roof & install 2 new GPS units on roof. Install related equipment in new head room in sub-cellar 1/2. Fiber run from cellar through roof.
On file for this project
3 documents
Removal of existing equipment at sub-cellar 2 and 29th floor. Install new head end room at sub-cellar 2, remove stairs at sub-cellar 1 and install new partitions. Related conduit run through cellar to roof.
On file for this project
3 documents
Floor 3724p · 10 filings · 20 docs
ArchitectureDMElectricalEquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Antenna · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods
Mechanical work as shown on plans.
On file for this project
4 documents · 2 drawing sheets
Sprinkler work as shown on plans.
On file for this project
4 documents · 1 drawing sheet
VERIZON - Remove existing GPS units on roof & install 2 new GPS units on roof. Install related equipment in new head room in sub-cellar 1/2. Fiber run from cellar through roof.
On file for this project
3 documents
Latest 3 of 8 filings on this floor.
Floor 36Under Construction14p · 4 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbing
Issued Permit Scope
Antenna · General Construction · Mechanical Systems · Plumbing
FILING FOR SPRINKLER WORK ASSOCIATED WITH INTERIOR DEMO OF 35TH THROUGH 39TH FLOORS AS PER PLANS.
On file for this project
26 documents · 5 drawing sheets
VERIZON - Remove existing GPS units on roof & install 2 new GPS units on roof. Install related equipment in new head room in sub-cellar 1/2. Fiber run from cellar through roof.
On file for this project
3 documents
Removal of existing equipment at sub-cellar 2 and 29th floor. Install new head end room at sub-cellar 2, remove stairs at sub-cellar 1 and install new partitions. Related conduit run through cellar to roof.
On file for this project
3 documents
Latest 3 of 4 filings on this floor.
Floor 35Under Construction14p · 4 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbing
Issued Permit Scope
Antenna · General Construction · Mechanical Systems · Plumbing
FILING FOR SPRINKLER WORK ASSOCIATED WITH INTERIOR DEMO OF 35TH THROUGH 39TH FLOORS AS PER PLANS.
On file for this project
26 documents · 5 drawing sheets
VERIZON - Remove existing GPS units on roof & install 2 new GPS units on roof. Install related equipment in new head room in sub-cellar 1/2. Fiber run from cellar through roof.
On file for this project
3 documents
Removal of existing equipment at sub-cellar 2 and 29th floor. Install new head end room at sub-cellar 2, remove stairs at sub-cellar 1 and install new partitions. Related conduit run through cellar to roof.
On file for this project
3 documents
Latest 3 of 4 filings on this floor.
Floor 347p · 4 filings · 20 docs
ArchitectureElectricalMechanical
Issued Permit Scope
Antenna · General Construction · Mechanical Systems
Structural work as shown on plans for concrete work on the 34th floor. Work to include concrete pad for two new chillers and one relocated refrigerant unit. Mechanical work is filed under mechanical subdocument.
On file for this project
10 documents · 1 drawing sheet
VERIZON - Remove existing GPS units on roof & install 2 new GPS units on roof. Install related equipment in new head room in sub-cellar 1/2. Fiber run from cellar through roof.
On file for this project
3 documents
Removal of existing equipment at sub-cellar 2 and 29th floor. Install new head end room at sub-cellar 2, remove stairs at sub-cellar 1 and install new partitions. Related conduit run through cellar to roof.
On file for this project
3 documents
Latest 3 of 4 filings on this floor.
Floor 33Under Construction52p · 4 filings · 20 docs
ArchitectureElectricalMechanical
Issued Permit Scope
Antenna · General Construction · Mechanical Systems
FILING FOR MECHANICAL WORK ASSOCIATED WITH THE INTERIOR RENO OF 32ND & 33RD FLOOR RMC OFFICE AS PER PLANS SUBMITTED HEREWITH.
On file for this project
27 documents · 3 drawing sheets
VERIZON - Remove existing GPS units on roof & install 2 new GPS units on roof. Install related equipment in new head room in sub-cellar 1/2. Fiber run from cellar through roof.
On file for this project
3 documents
Removal of existing equipment at sub-cellar 2 and 29th floor. Install new head end room at sub-cellar 2, remove stairs at sub-cellar 1 and install new partitions. Related conduit run through cellar to roof.
On file for this project
3 documents
Latest 3 of 4 filings on this floor.
Floor 32Under Construction63p · 6 filings · 20 docs
ArchitectureCivilElectricalMechanical
Issued Permit Scope
Antenna · General Construction · Mechanical Systems
FILING FOR MECHANICAL WORK ASSOCIATED WITH THE INTERIOR RENO OF 32ND & 33RD FLOOR RMC OFFICE AS PER PLANS SUBMITTED HEREWITH.
On file for this project
27 documents · 2 drawing sheets
Select demolition/construction of interior office areas, demolition & renovation of 32nd floor
On file for this project
15 documents · 11 drawing sheets
Modification to existing HVAC system as per plans filed herewith. NO change in use, egress or occupancy.
On file for this project
10 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 31Under Construction32p · 5 filings · 20 docs
ArchitectureElectricalMechanical
Issued Permit Scope
Antenna · General Construction · Mechanical Systems
APPLICATION FILED FOR SPRINKLER MODIFICATIONS/ADDITIONS ON THE PARTIAL 30TH & 31ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
11 documents · 7 drawing sheets
Select demolition/construction of interior office areas, demolition & renovation of 32nd floor
On file for this project
15 documents · 8 drawing sheets
VERIZON - Remove existing GPS units on roof & install 2 new GPS units on roof. Install related equipment in new head room in sub-cellar 1/2. Fiber run from cellar through roof.
On file for this project
3 documents
Latest 3 of 5 filings on this floor.
Floor 30Under Construction36p · 6 filings · 20 docs
ArchitectureCivilElectricalFire ProtectionMechanicalOther
Issued Permit Scope
Antenna · General Construction · Mechanical Systems · Sprinklers
APPLICATION FILED FOR SPRINKLER MODIFICATIONS/ADDITIONS ON THE PARTIAL 30TH & 31ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
11 documents · 7 drawing sheets
Select demolition/construction of interior office areas, demolition & renovation of 32nd floor
On file for this project
15 documents · 8 drawing sheets
Modification to existing HVAC system as per plans filed herewith. NO change in use, egress or occupancy.
On file for this project
10 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 2919p · 5 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Antenna · General Construction · Mechanical Systems · Plumbing · Sprinklers
APPLICATION FILED FOR STRUCTURAL MODIFICATIONS/ADDITIONS ON THE 29TH AND 30TH FLOOR FOR NEW CONVENIENCE STAIR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
32 documents · 7 drawing sheets
Subsequent application filed for Plumbing/Sprinkler removal on the 29th floor as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
13 documents · 2 drawing sheets
VERIZON - Remove existing GPS units on roof & install 2 new GPS units on roof. Install related equipment in new head room in sub-cellar 1/2. Fiber run from cellar through roof.
On file for this project
3 documents
Latest 3 of 5 filings on this floor.
Floor 28Under Construction59p · 5 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbing
Issued Permit Scope
Antenna · General Construction · Mechanical Systems
Subsequent application filed for Structural modifications/additions on the 28th floor as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
29 documents · 11 drawing sheets
Subsequent application filed for Plumbing/Sprinkler removal on the 28th floor as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
16 documents · 3 drawing sheets
VERIZON - Remove existing GPS units on roof & install 2 new GPS units on roof. Install related equipment in new head room in sub-cellar 1/2. Fiber run from cellar through roof.
On file for this project
3 documents
Latest 3 of 5 filings on this floor.
Floor 2721p · 7 filings · 20 docs
ArchitectureElectricalFire ProtectionGeneralMechanicalPlumbingOther
Issued Permit Scope
Antenna · General Construction · Mechanical Systems
APPLICATION FILED FOR PLUMBING/SPRINKLER MODIFICATIONS/ADDITIONS ON THE 26 & 27TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
8 documents · 5 drawing sheets
APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 27TH FLOOR AND NEW CONVENIENCE STAIR DOWN TO THE 26TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
10 documents · 8 drawing sheets
APPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS ON THE 27TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
9 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 2620p · 9 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbing
Issued Permit Scope
Antenna · General Construction · Mechanical Systems
APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 27TH FLOOR AND NEW CONVENIENCE STAIR DOWN TO THE 26TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
10 documents · 3 drawing sheets
VERIZON - Remove existing GPS units on roof & install 2 new GPS units on roof. Install related equipment in new head room in sub-cellar 1/2. Fiber run from cellar through roof.
On file for this project
3 documents
Removal of existing equipment at sub-cellar 2 and 29th floor. Install new head end room at sub-cellar 2, remove stairs at sub-cellar 1 and install new partitions. Related conduit run through cellar to roof.
On file for this project
3 documents
Latest 3 of 8 filings on this floor.
Floor 259p · 6 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbing
Issued Permit Scope
Antenna · General Construction · Mechanical Systems
VERIZON - Remove existing GPS units on roof & install 2 new GPS units on roof. Install related equipment in new head room in sub-cellar 1/2. Fiber run from cellar through roof.
On file for this project
3 documents
Removal of existing equipment at sub-cellar 2 and 29th floor. Install new head end room at sub-cellar 2, remove stairs at sub-cellar 1 and install new partitions. Related conduit run through cellar to roof.
On file for this project
3 documents
Installation of 2 HVAC units & 2 indoor condenser units within communications room on level A. Installation of utility cables & conduit on all floors from level c through 45. No change in use, egress, or occupancy.
On file for this project
11 documents
Latest 3 of 6 filings on this floor.
Floor 2414p · 7 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbing
Issued Permit Scope
Antenna · General Construction · Mechanical Systems
VERIZON - Remove existing GPS units on roof & install 2 new GPS units on roof. Install related equipment in new head room in sub-cellar 1/2. Fiber run from cellar through roof.
On file for this project
3 documents
Removal of existing equipment at sub-cellar 2 and 29th floor. Install new head end room at sub-cellar 2, remove stairs at sub-cellar 1 and install new partitions. Related conduit run through cellar to roof.
On file for this project
3 documents
Installation of 2 HVAC units & 2 indoor condenser units within communications room on level A. Installation of utility cables & conduit on all floors from level c through 45. No change in use, egress, or occupancy.
On file for this project
11 documents
Latest 3 of 7 filings on this floor.
Floor 23Under Construction27p · 7 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Antenna · General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Standpipe systems modification as shown on plans filed herewith.
On file for this project
25 documents
Interior structural work as shown on plans for slab demolition for 1 floor convenience stair between the 22nd and 23rd floor.
On file for this project
3 documents
FILING FOR SPRINKLER WORK ASSOCIATED WITH INTERIOR RENO OF SUB CELLAR CENTERBRIDGE STORAGE SPACE AND DEMO OF 2ND, 4TH, 13TH, 22ND, AND 23RD FLOORS AS PER PLANS SUBMITTED.
On file for this project
47 documents · 5 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 22Under Construction26p · 6 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Antenna · General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Standpipe systems modification as shown on plans filed herewith.
On file for this project
25 documents
Interior structural work as shown on plans for slab demolition for 1 floor convenience stair between the 22nd and 23rd floor.
On file for this project
3 documents
FILING FOR SPRINKLER WORK ASSOCIATED WITH INTERIOR RENO OF SUB CELLAR CENTERBRIDGE STORAGE SPACE AND DEMO OF 2ND, 4TH, 13TH, 22ND, AND 23RD FLOORS AS PER PLANS SUBMITTED.
On file for this project
47 documents · 5 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 216p · 3 filings · 17 docs
ArchitectureElectricalMechanical
Issued Permit Scope
Antenna · General Construction · Mechanical Systems
VERIZON - Remove existing GPS units on roof & install 2 new GPS units on roof. Install related equipment in new head room in sub-cellar 1/2. Fiber run from cellar through roof.
On file for this project
3 documents
Removal of existing equipment at sub-cellar 2 and 29th floor. Install new head end room at sub-cellar 2, remove stairs at sub-cellar 1 and install new partitions. Related conduit run through cellar to roof.
On file for this project
3 documents
Installation of 2 HVAC units & 2 indoor condenser units within communications room on level A. Installation of utility cables & conduit on all floors from level c through 45. No change in use, egress, or occupancy.
On file for this project
11 documents
Floor 207p · 4 filings · 20 docs
ArchitectureElectricalMechanicalStructural
Issued Permit Scope
Antenna · General Construction · Mechanical Systems
Structural work as shown on plans for work on the plaza level and event space.
On file for this project
14 documents · 1 drawing sheet
VERIZON - Remove existing GPS units on roof & install 2 new GPS units on roof. Install related equipment in new head room in sub-cellar 1/2. Fiber run from cellar through roof.
On file for this project
3 documents
Removal of existing equipment at sub-cellar 2 and 29th floor. Install new head end room at sub-cellar 2, remove stairs at sub-cellar 1 and install new partitions. Related conduit run through cellar to roof.
On file for this project
3 documents
Latest 3 of 4 filings on this floor.
Floor 196p · 3 filings · 17 docs
ArchitectureElectricalMechanical
Issued Permit Scope
Antenna · General Construction · Mechanical Systems
VERIZON - Remove existing GPS units on roof & install 2 new GPS units on roof. Install related equipment in new head room in sub-cellar 1/2. Fiber run from cellar through roof.
On file for this project
3 documents
Removal of existing equipment at sub-cellar 2 and 29th floor. Install new head end room at sub-cellar 2, remove stairs at sub-cellar 1 and install new partitions. Related conduit run through cellar to roof.
On file for this project
3 documents
Installation of 2 HVAC units & 2 indoor condenser units within communications room on level A. Installation of utility cables & conduit on all floors from level c through 45. No change in use, egress, or occupancy.
On file for this project
11 documents
Floor 188p · 4 filings · 20 docs
ArchitectureElectricalMechanical
Issued Permit Scope
Antenna · General Construction · Mechanical Systems
FILING FOR REPLACEMENT OF EXISTING HVAC UNIT AS PER PLANS SUBMITTED HEREWITH.
On file for this project
6 documents · 2 drawing sheets
VERIZON - Remove existing GPS units on roof & install 2 new GPS units on roof. Install related equipment in new head room in sub-cellar 1/2. Fiber run from cellar through roof.
On file for this project
3 documents
Removal of existing equipment at sub-cellar 2 and 29th floor. Install new head end room at sub-cellar 2, remove stairs at sub-cellar 1 and install new partitions. Related conduit run through cellar to roof.
On file for this project
3 documents
Latest 3 of 4 filings on this floor.
Floor 17Under Construction60p · 6 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbing
Issued Permit Scope
Antenna · General Construction · Mechanical Systems · Plumbing · Sprinklers
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
16 documents · 5 drawing sheets
FILING FOR SPRINKLER WORK ASSOCIATED WITH INTERIOR DEMO/WHITEBOX/BATHROOMS ON 17TH FLOOR AS PER PLANS.
On file for this project
22 documents · 8 drawing sheets
VERIZON - Remove existing GPS units on roof & install 2 new GPS units on roof. Install related equipment in new head room in sub-cellar 1/2. Fiber run from cellar through roof.
On file for this project
3 documents
Latest 3 of 6 filings on this floor.
Floor 1612p · 5 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbing
Issued Permit Scope
Antenna · General Construction · Mechanical Systems
APPLICATION FILED FOR PLUMBING/SPRINKLER MODIFICATIONS/ADDITIONS ON THE 16TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents · 3 drawing sheets
APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 16TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 3 drawing sheets
VERIZON - Remove existing GPS units on roof & install 2 new GPS units on roof. Install related equipment in new head room in sub-cellar 1/2. Fiber run from cellar through roof.
On file for this project
3 documents
Latest 3 of 5 filings on this floor.
Floor 1518p · 5 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbing
Issued Permit Scope
Antenna · General Construction · Mechanical Systems
APPLICATION FILED FOR STRUCTURAL MODIFICATIONS/ADDITIONS (NEW SLAB OPENING FOR CONVENIENCE STAIR) ON THE 14TH AND 15TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
53 documents · 10 drawing sheets
Subsequent application filed for Plumbing/Sprinkler removal on the 15th floor as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
11 documents · 2 drawing sheets
VERIZON - Remove existing GPS units on roof & install 2 new GPS units on roof. Install related equipment in new head room in sub-cellar 1/2. Fiber run from cellar through roof.
On file for this project
3 documents
Latest 3 of 5 filings on this floor.
Floor 1422p · 7 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbing
Issued Permit Scope
Antenna · General Construction · Mechanical Systems
APPLICATION FILED FOR STRUCTURAL MODIFICATIONS/ADDITIONS (NEW SLAB OPENING FOR CONVENIENCE STAIR) ON THE 14TH AND 15TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
53 documents · 7 drawing sheets
VERIZON - Remove existing GPS units on roof & install 2 new GPS units on roof. Install related equipment in new head room in sub-cellar 1/2. Fiber run from cellar through roof.
On file for this project
3 documents
Removal of existing equipment at sub-cellar 2 and 29th floor. Install new head end room at sub-cellar 2, remove stairs at sub-cellar 1 and install new partitions. Related conduit run through cellar to roof.
On file for this project
3 documents
Latest 3 of 7 filings on this floor.
Floor 13Under Construction25p · 6 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Antenna · General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
FILING FOR SPRINKLER WORK ASSOCIATED WITH INTERIOR RENO OF SUB CELLAR CENTERBRIDGE STORAGE SPACE AND DEMO OF 2ND, 4TH, 13TH, 22ND, AND 23RD FLOORS AS PER PLANS SUBMITTED.
On file for this project
47 documents · 4 drawing sheets
Structural steel supporting new doors, sliding partitions, and TV lifts in existing 12th and 13th floor office spaces.
On file for this project
3 documents
VERIZON - Remove existing GPS units on roof & install 2 new GPS units on roof. Install related equipment in new head room in sub-cellar 1/2. Fiber run from cellar through roof.
On file for this project
3 documents
Latest 3 of 6 filings on this floor.
Floor 1224p · 10 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Antenna · General Construction · Mechanical Systems · Structural
Interior renovation of existing 12th floor office. No change to egress, use, or occupancy.
On file for this project
3 documents · 6 drawing sheets
Mechanical work associated with renovation of existing 12th floor office.
On file for this project
25 documents · 4 drawing sheets
VERIZON - Remove existing GPS units on roof & install 2 new GPS units on roof. Install related equipment in new head room in sub-cellar 1/2. Fiber run from cellar through roof.
On file for this project
3 documents
Latest 3 of 8 filings on this floor.
Floor 1117p · 9 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbing
Issued Permit Scope
Antenna · General Construction · Mechanical Systems
New interior partitions and associated general construction work for 11th floor office. No change to egress, use, or occupancy.
On file for this project
5 documents · 3 drawing sheets
VERIZON - Remove existing GPS units on roof & install 2 new GPS units on roof. Install related equipment in new head room in sub-cellar 1/2. Fiber run from cellar through roof.
On file for this project
3 documents
Removal of existing equipment at sub-cellar 2 and 29th floor. Install new head end room at sub-cellar 2, remove stairs at sub-cellar 1 and install new partitions. Related conduit run through cellar to roof.
On file for this project
3 documents
Latest 3 of 8 filings on this floor.
Floor 1022p · 9 filings · 20 docs
ArchitectureCivilElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Antenna · General Construction · Mechanical Systems
Modification to existing plumbing fixtures as per plans filed herewith. NO change in use, egress or occupancy.
On file for this project
7 documents · 3 drawing sheets
Select demolition and renovation of selected areas of the 10th floor
On file for this project
5 documents · 6 drawing sheets
Removal of existing ductwork, installation of new ductwork in coordination with new architectural layout.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 914p · 6 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanical
Issued Permit Scope
Antenna · General Construction · Mechanical Systems
Modification to existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
8 documents · 1 drawing sheet
Replacement of an existing generator and associated components. No change in use, egress or occupancy.
On file for this project
13 documents · 2 drawing sheets
Construct a 2-hour fire rated enclosure around the new generator replacement area. No change in use, egress or occupancy.
On file for this project
12 documents · 5 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 820p · 10 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Antenna · General Construction · Mechanical Systems
Filing for sprinkler work as per plans submitted. No change in egress, use, or occupancy.
On file for this project
22 documents · 6 drawing sheets
Filing herewith to relocate diffusers on the 8th floor. No change in egress, use or occupancy.
On file for this project
13 documents · 1 drawing sheet
APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 8TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 716p · 7 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanical
Issued Permit Scope
Antenna · General Construction · Mechanical Systems
Filing for sprinkler work as per plans submitted. No change in egress, use, or occupancy.
On file for this project
22 documents · 8 drawing sheets
FILING FOR SPRINKLER WORK ASSOCIATED WITH INTERIOR DEMO/WHITEBOX/BATHROOMS ON 17TH FLOOR AS PER PLANS.
On file for this project
22 documents · 1 drawing sheet
APPLICATION FILED FOR PLUMBING/SPRINKLER MODIFICATIONS/ADDITIONS ON THE 26 & 27TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
8 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 613p · 4 filings · 20 docs
ArchitectureElectricalMechanicalStructural
Issued Permit Scope
Antenna · General Construction · Mechanical Systems
Filing herewith for replacement of a/c units on the 5th and 6th floor. No change in occupancy, use, or egress.
On file for this project
12 documents · 1 drawing sheet
VERIZON - Remove existing GPS units on roof & install 2 new GPS units on roof. Install related equipment in new head room in sub-cellar 1/2. Fiber run from cellar through roof.
On file for this project
3 documents
Removal of existing equipment at sub-cellar 2 and 29th floor. Install new head end room at sub-cellar 2, remove stairs at sub-cellar 1 and install new partitions. Related conduit run through cellar to roof.
On file for this project
3 documents
Latest 3 of 4 filings on this floor.
Floor 513p · 5 filings · 20 docs
ArchitectureElectricalMechanicalStructural
Issued Permit Scope
Antenna · General Construction · Mechanical Systems
Filing herewith for replacement of a/c units on the 5th and 6th floor. No change in occupancy, use, or egress.
On file for this project
12 documents
Structural work as shown on plans for work on the plaza level and event space.
On file for this project
14 documents · 1 drawing sheet
VERIZON - Remove existing GPS units on roof & install 2 new GPS units on roof. Install related equipment in new head room in sub-cellar 1/2. Fiber run from cellar through roof.
On file for this project
3 documents
Latest 3 of 5 filings on this floor.
Floor 4Under Construction29p · 4 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbing
Issued Permit Scope
Antenna · General Construction · Mechanical Systems · Plumbing · Sprinklers
FILING FOR SPRINKLER WORK ASSOCIATED WITH INTERIOR RENO OF SUB CELLAR CENTERBRIDGE STORAGE SPACE AND DEMO OF 2ND, 4TH, 13TH, 22ND, AND 23RD FLOORS AS PER PLANS SUBMITTED.
On file for this project
47 documents · 10 drawing sheets
VERIZON - Remove existing GPS units on roof & install 2 new GPS units on roof. Install related equipment in new head room in sub-cellar 1/2. Fiber run from cellar through roof.
On file for this project
3 documents
Removal of existing equipment at sub-cellar 2 and 29th floor. Install new head end room at sub-cellar 2, remove stairs at sub-cellar 1 and install new partitions. Related conduit run through cellar to roof.
On file for this project
3 documents
Latest 3 of 4 filings on this floor.
Floor 3Under Construction44p · 15 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Antenna · General Construction · Mechanical Systems · Standpipe
Modifications to the existing Standpipe System; Relocation of two (2) Fire Hose Rack and Fire Hose Valves and associated Fire Standpipe on the 3rd Floor as per plans (Wafra Inc. - Office Renovation.) No change to use, egress or occupancy.
On file for this project
8 documents · 5 drawing sheets
Modifications to the existing HVAC system and installation of AC units and ductwork as per plans (Wafra Inc. - Office Renovation.) No change to use, egress or occupancy.
On file for this project
12 documents · 3 drawing sheets
Interior renovation of existing 3rd floor office. No change to use egress or occupancy.
On file for this project
6 documents · 4 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 2Under Construction49p · 8 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Antenna · General Construction · Mechanical Systems · Plumbing · Sprinklers
Structural work as shown on plans filed herewith.
On file for this project
22 documents
FILING FOR SPRINKLER WORK ASSOCIATED WITH INTERIOR RENO OF SUB CELLAR CENTERBRIDGE STORAGE SPACE AND DEMO OF 2ND, 4TH, 13TH, 22ND, AND 23RD FLOORS AS PER PLANS SUBMITTED.
On file for this project
47 documents · 9 drawing sheets
Modifications to existing Sprinkler System as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
7 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 1209p · 24 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Antenna · General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural · Supported Scaffold
Application filed in order to establish public assembly space with minor general construction work as shown on pans filed herewith. Amended CO to be obtained.
On file for this project
25 documents · 12 drawing sheets
Removal of interior partitions and finishes as shown on plans in the lex and a-level. No structural demolition.
On file for this project
3 documents · 1 drawing sheet
Interior renovation to include demo of existing and construction of new partitions and finishes as shown on plans for plaza level. Modification to existing storefront.
On file for this project
18 documents · 6 drawing sheets
Latest 3 of 8 filings on this floor.
Cellar177p · 21 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Antenna · General Construction · Mechanical Systems · Plumbing · Sprinklers
Renovation to include construction of new interior partitions and finishes as shown on plans in the lex and a-level. No change to use egress or occupancy
On file for this project
18 documents · 5 drawing sheets
Application filed in order to establish public assembly space with minor general construction work as shown on pans filed herewith. Amended CO to be obtained.
On file for this project
25 documents · 6 drawing sheets
Interior renovation to include demo of existing and construction of new partitions and finishes as shown on plans for plaza level. Modification to existing storefront.
On file for this project
18 documents · 5 drawing sheets
Latest 3 of 8 filings on this floor.
Sub-Cellar120p · 21 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Antenna · General Construction · Mechanical Systems · Plumbing · Sprinklers
Modifications to existing sprinkler system on the plaza level
On file for this project
8 documents · 2 drawing sheets
Application filed in order to establish public assembly space with minor general construction work as shown on pans filed herewith. Amended CO to be obtained.
On file for this project
25 documents
Interior renovation to include demo of existing and construction of new partitions and finishes as shown on plans for plaza level. Modification to existing storefront.
On file for this project
18 documents · 3 drawing sheets
Latest 3 of 8 filings on this floor.