| Owner | Filings | Most Recent |
|---|---|---|
| RUDING MANAGEMENT | 1,933 | 09/26/2026 |
| 110 WALL STREET | 259 | 07/08/2026 |
| 345 PARK AVENUE L P | 256 | 03/22/2026 |
| RUDIN MANAGMENT CO INC AAF | 35 | 03/21/2026 |
| MANAGEMENT BUILDING | 7 | 03/22/2026 |
| WILLIAM VITACCO ASSOC LTD | 4 | 03/21/2026 |
| T-MOBILE | 3 | 03/22/2026 |
| BLACKSTONE GROUP | 3 | 03/22/2026 |
| RUDIN | 1 | 03/22/2026 |
| BLACKSTONE | 1 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| JAROS BAUM & BOLLES | 25 | 08/25/2026 |
| OFFICE OF JAMES RUDERMAN | 36 | 08/14/2026 |
| S&J Engineers PLLC | 1 | 08/12/2026 |
| SKIDMORE, OWINGS AND MERRILL LLP | 7 | 08/10/2026 |
| ANTONIO LEO ARCHITECT | 12 | 07/29/2026 |
| TPG ARCHITECTURE, LLP | 1 | 07/16/2026 |
| LORING CONSULTING ENGINEERS, INC. | 40 | 06/23/2026 |
| RICHARD PUSWALD PE | 5 | 06/12/2026 |
| AMA CONSULTING ENGINEERS, PC | 21 | 04/27/2026 |
| PAUL PERDEK, PROF. ENG. PLLC | 1 | 04/15/2026 |
| ROBERT DERECTOR ASSOCIATES | 74 | 03/03/2026 |
| GENSLER | 20 | 03/02/2026 |
| TED MOUDIS ASSOCIATES | 42 | 01/21/2026 |
| MRA ENGINEERING P.C. | 1 | 01/07/2026 |
| WELLWORTH CONSULTING LLC | 1 | 12/04/2025 |
| HIGHLAND ASSOCIATES | 15 | 11/25/2025 |
| SMITH ENGINEERING | 1 | 09/15/2025 |
| INTERIOR ARCHITECTS | 3 | 06/18/2025 |
| ANDREW FORMICHELLA | 2 | 05/27/2025 |
| URBAN INTEGRATIONS | 1 | 05/22/2025 |
| SYSKA HENNESSY GROUP | 72 | 02/06/2025 |
| JOHN F. GIUSEFFI, ARCHITECT, PC | 1 | 01/03/2025 |
| TOHFAZ UDDIN PE PC | 4 | 10/28/2024 |
| GEORGE J. XERAKIAS, PE | 2 | 09/23/2024 |
| THE SWITZER GROUP | 2 | 06/02/2023 |
| Representative | Filings | Most Recent |
|---|---|---|
| A1 EXPEDITING SERVICE | 20 | 03/21/2026 |
| WILLIAM VITACCO ASSOCIATES | 258 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 50 | 03/21/2026 |
| CONSTRUCTION PERMIT SERVICES | 10 | 03/21/2026 |
| EA DESIGN GROUP | 144 | 03/21/2026 |
| GREEN LIGHT EXPEDITING LLC | 76 | 03/21/2026 |
| RPO | 30 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 3 | 03/21/2026 |
| RIZZO GROUP | 20 | 03/21/2026 |
| SPRING SCAFFOLDING LLC | 8 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| JRM CONSTRUCTION MGMT LLC | General Contractor | 155 | 07/08/2026 |
| PAR FIRE PROTECTION LLC | Fire Protection | 63 | 09/26/2026 |
| JT MAGEN & COMPANY INC | General Contractor | 44 | 07/08/2026 |
| PAR PLUMBING CO., INC | Plumbing | 34 | 08/26/2026 |
| STRUCTURE TONE, LLC | General Contractor | 28 | 09/19/2026 |
| BENCHMARK BUILDERS LLC | General Contractor | 24 | 07/08/2026 |
| TURNER CONSTRUCTION COMPANY | General Contractor | 19 | 09/26/2026 |
| SAFWAY ATLANTIC, LLC | General Contractor | 16 | 07/08/2026 |
| CLUNE CONSTRUCTION CO LP | General Contractor | 13 | 07/08/2026 |
| SOH PAR SPRINKLER LLC | Fire Protection | 11 | 07/08/2026 |
| ON-TRAC CONSTRUCTION ASSO | General Contractor | 10 | 07/08/2026 |
| ABCO-PEERLESS SPRKLR CORP | Fire Protection | 10 | 07/08/2026 |
| ROBERT B. SAMUELS, INC. | Electrical | 10 | 03/22/2026 |
| THEODORE WILLIAMS CONSTR | General Contractor | 8 | 08/26/2026 |
| TIMBIL MECHANICAL, LLC | General Contractor | 7 | 07/08/2026 |
| MAC FELDER INC | Plumbing | 7 | 07/08/2026 |
| SIRINA FIRE PROT CORP | Fire Protection | 7 | 07/08/2026 |
| EAGLE SCAFFOLDING SVCS INC | General Contractor | 6 | 09/10/2026 |
| SQUAN CONSTRUCTION SERVIC | General Contractor | 5 | 07/08/2026 |
| TRISTATE PLBG SVCS CORP | Plumbing | 5 | 07/08/2026 |
| LAWRENCE J. LEVINE | Fire Protection | 5 | 03/21/2026 |
| DONATO PLMG INC | Fire Protection | 4 | 08/30/2026 |
| MACCARONE PLUMBING INC | Fire Protection | 4 | 07/08/2026 |
| LEVINE, GEORGE | Fire Protection | 4 | 03/21/2026 |
| RALPH OCCHIPINTI | Electrical | 4 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| CROSSCHECK INSPECTION SER | 544 | 79 | 08/25/2026 |
| AK ENGINEERING PC | 678 | 225 | 08/14/2026 |
| SOCOTEC ENGINEERING | 4983 | 4 | 03/03/2026 |
| ANTONIO LEO ARCHITECT | 1996 | 2 | 12/09/2025 |
| ETI CONSULTANTS LLC | 7694 | 18 | 08/28/2025 |
| GRANT ENGINEERING CONSULT | 3512 | 1 | 02/08/2023 |
| KMB DESIGN GROUP, LLC | 513 | 4 | 11/01/2021 |
| PSI AGENCY INC. | 254 | 1 | 08/19/2020 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Standpipe | Permit Issued | DONATO PLMG INC | 10/01/2026 |
| DOB NOW | Standpipe | Permit Issued | PAR FIRE PROTECTION LLC | 09/25/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | TURNER CONSTRUCTION COMPANY | 09/25/2026 |
| DOB NOW | Sprinklers | Permit Issued | PAR FIRE PROTECTION LLC | 09/25/2026 |
| DOB NOW | Structural | Permit Issued | STRUCTURE TONE, LLC | 09/18/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | STRUCTURE TONE, LLC | 09/15/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | EAGLE SCAFFOLDING SVCS INC | 09/09/2026 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 09/03/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | TURNER CONSTRUCTION COMPANY | 09/03/2026 |
| DOB NOW | Structural | Permit Issued | TURNER CONSTRUCTION COMPANY | 09/03/2026 |
| DOB NOW | Plumbing | Permit Issued | DONATO PLUMBING, INC | 08/28/2026 |
| DOB NOW | Sprinklers | Permit Issued | DONATO PLMG INC | 08/28/2026 |
| DOB NOW | Standpipe | Permit Issued | DONATO PLMG INC | 08/28/2026 |
| DOB NOW | Structural | Permit Issued | STRUCTURE TONE, LLC | 08/19/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | SOHO CONTRACTING CORP | 08/13/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | THEODORE WILLIAMS CONSTR | 08/03/2026 |
| DOB NOW | Sprinklers | Permit Issued | DONATO PLMG INC | 08/03/2026 |
| DOB NOW | Mechanical Systems | Signed-off | THEODORE WILLIAMS CONSTR | 08/03/2026 |
| DOB NOW | General Construction | Signed-off | THEODORE WILLIAMS CONSTR | 08/03/2026 |
| DOB NOW | General Construction | Signed-off | THEODORE WILLIAMS CONSTR | 08/03/2026 |
| DOB NOW | Sprinklers | Permit Issued | DONATO PLMG INC | 07/27/2026 |
| DOB NOW | General Construction | Permit Issued | TURNER CONSTRUCTION COMPANY | 07/24/2026 |
| DOB NOW | Plumbing | Permit Issued | DONATO PLUMBING, INC | 07/23/2026 |
| DOB NOW | Structural | Permit Issued | TURNER CONSTRUCTION COMPANY | 07/22/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | TURNER CONSTRUCTION COMPANY | 07/22/2026 |
| DOB NOW | Structural | Permit Issued | TURNER CONSTRUCTION COMPANY | 07/22/2026 |
| DOB NOW | Structural | Permit Issued | TURNER CONSTRUCTION COMPANY | 07/21/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | TURNER CONSTRUCTION COMPANY | 07/21/2026 |
| DOB NOW | General Construction | Permit Issued | TURNER CONSTRUCTION COMPANY | 07/09/2026 |
| DOB NOW | General Construction | Permit Issued | TURNER CONSTRUCTION COMPANY | 07/09/2026 |
| DOB NOW | Construction Fence | Permit Issued | EAGLE SCAFFOLDING SVCS INC | 06/15/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | EAGLE SCAFFOLDING SVCS INC | 06/11/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | EAGLE SCAFFOLDING SVCS INC | 06/10/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | EAGLE SCAFFOLDING SVCS INC | 06/08/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | EAGLE SCAFFOLDING SVCS INC | 06/08/2026 |
| DOB NOW | Sprinklers | Permit Issued | ALLSTATE SPRINKLER LLC | 05/05/2026 |
| DOB NOW | Plumbing | Permit Issued | A&A PLUMBING CORP | 05/01/2026 |
| DOB NOW | Plumbing | Permit Issued | A&A PLUMBING CORP | 05/01/2026 |
| DOB NOW | General Construction | Signed-off | THEODORE WILLIAMS CONSTR | 04/28/2026 |
| DOB NOW | Mechanical Systems | Signed-off | THEODORE WILLIAMS CONSTR | 04/27/2026 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/25/2026 | Permit Issued | TURNER CONSTRUCTION COMPA | Air Conditioning Systems, Heating Systems, Ventilation Systems | Cooling Nortek SB-010-3-0-GCBC-V0-10-000-A 180,600 BTU · Packaged Unit ×2 ZR726-02-03 658,155 BTU · Packaged Unit ×2 Skil-Aire MWC-036-H4 29,400 BTU · Vrf Outdoor ×1 Ventilation Greenheck BSQ-90HP 800 CFM · Exhaust Fan ×3 BSQ-130HP 1,000 CFM · Exhaust Fan ×1 BSQ-160HP 1,000 BTU · Exhaust Fan ×2 BSQ-180HP 3,635 CFM · Exhaust Fan ×2 AX-47-190-0415-M50 5,500 CFM · Exhaust Fan ×1 |
| 07/24/2026 | Signed-off | THEODORE WILLIAMS CONSTR | Air Conditioning Systems, Heating Systems, Ventilation Systems | Cooling Mitsubishi Electric MXZ-5D36NL 35,400 BTU · Vrf Outdoor ×8 |
| 04/27/2026 | Signed-off | JRM CONSTRUCTION MGMT LLC | Air Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems | Cooling Stulz OHS-040-HW 33,700 BTU · Wshp ×2 Heat / Cool Mitsubishi Electric TPEFYP018MA144A 18,000 BTU · Vrf Indoor ×14 TPEFYP015MA144A 15,000 BTU · Vrf Indoor ×13 TPEFYP012MA144A 12,000 BTU · Vrf Indoor ×6 TPEFYP008MA144A 8,000 BTU · Vrf Indoor ×4 .TPEFYP024MA144A 24,000 BTU · Vrf Indoor ×3 TQRYP1684AL42AN 192,000 BTU · Vrf Outdoor ×2 TPEFYP036MA144A 36,000 BTU · Vrf Indoor ×1 TQRYP1444AL42AN 144,000 BTU · Vrf Outdoor ×1 TQRYP1924AL42AN 168,000 BTU · Vrf Outdoor ×1 Ventilation Greenheck SQ-120-VG 1,300 CFM · Exhaust Fan ×2 |
| 04/22/2026 | Signed-off | THEODORE WILLIAMS CONSTR | Air Conditioning Systems | Cooling |
| 03/03/2026 | Permit Issued | JRM CONSTRUCTION MGMT LLC | Air Conditioning Systems, Ventilation Systems | Cooling |
| 11/25/2025 | Signed-off | JRM CONSTRUCTION MGMT LLC | Air Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems | Cooling Above Air HKW-009S1-4-000-00-00-1G-EC-00-LT-A 30,000 BTU · Wshp ×4 Heat / Cool Mitsubishi Electric TPEFYP015MA144A 15,000 BTU · Vrf Indoor ×30 TPEFYP018MA144A 18,000 BTU · Vrf Indoor ×18 TPEFYP024MA144A 24,000 BTU · Fan Coil Indoor ×14 TPEFYP012MA144A 12,000 BTU · Fan Coil Indoor ×12 TQRYP2404AL41AN 240,000 BTU · Condensing Unit ×8 TPEFYP006MA144A 6,000 BTU · Vrf Indoor ×6 Ventilation |
| 09/15/2025 | Signed-off | TIMBIL MECHANICAL, LLC | Air Conditioning Systems, Ventilation Systems | |
| 08/28/2025 | Permit Issued | JRM CONSTRUCTION MGMT LLC | Air Conditioning Systems | Cooling |
| 06/26/2025 | Permit Issued | JRM CONSTRUCTION MGMT LLC | Air Conditioning Systems | — |
| 10/11/2024 | Permit Issued | JRM CONSTRUCTION MGMT LLC | Associated Ducts and Piping | — |
| 02/27/2024 | Permit Issued | JT MAGEN & COMPANY INC | Heating and Air Conditioning Systems | Heat / Cool Above Air HKH-048S 53,000 BTU · Fan Coil Indoor ×4 CWU-011S-4-00-00-S 35,000 BTU · Condensing Unit ×2 HKH-060S 64,000 BTU · Fan Coil Indoor ×2 WCH-011S 35,000 BTU · Fan Coil Indoor ×2 XWU-048S-4-00-00-1G 53,100 BTU · Condensing Unit ×2 XWU-048S4-00-00-1G 53,100 BTU · Condensing Unit ×2 XWU-060S-4-00-00-1G 63,600 BTU · Condensing Unit ×2 Stulz OHS-024-W 24,000 BTU · Wshp ×4 |
| 08/09/2023 | — | — | Associated Ducts and Piping | Ducts & Piping N/A N/A Ductwork ×1 |
| 03/25/2022 | Signed-off | JRM CONSTRUCTION MGMT LLC | Others | Other N/A N/A Ductwork ×1 |
| 11/16/2021 | Permit Issued | JRM CONSTRUCTION MGMT LLC | Associated Ducts and Piping | Ducts & Piping N/A N/A Ductwork ×1 |
| 09/27/2021 | Permit Issued | SQUAN CONSTRUCTION SERVIC | Air Conditioning Systems | Cooling |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/11/2026 | Permit Issued | DONATO PLMG INC | Sprinkler System |
| 07/29/2026 | Permit Issued | STANDARD FIRE PROTECT LLC | Sprinkler System |
| 07/24/2026 | Permit Issued | AGGRESSIVE FIRE PROT LLC | Sprinkler System |
| 07/23/2026 | Permit Issued | DONATO PLMG INC | Sprinkler System |
| 05/28/2026 | — | — | Sprinkler System |
| 05/18/2026 | Permit Issued | CAPITOL FIRE SPRINKLER CO | Sprinkler System |
| 04/27/2026 | Signed-off | PAR FIRE PROTECTION LLC | 284 heads |
| 04/01/2026 | — | — | Sprinkler System |
| 03/03/2026 | Permit Issued | PAR FIRE PROTECTION LLC | Sprinkler System |
| 09/29/2025 | Permit Issued | PAR FIRE PROTECTION LLC | 3 heads |
| 07/08/2025 | Signed-off | SOH PAR SPRINKLER LLC | 245 heads |
| 06/27/2025 | Permit Issued | SOH PAR SPRINKLER LLC | 71 heads |
| 02/19/2025 | — | — | — |
| 12/04/2024 | Permit Issued | PAR FIRE PROTECTION LLC | 23 heads |
| 02/01/2024 | Signed-off | SOH PAR SPRINKLER LLC | 285 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/25/2026 | Permit Issued | DONATO PLUMBING, INC | Water/Sanitary |
| 07/29/2026 | Permit Issued | STANDARD PLBG SVS LLC | Water/Sanitary |
| 07/24/2026 | Permit Issued | MAC FELDER INC | Water/Sanitary |
| 05/28/2026 | — | — | — |
| 05/18/2026 | Permit Issued | A&A PLUMBING CORP | Water/Sanitary |
| 04/27/2026 | Signed-off | PAR PLUMBING CO., INC | Water/Sanitary |
| 03/03/2026 | Permit Issued | PAR PLUMBING CO., INC | Water/Sanitary |
| 09/29/2025 | — | — | — |
| 07/08/2025 | Signed-off | PAR PLUMBING CO., INC | Water/Sanitary |
| 06/27/2025 | Signed-off | PAR PLUMBING CO., INC | Water/Sanitary |
| 02/01/2024 | Signed-off | PAR PLUMBING CO., INC | Water/Sanitary |
| 01/29/2024 | Signed-off | PAR PLUMBING CO., INC | Water/Sanitary |
| 08/09/2023 | — | — | Water/Sanitary |
| 09/27/2022 | Signed-off | PAR PLUMBING CO., INC | Water/Sanitary |
| 11/16/2021 | — | — | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/22/2026 | Permit Issued | ROBERT B SAMUELS, INC | General Wiring |
| 09/21/2026 | Complete | ROBERT B SAMUELS, INC | General Wiring |
| 09/09/2026 | Permit Issued | ATLAS-ACON ELEC. SERVICE | General Wiring |
| 08/11/2026 | Permit Issued | PALANT ELEC'L CONTR'G COR | — |
| 07/20/2026 | Permit Issued | TRANSFORM ELECTL CONTRS I | General Wiring |
| 07/08/2026 | Permit Issued | ROBERT B SAMUELS, INC | General Wiring |
| 05/29/2026 | Permit Issued | CORPORATE ELEC. GROUP INC | — |
| 05/05/2026 | Permit Issued | ON POINT ELECTRIC INC | — |
| 05/05/2026 | Permit Issued | ON POINT ELECTRIC INC | General Wiring |
| 04/29/2026 | Permit Issued | ROBERT B SAMUELS, INC | — |
| 04/24/2026 | Permit Issued | ATLAS-ACON ELEC. SERVICE | General Wiring |
| 04/07/2026 | Permit Issued | P.E. STONE INC | General Wiring |
| 03/21/2026 | Permit Issued | ROBERT B SAMUELS, INC | General Wiring |
| 03/18/2026 | Permit Issued | ROBERT B SAMUELS, INC | General Wiring |
| 01/26/2026 | Permit Issued | ROBERT B SAMUELS, INC | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/25/2026 | Permit Issued | DONATO PLMG INC | Steel, Concrete |
| 08/14/2026 | Permit Issued | STRUCTURE TONE, LLC | Steel |
| 08/11/2026 | Permit Issued | DONATO PLMG INC | 1 scope_items |
| 07/29/2026 | Permit Issued | JRM CONSTRUCTION MGMT LLC | Steel, Concrete |
| 07/23/2026 | Permit Issued | TURNER CONSTRUCTION COMPA | 1 scope_items |
| 05/18/2026 | Permit Issued | TURNER CONSTRUCTION COMPA | Steel, Concrete |
| 04/27/2026 | Signed-off | PAR FIRE PROTECTION LLC | Steel |
| 11/25/2025 | Signed-off | PAR FIRE PROTECTION LLC | Steel |
| 09/15/2025 | Signed-off | TIMBIL MECHANICAL, LLC | Concrete |
| 06/26/2025 | Signed-off | JRM CONSTRUCTION MGMT LLC | Steel |
| 02/01/2024 | Signed-off | SOH PAR SPRINKLER LLC | 1 scope_items |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/12/2026 | Permit Issued | SOHO CONTRACTING CORP | Scaffold, Sidewalk Shed |
| 06/12/2026 | Permit Issued | EAGLE SCAFFOLDING SVCS IN | Fence |
| 06/09/2026 | Permit Issued | EAGLE SCAFFOLDING SVCS IN | Scaffold |
| 06/05/2026 | Permit Issued | EAGLE SCAFFOLDING SVCS IN | Sidewalk Shed |
| 07/11/2019 | Signed-off | SAFWAY ATLANTIC, LLC | Fence |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/26/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/06/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/20/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 07/14/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 06/29/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 06/15/2026 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 06/03/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 05/29/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/28/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/20/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 05/15/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/30/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/30/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/24/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/22/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/27/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/27/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/24/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/18/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 02/17/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/18/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/18/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 11/26/2025 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 11/21/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 11/18/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/12/2026 | Lighting controls | EUGENE BIFULCO | energy_progress |
| 08/12/2026 | Fire-Resistant Penetrations and Joints | EUGENE BIFULCO | special |
| 08/12/2026 | Energy Code Compliance Inspections | EUGENE BIFULCO | progress |
| 08/12/2026 | Mechanical Systems | EUGENE BIFULCO | special |
| 08/12/2026 | Post-installed Anchors | EUGENE BIFULCO | special |
| 08/12/2026 | Interior lighting power | EUGENE BIFULCO | energy_progress |
| 08/12/2026 | Maintenance information | EUGENE BIFULCO | energy_progress |
| 08/12/2026 | HVAC-R and service water piping design and insulation | EUGENE BIFULCO | energy_progress |
| 08/12/2026 | HVAC-R and service water heating system controls | EUGENE BIFULCO | energy_progress |
| 08/12/2026 | Final | EUGENE BIFULCO | progress |
| 08/12/2026 | Duct leakage testing, insulation and design | EUGENE BIFULCO | energy_progress |
| 08/12/2026 | Shutoff dampers | EUGENE BIFULCO | energy_progress |
| 08/12/2026 | Electrical motors and elevators | EUGENE BIFULCO | energy_progress |
| 08/12/2026 | Metering | EUGENE BIFULCO | energy_progress |
| 08/12/2026 | HVAC-R and service water heating equipment | EUGENE BIFULCO | energy_progress |
| 07/31/2026 | Maintenance information | EUGENE BIFULCO | energy_progress |
| 07/31/2026 | Energy Code Compliance Inspections | EUGENE BIFULCO | progress |
| 07/31/2026 | HVAC-R and service water heating equipment | EUGENE BIFULCO | energy_progress |
| 07/31/2026 | Fire-Resistant Penetrations and Joints | EUGENE BIFULCO | special |
| 07/31/2026 | HVAC-R and service water piping design and insulation | EUGENE BIFULCO | energy_progress |
| 07/31/2026 | HVAC-R and service water heating system controls | EUGENE BIFULCO | energy_progress |
| 07/31/2026 | Post-installed Anchors | EUGENE BIFULCO | special |
| 07/31/2026 | Post-installed Anchors | EUGENE BIFULCO | special |
| 07/31/2026 | Fire-Resistant Penetrations and Joints | EUGENE BIFULCO | special |
| 07/29/2026 | Fire-Resistant Penetrations and Joints | EUGENE BIFULCO | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| La Dolce Vita | Restaurant / Food Service | — | Project M01359684 |
| East West Bank | Office | Floor 17 | Project M01347626 |
| Blackstone | Office | Sub-cellar, Cellar, Concourse, Plaza, Floors 1, 3, 8–12, 14, 16, 24–28, 30–32, 40, 42–44 | Project M01260075 Project M01230584 Project M01230577 Project M01230610 Project M01215062 Project M01215105 Project M01177434 Project M01139758 Project M00941520 Project M00941530 Project M00941510 Project M00906339 |
| National Football League | Office | Floors 7, 8 | Project M01123842 Project M00594926 |
| KPMG | Office | Ground, Floor 37 | Project M00846296 Project M00684140 Project M00321161 Project M00321239 |
| Wafra | Office | Floors 3, 41 | Project M00468453 Project M00468492 Project M00468504 Project M00420783 Project M00386814 Project M00313921 Project M00313958 Project M00322766 |