← Back
Elevator apt, fireproof with stores
35 WEST 21 STREET
MANHATTAN · BIN 1088714
💬 Discuss this project
2007Year Built
15Stories
D6Building Class
C6-4AZoning
151,236 sfGross Floor Area
118Units
LL97 CoveredRent Stabilized0 Open ViolationsFISP: SAFE
Elevator apt, fireproof with stores · Owner of record: MARJAYROB ASSOCIATES, LLC · 12,134 sf lot · 12.46 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingFire Protection
Roof1p · 2 filings · 11 docs
Floor 19p · 2 filings · 20 docs
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ROSE ASSOCIATES2007/08/2026
C O ROSE ASSOCIATES2207/08/2026
MARJAYROB ASSOCIATES, LLC303/22/2026
PLAZA CONSTRUCTION903/22/2026
ROSELAND STEMPEL 21ST ST ASSOC7003/21/2026
ROSELAND STEMPEL 21 ST ASS403/21/2026
CANOE BROOK INVESTORS203/21/2026
35-39 WEST103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AK ENGINEERING, PC311/26/2025
ANGEL AYÓN211/07/2025
AMA CONSULTING ENGINEERS, PC304/14/2025
OTJ ARCHITECTS104/11/2025
URBAN INTEGRATIONS305/28/2024
BOND ENGINEERING PC106/16/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.1403/21/2026
CLARKE CONSTRUCTION CONSULTANTS403/21/2026
Rigid Structural Design, LLC403/21/2026
A K EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
APPLE RENOVATORS INCGeneral Contractor804/09/2026
NEW AMSTERDAM RESTORATIONGeneral Contractor607/08/2026
WATERMARK PLUMBING CORPPlumbing407/08/2026
BLUE CITY CONSTRUCTIONGeneral Contractor407/08/2026
ARCO PLBG HTGPlumbing303/22/2026
JOSEPH WEINSTEIN ELECTRIC 000796General Contractor103/22/2026
ARCO PLBG AND HTG INCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AK ENGINEERING PC678311/26/2025
SKYLINE ENGINEERING, PLLC267404/14/2025
DEAN MENDEZ ARCHITECT, P.8621106/16/2023
ROCK ARCH ENG CORP1760106/16/2023
Building Lifecycle
All (151)Filed (14)Permit Issued (14)Signed Off (10)Facade (FISP) (12)Violation (60)Inspection (5)Objection (6)Special Inspection (30)
08/24/2026
Signed off — Alteration
mechanical duct work during renovation of lobbies
M00694546-I1
08/24/2026
Special inspection requirement — Duct leakage testing, insulation and design
Ari Kamo
08/24/2026
Special inspection requirement — Mechanical Systems
Ari Kamo
08/24/2026
Special inspection requirement — Energy Code Compliance Inspections
Ari Kamo
08/24/2026
Special inspection requirement — Final
Ari Kamo
08/07/2026
Objection resolved — Resolved
04/15/2026
Violation issued (HPD, closed)
C
03/06/2026
Objection raised — Cost
03/03/2026
Objection resolved — Addressed
01/07/2026
Signed off — Alteration
INSTALLATION OF A SUSPENDED SCAFFOLD FOR FACADE INSPECTION AND REPAIR AS PER THE PLANS SUBMITTED. NO CHANGE TO EGRESS OR OCCUPANCY.
M01019456-I1
12/02/2025
Objection raised — Other
11/26/2025
Filed — Alteration
mechanical duct work during renovation of lobbies
M00694546-P1
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/07/2025
Filed — Alteration
M01273325-I1
10/20/2025
Special inspection requirement — Duct leakage testing, insulation and design
Ari Kamo
10/20/2025
Special inspection requirement — Mechanical Systems
Ari Kamo
10/20/2025
Special inspection requirement — Energy Code Compliance Inspections
Ari Kamo
10/20/2025
Special inspection requirement — Final
Ari Kamo
10/01/2025
Signed off — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH DOB NOW GC, PL AND SP. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01190687-S4
09/18/2025
Signed off — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH DOB NOW GC, PL AND SP. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01190687-I1
09/16/2025
Signed off — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH DOB NOW GC, PL AND SP. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01190687-S3
09/16/2025
Signed off — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH DOB NOW GC, PL AND SP. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01190687-S1
08/11/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/01/2025
Permit issued — Suspended Scaffold
M01019456-I1-SC
07/03/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/17/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/05/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/02/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/15/2025
Permit issued — Sprinklers
M01190687-S4-EW-SP
05/05/2025
Permit issued — Plumbing
M01190687-S1-PL
04/25/2025
Permit issued — Mechanical Systems
M01190687-S3-MS
04/25/2025
Permit issued — General Construction
M01190687-I1-GC
04/14/2025
Filed — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH DOB NOW GC, PL AND SP. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01190687-S4
04/14/2025
Filed — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH DOB NOW GC, PL AND SP. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01190687-S3
04/14/2025
Filed — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH DOB NOW GC, PL AND SP. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01190687-S1
04/11/2025
Filed — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH DOB NOW GC, PL AND SP. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01190687-I1
04/11/2025
Special inspection requirement — Lighting controls
Matthew Wavro
04/08/2025
Signed off — Alteration
Facade Repairs No change in use egress or occupancy
M00843942-I1
03/21/2025
Special inspection requirement — Post-installed Anchors
Matthew Wavro
03/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Wavro
03/18/2025
Special inspection requirement — Permanent certificate
Matthew Wavro
03/18/2025
Special inspection requirement — Duct leakage testing, insulation and design
Matthew Wavro
03/18/2025
Special inspection requirement — Electrical motors and elevators
Matthew Wavro
03/18/2025
Special inspection requirement — Interior lighting power
Matthew Wavro
03/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
Matthew Wavro
03/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
Matthew Wavro
03/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Wavro
03/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Matthew Wavro
03/18/2025
Special inspection requirement — Fire-Resistance Rated Construction
Matthew Wavro
03/18/2025
Special inspection requirement — Maintenance information
Matthew Wavro
03/18/2025
Special inspection requirement — Shutoff dampers
Matthew Wavro
03/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
Matthew Wavro
03/15/2025
Special inspection requirement — Sprinkler Systems
Matthew Wavro
03/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
Matthew Wavro
03/14/2025
Special inspection requirement — Tenant Protection Plan Compliance
Matthew Wavro
03/14/2025
Special inspection requirement — Mechanical Systems
Matthew Wavro
03/14/2025
Special inspection requirement — Final
Matthew Wavro
03/06/2025
Special inspection requirement — Tenant Protection Plan Compliance
Matthew Wavro
03/06/2025
Special inspection requirement — Final
Matthew Wavro
Latest 60 of 151 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offNEW AMSTERDAM RESTORATION08/01/2025
DOB NOWSprinklersSigned-offARCO PLBG AND HTG INC05/15/2025
DOB NOWPlumbingSigned-offWATERMARK PLUMBING CORP05/05/2025
DOB NOWMechanical SystemsSigned-offBLUE CITY CONSTRUCTION04/25/2025
DOB NOWGeneral ConstructionSigned-offBLUE CITY CONSTRUCTION04/25/2025
DOB NOWSidewalk ShedSigned-offNEW AMSTERDAM RESTORATION07/29/2024
DOB NOWSuspended ScaffoldSigned-offNEW AMSTERDAM RESTORATION03/14/2024
DOB NOWMechanical SystemsSigned-offAPPLE RENOVATORS INC01/16/2024
DOB NOWGeneral ConstructionSigned-offAPPLE RENOVATORS INC01/16/2024
DOB NOWGeneral ConstructionSigned-offNEW AMSTERDAM RESTORATION08/23/2023
DOB NOWSupported ScaffoldSigned-offNEW AMSTERDAM RESTORATION08/09/2023
DOB NOWSidewalk ShedSigned-offNEW AMSTERDAM RESTORATION07/28/2023
DOB NOWMechanical SystemsSigned-offAPPLE RENOVATORS INC01/11/2023
DOB NOWGeneral ConstructionSigned-offAPPLE RENOVATORS INC01/11/2023
BISMHISSUED2260 MAG CORP04/16/2018
BISSPISSUEDTOMKAT PLUMBING HEATING LLC02/06/2018
BISOTISSUED2260 MAG CORP01/12/2018
BISPLISSUEDPARKVIEW P&H INC04/21/2017
BISMHISSUEDA. BONADUCE, INC02/01/2017
BISOTISSUEDA. BONADUCE, INC02/01/2017
BISMHISSUED321 99TH STREET LLC06/24/2016
BISSPISSUEDA + SPRINKLER CORP06/17/2016
BISPLISSUEDKATAN P & H INC06/17/2016
BISOTISSUED321 99TH STREET LLC04/12/2016
BISOTISSUEDA. BONADUCE, INC03/30/2016
BISMHISSUEDA. BONADUCE, INC03/30/2016
BISMHISSUEDAP MECHANICAL LLC05/20/2015
BISSPISSUEDGO GREENER PLUMBING LLC04/01/2015
BISPLISSUEDGO GREENER PLUMBING LLC03/10/2015
BISOTISSUEDA. BONADUCE, INC03/09/2015
BISMHISSUEDA. BONADUCE, INC03/09/2015
BISMHISSUEDVIVID INTERIORS LLC02/14/2013
BISOTISSUEDVIVID INTERIORS LLC02/14/2013
BISSPISSUEDDC BUILDING SERVICES INC01/10/2013
BISMHISSUEDVIVID INTERIORS LLC12/28/2012
BISPLISSUEDMARATHON MECHANICAL LLC11/29/2012
BISOTISSUEDVIVID INTERIORS LLC11/19/2012
BISSPISSUEDHEADS UP FIRE SPRINKLER07/13/2011
BISMHISSUEDURBAN BUILDERS GROUP LTD07/12/2011
BISPLISSUEDCITY/SUBURBAN PLBG CORP05/31/2011
+ 24 more permits on file
1 project · most recent 10/13/2022
Gas
FiledStatusContractorScope
10/13/2022——Gas
3 projects · most recent 12/05/2025
General Wiring
FiledStatusContractorScope
12/05/2025CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
08/14/2023CompleteGLENDALE ELECTL CONTNG IN—
01/29/2019CompleteINTER CONNECTION ELEC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/11/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/03/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/17/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/05/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/02/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
08/24/2026Duct leakage testing, insulation and designAri Kamoenergy_progress
08/24/2026Mechanical SystemsAri Kamospecial
08/24/2026Energy Code Compliance InspectionsAri Kamoprogress
08/24/2026FinalAri Kamoprogress
10/20/2025Duct leakage testing, insulation and designAri Kamoenergy_progress
10/20/2025Mechanical SystemsAri Kamospecial
10/20/2025Energy Code Compliance InspectionsAri Kamoprogress
10/20/2025FinalAri Kamoprogress
04/11/2025Lighting controlsMatthew Wavroenergy_progress
03/21/2025Post-installed AnchorsMatthew Wavrospecial
03/21/2025Fire-Resistant Penetrations and JointsMatthew Wavrospecial
03/18/2025Permanent certificateMatthew Wavroenergy_progress
03/18/2025Duct leakage testing, insulation and designMatthew Wavroenergy_progress
03/18/2025Electrical motors and elevatorsMatthew Wavroenergy_progress
03/18/2025Interior lighting powerMatthew Wavroenergy_progress
03/18/2025HVAC-R and service water heating system controlsMatthew Wavroenergy_progress
03/18/2025HVAC-R and service water heating equipmentMatthew Wavroenergy_progress
03/18/2025Fire-Resistant Penetrations and JointsMatthew Wavrospecial
03/18/2025HVAC-R and service water piping design and insulationMatthew Wavroenergy_progress
03/18/2025Fire-Resistance Rated ConstructionMatthew Wavroprogress
03/18/2025Maintenance informationMatthew Wavroenergy_progress
03/18/2025Shutoff dampersMatthew Wavroenergy_progress
03/15/2025Tenant Protection Plan ComplianceMatthew Wavrospecial
03/15/2025Sprinkler SystemsMatthew Wavrospecial
03/15/2025Tenant Protection Plan ComplianceMatthew Wavrospecial
Latest 25 of 39.
▾Documents — 436 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
09/01/2026M00694580-I1Request digital key ↗
09/01/2026M00694546-I1Request digital key ↗
08/30/2026M00843942-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits79
▸BISPLAN / WORK APPROVAL APPLICATION40
05/25/2021104339182Open ↗
03/02/2021104339182Open ↗
02/24/2021104339182Open ↗
Showing 3 of 40 on file for this type
▸BISWORK PERMIT APPLICATION28
05/22/2018121395132Open ↗
02/07/2018121395132Open ↗
01/18/2018121356335Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWLPC Approval/Permit9
08/20/2026M00694546-I1Open ↗
08/13/2026M01190687-S3Open ↗
08/13/2026M01190687-S1Open ↗
Showing 3 of 9 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
04/16/2019123735137Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
06/15/2018121395132Open ↗
▸Zoning, Tax Lot & Property Records5
▸BISZONING RESOLUTION DETERMINATION1
03/08/2019104339182Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
11/12/2020104339182Open ↗
▸BISVERIFY TAX LOT1
07/01/2021104339182Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
07/06/2021104339182Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
03/07/2019104339182Open ↗
▸Seals & Professional Certifications84
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION38
07/22/2019104761580Open ↗
06/15/2018121356335Open ↗
06/15/2018121356335Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/01/2026M00694530-I1Open ↗
09/01/2026M00694546-I1Open ↗
08/30/2026M00843942-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026M00694546-I1Open ↗
09/01/2026M00694546-I1Open ↗
08/28/2026M00694530-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026M00694546-I1Open ↗
08/28/2026M00694530-I1Open ↗
08/26/2026M00843942-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
04/08/2016140473048Open ↗
Showing 1 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/08/2016140473048Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/08/2016140473048Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment45
▸BISSELF-CERT PLUMBING NOTICE15
09/17/2015122281645Open ↗
07/08/2015122281645Open ↗
06/10/2015122281645Open ↗
Showing 3 of 15 on file for this type
▸BISSCHEDULE B - PLUMBING11
04/08/2016140473048Open ↗
Showing 1 of 11 on file for this type
▸BISEQUIPMENT USE PERMITS7
03/07/2019104339182Open ↗
06/15/2018121395132Open ↗
06/24/2015122179221Open ↗
Showing 3 of 7 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT5
06/15/2018121395132Open ↗
06/24/2015122179221Open ↗
06/12/2015122179221Open ↗
Showing 3 of 5 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
06/09/2016122333750Open ↗
10/29/2015122333750Open ↗
Showing 2 of 3 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
06/29/2016140473048Open ↗
Showing 1 of 2 on file for this type
▸BISSPRINKLER INSP REPORT : FP-852
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES2
05/13/2021104339182Open ↗
04/08/2016140473048Open ↗
▸Environmental & Asbestos25
▸DOB NOWOER: Notice to Proceed7
09/01/2026M00694546-I1Open ↗
08/13/2026M00843942-I1Open ↗
08/13/2026M00694530-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
04/08/2016140473048Open ↗
Showing 1 of 5 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED4
05/01/2020123735137Open ↗
04/08/2016140473048Open ↗
Showing 2 of 4 on file for this type
▸DOB NOWOER: Notice of Satisfaction4
09/01/2026M00694546-I1Open ↗
08/13/2026M00843942-I1Open ↗
08/13/2026M00694530-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance27
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS11
06/15/2018121356335Open ↗
06/15/2018121356335Open ↗
06/15/2018121395132Open ↗
Showing 3 of 11 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
06/15/2018121356335Open ↗
06/15/2018121395132Open ↗
05/08/2017140473048Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
04/08/2016140473048Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
04/08/2016140473048Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY2
04/08/2016140473048Open ↗
04/08/2016140473048Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
06/15/2018121395132Open ↗
▸BISTR2: CONCRETE TEST CYLINDERS TECHNICAL REPORT1
03/08/2019104339182Open ↗
▸Approvals, Objections & Sign-offs67
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST27
12/23/2020104339182Open ↗
12/22/2020104339182Open ↗
09/21/2020104339182Open ↗
Showing 3 of 27 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION12
03/07/2019104339182Open ↗
03/07/2019104761580Open ↗
02/26/2018121356335Open ↗
Showing 3 of 12 on file for this type
▸BISLANDMARKS APPROVAL11
05/01/2020123735137Open ↗
07/22/2019104761580Open ↗
06/15/2018121356335Open ↗
Showing 3 of 11 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
03/02/2021104339182Open ↗
02/24/2021104339182Open ↗
01/14/2021104339182Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER3
05/22/2018121395132Open ↗
02/07/2018121395132Open ↗
01/18/2018121356335Open ↗
▸BISCONSTRUCTION CODE DETERMINATION2
04/16/2019104761580Open ↗
01/04/2017122281645Open ↗
▸BISLETTERS - APPRVD FAB CERT-INTENT1
03/07/2019104339182Open ↗
▸Cost, Insurance & Ownership23
▸BISCOST AFFIDAVIT23
06/15/2018121356335Open ↗
06/15/2018121395132Open ↗
05/15/2017122333750Open ↗
Showing 3 of 23 on file for this type
▸Filing & Intake Forms39
▸BISBOROUGH INTAKE FORM16
04/06/2020104339182Open ↗
10/16/2019104339182Open ↗
07/25/2019104339182Open ↗
Showing 3 of 16 on file for this type
▸BISADDITIONAL INFORMATION11
03/09/2021104339182Open ↗
03/11/2020104339182Open ↗
01/10/2019104339182Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET11
04/16/2019123735137Open ↗
11/21/2016122951680Open ↗
03/18/2015122333750Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
04/08/2016140473048Open ↗
▸Other Documents21
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION8
03/09/2021104339182Open ↗
04/09/2019104339182Open ↗
03/08/2019104339182Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDHCR Document3
09/01/2026M00694546-I1Open ↗
08/13/2026M01273325-I1Open ↗
08/13/2026M00694546-P1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION2
05/01/2020123735137Open ↗
05/01/2020123735137Open ↗
▸BISTCO - Supporting Documents2
07/06/2021104339182Open ↗
03/09/2021104339182Open ↗
▸BISENVIRONMENTAL 'E' DEP NOTICE TO PROCEED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSupporting Document: Fee Deferment1
11/21/2016122951680Open ↗
▸BISENVIRONMENTAL "E" DEP NOTICE OF SATISFACTION1
03/08/2019104339182Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01019456-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01019456-I1Open ↗