| Job | Address | Type | Status | Filed | Latest permit | Description |
|---|---|---|---|---|---|---|
| M01346961 ↗ | 420 PARK AVENUE SOUTH MANHATTAN | Alteration | Permit Issued | 02/12/2026 | 09/29/2026 | Roof Elevator Extension |
| M01346946 ↗ | 420 PARK AVENUE SOUTH MANHATTAN | Alteration | Permit Issued | 02/12/2026 | 09/18/2026 | FACADE RENOVATION IS LIMITED TO FLOORS 1, 2, AND 3 ONLY, REMOVAL OF DIRECT APPLIED EXISTING STONE & CERAMIC TILE & SELECT AREAS OF CURTAIN … |
| M01347075 ↗ | 420 PARK AVENUE SOUTH MANHATTAN | Alteration CO | Permit Issued | 02/12/2026 | 09/18/2026 | Plumbing modifications related to 1st, 2nd, 3rd floor public spaces renovation. |
| M01420460 ↗ | 392 7 AVENUE MANHATTAN | Alteration | Permit Issued | 07/01/2026 | 08/18/2026 | Hereby filing to remove and install sprinkler heads with related piping and add two (2) remote Fire Hose Valve Cabinets for office renovatio… |
| M01409957 ↗ | 1350 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 07/31/2026 | 08/13/2026 | Interior renovation of existing office space including partitions, doors, walls, floors, ceilings on the 25th Floor (Geico), as per plans. N… |
| Q01258813 ↗ | 46-37 VERNON BOULEVARD QUEENS | Alteration CO | Permit Issued | 09/10/2025 | 08/13/2026 | Structural modifications as per plans filed herewith. Slab on grade repair, Masonry wall openings. Sistering of Wood Joists, Moveable Partit… |
| Job | Address | Type | Status | Filed | Latest permit | Description |
|---|---|---|---|---|---|---|
| M01346961 ↗ | 420 PARK AVENUE SOUTH MANHATTAN | Alteration | Permit Issued | 02/12/2026 | 09/29/2026 | Roof Elevator Extension |
| M01346946 ↗ | 420 PARK AVENUE SOUTH MANHATTAN | Alteration | Permit Issued | 02/12/2026 | 09/18/2026 | FACADE RENOVATION IS LIMITED TO FLOORS 1, 2, AND 3 ONLY, REMOVAL OF DIRECT APPLIED EXISTING STONE & CERAMIC TILE & SELECT AREAS OF CURTAIN … |
| M01347075 ↗ | 420 PARK AVENUE SOUTH MANHATTAN | Alteration CO | Permit Issued | 02/12/2026 | 09/18/2026 | Plumbing modifications related to 1st, 2nd, 3rd floor public spaces renovation. |
| M01420460 ↗ | 392 7 AVENUE MANHATTAN | Alteration | Permit Issued | 07/01/2026 | 08/18/2026 | Hereby filing to remove and install sprinkler heads with related piping and add two (2) remote Fire Hose Valve Cabinets for office renovatio… |
| M01409957 ↗ | 1350 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 07/31/2026 | 08/13/2026 | Interior renovation of existing office space including partitions, doors, walls, floors, ceilings on the 25th Floor (Geico), as per plans. N… |
| Q01258813 ↗ | 46-37 VERNON BOULEVARD QUEENS | Alteration CO | Permit Issued | 09/10/2025 | 08/13/2026 | Structural modifications as per plans filed herewith. Slab on grade repair, Masonry wall openings. Sistering of Wood Joists, Moveable Partit… |
| Q01275311 ↗ | 46-41 VERNON BOULEVARD QUEENS | Alteration | Permit Issued | 09/10/2025 | 08/11/2026 | NEW LOT LINE PROTECTED OPENING IN EXISTING CMU WALL ON GROUNDFLOOR TO BE COMPLETED ALONG WITH NEW VESTIBULE AND DOOR. |
| M01414368 ↗ | 52 EAST 68 STREET MANHATTAN | Alteration | Permit Issued | 06/15/2026 | 07/28/2026 | Interior renovation of Peterson Hall Associated with the Sprinkler Scope. No change in use, egress or occupancy under this application. |
| M01415569 ↗ | 670 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 06/15/2026 | 07/28/2026 | This Application is filed for new screen wall louver supports and support of new RTU units and Associated duct openings associated with the … |
| M01423092 ↗ | 776 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 07/09/2026 | 07/23/2026 | Modification to existing sprinkler heads and piping for tenant fitout. No change to occupancy, use or egress. |
| M01379481 ↗ | 420 PARK AVENUE SOUTH MANHATTAN | Alteration | Permit Issued | 04/21/2026 | 06/11/2026 | STRUCTURAL FRAMING WITH STEEL ON 18TH AND 19TH FLOORS. NO CHANGE IN OCCUPANCY, USE OR EGRESS. |
| M01347016 ↗ | 420 PARK AVENUE SOUTH MANHATTAN | Alteration | Permit Issued | 02/12/2026 | 05/28/2026 | Plumbing modifications related to Hotel Lobby Renovations per plans filed. |
| M01346690 ↗ | 420 PARK AVENUE SOUTH MANHATTAN | Alteration | Permit Issued | 02/12/2026 | 05/06/2026 | RENOVATION OF GUESTROOMS DEMOLITION OF A LIMITED NUMBER OF NON-LOAD BEARING PARTITIONS ON FLOORS 4-17, REVISED BATHROOM LAYOUT IN THE PRESID… |
| M01347052 ↗ | 420 PARK AVENUE SOUTH MANHATTAN | Alteration | Permit Issued | 02/19/2026 | 05/05/2026 | Structural reinforcements related to restaurant renovation, Support for (1) folding partition, removal of existing canopy. |
| M01331293 ↗ | 40 RECTOR STREET MANHATTAN | Alteration | Permit Issued | 01/22/2026 | 02/25/2026 | Interior Renovation. No change in use, occupancy, or egress. |
| M01332597 ↗ | 600 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 02/03/2026 | 02/06/2026 | Filing herewith drawings indicating interior renovations on the 7th floor. No change in use, egress, or occupancy under this application. |
| M01232295 ↗ | 600 LEXINGTON AVENUE MANHATTAN | Alteration | Permit Issued | 06/06/2025 | 01/07/2026 | Filing herewith drawings indicating interior renovations on the 16th floor construction (marketing as the 17th floor). No change in use, egr… |
| M01308368 ↗ | 250 WEST 55 STREET MANHATTAN | Alteration | Signed-off | 11/14/2025 | 12/03/2025 | Modification to plumbing fixtures and related piping as per plans. No change in use, egress or occupancy. |
| M01190322 ↗ | 5 BRYANT PARK MANHATTAN | Alteration | Signed-off | 10/20/2025 | 11/25/2025 | Interior modifications as per plans filed herewith. No change to occupancy, use, or egress. |
| M01257537 ↗ | 420 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 07/24/2025 | 09/17/2025 | REMOVAL OF EXISTING PLUMBING FIXTURES, TUB TO SHOWER CONVERSION, REPLACE EXISTING FIXTURES WITH NEW PER PLANS FILED. |
| B01086483 ↗ | 536 MYRTLE AVENUE BROOKLYN | Alteration CO | Permit Issued | 11/11/2024 | 07/15/2025 | Interior renovation of plan east of 3rd floor. New interior partitions and finishes. Minimal addition of plumbing fixtures and minimal struc… |
| M01190687 ↗ | 35 WEST 21 STREET MANHATTAN | Alteration | Signed-off | 04/11/2025 | 05/15/2025 | SPRINKLER WORK FILED IN CONJUNCTION WITH DOB NOW GC, PL AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| B00980666 ↗ | 350 JAY STREET BROOKLYN | Alteration | Signed-off | 01/10/2024 | 05/14/2025 | Structural reinforcing at 29th and 30th floors. Extension of stair from 29th to 30th floors. |
| B01158620 ↗ | 536 MYRTLE AVENUE BROOKLYN | Alteration | Signed-off | 01/31/2025 | 05/05/2025 | Structural modifications as per plans filed herewith. |
| M01196183 ↗ | 190 VARICK STREET MANHATTAN | Alteration | Signed-off | 04/07/2025 | 04/10/2025 | INTERIOR RENOVATION OF EXISTING OFFICE WITH NEW WALLS, LIGHTING, PLUMBING FIXTURES, MILLWORK AND APPLIANCES. NO CHANGE OF USE, OCCUPANCY, EG… |
| Q01143653 ↗ | 46-29 VERNON BOULEVARD QUEENS | Alteration | Permit Issued | 01/14/2025 | 02/27/2025 | HEREWITH FILING PLUMBING WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| M01017512 ↗ | 717 5 AVENUE MANHATTAN | Alteration | Signed-off | 02/04/2025 | 02/07/2025 | GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 14TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01129344 ↗ | 338 5 AVENUE MANHATTAN | Alteration | Permit Issued | 12/09/2024 | 12/12/2024 | GENERAL COSTRUCTION ON THE 78TH AND 79TH FLOORS AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01124550 ↗ | 218 WEST 18 STREET MANHATTAN | Alteration | Signed-off | 10/22/2024 | 11/27/2024 | GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01127014 ↗ | 420 FIFTH AVENUE MANHATTAN | Alteration | Signed-off | 10/29/2024 | 11/07/2024 | General Construction Modification of 8th floor as per plans filed herewith. No change in egress, use, or occupancy. |
| M01119206 ↗ | 110 EAST 42 STREET MANHATTAN | Alteration | Signed-off | 10/30/2024 | 11/01/2024 | Removal doors and frames that provide access from the 11 &12 floors at 110 E 42nd Street to 125 Park Ave.Infill of opening with CMU block wa… |
| M01122335 ↗ | 338 5 AVENUE MANHATTAN | Alteration | Permit Issued | 10/22/2024 | 10/31/2024 | GENERAL CONSTRUCTION ON THE 78TH AND 79TH FLOORS AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01122334 ↗ | 338 5 AVENUE MANHATTAN | Alteration | Permit Issued | 10/22/2024 | 10/24/2024 | GENERAL CONSTRUCTION OF LOUVERS ON THE 78TH AND 79TH FLOORS AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01111788 ↗ | 617 WASHINGTON STREET MANHATTAN | Alteration | Signed-off | 10/03/2024 | 10/21/2024 | RELOCATION OF DUCTWORK, DIFFUSERS, FANS, A/C UNIT AND RELATED MECHANICAL PIPING TO 6TH FLOOR OFFICE. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01121476 ↗ | 136 WEST 42 STREET MANHATTAN | No Work | Filed — no permit on record | 10/18/2024 | — | — |
| M01121519 ↗ | 136 WEST 42 STREET MANHATTAN | No Work | Filed — no permit on record | 10/18/2024 | — | — |
| M00734232 ↗ | 136 WEST 42 STREET MANHATTAN | Alteration CO | Permit Issued | 06/08/2022 | 09/23/2024 | Installation of interior walls, doors, ceilings and finishes. Change of use and occupancy. No change to egress or zoning with this applicati… |
| M01095188 ↗ | 757 3 AVENUE MANHATTAN | Alteration | Signed-off | 08/22/2024 | 08/23/2024 | General Construction to take place on the 23rd floor as per drawings filed herewith. no change in use, egress, or occupancy. |
| M01060384 ↗ | 251 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 07/22/2024 | 08/01/2024 | INTERIOR RENOVATIONS AND MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY |
| M01025348 ↗ | 617 WASHINGTON STREET MANHATTAN | Alteration | Signed-off | 04/23/2024 | 05/24/2024 | RELOCATION OF DUCTWORK, DIFFUSERS, FANS, A/C UNIT AND RELATED MECHANICAL PIPING 5TH AND 6TH FLOOR OFFICE. NO CHANGE TO USE, EGRESS OR OCCUP… |
| M01018284 ↗ | 1251 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 05/08/2024 | 05/10/2024 | ARCHITECTURAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01010314 ↗ | 1251 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 03/27/2024 | 03/29/2024 | Construction modifications on the 24th Floor as per plans filed herewith. No change to use egress or occupancy. |
| M08045996 ↗ | 136 WEST 42 STREET MANHATTAN | Alteration | Signed-off | 12/12/2022 | 03/29/2024 | Removal and installation of interior non-bearing partitions and related finishes as per plans filed herewith. Installation of one-story conn… |
| M00841902 ↗ | 601 WEST 26 STREET MANHATTAN | Alteration | Filed — no permit on record | 12/06/2023 | — | — |
| M00822300 ↗ | 16 WALKER STREET MANHATTAN | Alteration | Signed-off | 06/21/2023 | 06/23/2023 | Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or oc… |
| M00855931 ↗ | 25 BROADWAY MANHATTAN | Alteration | Signed-off | 04/25/2023 | 05/30/2023 | General construction work as shown on plans (LL Core Phase). |
| M00857796 ↗ | 25 BROADWAY MANHATTAN | Alteration | Signed-off | 05/16/2023 | 05/30/2023 | General construction work as shown on plans (Tenant Fitout Phase). |
| Q00868815 ↗ | 8150A UTOPIA PARKWAY QUEENS | Alteration | Signed-off | 05/23/2023 | 05/25/2023 | FILING HEREWITH FOR GC WORK AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY ON THIS APPLICATION. |
| M00557837 ↗ | 708 3 AVENUE MANHATTAN | Alteration | Permit Issued | 07/29/2021 | 04/14/2023 | Interior demolition of non load bearing partitions on the 1st floor as indicated on drawings. |
| M08004670 ↗ | 589 5 AVENUE MANHATTAN | Alteration | Signed-off | 10/21/2022 | 12/14/2022 | Modification of facade per plans filed herewith |
| M08031251 ↗ | 2305 EAST 125 STREET MANHATTAN | Alteration | Signed-off | 11/17/2022 | 12/08/2022 | Removal and renovation of interior non-bearing partitions as per plans filed herewith. No change in use, egress or occupancy under this appl… |
| M08005444 ↗ | 589 5 AVENUE MANHATTAN | Alteration | Signed-off | 10/24/2022 | 11/29/2022 | Modification of the roof per plans filed herewith |
| M00797904 ↗ | 125 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 09/28/2022 | 10/11/2022 | Construction modifications taking place on the 12th floor as per plans filed herewith. No change in use, egress or occupancy. |
| M00651146 ↗ | 860 5 AVENUE MANHATTAN | Alteration | Signed-off | 03/11/2022 | 09/08/2022 | Removal and installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or o… |
| M00648707 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 01/19/2022 | 02/02/2022 | Minor construction work on the 51st floor (Lumen) as indicated on drawings |
| M00645254 ↗ | 273 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 01/13/2022 | 01/19/2022 | Filing herewith for the removal and installation of partitions for office renovation |
| M00536995 ↗ | 545 8 AVENUE MANHATTAN | Alteration | Signed-off | 09/09/2021 | 01/04/2022 | AT FLOORS 7, 8, 16, 17, 23, REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRES… |
| M00542989 ↗ | 860 5 AVENUE MANHATTAN | Alteration | Signed-off | 07/19/2021 | 11/01/2021 | Removal and installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or o… |
| M00529563 ↗ | 545 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 06/08/2021 | 09/28/2021 | Construction work on the 14th floor (prebuild space) as indicated on drawings. |
| M00510628 ↗ | 4 COLUMBUS CIRCLE MANHATTAN | Alteration | Signed-off | 06/10/2021 | 06/18/2021 | Interior demolition of non load bearing partitions on the 1st floor as indicated on drawings |
| Person | Filings | Most recent |
|---|---|---|
| LAWRANCE JACCARD | 45 | 06/26/2026 |
| Name | Jobs together | Most recent |
|---|---|---|
| GILSANZ MURRAY STEFICEK LLP | 6 | 07/28/2026 |
| LORING CONSULTING ENGINEERS, INC. | 5 | 07/28/2026 |
| ROBERT DERECTOR ASSOCIATES | 3 | 05/18/2026 |
| AMA CONSULTING ENGINEERS, PC | 2 | 06/09/2025 |
| CMTA | 2 | 06/17/2026 |
| POLISE CONSULTING ENGINEERS DPC | 2 | 09/25/2025 |
| GREENMAN-PEDERSEN, INC. | 1 | 02/18/2025 |
| PATTI & ANTHES CONSULTING ENGINEERS | 1 | 07/09/2026 |
| STEVEN PAUL HAMMER | 1 | 07/02/2026 |
| Name | Jobs together | Most recent |
|---|---|---|
| L&K PARTNERS, INC | 8 | 07/20/2026 |
| DONATO PLUMBING, INC | 5 | 07/28/2026 |
| STRUCTURE TONE, LLC | 4 | 08/22/2024 |
| CROSS MANAGEMENT CORP | 3 | 12/09/2024 |
| JRM CONSTRUCTION MGMT LLC | 3 | 07/31/2026 |
| PHASE 3 INTERIORS LLC | 3 | 09/04/2025 |
| SCALI CONSTRUCTION INC | 3 | 10/02/2025 |
| CAPITOL FIRE SPRINKLER CO | 2 | 06/17/2026 |
| CLUNE CONSTRUCTION CO LP | 2 | 10/07/2024 |
| FMG GENERAL CONTRACTING * | 2 | 10/30/2024 |
| NUCOR CONSTRUCTION CORP | 2 | 05/16/2023 |
| RAD CONSTRUCTION & DESIGN | 2 | 03/11/2022 |
| SPK/LEWIS CONSTRUCTION LL | 2 | 10/20/2025 |
| TALISEN CONSTRUCTION CORP | 2 | 12/22/2025 |
| WOLF CONSTRUCTION CORP 20 | 2 | 06/17/2026 |
| ABCO-PEERLESS SPRKLR CORP | 1 | 07/02/2026 |
| ARCO PLBG AND HTG INC | 1 | 04/14/2025 |
| ASHLAND PLUMBING CORP | 1 | 07/02/2026 |
| BEDROCK MECHANICAL INC | 1 | 06/09/2025 |
| BEDROCK PLBG. & HTG., INC | 1 | 06/09/2025 |
| BENCHMARK BUILDERS LLC | 1 | 02/03/2026 |
| BLACK BULL BULDERS LLC | 1 | 06/06/2025 |
| BLUE CITY CONSTRUCTION | 1 | 04/14/2025 |
| CONSTRUCTOMICS LLC | 1 | 11/17/2022 |
| DEPENDABLE MECH CORP | 1 | 07/09/2026 |
| Name | Jobs together | Most recent |
|---|---|---|
| HIGHGATE HOTELS LP | 6 | 07/28/2026 |
| E-J ELECTRIC INSTALLATION CO. | 3 | 10/02/2025 |
| CUSHMAN & WAKEFIELD | 2 | 12/06/2022 |
| REEP-OFC 757 Third Avenue NY LLC | 2 | 10/31/2024 |
| REJUVENATION PROPERTIES LLC | 2 | 03/11/2022 |
| RFR REALTY LLC | 2 | 10/07/2024 |
| SL GREEN REALTY CORP | 2 | 07/31/2026 |
| 1251 AMERICAS ASSOCIATES II, L.P. | 1 | 05/08/2024 |
| BOSTON PROPERTIES | 1 | 05/18/2026 |
| C&W | 1 | 09/04/2025 |
| C/O ROSE ASSOCIATES, INC. | 1 | 04/14/2025 |
| Chelsea NY Realty Co LLC | 1 | 07/09/2026 |
| Legal Defense Fund (LDF) | 1 | 01/22/2026 |
| MARX REALTY | 1 | 07/29/2021 |
| MUSS DEVELOPMENT LLC | 1 | 02/18/2025 |
| RUDIN MANAGEMENT CO INC | 1 | 06/21/2023 |
| RXR SL OWNER LLC | 1 | 12/06/2023 |
| TRG | 1 | 11/17/2022 |
| VORNADO REALTY TRUST | 1 | 07/02/2026 |
| Name | Jobs together | Most recent |
|---|---|---|
| A1 EXPEDITING SERVICE CORP. | 7 | 01/22/2026 |
| JAM CONSULTANTS, INC. | 7 | 07/28/2026 |
| RIZZO GROUP | 7 | 07/31/2026 |
| GILLMAN CONSULTING INC | 2 | 07/02/2026 |
| METROPOLIS GROUP INC | 2 | 10/07/2024 |
| NYCCODE LLC | 2 | 06/17/2026 |
| ARCHETYPE CONSULTANTS, INC. | 1 | 07/29/2021 |
| BARNWELL CONSULTANTS | 1 | 05/08/2024 |
| CLARKE CONSTRUCTION CONSULTANTS | 1 | 04/14/2025 |
| CONVERSANO ASSOCIATES, INC. | 1 | 01/13/2022 |
| GREEN LIGHT EXPEDITING LLC | 1 | 02/18/2025 |
| JM ZONING, LLC. | 1 | 01/17/2025 |
| WILLIAM VITACCO ASSOCIATES | 1 | 06/21/2023 |