BuildNYC
Elevator cooperative
3515 HENRY HUDSON PARKWAY
BRONX · BIN 2085774
💬 Discuss this project
1954Year Built
11Stories
D4Building Class
R7AZoning
104,000 sfGross Floor Area
79Units
LL97 CoveredRent Stabilized7 Active Violations 1 old, status unconfirmed ▸FISP: SWARMP
Elevator cooperative · Owner of record: 3515 Owners · 47,425 sf lot · 2.19 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofRobert E. Hill, INC.2p · 2 filings · 15 docs
Floor 11Unit 11E, Unit 11F, Unit 11EF4p · 2 filings · 15 docs
Floor 10
Floor 9
Floor 8
Floor 7Unit 7B1p · 1 filing · 5 docs
Floor 6
Floor 5
Floor 4Unit 4D, Unit 4E1 filing · 6 docs
Floor 3
Floor 2
Floor 1
CellarInstall domestic water booster pumpsUnder Construction1p · 1 filing · 5 docs
Site & exteriorRobert E. Hill, INC.24p · 2 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
3515 Owners4103/22/2026
Robert E. Hill610/07/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
New York & Company109/14/2026
Freda Design Architect408/29/2025
Digeronimo105/03/2024
NY Restoration Technology305/11/2023
Joseph K. Blum Co205/01/2023
Robert Arthur King, Architect112/05/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Municipal Building Consultants103/21/2026
D D Expeditors403/21/2026
MP Design and Construction203/21/2026
New Amsterdam Expediting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Avarga ConstructionGeneral Contractor507/08/2026
Avarga ConstructionScaffold407/08/2026
Zabdiel Construction ServiceGeneral Contractor303/21/2026
Orbit Plumbing & HeatingPlumbing207/08/2026
S. Tieger Plumbing CoPlumbing207/08/2026
Kramer ElectricElectrical103/21/2026
WTC Plumbing & HeatingPlumbing110/07/2026
Astro Electrical ContngElectrical103/22/2026
Kriscorp Electrical ContngElectrical103/21/2026
Handy Men of NYCGeneral Contractor104/09/2026
Signore & Sons Plumbingspecialty_contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
New York Engineering Associates851109/14/2026
Inm Architect3351105/03/2024
Joseph K. Blum Co1741205/01/2023
Building Lifecycle
All (135)Filed (13)Permit Issued (12)Signed Off (4)Facade (FISP) (13)Violation (60)Inspection (3)Objection (10)Special Inspection (20)
10/06/2026
Permit issued — Plumbing
X01367957-I1-PL
09/14/2026
Filed — Alteration
INSTALL DOMESTIC WATER BOOSTER PUMPS PER PLANS.
X01367957-I1
08/11/2026
Violation issued (HPD, open)
A
08/11/2026
Violation issued (HPD, open)
A
08/11/2026
Violation issued (HPD, open)
C
08/11/2026
Violation issued (HPD, open)
A
08/11/2026
Violation issued (HPD, open)
A
08/11/2026
Violation issued (HPD, open)
A
03/06/2026
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
03/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
01/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/30/2025
Permit issued — Plumbing
X01279024-S1-PL
09/29/2025
Permit issued — General Construction
X01279024-I1-GC
09/23/2025
Objection resolved — Addressed
09/11/2025
Objection resolved — Addressed
09/11/2025
Objection resolved — Addressed
09/09/2025
Objection raised — Admin
09/09/2025
Objection raised — Scope
09/09/2025
Objection raised — Mechanical
08/29/2025
Filed — Alteration
plumbing work to relocate 2 sinks and install 1 shower
X01279024-S1
08/29/2025
Filed — Alteration
plumbing work to relocate 2 sinks and install 1 shower
X01279024-I1
08/28/2025
Special inspection requirement — Lighting in dwelling units
Antonio Freda
06/05/2025
Signed off — Alteration
application filed to correct existing plumbing work completed as described in plumbing scope within Coop Unit 11E that is merged with 11F
X01198276-S1
06/05/2025
Signed off — Alteration
application filed to correct existing plumbing work completed as described in plumbing scope within Coop Unit 11E that is merged with 11F
X01198276-I1
05/28/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/08/2025
Permit issued — Plumbing
X01198276-S1-PL
05/01/2025
Permit issued — General Construction
X01198276-I1-GC
04/01/2025
Filed — Alteration
application filed to correct existing plumbing work completed as described in plumbing scope within Coop Unit 11E that is merged with 11F
X01198276-S1
04/01/2025
Filed — Alteration
application filed to correct existing plumbing work completed as described in plumbing scope within Coop Unit 11E that is merged with 11F
X01198276-I1
03/27/2025
Special inspection requirement — Final
Antonio Freda
03/12/2025
Signed off — Alteration
PERFORM MINOR INTERIOR PARTITION DEMOLITION & CONSTRUCTION INCONJUNCTION WITH APT#7B RENOVATION. RECONFIGURE BATHROOM AND KITCHEN. MODIFY EXISTING & INSTALL CLOSETS. INSTALL NEW LIGHTING. NO CHANGE TO USE, EGRESS, OCCUPANCY OR FIRE PROTECTION.
X01042445-I1
06/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/12/2024
Permit issued — Suspended Scaffold
X01063054-I1-SC
06/07/2024
Filed — Alteration
X01063054-I1
05/14/2024
Permit issued — General Construction
X01042445-I1-GC
05/03/2024
Filed — Alteration
PERFORM MINOR INTERIOR PARTITION DEMOLITION & CONSTRUCTION INCONJUNCTION WITH APT#7B RENOVATION. RECONFIGURE BATHROOM AND KITCHEN. MODIFY EXISTING & INSTALL CLOSETS. INSTALL NEW LIGHTING. NO CHANGE TO USE, EGRESS, OCCUPANCY OR FIRE PROTECTION.
X01042445-I1
05/03/2024
Special inspection requirement — Fire-Resistance Rated Construction
LOUIS DIGERONIMO
04/30/2024
Special inspection requirement — Tenant Protection Plan Compliance
Nikola Martinovic
04/30/2024
Special inspection requirement — Energy Code Compliance Inspections
LOUIS DIGERONIMO
04/26/2024
Special inspection requirement — Final
LOUIS DIGERONIMO
02/16/2024
Signed off — Alteration
Proposed installation of a temporary sidewalk shed as per plans submitted. Work shall comply with 2014 building codes, chapter 33. No change in use, egress or occupancy.
X00604453-I1
12/19/2023
Cycle 9 facade report signed — SWARMP
12/18/2023
Cycle 9 facade report submitted
11/21/2023
Cycle 9 facade inspection completed
05/11/2023
Filed — Alteration
Proposed installation of a temporary sidewalk shed as per plans submitted. Work shall comply with 2014 building codes, chapter 33. No change in use, egress or occupancy.
X00604453-P2
05/05/2023
Objection resolved — Addressed
05/05/2023
Special inspection requirement — Masonry
Dane Barnes
05/05/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Dane Barnes
05/05/2023
Special inspection requirement — Final
Dane Barnes
05/05/2023
Special inspection requirement — Energy Code Compliance Inspections
Dane Barnes
05/05/2023
Special inspection requirement — Fenestration air leakage
Dane Barnes
05/03/2023
Objection raised — Other
05/01/2023
Filed — Alteration
Repair/replace facade as necessary to include masonry, pointing, sills, lintels, caulking of windows as necessary. Replace plaza terrazzo in kind, create convenience ramps for tenants, all work is within the property line.
X00565649-P1
04/25/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Dane Barnes
04/25/2023
Special inspection requirement — Final
Dane Barnes
04/25/2023
Special inspection requirement — Energy Code Compliance Inspections
Dane Barnes
04/25/2023
Special inspection requirement — Fenestration air leakage
Dane Barnes
04/25/2023
Special inspection requirement — Masonry
Dane Barnes
04/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 135 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedWTC Plumbing & Heating10/06/2026
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating09/30/2025
DOB NOWGeneral ConstructionPermit IssuedHandy Men of NYC09/29/2025
DOB NOWPlumbingSigned-offS. Tieger Plumbing Co05/08/2025
DOB NOWGeneral ConstructionSigned-offSignore & Sons Plumbing05/01/2025
DOB NOWSuspended ScaffoldPermit IssuedJRR Contracting06/12/2024
DOB NOWGeneral ConstructionSigned-offZabdiel Construction Service05/14/2024
DOB NOWGeneral ConstructionPermit IssuedAvarga Construction04/06/2023
DOB NOWSidewalk ShedSigned-offAvarga Construction03/31/2022
DOB NOWGeneral ConstructionPermit IssuedAvarga Construction03/29/2022
DOB NOWGeneral ConstructionPermit IssuedAvarga Construction12/18/2021
DOB NOWSidewalk ShedSigned-offAvarga Construction10/23/2021
BISOTISSUEDM Group Management07/07/2020
BISOTISSUEDM Group Management01/07/2020
BISOTISSUEDEmg Industrial Chimney07/21/2016
BISFSISSUEDMarlande Heating06/13/2016
BISPLISSUEDAqua Blue Plumbing Svces08/28/2015
BISOTISSUEDHigh End Construction08/10/2015
BISOTISSUEDHigh End Construction07/30/2015
BISPLISSUEDAqua Blue Plumbing Svces04/16/2015
BISOTISSUEDHigh End Construction03/05/2015
BISEQISSUEDPowers Bridging & Scaffolding07/23/2014
BISOTISSUEDAllied Contracting II07/15/2014
BISFSISSUEDMarlande Heating12/16/2013
BISPLISSUEDAlklem Plumbing12/16/2013
BISOTISSUEDAllied Contracting II10/01/2012
BISEQISSUEDPowers Bridging & Scaffolding09/26/2012
BISOTISSUEDDJM Restoration06/26/2009
BISOTISSUEDSim Soon Construction11/13/2008
BISOTISSUEDDJM Contracting05/04/2006
BISOTISSUEDDJM Contracting11/07/2005
BISEQISSUEDSpring Scaffolding01/29/2004
BISOTISSUEDRichardson & Lucas04/25/2003
BISEQISSUEDSpring Scaffolding03/05/2003
BISOTISSUEDRichardson & Lucas09/11/2002
BISEQISSUEDSpring Scaffolding09/07/2002
BISOTISSUEDNational Microwave12/08/1994
2 projects · most recent 09/14/2026
Water/Sanitary
FiledStatusContractorScope
09/14/2026Permit IssuedWTC Plumbing & HeatingWater/Sanitary
08/29/2025Signed-offOrbit Plumbing & HeatingWater/Sanitary
9 projects · most recent 07/29/2026
General Wiring
FiledStatusContractorScope
07/29/2026CompleteKriscorp Electrical ContngGeneral Wiring
05/15/2024CompleteMase ElectricGeneral Wiring
07/09/2023CompleteI.D.K. Electric CoGeneral Wiring
03/14/2023CompleteValley Electric of NYGeneral Wiring
05/09/2022Permit IssuedVillage Electl Contractors1 meters, 1 new_meters
01/25/2022CompleteTop Shelf Electric—
07/19/2021CompleteAstro Electrical ContngGeneral Wiring
04/12/2020CompleteAstro Electrical Contng1 meters, 1 new_meters
04/09/2018CompleteFusion Electl ContrngGeneral Wiring
1 project · most recent 08/29/2025
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
08/29/2025Signed-offOrbit Plumbing & HeatingTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
01/06/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/28/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
03/06/2026Energy Code Compliance InspectionsLOUIS ARENAprogress
03/06/2026Tenant Protection Plan ComplianceLOUIS ARENAspecial
08/28/2025Lighting in dwelling unitsAntonio Fredaenergy_progress
03/27/2025FinalAntonio Fredaprogress
05/03/2024Fire-Resistance Rated ConstructionLOUIS DIGERONIMOprogress
04/30/2024Tenant Protection Plan ComplianceNikola Martinovicspecial
04/30/2024Energy Code Compliance InspectionsLOUIS DIGERONIMOprogress
04/26/2024FinalLOUIS DIGERONIMOprogress
05/05/2023MasonryDane Barnesspecial
05/05/2023Structural Stability – Alterations of existing buildingsDane Barnesspecial
05/05/2023FinalDane Barnesprogress
05/05/2023Energy Code Compliance InspectionsDane Barnesprogress
05/05/2023Fenestration air leakageDane Barnesenergy_progress
04/25/2023Structural Stability – Alterations of existing buildingsDane Barnesspecial
04/25/2023FinalDane Barnesprogress
04/25/2023Energy Code Compliance InspectionsDane Barnesprogress
04/25/2023Fenestration air leakageDane Barnesenergy_progress
04/25/2023MasonryDane Barnesspecial
12/05/2022Tenant Protection Plan ComplianceWithdrawnspecial
10/27/2022FinalROBERT ARTHUR KING, FAIAprogress
▾Documents — 243 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
10/07/2026X01367957-I1Request digital key ↗
08/25/2026X00604453-P2Request digital key ↗
08/25/2026X00604453-P1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits39
▸BISWORK PERMIT APPLICATION22
07/07/2020220707457Open ↗
01/07/2020220707457Open ↗
07/20/2016240149184Open ↗
Showing 3 of 22 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION17
03/07/2024220707457Open ↗
11/29/2019220288169Open ↗
11/20/2019220288169Open ↗
Showing 3 of 17 on file for this type
▸Seals & Professional Certifications66
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION19
09/17/2019220707457Open ↗
09/05/2017240065362Open ↗
04/04/2017240065362Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
10/07/2026X01367957-I1Open ↗
08/25/2026X00604453-P2Open ↗
08/25/2026X00604453-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
10/08/2026X01367957-I1Open ↗
08/31/2026X01198276-I1Open ↗
08/31/2026X01279024-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
07/20/2016240149184Open ↗
06/16/2016220288169Open ↗
07/29/2015240108156Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
10/08/2026X01367957-I1Open ↗
08/29/2026X00565649-I1Open ↗
08/28/2026X00565649-P1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
07/20/2016240149184Open ↗
07/29/2015240108156Open ↗
03/04/2015240087231Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
07/20/2016240149184Open ↗
07/29/2015240108156Open ↗
03/04/2015240087231Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
06/16/2016220288169Open ↗
06/28/2014220390716Open ↗
12/17/2013220288169Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
09/27/2012220231577Open ↗
▸BISPC FULL REPORT1
10/01/2007210016276Open ↗
▸Trade Schedules & Equipment15
▸BISSELF-CERT PLUMBING NOTICE7
11/24/2015240108156Open ↗
10/30/2015240108156Open ↗
06/09/2015240087231Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING4
07/29/2015240108156Open ↗
03/04/2015240087231Open ↗
12/17/2013220288169Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
05/30/2014220288169Open ↗
12/17/2013220288169Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
05/16/2015240087231Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
07/05/2014220288169Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES2
07/20/2016240149184Open ↗
09/17/2019220707457Open ↗
▸Environmental & Asbestos20
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/23/2026X08029182-I1Open ↗
08/21/2026X01042445-I1Open ↗
08/19/2026X01198276-S1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
07/20/2016240149184Open ↗
07/29/2015240108156Open ↗
03/04/2015240087231Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
06/15/2009220011323Open ↗
10/01/2007210016276Open ↗
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU1373BX191
03/11/2024220707457Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
07/23/2008210060119Open ↗
▸BISDEP FORM V5 - ASBESTOS VARIANCE1
01/07/2020220707457Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
10/07/2026X01367957-I1Open ↗
▸Energy Compliance21
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
09/17/2019220707457Open ↗
03/07/2017240149184Open ↗
07/21/2016240108156Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
03/10/2024220707457Open ↗
07/20/2016240149184Open ↗
07/29/2015240108156Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
03/10/2024220707457Open ↗
03/07/2017240149184Open ↗
07/21/2016240108156Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
07/20/2016240149184Open ↗
07/29/2015240108156Open ↗
03/04/2015240087231Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
07/22/2014240065362Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
03/10/2024220707457Open ↗
07/20/2016240149184Open ↗
07/29/2015240108156Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs22
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST13
03/11/2024220707457Open ↗
05/06/2020220288169Open ↗
09/05/2017240065362Open ↗
Showing 3 of 13 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
09/27/2012220231577Open ↗
08/14/2012220227038Open ↗
06/15/2009220011323Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
03/07/2017240149184Open ↗
05/03/2013220011323Open ↗
06/16/2009210060119Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT16
03/10/2024220707457Open ↗
09/17/2019220707457Open ↗
03/07/2017240149184Open ↗
Showing 3 of 16 on file for this type
▸Filing & Intake Forms20
▸BISADDITIONAL INFORMATION7
09/20/2019220288169Open ↗
09/17/2019220707457Open ↗
02/15/2017240149184Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET7
09/24/2019220707457Open ↗
06/28/2014220390716Open ↗
12/17/2013220288169Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
07/20/2016240149184Open ↗
07/29/2015240108156Open ↗
03/04/2015240087231Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM2
11/29/2019220288169Open ↗
09/05/2017240065362Open ↗
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
07/29/2015240108156Open ↗
03/04/2015240087231Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026X01063054-I1Open ↗
▸DOB NOWCalculations1
08/13/2026X01063054-I1Open ↗