DOB03/16/2020VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
DOB03/16/2020VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
DOB03/16/2020VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
DOB03/16/2020VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
DOB06/22/2018VIOLATION ISSUED FOR FAILURE TO FILE 2016 ANNUAL HIGH PRESSURE BOILER INSPECTION
DOB06/23/2017VIOLATION ISSUED FOR FAILURE TO FILE 2015 ANNUAL HIGH PRESSURE BOILER INSPECTION
DOB03/01/2013VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
DOB03/26/2002V-DOB VIOLATION - ACTIVE
DOB02/27/2001V-DOB VIOLATION - ACTIVE
DOB02/07/2000V-DOB VIOLATION - ACTIVE
ECB02/02/2026FAILURE TO MAINTAIN BLDG EXTERIOR FACADE AND APPURTENANCES. NOTE: AT TIME OF INSPECTION, I OBSERVED AT EXP #3 EAST-CRACKED BRICK MULTI LOC.-ROOF-CRACKED BRICK AT BULKHEADS MULTI LOC. REMEDY: MAINTAIN BLDG EXTERHearing held — result not yet published$2K proposed
ECB03/11/2021CLASS 1 VIOLATION ISSUED RTS, UPON INSPECTION OF DEVICE IT WAS FOUND OUT OF SERVICE REMEDY; REPAIR THEN NOTIFY THE NYCDOB OF SERVICE RESTORE, CLASS 2 , MISSING MANUAL LOWERING BOX KEY REMEDY; PROVIDE, MISSING HNothing owed — awaiting certificate of correction
ECB05/16/2017B254,36. AS PER CLASS 254-36 BURNER NOT REGISTERED AS PER DOB RECORDSCORRECT ALL VIOLATING CONDITIONS AND SUBMIT A CERTIFICATE OF CORRECT ION.Nothing owed — awaiting certificate of correction
ECB03/13/200950 FULTON VT BOILER 10HP NB90364 GAS 2002 50 REFERENCED BOILER #1 FLUEPIPE IS COMBINED W/ ADJACENT #2 FLUE PIPE W/ NO INCREASE IN NOMINAL PIPE SIZE TO THE CHIMNEY INCREASE COMBINED PIPE SIKE OR RUN FLUE PIPESNothing owed — awaiting certificate of correction
ECB03/13/200950 FULTON VT BOILER 10HP NB90848 GAS 2002 50 REFERENCED BOILER #2 FLUEPIPE IS COMBINED W/ ADJACENT BOILER #1 FLUE PIPE W/ NO INCREASE IN NOMINAL PIPE SIZE TO THE CHIMNEY INCREASE COMBINED FLUE PIPE SIZE OR RUNNothing owed — awaiting certificate of correction
ECB11/02/200550. A.O SMITH COIL W.T. BOILER LP/HWS 50 PRESSURE RELIEF VALVE IS MOUNTED AT THE LOWEST ELEVATION ON THE BOILER. RE-POSITION THE PRESSURE RELIEF VALVE AT A HIGH ELEVATION ON THE BOILER FOR CODE COMPLIANCE.Nothing owed — awaiting certificate of correction
ECB11/02/200550. FULTON Y.T. BOILER, 10HP, NB90848, GAS 2002 (#1) (50) THE FLUE PIPE OF THE REFERENCED HIGH PRESSURE STEAM BOILER IS CONNECTED DIRECTLY TO THE FLUE PIPE OF SIMILAR SIZE INSTALLED ON BOILER #2. CUMMULATIVE FLNothing owed — awaiting certificate of correction
ECB11/02/2005A.O SMITH COIL W.T. LP HOT WTR BLR GAS. 50 PRESSURE RELIEF VALVE IS MOUNTED AT THE LOWEST ELEVATION ON THE BOILER STRUCTURE. RE-POSITION THE PRESSURE RELIEF VALVE AT A HIGH ELEVATION ON THE BOILER FOR CODE COMPNothing owed — awaiting certificate of correction
ECB11/02/200550. FULTON Y.T BOILER, 10HP, NB90364, GAS, 2002 (#2) (50) THE FLUE PIPE OF THE REFERENCED HIGH PRESSURE STEAM BOILER IS CONNECTED DIRECTLY TO THE FLUE PIPE OF SIMILAR SIZE INSTALLED ON BOILER #1. CUMMULATIVE FLNothing owed — awaiting certificate of correction
ECB08/08/200350. 50-INTERNAL INSPECTION REQUIRED.Nothing owed — awaiting certificate of correction
ECB08/08/20034A,50,36. 50)RELIEF VALVE DISCHARGE MUST BE PIPED DOWNNothing owed — awaiting certificate of correction
ECB08/08/200350. 50)INTERNAL INSPECTION REQUIRED.Nothing owed — awaiting certificate of correction
ECB08/08/200350,34,4A. 50)RELIEF VALVE DISCHARGE MUST BE PIPED DOWN.Nothing owed — awaiting certificate of correction