← Back
BuildNYC
Parks / recreation facility
353 WEST 110TH STREET
MANHATTAN · Morningside Heights · BIN 1811450
💬 Discuss this project
1900Year Built
1Stories
Q1Building Class
PARKZoning
2,865 sfGross Floor Area
1Units
1 Active Violation 0 unresolved · 1 paperwork only ▸
Parks / recreation facility · Owner of record: NYC Department of Parks and Recreation · 1,302,350 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofMorningside Park Cafe1p · 1 filing · 20 docs
Floor 1Morningside Park Cafe52p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Parks1307/08/2026
NYC Department of Parks and Recreation503/21/2026
NYC School Construction Authority103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bravo Group404/30/2025
Fmo Engineering107/21/2023
George Ranalli, Architect105/22/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Clarke Construction Consultants603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Peninsula ConstructionGeneral Contractor1107/08/2026
J.k.electrical ContractorElectrical203/21/2026
Y.S. ElectricElectrical103/21/2026
Avon Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Winton Group Architecture4343204/30/2025
Fmo Engineering1798107/21/2023
George Ranalli, Architect992107/21/2023
Building Lifecycle
All (51)Filed (6)Permit Issued (6)Signed Off (4)Inspection (3)Objection (20)Special Inspection (12)
03/16/2026
Signed off — Alteration
MH WORK FILED IN CONJUNCTION WITH CONSTRUCTION OF A KIOSK ON THE TERRACE OF THE SERVICE BUILDING. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00856396-S1
02/19/2026
Signed off — Alteration
MH WORK FILED IN CONJUNCTION WITH CONSTRUCTION OF A KIOSK ON THE TERRACE OF THE SERVICE BUILDING. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00856396-S2
01/16/2026
Objection resolved — Addressed
01/16/2026
Objection resolved — Addressed
05/16/2025
Objection raised — Scope
05/06/2025
Objection raised — Admin
04/30/2025
Filed — Alteration
MH WORK FILED IN CONJUNCTION WITH CONSTRUCTION OF A KIOSK ON THE TERRACE OF THE SERVICE BUILDING. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00856396-P1
04/29/2025
Filed — Alteration
MH WORK FILED IN CONJUNCTION WITH CONSTRUCTION OF A KIOSK ON THE TERRACE OF THE SERVICE BUILDING. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00856396-P2
04/22/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/17/2025
Special inspection requirement — Final
George Ranalli
04/17/2025
Special inspection requirement — Mechanical Systems
Vladimir Kaushansky
04/16/2025
Permit issued — Mechanical Systems
M00856396-S2-MS
04/04/2025
Signed off — Alteration
MH WORK FILED IN CONJUNCTION WITH CONSTRUCTION OF A KIOSK ON THE TERRACE OF THE SERVICE BUILDING. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00856396-S3
03/25/2025
Permit issued — Structural
M00856396-S3-ST
03/20/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/25/2025
Signed off — Alteration
MH WORK FILED IN CONJUNCTION WITH CONSTRUCTION OF A KIOSK ON THE TERRACE OF THE SERVICE BUILDING. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00856396-I1
01/22/2025
Permit issued — General Construction
M00856396-I1-GC
06/07/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/13/2024
Permit issued — General Construction
M00856396-I1-GC
02/08/2024
Permit issued — General Construction
M00856396-I1-GC
01/25/2024
Permit issued — Plumbing
M00856396-S1-PL
08/29/2023
Objection raised — Other
08/29/2023
Objection resolved — Addressed
08/29/2023
Objection raised — Inspections
08/29/2023
Objection resolved — Addressed
08/24/2023
Objection resolved — Addressed
08/24/2023
Objection resolved — Addressed
08/22/2023
Objection raised — Scope
08/22/2023
Objection raised — Scope
08/08/2023
Objection resolved — Addressed
08/08/2023
Objection resolved — Addressed
08/07/2023
Objection raised — Structural
08/07/2023
Objection raised — Inspections
08/01/2023
Objection raised — Scope
08/01/2023
Objection resolved — Addressed
07/21/2023
Filed — Alteration
MH WORK FILED IN CONJUNCTION WITH CONSTRUCTION OF A KIOSK ON THE TERRACE OF THE SERVICE BUILDING. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00856396-S3
07/21/2023
Special inspection requirement — Post-installed Anchors
FRANCESCO MO
07/21/2023
Special inspection requirement — Structural Cold-Formed Steel
FRANCESCO MO
07/21/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
FRANCESCO MO
07/21/2023
Special inspection requirement — Structural Steel - Details
FRANCESCO MO
07/21/2023
Special inspection requirement — Structural Steel - Welding
FRANCESCO MO
07/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
George Ranalli
07/21/2023
Special inspection requirement — Structural Steel - High Strength Bolting
FRANCESCO MO
07/21/2023
Special inspection requirement — Concrete - Cast-In-Place
FRANCESCO MO
07/19/2023
Special inspection requirement — Final
FRANCESCO MO
07/18/2023
Objection raised — Scope
07/18/2023
Objection resolved — Addressed
05/23/2023
Filed — Alteration
MH WORK FILED IN CONJUNCTION WITH CONSTRUCTION OF A KIOSK ON THE TERRACE OF THE SERVICE BUILDING. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00856396-S2
05/22/2023
Filed — Alteration
MH WORK FILED IN CONJUNCTION WITH CONSTRUCTION OF A KIOSK ON THE TERRACE OF THE SERVICE BUILDING. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00856396-S1
05/22/2023
Filed — Alteration
MH WORK FILED IN CONJUNCTION WITH CONSTRUCTION OF A KIOSK ON THE TERRACE OF THE SERVICE BUILDING. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00856396-I1
04/06/2023
Special inspection requirement — Final
George Ranalli
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offPeninsula Construction04/16/2025
DOB NOWStructuralSigned-offPeninsula Construction03/25/2025
DOB NOWGeneral ConstructionSigned-offPeninsula Construction01/22/2025
DOB NOWGeneral ConstructionSigned-offPeninsula Construction05/13/2024
DOB NOWGeneral ConstructionSigned-offPeninsula Construction02/08/2024
DOB NOWPlumbingSigned-offAvon Plumbing & Heating01/25/2024
BISOTISSUEDU.A. Construction12/17/2007
BISPLISSUEDTMS Plumbing & Heating05/10/2002
BISOTISSUEDCambria Construction04/22/2002
BISEQISSUEDUnited Hoisting CO._INC04/22/1994
1 project · most recent 05/21/2025
General Wiring
FiledStatusContractorScope
05/21/2025CompleteY.S. ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/22/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/20/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/07/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
04/17/2025FinalGeorge Ranalliprogress
04/17/2025Mechanical SystemsVladimir Kaushanskyspecial
07/21/2023Post-installed AnchorsFRANCESCO MOspecial
07/21/2023Structural Cold-Formed SteelFRANCESCO MOspecial
07/21/2023Structural Stability – Alterations of existing buildingsFRANCESCO MOspecial
07/21/2023Structural Steel - DetailsFRANCESCO MOspecial
07/21/2023Structural Steel - WeldingFRANCESCO MOspecial
07/21/2023Fire-Resistant Penetrations and JointsGeorge Ranallispecial
07/21/2023Structural Steel - High Strength BoltingFRANCESCO MOspecial
07/21/2023Concrete - Cast-In-PlaceFRANCESCO MOspecial
07/19/2023FinalFRANCESCO MOprogress
04/06/2023FinalGeorge Ranalliprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Morningside Park CafeRestaurant / Food ServiceFloor 1
Project M00856396 Alteration · LOC Issued · 05/22/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 43 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/29/2026M00856396-I1Request digital key ↗
08/29/2026M00856396-S2Request digital key ↗
08/29/2026M00856396-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits6
▸DOB NOWLPC Approval/Permit6
08/13/2026M00856396-P2Open ↗
08/13/2026M00856396-S2Open ↗
08/13/2026M00856396-I1Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/29/2026M00856396-P1Open ↗
08/29/2026M00856396-I1Open ↗
08/29/2026M00856396-S2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
10/01/2026M00856396-P1Open ↗
08/28/2026M00856396-S3Open ↗
08/27/2026M00856396-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
10/01/2026M00856396-P1Open ↗
08/28/2026M00856396-S3Open ↗
08/28/2026M00856396-S3Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/29/2026M00856396-S2Open ↗
08/29/2026M00856396-S1Open ↗
08/29/2026M00856396-I1Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00856396-S2Open ↗
▸Approvals, Objections & Sign-offs11
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/13/2026M00856396-P2Open ↗
08/13/2026M00856396-P1Open ↗
08/13/2026M00856396-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)2
08/13/2026M00856396-S3Open ↗
08/13/2026M00856396-I1Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)2
08/13/2026M00856396-S3Open ↗
08/13/2026M00856396-I1Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/28/2018100807806Open ↗
▸Filing & Intake Forms1
▸BISBOROUGH INTAKE FORM1
12/28/2018100807806Open ↗