← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Greenwich Townhouse Condominium
355 GREENWICH STREET · BIN 1002083
💬 Discuss this project
1915Year Built
5Stories
RMBuilding Class
C6-2AZoning
17,140 sfGross Floor Area
12Units
Rent Stabilized3 Open Violations ▸FDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 4,928 sf lot · 3.48 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Floor 1Under Construction36p · 7 filings · 20 docs
CellarUnder Construction43p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
C.S.K. ENTERPRISES INC103/22/2026
355 GREENWICH LLC C/O WALTER & S503/21/2026
GREENWICH903/21/2026
355 GREENWICH LLC C O WALTER S1203/21/2026
GREENWICH TOWNHOUSE CONDOMINIUM ASSOC203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TAN ENGINEERING PC405/15/2025
SARAH CARPENTER303/03/2025
BASIC GROUPS CORP911/22/2022
L & C ASSOCIATES212/23/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METROPOLIS GROUP INC1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
COCOZZA GROUP LLCGeneral Contractor1706/28/2026
KITCHEN EXHAUST SOLUTIONGeneral Contractor303/21/2026
J. CAIAZZO PLBG & HTG CORPFire Protection106/28/2026
J. CAIAZZO PLBG & HTG CORPlumbing107/08/2026
LG ELITE PLUMBING INCPlumbing107/08/2026
KJK ELECTRIC INCElectrical103/22/2026
MES CONSTRUCTION CORPPlumbing107/08/2026
ALL PRO PLBG & HTG INCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASSURE PROFESSIONAL ENGIN6962505/15/2025
TAN ENGINEERING, P.C.1291405/15/2025
ANDREW GOODRICH, P.E., PL965211/22/2022
KL INNOVATIVE DESIGN INC7225212/23/2021
LAM AND CO CONSULTING LLC8065212/23/2021
NY ACOM ENGINEERING PLLC7061707/22/2021
Building Lifecycle
All (94)Filed (18)Permit Issued (13)Signed Off (1)Violation (18)Inspection (14)Special Inspection (30)
04/09/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/08/2026
Permit issued — Mechanical Systems
M01109085-I1-MS
04/08/2026
Permit issued — General Construction
M01101042-I1-GC
02/10/2026
Permit issued — Construction Fence
M01112874-I1-FN
09/04/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/04/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/05/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/30/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/15/2025
Filed — Alteration
M01109377-P1
05/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
GUNJAN KHANDWALA
05/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
05/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/06/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/29/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/02/2025
Permit issued — Sprinklers
M01109087-I1-EW-SP
03/11/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/04/2025
Permit issued — Construction Fence
M01112874-I1-FN
03/03/2025
Filed — Alteration
M01112874-I1
01/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/12/2024
Permit issued — Plumbing
M01109377-I1-PL
12/11/2024
Permit issued — Mechanical Systems
M01109085-I1-MS
12/09/2024
Permit issued — General Construction
M01101042-I1-GC
11/22/2024
Filed — Alteration
HEREWITH FILING MECHANICAL WORK AS PER PLANS.
M01109085-I1
11/22/2024
Filed — Alteration
HEREWITH FILING FOR MODIFICATION OF EXISTING SPRINKLER SYSTEM AS PER PLANS.
M01109087-I1
11/22/2024
Filed — Alteration
M01109377-I1
11/14/2024
Filed — Alteration
M01101042-I1
09/16/2024
Special inspection requirement — Tenant Protection Plan Compliance
GUNJAN KHANDWALA
09/16/2024
Special inspection requirement — Tenant Protection Plan Compliance
GUNJAN KHANDWALA
09/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
09/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
09/16/2024
Special inspection requirement — Tenant Protection Plan Compliance
GUNJAN KHANDWALA
09/10/2024
Special inspection requirement — Mechanical Systems
Roger Tan
09/10/2024
Special inspection requirement — Sprinkler Systems
Roger Tan
09/10/2024
Special inspection requirement — Final
Roger Tan
08/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
GUNJAN KHANDWALA
08/23/2024
Special inspection requirement — Final
GUNJAN KHANDWALA
08/23/2024
Special inspection requirement — Fire-Resistance Rated Construction
GUNJAN KHANDWALA
08/23/2024
Special inspection requirement — Post-installed Anchors
GUNJAN KHANDWALA
06/06/2024
Permit issued — General Construction
M01042636-I1-GC
05/09/2024
Filed — Alteration
M01042636-I1
01/11/2023
Violation issued (FDNY_NOV, closed)
01/03/2023
Violation issued (FDNY_NOV, closed)
11/28/2022
Special inspection requirement — Energy Code Compliance Inspections
ANDREW GOODRICH
11/28/2022
Special inspection requirement — HVAC insulation and sealing
ANDREW GOODRICH
11/28/2022
Special inspection requirement — Final
ANDREW GOODRICH
11/28/2022
Special inspection requirement — Mechanical Systems
ANDREW GOODRICH
11/28/2022
Special inspection requirement — Maintenance information
ANDREW GOODRICH
11/28/2022
Special inspection requirement — HVAC and service water heating system controls
ANDREW GOODRICH
11/28/2022
Special inspection requirement — HVAC and service water heating equipment
ANDREW GOODRICH
11/28/2022
Special inspection requirement — Fire-Resistance Rated Construction
ANDREW GOODRICH
11/28/2022
Special inspection requirement — Shutoff dampers
ANDREW GOODRICH
11/28/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANDREW GOODRICH
11/22/2022
Filed — Alteration
PROPOSED MECHANICAL WORK AS PER INTERIOR RENOVATION IN ALT-1 #140962901 ON EXISTING COMMERCIAL SPACE AND CELLAR FLOOR.
M00419191-P2
11/22/2022
Special inspection requirement — Fire-Resistance Rated Construction
ANDREW GOODRICH
11/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANDREW GOODRICH
11/22/2022
Special inspection requirement — Mechanical Systems
ANDREW GOODRICH
11/22/2022
Special inspection requirement — Energy Code Compliance Inspections
ANDREW GOODRICH
11/22/2022
Special inspection requirement — Final
ANDREW GOODRICH
11/22/2022
Special inspection requirement — HVAC and service water heating equipment
ANDREW GOODRICH
03/16/2022
Signed off — Alteration
PROPOSED PLUMBING AND SPRINKLER WORK AS PER INTERIOR RENOVATION IN ALT-1 #140962901 ON EXISTING COMMERCIAL SPACE AND CELLAR FLOOR. PLUMBING AND SPRINKLER WORKS AS PER PLAN.
M00419176-I1
Latest 60 of 94 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedCOCOZZA GROUP LLC04/08/2026
DOB NOWGeneral ConstructionPermit IssuedCOCOZZA GROUP LLC04/08/2026
DOB NOWConstruction FencePermit IssuedCOCOZZA GROUP LLC02/10/2026
DOB NOWSprinklersPermit IssuedANTHONY CAIAZZO04/02/2025
DOB NOWConstruction FencePermit IssuedCOCOZZA GROUP LLC03/04/2025
DOB NOWPlumbingPermit IssuedJ. CAIAZZO PLBG & HTG COR12/12/2024
DOB NOWMechanical SystemsPermit IssuedCOCOZZA GROUP LLC12/11/2024
DOB NOWGeneral ConstructionPermit IssuedCOCOZZA GROUP LLC12/09/2024
DOB NOWGeneral ConstructionPermit IssuedCOCOZZA GROUP LLC06/06/2024
DOB NOWPlumbingSigned-offMES CONSTRUCTION CORP11/17/2021
DOB NOWMechanical SystemsPermit IssuedKITCHEN EXHAUST SOLUTION10/26/2021
DOB NOWSprinklersSigned-offALL PRO PLBG & HTG INC07/28/2021
DOB NOWSprinklersSigned-offLG ELITE PLUMBING INC01/13/2021
BISPLISSUEDRRP PLUMBING CORP03/26/2024
BISSPISSUEDRRP PLUMBING CORP03/20/2024
BIS—ISSUEDLWS CONSTRUCTION INC12/10/2020
BISPLISSUEDTRI STATE PLBG & HTG INC08/29/2019
BISSPISSUEDRRP PLUMBING CORP08/29/2019
BISPLISSUEDNYC PLUMBING & HEATING IN11/13/2018
BISOTISSUEDDALCRO INTERIORS, INC05/20/2015
BISSPISSUEDDOYLE BROS PLBG & HTG INC05/19/2015
BISPLISSUEDDOYLE BROS PLBG & HTG INC04/27/2015
BISMHISSUEDDALCRO INTERIORS, INC04/17/2015
BISOTISSUEDDALCRO INTERIORS, INC04/16/2015
BISOTISSUEDNEW YORK CONSTRUCTION ASS02/24/2015
BISEQISSUEDNEW YORK CONSTRUCTION ASS02/24/2015
BISFPISSUEDCHIEF FIRE PREVENTION & MECHANIC11/13/2006
BISMHISSUEDPLAN CONSTRUCTION GROUP,INC.05/13/2004
BISOTISSUEDPLAN CONSTRUCTION GROUP,INC.05/13/2004
BISMHISSUEDPLAN CONSTRUCTION GROUP,INC.07/31/2003
BIS—ISSUEDPLAN CONSTRUCTION GROUP INC.07/31/2003
BISOTISSUEDPLAN CONSTRUCTION GROUP,INC.07/31/2003
BISPLISSUEDDONATO INC.06/16/2003
BISMHISSUEDPLAN CONSTRUCTION GROUP,INC.04/24/2003
BISOTISSUEDPLAN CONSTRUCTION GROUP,INC.04/24/2003
BIS—ISSUEDPLAN CONSTRUCTION GROUP INC.03/14/2003
BIS—ISSUEDPLAN CONSTRUCTION GROUP INC.06/13/2002
BISOTISSUEDPLAN CONSTRUCTION GROUP,INC.05/23/2002
BISMHISSUEDPLAN CONSTRUCTION GROUP,INC.05/23/2002
BISPLISSUEDDONATO INC.04/24/2002
+ 19 more permits on file
2 projects · most recent 11/22/2024
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/22/2024Permit IssuedCOCOZZA GROUP LLCAir Conditioning Systems
Cooling
Lg ARNU243TAA4 27,300 BTU · Vrf Indoor ×7
ARNU483TAA4 51,200 BTU · Vrf Indoor ×3
ARUM144BTE5 162,000 BTU · Vrf Outdoor ×1
ARUM168BTE5 189,000 BTU · Vrf Outdoor ×1
11/22/2022Permit IssuedKITCHEN EXHAUST SOLUTIONVentilation Systems
Ventilation
Captiveaire 5412 SND-2-PSP-F 3,000 CFM · Kitchen Exhaust ×1
6012 VHB-G-PSP-F 1,485 CFM · Kitchen Exhaust ×1
1 project · most recent 11/22/2024
FiledStatusContractorScope
11/22/2024Permit IssuedJ. CAIAZZO PLBG & HTG COR135 heads
4 projects · most recent 01/30/2025
General Wiring Lighting
FiledStatusContractorScope
01/30/2025CompleteY.S ELECTRICGeneral Wiring, Lighting
05/10/2024CompleteDENMAR ELECTRIC CORPGeneral Wiring
07/27/2021CompleteKJK ELECTRIC INCGeneral Wiring
07/27/2021CompleteWCK ELECTRIC CORP.1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
04/09/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/04/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/04/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/05/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/30/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/06/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/11/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/09/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/14/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/09/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/04/2021Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/30/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 64
DateRequirementInspectorRole
05/15/2025Tenant Protection Plan ComplianceGUNJAN KHANDWALAspecial
05/15/2025Fire-Resistant Penetrations and JointsRoger Tanspecial
09/16/2024Fire-Resistant Penetrations and JointsRoger Tanspecial
09/16/2024Tenant Protection Plan ComplianceGUNJAN KHANDWALAspecial
09/16/2024Fire-Resistant Penetrations and JointsRoger Tanspecial
09/16/2024Tenant Protection Plan ComplianceGUNJAN KHANDWALAspecial
09/16/2024Tenant Protection Plan ComplianceGUNJAN KHANDWALAspecial
09/10/2024Mechanical SystemsRoger Tanspecial
09/10/2024FinalRoger Tanprogress
09/10/2024Sprinkler SystemsRoger Tanspecial
08/23/2024Post-installed AnchorsGUNJAN KHANDWALAspecial
08/23/2024Fire-Resistance Rated ConstructionGUNJAN KHANDWALAprogress
08/23/2024FinalGUNJAN KHANDWALAprogress
08/23/2024Fire-Resistant Penetrations and JointsGUNJAN KHANDWALAspecial
11/28/2022HVAC and service water heating system controls ANDREW GOODRICHenergy_progress
11/28/2022FinalANDREW GOODRICHprogress
11/28/2022Energy Code Compliance InspectionsANDREW GOODRICHprogress
11/28/2022Fire-Resistance Rated ConstructionANDREW GOODRICHprogress
11/28/2022Mechanical SystemsANDREW GOODRICHspecial
11/28/2022Fire-Resistant Penetrations and JointsANDREW GOODRICHspecial
11/28/2022Shutoff dampersANDREW GOODRICHenergy_progress
11/28/2022HVAC and service water heating equipment ANDREW GOODRICHenergy_progress
11/28/2022Maintenance informationANDREW GOODRICHenergy_progress
11/28/2022HVAC insulation and sealing ANDREW GOODRICHenergy_progress
11/22/2022HVAC and service water heating system controls ANDREW GOODRICHenergy_progress
Latest 25 of 64.
▾Documents — 359 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch - Sprinkler8
09/04/2026M00419176-P2Request digital key ↗
09/04/2026M00419176-I1Request digital key ↗
09/04/2026M00419176-P3Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Plumbing8
09/04/2026M00419176-P2Request digital key ↗
09/04/2026M00419176-I1Request digital key ↗
09/04/2026M00419176-P3Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch7
08/27/2026M01042636-I1Request digital key ↗
08/25/2026M01101042-I1Request digital key ↗
08/25/2026M01109085-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/01/2026M00419191-I1Request digital key ↗
08/15/2026M00419191-P1Request digital key ↗
08/15/2026M00419191-P2Request digital key ↗
▸Applications & Permits79
▸BISPLAN / WORK APPROVAL APPLICATION46
01/27/2025102045724Open ↗
01/24/2025102045724Open ↗
12/09/2024140962901Open ↗
Showing 3 of 46 on file for this type
▸BISWORK PERMIT APPLICATION14
03/26/2024122155880Open ↗
03/21/2024122155880Open ↗
03/20/2024122098531Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWLPC Approval/Permit13
09/04/2026M00419176-P2Open ↗
09/04/2026M00419176-I1Open ↗
09/04/2026M00419176-P8Open ↗
Showing 3 of 13 on file for this type
▸BISPLACE OF ASSEMBLY4
11/30/2015122470147Open ↗
10/26/2015122470147Open ↗
10/20/2015122470147Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
07/15/2024102045724Open ↗
08/05/2021140962901Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
08/18/2022140962901Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
08/18/2022140962901Open ↗
▸Seals & Professional Certifications110
▸DOB NOWProgress Inspector Seal & Signature39
08/29/2026M01109085-I1Open ↗
08/28/2026M00419176-P2Open ↗
08/28/2026M00419176-P2Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature23
09/04/2026M01109087-I1Open ↗
09/04/2026M01109087-I1Open ↗
08/29/2026M01109085-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
09/04/2026M00419176-P2Open ↗
09/04/2026M00419176-I1Open ↗
09/04/2026M00419176-P8Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION17
09/24/2019122205336Open ↗
09/24/2019122205336Open ↗
09/13/2019122098522Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
05/15/2015122098531Open ↗
05/15/2015122098522Open ↗
Showing 2 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
07/29/2015122470147Open ↗
05/15/2015122098522Open ↗
Showing 2 of 5 on file for this type
▸BISProfessional and Owner Certification (POC3)1
07/29/2015122470147Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/08/2020140962901Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/08/2020140962901Open ↗
▸Trade Schedules & Equipment15
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE12
10/11/2019102451829Open ↗
10/11/2019102451829Open ↗
10/08/2019122098531Open ↗
Showing 3 of 12 on file for this type
▸BISSELF-CERT PLUMBING NOTICE2
10/13/2015122155880Open ↗
07/16/2015122155880Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
06/19/2024102045724Open ↗
▸Safety & Tenant Protection5
▸DOB NOWTenant Protection Plan2
08/13/2026M00419191-P2Open ↗
08/13/2026M00419191-I1Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
11/10/2020140962901Open ↗
▸BISSTREET TREE CHECKLIST1
10/23/2020140962901Open ↗
▸BISSTREET TREE SIGNOFF1
08/18/2022140962901Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/27/2026M01042636-I1Open ↗
08/13/2026M01109377-P1Open ↗
08/13/2026M01109377-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
05/15/2015122098531Open ↗
05/15/2015122098522Open ↗
Showing 2 of 5 on file for this type
▸Energy Compliance20
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
09/24/2019122205336Open ↗
04/30/2015122155880Open ↗
04/24/2015122205336Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
09/22/2022140962901Open ↗
08/01/2022140962901Open ↗
10/26/2021140962901Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
08/17/2022140962901Open ↗
09/24/2019122205336Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
08/17/2022140962901Open ↗
08/17/2022140962901Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/08/2020140962901Open ↗
▸BISFENESTRATION AIR LEAKAGE1
08/17/2022140962901Open ↗
▸BISINTERIOR LIGHTING POWER1
08/17/2022140962901Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
08/17/2022140962901Open ↗
▸BISFENESTRATION AREAS1
08/17/2022140962901Open ↗
▸BISLIGHTING CONTROLS1
08/17/2022140962901Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/18/2022140962901Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY4
09/22/2022140962901Open ↗
08/01/2022140962901Open ↗
10/26/2021140962901Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION1
09/10/2019122098531Open ↗
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
11/20/2023102451829Open ↗
▸BIS* STRUCTURAL STABILITY 1 RCNY:16-011
12/05/2023102045724Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
08/17/2022140962901Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
08/17/2022140962901Open ↗
▸Approvals, Objections & Sign-offs26
▸BISSCHEDULE A - OCCUPANCY / USE8
12/03/2024140962901Open ↗
06/20/2024102045724Open ↗
09/29/2023102045724Open ↗
Showing 3 of 8 on file for this type
▸BISSUPERSEDING LETTER5
03/26/2024122155880Open ↗
03/20/2024122155880Open ↗
08/29/2019122098531Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
11/28/2023102451829Open ↗
09/24/2019122205336Open ↗
09/13/2019122098522Open ↗
Showing 3 of 5 on file for this type
▸BISLANDMARKS APPROVAL5
11/10/2020140962901Open ↗
09/13/2019122098522Open ↗
05/15/2015122098522Open ↗
Showing 3 of 5 on file for this type
▸BISLANDMARKS SIGNOFF3
08/09/2024140962901Open ↗
06/14/2024102045724Open ↗
11/21/2023102451829Open ↗
▸Cost, Insurance & Ownership14
▸BISCOST AFFIDAVIT10
10/08/2020140962901Open ↗
09/24/2019122205336Open ↗
09/13/2019122098522Open ↗
Showing 3 of 10 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
11/20/2023102451829Open ↗
08/17/2022140962901Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
12/11/2020140962901Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
12/03/2020140962901Open ↗
▸Filing & Intake Forms34
▸BISADDITIONAL INFORMATION18
12/11/2024140962901Open ↗
12/02/2022140962901Open ↗
11/30/2022140962901Open ↗
Showing 3 of 18 on file for this type
▸BISBOROUGH INTAKE FORM10
03/26/2024122155880Open ↗
03/20/2024122155880Open ↗
03/20/2024122098531Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING COVER SHEET5
05/15/2015122098531Open ↗
05/15/2015122098522Open ↗
Showing 2 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
10/08/2020140962901Open ↗
▸Other Documents8
▸DOB NOWProof of Historic Building4
08/13/2026M01101042-I1Open ↗
08/13/2026M01109085-I1Open ↗
08/13/2026M01109377-P1Open ↗
Showing 3 of 4 on file for this type
▸BIS* FIRE STOPS 27-3452
12/05/2023102045724Open ↗
12/05/2023102045724Open ↗
▸BISFIRE SUPP ANSUL APPROVL: FD-FSS1
07/31/2024140962901Open ↗
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7791
12/05/2023102045724Open ↗