← Back
BuildNYC
Over six families without stores
36 MARBLE HILL AVENUE
MANHATTAN · BIN 1064674
💬 Discuss this project
1924Year Built
4Stories
C1Building Class
R6Zoning
10,320 sfGross Floor Area
9Units
Rent Stabilized47 Active Violations ▸
Over six families without stores · Owner of record: 36 Marble Hill · 3,000 sf lot · 3.44 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofGeneral construction to renovate residential apartments5p · 5 filings · 20 docs
Floor 4General construction to renovate residential apartments17p · 6 filings · 20 docs
Floor 3General construction to renovate residential apartments17p · 6 filings · 20 docs
Floor 2General construction to renovate residential apartments17p · 6 filings · 20 docs
Floor 1General construction to renovate residential apartments20p · 8 filings · 20 docs
CellarGeneral construction to renovate residential apartments13p · 6 filings · 20 docs
Site & exteriorFacade and retaining wall repair22p · 2 filings · 19 docs
Filed — no permit issued36 Marble Hill LLC30p · 2 filings · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
36 Marble Hill1303/22/2026
Narhi Realty203/21/2026
NYC Department of Housing Preservation and Development103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Raimundo Ramos311/03/2026
Nasir J, Khanzada106/29/2026
Meltzer/Mandl Architects506/24/2026
CKL Engineering201/27/2026
MSM Engineering Services307/15/2025
Chun Engineering Consultant409/05/2024
Asr Engineering108/26/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Cavalry1203/21/2026
Expediting103/21/2026
Acde Group103/21/2026
Municipal Building Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Rapid Masonry Restorationspecialty_contractor403/21/2026
ZKW EnterprisesScaffold404/09/2026
Dudley JamalElectrical203/21/2026
Dudley & Associates Lic. ElectricElectrical203/21/2026
CavalryGeneral Contractor207/08/2026
J & G Construction ServicesScaffold207/08/2026
Singer Electric CoElectrical103/21/2026
Current Mechs Electric ContsElectrical103/21/2026
Norway ElectricElectrical103/21/2026
Current Mechs Electric ContsElectrical103/22/2026
Bluestone Construction AnGeneral Contractor106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Sia Inspections7306206/24/2026
Chun Engineering Consulta9605301/27/2026
Dal H Chun Engineer1972103/20/2024
Building Lifecycle
11/03/2026
Filed — Alteration
X01473454-I1
11/03/2026
Filed — Alteration
MECHANICAL WORK AT CEL, 1ST THROUGH 4TH FLOORS & ROOF AS PER PLANS FILED HEREWITH
X01476557-I1
11/03/2026
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
M01322418-I1-GC
11/02/2026
Filed — Alteration
X01473453-I1
11/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
281 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBluestone Construction An05/26/2026
DOB NOWSuspended ScaffoldSigned-offRapid Masonry Rest03/03/2026
DOB NOWGeneral ConstructionPermit IssuedPiotr Potocki03/24/2025
DOB NOWSidewalk ShedPermit IssuedJ & G Construction Services03/06/2025
DOB NOWSidewalk ShedSigned-offZKW Enterprises08/27/2024
DOB NOWSidewalk ShedSigned-offZKW Enterprises08/27/2024
DOB NOWSuspended ScaffoldSigned-offRapid Masonry Rest08/22/2024
DOB NOWGeneral ConstructionPermit IssuedPiotr Potocki07/10/2024
DOB NOWGeneral ConstructionSigned-offCavalry06/07/2024
DOB NOWStructuralSigned-offCavalry03/28/2024
DOB NOWSidewalk ShedPermit IssuedJ & G Construction Services03/19/2024
BISPLISSUEDBent Mechanical07/01/2019
BISBLISSUEDBent Mechanical07/01/2019
BISBLISSUEDBent Mechanical02/01/2018
BISPLISSUEDBent Mechanical02/01/2018
BISPLISSUEDBent Mechanical03/17/2016
BISBLISSUEDBent Mechanical03/17/2016
BISOTISSUEDMand Restoration12/27/2015
1 project · most recent 11/03/2026
Heating and Air Conditioning Systems
FiledStatusContractorScope
11/03/2026——Heating and Air Conditioning Systems
3 projects · most recent 08/28/2024
General Wiring
FiledStatusContractorScope
08/28/2024Permit IssuedRichard Neu—
04/03/2024Permit IssuedCurrent Mechs Electric ContsGeneral Wiring
03/13/2024Permit IssuedRichard Neu—
2 projects · most recent 06/29/2026
Steel Concrete Masonry
FiledStatusContractorScope
06/29/2026——Steel
01/27/2026Permit IssuedRapid Masonry RestorationSteel, Concrete, Masonry
2 projects · most recent 06/22/2026
Fence Sidewalk Shed
FiledStatusContractorScope
06/22/2026——Fence
07/15/2025Permit IssuedJ & G Construction ServicesSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 59
DateRequirementInspectorRole
11/02/2026HVAC-R and service water heating system controls—energy_progress
11/02/2026Maintenance information—energy_progress
11/02/2026HVAC-R and service water piping design and insulation—energy_progress
11/02/2026HVAC-R and service water heating equipment—energy_progress
11/02/2026Shutoff dampers—energy_progress
10/21/2026Fire-Resistant Penetrations and Joints—special
10/21/2026Heating Systems—special
10/21/2026Energy Code Compliance Inspections—progress
10/19/2026Final—progress
10/19/2026Mechanical Systems—special
10/15/2026Fire-Resistant Penetrations and Joints—special
10/14/2026Energy Code Compliance InspectionsRaimundo Ramosprogress
10/14/2026Fire-Resistant Penetrations and Joints—special
10/13/2026Sprinkler Systems—special
06/26/2026Lighting controlsSOFIA KAPELYANenergy_progress
06/26/2026Fire-Resistant Penetrations and JointsSOFIA KAPELYANspecial
06/26/2026FinalSOFIA KAPELYANprogress
06/26/2026Energy Code Compliance InspectionsSOFIA KAPELYANprogress
06/26/2026Fire-Resistance Rated ConstructionSOFIA KAPELYANprogress
06/26/2026Insulation placement and R valuesSOFIA KAPELYANenergy_progress
06/26/2026Fenestration areasSOFIA KAPELYANenergy_progress
06/26/2026MeteringSOFIA KAPELYANenergy_progress
06/26/2026Lighting in dwelling unitsSOFIA KAPELYANenergy_progress
06/26/2026Exterior lighting powerSOFIA KAPELYANenergy_progress
06/26/2026Air barrier - visual inspectionSOFIA KAPELYANenergy_progress
Latest 25 of 59.
128 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account