1906Year Built
10Stories
O6Building Class
M1-9A/R12Zoning
44,115 sfGross Floor Area
13Units
LL97 Covered25 Open Violations 13 unresolved · 12 paperwork only ▸FISP: SAFE
Office with commercial, 7-19 stories · 5,000 sf lot · 8.82 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalFire ProtectionGeneral
Roof2p · 2 filings · 19 docs
Floor 76p · 3 filings · 20 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JERRICK ASSOCIATES407/08/2026
ASM REALTY GROUP2507/08/2026
OWNER OF 36 W 37 ST203/22/2026
C O ASM REALTY GROUP1003/21/2026
ASM REALTY603/21/2026
MANDELBAUM GLUCK LLC C O ASM R203/21/2026
MTI THE IMAGE GROUP103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS103/21/2026
KOSSAR + GARRY ARCHITECTS, LLP403/21/2026
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
(718)541-0701 MANAGEMENTGeneral Contractor303/21/2026
AIR STREAM AIR CONDITIONINGGeneral Contractor203/21/2026
JERRICK ASSOCIATES INCGeneral Contractor207/08/2026
TRINCHESE CONSTRUCTION INGeneral Contractor203/21/2026
A & F FIRE PROTECTION COFire Protection207/08/2026
CHARLES LENORD STEEL SERVElectrical103/21/2026
KAPNAG HTG & PLBG CORP.Plumbing107/08/2026
FRANCIS, WALLINGTONElectrical103/21/2026
GREGORY PAPANTONIOUElectrical103/21/2026
HARRINGTON ELECT CONTR INElectrical103/22/2026
MICHAEL MINIEROElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARADIGM ARCHITECTURE5931104/26/2023
SE INSPECTIONS7486207/08/2021
Building Lifecycle
All (135)Filed (7)Permit Issued (8)Signed Off (6)Facade (FISP) (15)Violation (60)Inspection (9)Objection (6)Special Inspection (24)
07/03/2024
Violation issued (ECB, open)
Construction
02/09/2024
Signed off — Alteration
M00815597-I1
01/31/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/12/2023
Cycle 9 facade report submitted
12/12/2023
Cycle 9 facade report signed — SAFE
11/28/2023
Signed off — Alteration
Exterior restoration to include caulking, lintel replacement, replace masonry and sills as per plans filed herewith. No change to use, egress or occupancy
M00856970-I1
11/20/2023
Cycle 9 facade inspection completed
11/01/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/15/2023
Permit issued — General Construction
M00856970-I1-GC
06/14/2023
Signed off — Alteration
NEW SPRINKLER HEAD LAYOUT TO MATCH NEW OFFICE LAYOUT
M00552851-I1
06/08/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/23/2023
Objection raised — Energy
05/23/2023
Objection resolved — Addressed
05/23/2023
Objection raised — Structural
05/23/2023
Objection resolved — Addressed
05/04/2023
Objection raised — Energy
05/04/2023
Objection resolved — Addressed
04/26/2023
Filed — Alteration
Exterior restoration to include caulking, lintel replacement, replace masonry and sills as per plans filed herewith. No change to use, egress or occupancy
M00856970-I1
04/10/2023
Special inspection requirement — Masonry
Anthony Addesso
04/10/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Addesso
04/10/2023
Special inspection requirement — Energy Code Compliance Inspections
Anthony Addesso
04/10/2023
Special inspection requirement — Air barrier - visual inspection
Anthony Addesso
04/07/2023
Special inspection requirement — Final
Anthony Addesso
04/05/2023
Permit issued — Sprinklers
M00552851-I1-EW-SP
02/28/2023
Violation issued (ECB, closed)
Construction
02/28/2023
Violation issued (ECB, closed)
Construction
02/13/2023
Cycle 9 facade report submitted
02/13/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/08/2023
Permit issued — Sidewalk Shed
M00815597-I1-SH
02/02/2023
Cycle 9 facade report signed — UNSAFE
02/01/2023
Cycle 9 facade inspection completed
01/25/2023
Filed — Alteration
M00815597-I1
10/12/2022
Signed off — Alteration
M00547997-I1
11/10/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/26/2021
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/26/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/18/2021
Signed off — Alteration
M00541826-I1
10/13/2021
Signed off — Alteration
M00510460-I1
09/08/2021
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
08/25/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/19/2021
Special inspection requirement — Energy Code Compliance Inspections
Alan Garry
08/19/2021
Special inspection requirement — Interior lighting power
Alan Garry
08/19/2021
Special inspection requirement — Lighting controls
Alan Garry
08/19/2021
Special inspection requirement — Final
Alan Garry
08/17/2021
Filed — Alteration
M00510460-P1
08/17/2021
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/17/2021
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
07/20/2021
Permit issued — Plumbing
M00541826-I1-PL
07/19/2021
Permit issued — Mechanical Systems
M00547997-I1-MS
07/19/2021
Permit issued — Sprinklers
M00552851-I1-EW-SP
07/15/2021
Special inspection requirement — Lighting controls
Alan Garry
07/15/2021
Special inspection requirement — Energy Code Compliance Inspections
Alan Garry
07/15/2021
Special inspection requirement — Final
Alan Garry
07/15/2021
Special inspection requirement — Interior lighting power
Alan Garry
07/14/2021
Filed — Alteration
M00541826-I1
07/08/2021
Filed — Alteration
NEW SPRINKLER HEAD LAYOUT TO MATCH NEW OFFICE LAYOUT
M00552851-I1
07/07/2021
Filed — Alteration
M00547997-I1
07/06/2021
Special inspection requirement — Energy Code Compliance Inspections
Spencer Goroff
07/06/2021
Special inspection requirement — Post-installed Anchors
Spencer Goroff
07/06/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Spencer Goroff
Latest 60 of 135 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offGE 2A CONSTRUCTION06/15/2023
DOB NOWSprinklersSigned-offADVANCED AUTO SPR.CO.,INC04/05/2023
DOB NOWSidewalk ShedSigned-offGE 2A CONSTRUCTION02/08/2023
DOB NOWPlumbingSigned-offKAPNAG HTG & PLBG CORP.07/20/2021
DOB NOWMechanical SystemsSigned-offAIR STREAM AIR CONDITIONI07/19/2021
DOB NOWSprinklersSigned-offADVANCED AUTO SPR.CO.,INC07/19/2021
DOB NOWGeneral ConstructionSigned-offTRINCHESE CONSTRUCTION IN06/07/2021
DOB NOWGeneral ConstructionSigned-off(718)541-0701 MANAGEMENT05/24/2021
BISOTISSUEDJERRICK ASSOCIATES INC04/08/2021
BISOTISSUEDJERRICK ASSOCIATES INC09/22/2020
BISOTISSUEDJERRICK ASSOCIATES INC10/11/2019
BISMHISSUEDTRYSTATE MECHANICAL, INC06/17/2019
BISFSISSUEDCHAMPION COMBUSTION CORP07/01/2014
BISFSISSUEDCHAMPION COMBUSTION CORP03/03/2014
BISMHISSUEDAIR TECH COOLING INC12/15/2010
BISMHISSUEDAIR TECH COOLING INC06/02/2009
BISMHISSUEDAIR TECH COOLING INC11/13/2007
BISOTISSUEDCOUNTRY WIDE CONSTRUCTION CORP04/23/2007
BISSPISSUEDFIVE BORO ASSOCIATES INC03/06/2006
BISPLISSUEDCASINO MECHANICAL CORP01/09/2006
BISMHISSUEDDONNELLY INDUSTRIES INC01/06/2006
BISOTISSUEDDONNELLY INDUSTRIES INC01/06/2006
BISMHISSUEDAIR STREAM AIR CONDITIONING04/29/2002
BISEQISSUEDJERRICK WATERPROOFING CO04/02/2002
6 projects · most recent 01/13/2025
General Wiring
FiledStatusContractorScope
01/13/2025CancelledISTRA ELEC'L CONTRS CORPGeneral Wiring
09/22/2023CompleteHARRINGTON ELECT CONTR IN1 meters, 1 new_meters
07/27/2023CompleteBOROWIDE ELECT'L CONTR'S—
06/23/2021Permit IssuedFRACCAVENTO ELEC. CORPGeneral Wiring
06/24/2019CompleteHARRINGTON ELECT CONTR INGeneral Wiring
05/04/2018Permit IssuedCAPUTEK ELEC'L SERVICES,—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
01/31/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/08/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/10/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/26/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/26/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/08/2021Pass-Final PL - UndergroundPassView ↗
08/25/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/17/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/17/2021Certified Sprinkler - SP - RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
04/10/2023MasonryAnthony Addessospecial
04/10/2023Structural Stability – Alterations of existing buildingsAnthony Addessospecial
04/10/2023Energy Code Compliance InspectionsAnthony Addessoprogress
04/10/2023Air barrier - visual inspectionAnthony Addessoenergy_progress
04/07/2023FinalAnthony Addessoprogress
08/19/2021Energy Code Compliance InspectionsAlan Garryprogress
08/19/2021Interior lighting powerAlan Garryenergy_progress
08/19/2021Lighting controlsAlan Garryenergy_progress
08/19/2021FinalAlan Garryprogress
07/15/2021Lighting controlsAlan Garryenergy_progress
07/15/2021Energy Code Compliance InspectionsAlan Garryprogress
07/15/2021FinalAlan Garryprogress
07/15/2021Interior lighting powerAlan Garryenergy_progress
07/06/2021Energy Code Compliance InspectionsSpencer Goroffprogress
07/06/2021Post-installed AnchorsSpencer Goroffspecial
07/06/2021Fire-Resistant Penetrations and JointsSpencer Goroffspecial
07/06/2021Sprinkler SystemsSpencer Goroffspecial
06/29/2021HVAC-R and service water heating system controlsSpencer Goroffenergy_progress
06/29/2021HVAC-R and service water piping design and insulationSpencer Goroffenergy_progress
06/29/2021HVAC-R and service water heating equipmentSpencer Goroffenergy_progress
06/29/2021Energy Code Compliance InspectionsSpencer Goroffprogress
06/29/2021Maintenance informationSpencer Goroffenergy_progress
06/28/2021Mechanical SystemsSpencer Goroffspecial
06/28/2021FinalSpencer Goroffprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
NEP Mobile UnitsOfficeFloor 7
Project M00552851 Alteration · LOC Issued · 07/08/2021
Project M00547997 Alteration · LOC Issued · 07/07/2021
Project M00510460 Alteration · LOC Issued · 05/13/2021
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 153 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
09/03/2026M00510460-I1Request digital key ↗
09/03/2026M00510460-P1Request digital key ↗
09/03/2026M00547997-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits21
▸BISWORK PERMIT APPLICATION15
04/06/2023123748132Open ↗
03/16/2023123748132Open ↗
04/20/2021123748132Open ↗
Showing 3 of 15 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION6
09/25/2019123748132Open ↗
06/18/2019123554340Open ↗
02/26/2014140166184Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications52
▸DOB NOWProgress Inspector Seal & Signature18
08/31/2026M00856970-I1Open ↗
08/31/2026M00856970-I1Open ↗
08/31/2026M00856970-I1Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
09/25/2019123748132Open ↗
07/29/2019123554340Open ↗
06/18/2019123554340Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/03/2026M00510460-I1Open ↗
09/03/2026M00510460-P1Open ↗
09/03/2026M00541826-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/31/2026M00856970-I1Open ↗
08/31/2026M00856970-I1Open ↗
08/29/2026M00552851-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
06/18/2019123554340Open ↗
02/24/2010120255268Open ↗
06/01/2009120034667Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
06/18/2019123554340Open ↗
02/26/2014140166184Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
02/24/2010120255268Open ↗
06/01/2009120034667Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/26/2014140166184Open ↗
▸BISPC FULL REPORT1
11/13/2007110011415Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
02/26/2014140166184Open ↗
▸Trade Schedules & Equipment8
▸BISEQUIPMENT USE PERMITS4
07/29/2019123554340Open ↗
07/05/2012120255268Open ↗
07/05/2012120255268Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
07/29/2019123554340Open ↗
09/02/2009120034667Open ↗
12/12/2007110011415Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
02/26/2014140166184Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes1
09/25/2019123748132Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
10/02/2019123748132Open ↗
▸Environmental & Asbestos15
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
02/24/2010120255268Open ↗
02/24/2010120255268Open ↗
06/01/2009120034667Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/03/2026M00510460-I1Open ↗
09/03/2026M00510460-P1Open ↗
09/03/2026M00541826-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
09/25/2019123748132Open ↗
02/26/2014140166184Open ↗
08/03/2012121142539Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M00856970-I1Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
10/11/2019123748132Open ↗
09/25/2019123748132Open ↗
07/29/2019123554340Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026M00547997-I1Open ↗
08/13/2026M00541826-I1Open ↗
08/13/2026M00510460-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
07/29/2019123554340Open ↗
04/10/2018140166184Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
02/26/2014140166184Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
02/26/2014140166184Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
02/26/2014140166184Open ↗
▸Approvals, Objections & Sign-offs10
▸BISADMINISTRATIVE OBJECTIONS4
08/03/2012121142539Open ↗
02/24/2010120255268Open ↗
06/01/2009120034667Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
07/29/2019123554340Open ↗
04/10/2018140166184Open ↗
09/02/2009120034667Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
04/10/2018140166184Open ↗
09/02/2009120034667Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT10
09/25/2019123748132Open ↗
07/29/2019123554340Open ↗
06/18/2019123554340Open ↗
Showing 3 of 10 on file for this type
▸Filing & Intake Forms13
▸BISBOROUGH INTAKE FORM8
04/06/2023123748132Open ↗
03/15/2023123748132Open ↗
04/20/2021123748132Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET3
09/25/2019123748132Open ↗
06/18/2019123554340Open ↗
08/03/2012121142539Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
02/26/2014140166184Open ↗
▸BISADDITIONAL INFORMATION1
06/25/2012120255268Open ↗
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
03/03/2014140166184Open ↗