DOB11/01/2023FAILURE TO CORRECT SWARMP CONDITIONS
DOB02/13/2023CYCLE 9B UNSAFE REPORT FILED
DOB09/03/2019FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
DOB10/08/2010V-DOB VIOLATION - ACTIVE
DOB11/30/2007V-DOB VIOLATION - ACTIVE
DOB11/19/2004V-DOB VIOLATION - ACTIVE
DOB08/13/2004V-DOB VIOLATION - ACTIVE
DOB08/13/2004V-DOB VIOLATION - ACTIVE
DOB04/21/2004V-DOB VIOLATION - ACTIVE
DOB03/18/1993V-DOB VIOLATION - ACTIVE
DOB07/01/1992V-DOB VIOLATION - ACTIVE
DOB04/07/19922
DOB04/25/19912
ECB07/03/2024A. C. 27-929.1, FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL IN AN OFFICE BUILDING 100 FEET OR MORNothing owed — awaiting certificate of correction
ECB05/19/2010FAILURE TO FILE AN ACCEPTABLE 6TH ROUND TECHNICAL REPORT IN COMPLIANCEW/CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS AND APPURTENANCES AS REQUIRED BY ARTICLE 28.302 & THE DOB RULES AND REGULATIONS.Nothing owed — awaiting certificate of correction
ECB03/24/2010FAILURE TO PROVIDE SAFETY MEASURES; SIDEWALK SHED ETC. 5TH CYCLE WAS FILED "UNSAFE" BY ENGINEER, AND NO FILING OF 6TH CYCLE ENGINEER REPORT W/DOB. REMEDY: PROVIDE SAFETY MEASURES; SIDEWALK SHED, ETC. AND FILENothing owed — awaiting certificate of correction
ECB04/17/2009FAILURE TO SUBMIT AN ACCEPTABLE 6TH ROUND TECHNICAL REPORT IN COMPLIANCE WITH CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS & APPURTENANCES AS REQUIRED BY ARTICLE 28.302 & THE D.O.B. RULES & REGULATIONNothing owed — awaiting certificate of correction
ECB03/02/2007SEC 27-597:QUESTIONABLE CONSTRUCTION. NOTED:AT 2ND FL A WOOD PLATFORM APPROX 9' X 20' X 40' MADE OF PLYWOOD & 2" X 6" JOISTS W/ 3"CAST IRON PIPE COLUMNS HAS BEEN ERECTED W/ STRAPS SUSPENDING THE JOISTS,THENothing owed — awaiting certificate of correction
ECB08/16/1999FAILURE TO OBTIAN A CERTIFICATE OF ELECTRICAL INSPECTION FROM TH EBUREAU OF ELECTRICAL CONTROL FOR THE INSTALLATION OF EMERGENCY POWER TO EXIT LIGHTS FAILURE TO ONTIAN A CERTIFICATE OF ELECTRICAL INSPECTIONNothing owed — awaiting certificate of correction
ECB12/16/1994FAILURE TO PRVIDE ADEQUATE EMERGENCY POWER EXIT LIGHT PURSUANT TO BEC STANDARDS.REMEDY: PROVIDE ADEQUATE EMERGENCY POWER TO EXIT LIGHT PURSUANT TO BEC STANDARDS, AND LOCAL LAW 16/84 .Nothing owed — awaiting certificate of correction
ECB06/28/1994FAILURE TKO PROVIDE ADEQUATE EMERGENCY POWER EXIT LIGHT PURSUANT TO BEC STANDARDS. REMEDY PROVIDE ADEQUATE EMERGENCY POWER TO EXIT LIGHT PUISUANT TO BEC STANDARDNothing owed — awaiting certificate of correction
ECB05/26/1993FAILURE TO PROVIDE ADEQUATE MEERGENCY EXIT LIGHT ON 10TH 6,2 FLOORS AND FREIGHT ELEVATOR FOYERS REMEDY PROVIDE EMERG PWR EXIT LIGHT ACCORDING TO BEC STANDARDS AND LL16Nothing owed — awaiting certificate of correction
ECB01/12/1993FAILURE TO PROVIDE ADEQUATE EMERGENCY POWER EXIT LIGHT IN CORRIDORS AND TENANT SPACE THROUGHOUT FLOOR AREAS. REMEDY:PROVIDE EMERGENCY POWER EXIT LIGHT ACCORDING TO B.E.C. STANDARDS AND LOCAL LAW 16/84Nothing owed — awaiting certificate of correction
ECB03/05/1992FLOOR NUMBERING SIGNS NOT DURABLE STAIR I.D. SIGN NOT DURABLE AND OR MISSING. REMEDY: INSTALL SIGNS AS PER CODE LL 16/84.Nothing owed — awaiting certificate of correction
ECB03/05/1992FAILURE TO PROVIDE ADEQUATE EMERGENCY POWER EXIT LIGHT IN CORRIDORS & TENANT FLOOR AREAS. REMEDY:INSTALL EMERGENCY POWRER EXIT LIGHTS ACCORDING TO B.E.C. STANDARDS.Nothing owed — awaiting certificate of correction
Office with commercial, 7-19 stories · 5,000 sf lot · 8.82 FAR built · Flood zone X