Office with commercial, 7-19 stories
36 WEST 37TH STREET
MANHATTAN · BIN 1015950
💬 Discuss this project
1906Year Built
10Stories
O6Building Class
M1-9A/R12Zoning
44,115 sfGross Floor Area
13Units
LL97 Covered6 Active Violations 1 unresolved · 5 paperwork only 2 old, status unconfirmed ▸FISP: SAFE
Office with commercial, 7-19 stories · 5,000 sf lot · 8.82 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofNEP Mobile Units2p · 2 filings · 19 docs
Floor 7NEP Mobile Units13p · 4 filings · 20 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Site & exteriorAsm Realty Group INC6p · 2 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Asm Realty Group2407/08/2026
Mandelbaum & Gluck LLC C/O Asm R1903/22/2026
Asm Realty603/21/2026
Jerrick Associates407/08/2026
Mti the Image Group103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Paradigm Architecture104/26/2023
Paul Perdek, Prof. Engineering101/25/2023
Kossar + Garry Architects308/17/2021
Infinity Design207/08/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Municipal Building Consultants103/21/2026
Kossar + Garry Architects403/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
(718) 541-0701 ManagementGeneral Contractor303/21/2026
Trinchese ConstructionGeneral Contractor203/21/2026
Air Stream Air Conditioningspecialty_contractor203/21/2026
A & F Fire Protection CoFire Protection207/08/2026
Jerrick AssociatesGeneral Contractor107/08/2026
Jerrick AssociatesScaffold107/08/2026
W.F. Electrical ContractorsElectrical103/21/2026
Kapnag Heating & PlumbingPlumbing107/08/2026
Borowide Elect'l ContractorsElectrical103/21/2026
Harrington Electric ContractingElectrical103/22/2026
Istra Electrical ContractorsElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Paradigm Architecture5931104/26/2023
SE Inspections7486207/08/2021
Building Lifecycle
All (135)Filed (7)Permit Issued (8)Signed Off (6)Facade (FISP) (15)Violation (60)Inspection (9)Objection (6)Special Inspection (24)
07/03/2024
Violation issued (ECB, open)
Construction
02/09/2024
Signed off — Alteration
M00815597-I1
01/31/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/12/2023
Cycle 9 facade report submitted
12/12/2023
Cycle 9 facade report signed — SAFE
11/28/2023
Signed off — Alteration
Exterior restoration to include caulking, lintel replacement, replace masonry and sills as per plans filed herewith. No change to use, egress or occupancy
M00856970-I1
11/20/2023
Cycle 9 facade inspection completed
11/01/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/15/2023
Permit issued — General Construction
M00856970-I1-GC
06/14/2023
Signed off — Alteration
NEW SPRINKLER HEAD LAYOUT TO MATCH NEW OFFICE LAYOUT
M00552851-I1
06/08/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/23/2023
Objection raised — Energy
05/23/2023
Objection resolved — Addressed
05/23/2023
Objection raised — Structural
05/23/2023
Objection resolved — Addressed
05/04/2023
Objection raised — Energy
05/04/2023
Objection resolved — Addressed
04/26/2023
Filed — Alteration
Exterior restoration to include caulking, lintel replacement, replace masonry and sills as per plans filed herewith. No change to use, egress or occupancy
M00856970-I1
04/10/2023
Special inspection requirement — Masonry
Anthony Addesso
04/10/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Addesso
04/10/2023
Special inspection requirement — Energy Code Compliance Inspections
Anthony Addesso
04/10/2023
Special inspection requirement — Air barrier - visual inspection
Anthony Addesso
04/07/2023
Special inspection requirement — Final
Anthony Addesso
04/05/2023
Permit issued — Sprinklers
M00552851-I1-EW-SP
02/28/2023
Violation issued (ECB, closed)
Construction
02/28/2023
Violation issued (ECB, closed)
Construction
02/13/2023
Cycle 9 facade report submitted
02/13/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/08/2023
Permit issued — Sidewalk Shed
M00815597-I1-SH
02/02/2023
Cycle 9 facade report signed — UNSAFE
02/01/2023
Cycle 9 facade inspection completed
01/25/2023
Filed — Alteration
M00815597-I1
10/12/2022
Signed off — Alteration
M00547997-I1
11/10/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/26/2021
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/26/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/18/2021
Signed off — Alteration
M00541826-I1
10/13/2021
Signed off — Alteration
M00510460-I1
09/08/2021
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
08/25/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/19/2021
Special inspection requirement — Energy Code Compliance Inspections
Alan Garry
08/19/2021
Special inspection requirement — Interior lighting power
Alan Garry
08/19/2021
Special inspection requirement — Lighting controls
Alan Garry
08/19/2021
Special inspection requirement — Final
Alan Garry
08/17/2021
Filed — Alteration
M00510460-P1
08/17/2021
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/17/2021
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
07/20/2021
Permit issued — Plumbing
M00541826-I1-PL
07/19/2021
Permit issued — Mechanical Systems
M00547997-I1-MS
07/19/2021
Permit issued — Sprinklers
M00552851-I1-EW-SP
07/15/2021
Special inspection requirement — Lighting controls
Alan Garry
07/15/2021
Special inspection requirement — Energy Code Compliance Inspections
Alan Garry
07/15/2021
Special inspection requirement — Final
Alan Garry
07/15/2021
Special inspection requirement — Interior lighting power
Alan Garry
07/14/2021
Filed — Alteration
M00541826-I1
07/08/2021
Filed — Alteration
NEW SPRINKLER HEAD LAYOUT TO MATCH NEW OFFICE LAYOUT
M00552851-I1
07/07/2021
Filed — Alteration
M00547997-I1
07/06/2021
Special inspection requirement — Energy Code Compliance Inspections
Spencer Goroff
07/06/2021
Special inspection requirement — Post-installed Anchors
Spencer Goroff
07/06/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Spencer Goroff
Latest 60 of 135 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offGE 2A Construction06/15/2023
DOB NOWSprinklersSigned-offAdvanced Automatic Sprinkler Co04/05/2023
DOB NOWSidewalk ShedSigned-offGE 2A Construction02/08/2023
DOB NOWPlumbingSigned-offKapnag Heating & Plumbing07/20/2021
DOB NOWMechanical SystemsSigned-offAir Stream Air Conditioni07/19/2021
DOB NOWSprinklersSigned-offAdvanced Automatic Sprinkler Co07/19/2021
DOB NOWGeneral ConstructionSigned-offTrinchese Construction06/07/2021
DOB NOWGeneral ConstructionSigned-off(718) 541-0701 Management05/24/2021
BISOTISSUEDJerrick Associates04/08/2021
BISOTISSUEDJerrick Associates09/22/2020
BISOTISSUEDJerrick Associates10/11/2019
BISMHISSUEDTrystate Mechanical06/17/2019
BISFSISSUEDChampion Combustion07/01/2014
BISFSISSUEDChampion Combustion03/03/2014
BISMHISSUEDAir Tech Cooling12/15/2010
BISMHISSUEDAir Tech Cooling06/02/2009
BISMHISSUEDAir Tech Cooling11/13/2007
BISOTISSUEDCountry Wide Construction04/23/2007
BISSPISSUEDFive Boro Associates03/06/2006
BISPLISSUEDCasino Mechanical01/09/2006
BISMHISSUEDDonnelly Industries01/06/2006
BISOTISSUEDDonnelly Industries01/06/2006
BISMHISSUEDAir Stream Air Conditioning04/29/2002
BISEQISSUEDJerrick Waterproofing Co04/02/2002
6 projects · most recent 01/13/2025
General Wiring
FiledStatusContractorScope
01/13/2025CancelledIstra Electrical ContractorsGeneral Wiring
09/22/2023CompleteHarrington Electric Contracting1 meters, 1 new_meters
07/27/2023CompleteBorowide Elect'l Contractors—
06/23/2021Permit IssuedFraccavento ElectricGeneral Wiring
06/24/2019CompleteHarrington Electric ContractingGeneral Wiring
05/04/2018Permit IssuedCaputek Electrical Services—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
01/31/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/08/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/10/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/26/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/26/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/08/2021Pass-Final PL - UndergroundPassView ↗
08/25/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/17/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/17/2021Certified Sprinkler - SP - RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
04/10/2023MasonryAnthony Addessospecial
04/10/2023Structural Stability – Alterations of existing buildingsAnthony Addessospecial
04/10/2023Energy Code Compliance InspectionsAnthony Addessoprogress
04/10/2023Air barrier - visual inspectionAnthony Addessoenergy_progress
04/07/2023FinalAnthony Addessoprogress
08/19/2021Energy Code Compliance InspectionsAlan Garryprogress
08/19/2021Interior lighting powerAlan Garryenergy_progress
08/19/2021Lighting controlsAlan Garryenergy_progress
08/19/2021FinalAlan Garryprogress
07/15/2021Lighting controlsAlan Garryenergy_progress
07/15/2021Energy Code Compliance InspectionsAlan Garryprogress
07/15/2021FinalAlan Garryprogress
07/15/2021Interior lighting powerAlan Garryenergy_progress
07/06/2021Energy Code Compliance InspectionsSpencer Goroffprogress
07/06/2021Post-installed AnchorsSpencer Goroffspecial
07/06/2021Fire-Resistant Penetrations and JointsSpencer Goroffspecial
07/06/2021Sprinkler SystemsSpencer Goroffspecial
06/29/2021HVAC-R and service water heating system controlsSpencer Goroffenergy_progress
06/29/2021HVAC-R and service water piping design and insulationSpencer Goroffenergy_progress
06/29/2021HVAC-R and service water heating equipmentSpencer Goroffenergy_progress
06/29/2021Energy Code Compliance InspectionsSpencer Goroffprogress
06/29/2021Maintenance informationSpencer Goroffenergy_progress
06/28/2021Mechanical SystemsSpencer Goroffspecial
06/28/2021FinalSpencer Goroffprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
NEP Mobile UnitsOfficeFloor 7
Project M00552851 Alteration · LOC Issued · 07/08/2021
Project M00547997 Alteration · LOC Issued · 07/07/2021
Project M00510460 Alteration · LOC Issued · 05/13/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 153 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
09/03/2026M00510460-I1Request digital key ↗
09/03/2026M00510460-P1Request digital key ↗
09/03/2026M00547997-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits21
▸BISWORK PERMIT APPLICATION15
04/06/2023123748132Open ↗
03/16/2023123748132Open ↗
04/20/2021123748132Open ↗
Showing 3 of 15 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION6
09/25/2019123748132Open ↗
06/18/2019123554340Open ↗
02/26/2014140166184Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications52
▸DOB NOWProgress Inspector Seal & Signature18
08/31/2026M00856970-I1Open ↗
08/31/2026M00856970-I1Open ↗
08/31/2026M00856970-I1Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
09/25/2019123748132Open ↗
07/29/2019123554340Open ↗
06/18/2019123554340Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/03/2026M00510460-I1Open ↗
09/03/2026M00510460-P1Open ↗
09/03/2026M00541826-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/31/2026M00856970-I1Open ↗
08/31/2026M00856970-I1Open ↗
08/29/2026M00552851-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
06/18/2019123554340Open ↗
02/24/2010120255268Open ↗
06/01/2009120034667Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
06/18/2019123554340Open ↗
02/26/2014140166184Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
02/24/2010120255268Open ↗
06/01/2009120034667Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/26/2014140166184Open ↗
▸BISPC FULL REPORT1
11/13/2007110011415Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
02/26/2014140166184Open ↗
▸Trade Schedules & Equipment8
▸BISEQUIPMENT USE PERMITS4
07/29/2019123554340Open ↗
07/05/2012120255268Open ↗
07/05/2012120255268Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
07/29/2019123554340Open ↗
09/02/2009120034667Open ↗
12/12/2007110011415Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
02/26/2014140166184Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes1
09/25/2019123748132Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
10/02/2019123748132Open ↗
▸Environmental & Asbestos15
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
02/24/2010120255268Open ↗
02/24/2010120255268Open ↗
06/01/2009120034667Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/03/2026M00510460-I1Open ↗
09/03/2026M00510460-P1Open ↗
09/03/2026M00541826-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
09/25/2019123748132Open ↗
02/26/2014140166184Open ↗
08/03/2012121142539Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M00856970-I1Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
10/11/2019123748132Open ↗
09/25/2019123748132Open ↗
07/29/2019123554340Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026M00547997-I1Open ↗
08/13/2026M00541826-I1Open ↗
08/13/2026M00510460-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
07/29/2019123554340Open ↗
04/10/2018140166184Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
02/26/2014140166184Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
02/26/2014140166184Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
02/26/2014140166184Open ↗
▸Approvals, Objections & Sign-offs10
▸BISADMINISTRATIVE OBJECTIONS4
08/03/2012121142539Open ↗
02/24/2010120255268Open ↗
06/01/2009120034667Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
07/29/2019123554340Open ↗
04/10/2018140166184Open ↗
09/02/2009120034667Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
04/10/2018140166184Open ↗
09/02/2009120034667Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT10
09/25/2019123748132Open ↗
07/29/2019123554340Open ↗
06/18/2019123554340Open ↗
Showing 3 of 10 on file for this type
▸Filing & Intake Forms13
▸BISBOROUGH INTAKE FORM8
04/06/2023123748132Open ↗
03/15/2023123748132Open ↗
04/20/2021123748132Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET3
09/25/2019123748132Open ↗
06/18/2019123554340Open ↗
08/03/2012121142539Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
02/26/2014140166184Open ↗
▸BISADDITIONAL INFORMATION1
06/25/2012120255268Open ↗
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
03/03/2014140166184Open ↗