Elevator apt, fireproof without stores
Patterson (NYCHA)
300 MORRIS AVENUE · BIN 2091127
💬 Discuss this project
1950Year Built
14Stories
D3Building Class
R6Zoning
954,414 sfGross Floor Area
929Units
LL97 Covered9 Open Violations 6 unresolved · 3 paperwork only ▸FISP: SWARMP
Elevator apt, fireproof without stores · Owner of record: NYC HOUSING AUTHORITY · 375,000 sf lot · 2.55 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction16p · 5 filings · 20 docs
BulkheadUnder Construction14p · 3 filings · 20 docs
Floor 61 filing · 3 docs
Floor 51 filing · 3 docs
Floor 41 filing · 3 docs
Floor 31 filing · 3 docs
Floor 21 filing · 3 docs
Floor 11 filing · 3 docs
Cellar16p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA6009/30/2026
NYC NYCHA103/22/2026
NYC HOUSING AUTHORITY303/22/2026
NEW YORK CITY HOUSING AUTHORITY903/21/2026
NEELAM CONSTRUCTION203/21/2026
TALICO CONTRACTING203/21/2026
SHARAN BUILDERS403/21/2026
NEW YORK HOUSING AUTHORITY103/21/2026
HPD103/21/2026
CAPITAL PROJECTS103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYCHA503/21/2026
JAM CONSULTANTS, INC.403/21/2026
AK CONSULTING SERVICES403/21/2026
CONVERSANO ASSOCIATES, INC.1603/21/2026
JOEL PHAGOO P.E. PLLC103/21/2026
EUROCELT EXPEDITING, INC403/21/2026
SMEP DESIGN & CONSULTATION LLC203/21/2026
KM ASSOCITES403/21/2026
JOEL PHAGOO P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JEMCO ELECTRICAL CONT INCGeneral Contractor707/08/2026
MARIC MECHANICAL INCGeneral Contractor607/08/2026
J & N CONSTRUCTION GROUPGeneral Contractor407/08/2026
CHARNJIT SINGHElectrical303/21/2026
P & K CONTRACTING INCGeneral Contractor307/08/2026
ZORIA HOUSING, LLCGeneral Contractor307/08/2026
FRANCIS RICHARDSElectrical203/21/2026
EASTERN PLBG & MECH CONTRPlumbing207/08/2026
ROMA SCAFFOLDING INCGeneral Contractor109/30/2026
VIKRANT CONTRACTING & BUILDERGeneral Contractor107/08/2026
STEPHENS, KENNETHElectrical103/21/2026
LIT MODE ELECL CONTG INCElectrical103/22/2026
Q.Y. ELECTRIC, INCElectrical103/22/2026
CHARLES A DIMINO INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUREAU VERITAS NA69021207/08/2026
JOEL PHAGOO ,PE, PLLC2416205/13/2025
RI CONSULTING SERVICES IN8904101/22/2025
VENTROP ENGINEERING CONSU450202/14/2022
Building Lifecycle
All (195)Filed (36)Permit Issued (26)Signed Off (13)Facade (FISP) (23)Violation (16)Inspection (7)Objection (44)Special Inspection (30)
09/30/2026
Permit issued — Sidewalk Shed
X01454637-I1-SH
09/29/2026
Permit issued — Construction Fence
X01454442-I1-FN
08/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
08/05/2026
Special inspection requirement — Vestibules
IBRAHIM MOURAD
08/05/2026
Special inspection requirement — Final
IBRAHIM MOURAD
08/05/2026
Special inspection requirement — Energy Code Compliance Inspections
IBRAHIM MOURAD
08/05/2026
Special inspection requirement — Aluminum Construction
IBRAHIM MOURAD
08/05/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
IBRAHIM MOURAD
08/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
08/05/2026
Special inspection requirement — Preliminary
IBRAHIM MOURAD
08/05/2026
Special inspection requirement — Fire-Resistance Rated Construction
IBRAHIM MOURAD
08/05/2026
Special inspection requirement — Protection of exposed foundation insulation
IBRAHIM MOURAD
08/05/2026
Special inspection requirement — Fenestration areas
IBRAHIM MOURAD
08/05/2026
Special inspection requirement — Fenestration air leakage
IBRAHIM MOURAD
08/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
IBRAHIM MOURAD
08/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
IBRAHIM MOURAD
08/05/2026
Special inspection requirement — Air barrier — testing
IBRAHIM MOURAD
08/05/2026
Special inspection requirement — Insulation placement and R values
IBRAHIM MOURAD
08/05/2026
Special inspection requirement — Air barrier continuity plan testing
IBRAHIM MOURAD
08/05/2026
Special inspection requirement — Air barrier - visual inspection
IBRAHIM MOURAD
08/04/2026
Special inspection requirement — Energy Code Compliance Inspections
IBRAHIM MOURAD
08/04/2026
Special inspection requirement — Tenant Protection Plan Compliance
IBRAHIM MOURAD
08/04/2026
Special inspection requirement — Mechanical Systems
IBRAHIM MOURAD
08/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
08/04/2026
Special inspection requirement — Shutoff dampers
IBRAHIM MOURAD
08/04/2026
Special inspection requirement — Interior lighting power
IBRAHIM MOURAD
08/04/2026
Special inspection requirement — Lighting controls
IBRAHIM MOURAD
08/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
IBRAHIM MOURAD
08/04/2026
Special inspection requirement — Maintenance information
IBRAHIM MOURAD
08/04/2026
Special inspection requirement — Final
IBRAHIM MOURAD
08/03/2026
Special inspection requirement — Structural Steel - Welding
IBRAHIM MOURAD
08/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
IBRAHIM MOURAD
07/08/2026
Filed — Alteration
STRUCTURAL WORK FOR PATTERSON COMMUNITY CENTER UPGRADES, BUILDING 4. PROVIDE ONE STORY FRAMING FOR VESTIBULE ON CELLAR FLOOR AND CONCRETE PADS FOR ACCU UNITS W/SECURITY FENCE.
X01070393-P3
07/08/2026
Filed — Alteration
STRUCTURAL WORK FOR PATTERSON COMMUNITY CENTER UPGRADES, BUILDING 4. PROVIDE ONE STORY FRAMING FOR VESTIBULE ON CELLAR FLOOR AND CONCRETE PADS FOR ACCU UNITS W/SECURITY FENCE.
X01070393-P2
07/07/2026
Filed — Alteration
STRUCTURAL WORK FOR PATTERSON COMMUNITY CENTER UPGRADES, BUILDING 4. PROVIDE ONE STORY FRAMING FOR VESTIBULE ON CELLAR FLOOR AND CONCRETE PADS FOR ACCU UNITS W/SECURITY FENCE.
X01070393-P1
06/30/2026
Filed — Alteration
STRUCTURAL WORK FOR PATTERSON COMMUNITY CENTER UPGRADES, BUILDING 4. PROVIDE ONE STORY FRAMING FOR VESTIBULE ON CELLAR FLOOR AND CONCRETE PADS FOR ACCU UNITS W/SECURITY FENCE.
X01070393-P4
06/26/2026
Permit issued — Construction Fence
X01153163-S3-FN
06/23/2026
Filed — Alteration
B4 PATTERSON HOUSES. RENOVATION AND REPAIRS TO BULKHEAD AND ROOF AS PER PLANS FILED HEREWITH. WINDOW REPLACEMENT AND NEW INFILL WALL AT 2ND FLOOR DIRECTLY ABOVE SETBACK ROOF ABOVE BUILDING ENTRY. NO CHANGE IN USE, EGRESS OR OCCUPANCY
X01153163-S3
06/10/2026
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
X01265212-I1
05/05/2026
Signed off — Alteration
BUILDING 4: FACADE REPAIRS TO COMPLY WITH LL 11/98. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01165482-I1
04/22/2026
Filed — Alteration
BUILDING 4: FACADE REPAIRS TO COMPLY WITH LL 11/98. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01165482-P2
03/09/2026
Filed — Alteration
BUILDING 4: FACADE REPAIRS TO COMPLY WITH LL 11/98. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01165482-P1
02/26/2026
Signed off — Alteration
X01220172-I1
10/17/2025
Signed off — Alteration
X01129745-I1
10/17/2025
Signed off — Alteration
X01129747-I1
08/22/2025
Cycle 10 facade report signed — SAFE
08/18/2025
Cycle 10 facade report submitted
08/12/2025
Cycle 10 facade inspection completed
08/05/2025
Permit issued — Suspended Scaffold
X01265212-I1-SC
08/04/2025
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
X01265212-I1
07/11/2025
Objection resolved — Addressed
07/08/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/19/2025
Permit issued — Suspended Scaffold
X01220172-I1-SC
05/13/2025
Filed — Alteration
X01220172-I1
04/18/2025
Permit issued — General Construction
X01165482-I1-GC
02/28/2025
Objection resolved — Addressed
02/14/2025
Objection raised — Other
02/07/2025
Filed — Alteration
B4 PATTERSON HOUSES. RENOVATION AND REPAIRS TO BULKHEAD AND ROOF AS PER PLANS FILED HEREWITH. WINDOW REPLACEMENT AND NEW INFILL WALL AT 2ND FLOOR DIRECTLY ABOVE SETBACK ROOF ABOVE BUILDING ENTRY. NO CHANGE IN USE, EGRESS OR OCCUPANCY
X01153163-S1
02/05/2025
Filed — Alteration
BUILDING 4: FACADE REPAIRS TO COMPLY WITH LL 11/98. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01165482-I1
02/04/2025
Filed — Alteration
B4 PATTERSON HOUSES. RENOVATION AND REPAIRS TO BULKHEAD AND ROOF AS PER PLANS FILED HEREWITH. WINDOW REPLACEMENT AND NEW INFILL WALL AT 2ND FLOOR DIRECTLY ABOVE SETBACK ROOF ABOVE BUILDING ENTRY. NO CHANGE IN USE, EGRESS OR OCCUPANCY
X01153163-I1
Latest 60 of 195 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedROMA SCAFFOLDING INC09/30/2026
DOB NOWConstruction FencePermit IssuedROMA SCAFFOLDING INC09/29/2026
DOB NOWConstruction FencePermit IssuedJEMCO ELECTRICAL CONT INC06/26/2026
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM08/05/2025
DOB NOWSuspended ScaffoldSigned-offJ&N CONSTRUCTION GRP CORP05/19/2025
DOB NOWGeneral ConstructionSigned-offJ & N CONSTRUCTION GROUP04/18/2025
DOB NOWSuspended ScaffoldPermit IssuedJ&N CONSTRUCTION GRP CORP01/27/2025
DOB NOWSupported ScaffoldPermit IssuedJ & N CONSTRUCTION GROUP11/19/2024
DOB NOWSidewalk ShedSigned-offJ & N CONSTRUCTION GROUP11/04/2024
DOB NOWConstruction FenceSigned-offJ & N CONSTRUCTION GROUP11/04/2024
DOB NOWMechanical SystemsPermit IssuedJEMCO ELECTRICAL CONT08/09/2023
DOB NOWPlumbingSigned-offEASTERN PLBG & MECH CONTR03/15/2023
DOB NOWConstruction FencePermit IssuedJEMCO ELECTRICAL CONT10/21/2022
DOB NOWMechanical SystemsPermit IssuedJEMCO ELECTRICAL CONT05/06/2022
DOB NOWMechanical SystemsSigned-offMARIC MECHANICAL INC03/22/2022
DOB NOWStructuralSigned-offMARIC MECHANICAL INC03/21/2022
DOB NOWPlumbingSigned-offCHARLES A DIMINO INC03/15/2022
DOB NOWPlumbingSigned-offEASTERN PLBG & MECH CONTR03/15/2022
DOB NOWStructuralSigned-offMARIC MECHANICAL INC03/04/2022
DOB NOWMechanical SystemsSigned-offMARIC MECHANICAL INC03/03/2022
DOB NOWMechanical SystemsPermit IssuedJEMCO ELECTRICAL CONT08/30/2021
DOB NOWSupported ScaffoldSigned-offZORIA HOUSING, LLC03/11/2020
DOB NOWConstruction FenceSigned-offZORIA HOUSING, LLC01/23/2020
DOB NOWSidewalk ShedSigned-offVIKRANT CONTRACTING & BUI01/22/2020
DOB NOWConstruction FenceSigned-offP & K CONTRACTING INC01/21/2020
DOB NOWSidewalk ShedSigned-offP & K CONTRACTING INC01/17/2020
BISOTISSUEDJEMCO ELECTRICAL CONT INC03/29/2023
BISOTISSUEDJEMCO ELECTRICAL CONT INC03/29/2023
BISOTISSUEDJEMCO ELECTRICAL CONT INC11/30/2022
BISOTISSUEDJEMCO ELECTRICAL CONT INC10/24/2022
BISOTISSUEDZORIA HOUSING, LLC03/20/2020
BISEQISSUEDSKYWORX CONTRACTING INC10/15/2019
BISEQISSUEDSKYWORX CONTRACTING INC10/12/2018
BISEQISSUEDTALICO CONTRACTING INC12/07/2017
BISPLISSUEDDANCO, INC09/13/2017
BISEQISSUEDTALICO CONTRACTING INC12/27/2016
BISEQISSUEDNEELAM CONSTRUCTION CORP12/27/2016
BISPLISSUEDBELCO ASSOCIATES LLC07/25/2016
BISPLISSUEDBELCO ASSOCIATES LLC07/07/2016
BISPLISSUEDDANCO, INC03/09/2015
+ 18 more permits on file
2 projects · most recent 07/08/2026
Ventilation Systems Air Conditioning Systems Associated Ducts and Piping Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
07/08/2026——Air Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric TUHYE0723AN41AN 72,000 BTU · Condensing Unit ×1
TUHYE0963AN41AN 96,000 BTU · Vrf Outdoor ×1
TUHYE1203AN41AN 120,000 BTU · Vrf Outdoor ×1
TUHYE1683AN41AN 168,000 BTU · Vrf Outdoor ×1
TUHYH0723AN40AN 72,000 BTU · Condensing Unit ×1
Ventilation
Greenheck SQ-80-DGEX-QD 375 CFM · Exhaust Fan ×1
08/25/2023Permit IssuedJEMCO ELECTRICAL CONT INCAssociated Ducts and Piping, Heating Systems, Ventilation Systems
Heating
Captiveaire A1-E.362-15D 1,500 CFM · Makeup Air ×2
Ventilation
Captiveaire DU180HFA 1,500 CFM · Kitchen Exhaust ×2
Ducts & Piping
Captiveaire A1-E.362-15D 122,868 BTU · Makeup Air ×2
2 projects · most recent 07/08/2026
Storm Water/Sanitary
FiledStatusContractorScope
07/08/2026——Storm, Water/Sanitary
06/24/2022——Storm
12 projects · most recent 09/29/2026
General Wiring
FiledStatusContractorScope
09/29/2026Permit IssuedAUJLA ELECTRIC CORP—
07/28/2026Permit IssuedJEMCO ELECT. CONTRS INC—
10/28/2025Permit IssuedLIT MODE ELECL CONTG INC—
05/19/2025CompleteLIT MODE ELECL CONTG INC—
05/01/2025CompleteLIT MODE ELECL CONTG INC—
10/14/2024CompleteLIT MODE ELECL CONTG INC—
12/15/2021CompleteA.T.J. ELECTRICAL CO.INC.General Wiring
09/16/2021CompleteJEMCO ELECT. CONTRS INCGeneral Wiring
01/17/2020CompleteQ.Y. ELECTRIC, INC—
01/17/2020CompleteQ.Y. ELECTRIC, INC—
01/10/2020Permit IssuedAMIN ELECTRICAL CORP—
03/28/2019Permit IssuedEIA ELECTRIC, INCGeneral Wiring
3 projects · most recent 07/08/2026
Concrete Steel Masonry
FiledStatusContractorScope
07/08/2026——Steel, Concrete, Masonry
06/23/2026Permit IssuedJEMCO ELECTRICAL CONT INCSteel, Concrete, Masonry
09/30/2019——Concrete
1 project · most recent 07/23/2019
Fence
FiledStatusContractorScope
07/23/2019Permit IssuedJEMCO ELECTRICAL CONT INCFence
1 project · most recent 08/04/2025
Suspended Scaffold
FiledStatusContractorScope
08/04/2025Signed-offSTRUCTUAL PRESV SYSTEMSuspended Scaffold
2 projects · most recent 08/04/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
08/04/2025Signed-offSTRUCTUAL PRESV SYSTEM—
01/22/2025Permit IssuedJ&N CONSTRUCTION GRP CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
12/18/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/06/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/30/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/24/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/24/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/09/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/15/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 123
DateRequirementInspectorRole
08/05/2026Air barrier - visual inspectionIBRAHIM MOURADenergy_progress
08/05/2026Fenestration air leakageIBRAHIM MOURADenergy_progress
08/05/2026Air barrier continuity plan testingIBRAHIM MOURADenergy_progress
08/05/2026VestibulesIBRAHIM MOURADenergy_progress
08/05/2026Fenestration areasIBRAHIM MOURADenergy_progress
08/05/2026Air barrier — testing IBRAHIM MOURADenergy_progress
08/05/2026Protection of exposed foundation insulationIBRAHIM MOURADenergy_progress
08/05/2026Fenestration and door U-factor and product ratingsIBRAHIM MOURADenergy_progress
08/05/2026Insulation placement and R valuesIBRAHIM MOURADenergy_progress
08/05/2026Tenant Protection Plan ComplianceIBRAHIM MOURADspecial
08/05/2026Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
08/05/2026Tenant Protection Plan ComplianceIBRAHIM MOURADspecial
08/05/2026Aluminum ConstructionIBRAHIM MOURADspecial
08/05/2026Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
08/05/2026Energy Code Compliance InspectionsIBRAHIM MOURADprogress
08/05/2026Fire-Resistance Rated ConstructionIBRAHIM MOURADprogress
08/05/2026FinalIBRAHIM MOURADprogress
08/05/2026PreliminaryIBRAHIM MOURADprogress
08/04/2026Lighting controlsIBRAHIM MOURADenergy_progress
08/04/2026Interior lighting powerIBRAHIM MOURADenergy_progress
08/04/2026Shutoff dampersIBRAHIM MOURADenergy_progress
08/04/2026Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
08/04/2026Mechanical SystemsIBRAHIM MOURADspecial
08/04/2026Tenant Protection Plan ComplianceIBRAHIM MOURADspecial
08/04/2026Energy Code Compliance InspectionsIBRAHIM MOURADprogress
Latest 25 of 123.
▾Documents — 396 on file (BIS + DOB NOW)
▸Plans & Drawings36
▸DOB NOWPlans/Sketch27
08/25/2026X00491140-I1Request digital key ↗
08/24/2026X00648845-P1Request digital key ↗
08/24/2026X00648845-I1Request digital key ↗
Showing 3 of 27 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence3
08/26/2026X00295230-I1Request digital key ↗
08/26/2026X00301507-I1Request digital key ↗
08/15/2026X00196142-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/22/2026X00326751-P1Request digital key ↗
08/22/2026X00326751-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
08/26/2026X00294409-I1Request digital key ↗
08/26/2026X00301500-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/14/2026X00226596-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
08/26/2026X00329445-I1Request digital key ↗
▸Applications & Permits48
▸BISPLAN / WORK APPROVAL APPLICATION29
07/01/2025240091119Open ↗
07/01/2025200853567Open ↗
06/17/2025240091119Open ↗
Showing 3 of 29 on file for this type
▸BISWORK PERMIT APPLICATION17
10/24/2022240243982Open ↗
03/20/2020240269623Open ↗
10/15/2019240167617Open ↗
Showing 3 of 17 on file for this type
▸BISTEMPORARY FENCE APPLICATION & PERMIT1
10/24/2022240243982Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
10/28/2015220361695Open ↗
▸Seals & Professional Certifications112
▸DOB NOWDPL-1: Design Professional Seal & Signature33
08/26/2026X00226596-I1Open ↗
08/26/2026X00294409-I1Open ↗
08/26/2026X00329445-I1Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWProgress Inspector Seal & Signature23
09/02/2026X00491140-I1Open ↗
09/01/2026X01070393-P2Open ↗
09/01/2026X01070393-P2Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/02/2026X00491140-I1Open ↗
09/01/2026X01070393-P2Open ↗
08/31/2026X00326751-P1Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
02/19/2020240167699Open ↗
02/19/2020240167617Open ↗
02/06/2020240167617Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT9
02/25/2020240269623Open ↗
02/06/2020240167617Open ↗
02/06/2020240167699Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
02/06/2020240167617Open ↗
02/06/2020240167699Open ↗
11/08/2017240091119Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
02/25/2020240269623Open ↗
12/22/2016240167699Open ↗
12/22/2016240167617Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
02/25/2020240269623Open ↗
12/22/2016240167699Open ↗
12/22/2016240167617Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
08/02/2021240243982Open ↗
12/14/2018240244222Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
11/08/2017240091119Open ↗
06/09/2016240091119Open ↗
03/13/2015240091119Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
01/23/2018220420293Open ↗
▸BISSCHEDULE B - PLUMBING1
03/03/2015240091119Open ↗
▸Safety & Tenant Protection18
▸BISTenant Protection Plan and Notes9
02/04/2022240243982Open ↗
02/06/2020240167617Open ↗
02/06/2020240167699Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWTenant Protection Plan9
08/13/2026X00196142-I1Open ↗
08/13/2026X00226596-I1Open ↗
08/13/2026X00329445-I1Open ↗
Showing 3 of 9 on file for this type
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/22/2026X00326751-I1Open ↗
08/22/2026X00326751-P1Open ↗
08/13/2026X00672594-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
03/22/2019240243982Open ↗
12/14/2018240244222Open ↗
05/24/2017220420293Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)3
02/25/2020240269623Open ↗
10/20/2017220358636Open ↗
04/16/2014220358636Open ↗
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU0227BX201
01/27/2021240269623Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/17/2026X01165482-I1Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
09/23/2019220715475Open ↗
10/20/2017220358636Open ↗
03/19/2014220358636Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
02/04/2022240243982Open ↗
10/29/2021240243982Open ↗
01/27/2021240269623Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
02/25/2020240269623Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
10/20/2017220358636Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
12/22/2016240167617Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/27/2021240269623Open ↗
▸BISNYCECC ANALYSIS1
02/25/2020240269623Open ↗
▸Inspections & Test Reports27
▸BISTECHNICAL REPORT: RESPONSIBILITY18
07/15/2025200853567Open ↗
07/15/2025200853567Open ↗
07/15/2025200853567Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION4
08/02/2021240243982Open ↗
08/02/2021240243982Open ↗
05/22/2020240243982Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSOIL REPORT2
08/20/2026X01070393-P4Open ↗
08/13/2026X01070393-S4Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
08/02/2022240243982Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
08/02/2022240243982Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026X01070393-S4Open ↗
▸Approvals, Objections & Sign-offs71
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter36
08/20/2026X01070393-P2Open ↗
08/20/2026X01070393-P4Open ↗
08/20/2026X01070393-P3Open ↗
Showing 3 of 36 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST13
07/16/2025200853567Open ↗
07/16/2025200525761Open ↗
06/13/2025240091119Open ↗
Showing 3 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
03/20/2020240269623Open ↗
10/15/2019240167617Open ↗
09/23/2019220715475Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)6
08/13/2026X00301507-I1Open ↗
08/13/2026X00294409-I1Open ↗
08/13/2026X00301500-I1Open ↗
Showing 3 of 6 on file for this type
▸BISSUPERSEDING LETTER3
10/12/2018240167617Open ↗
09/15/2017240091119Open ↗
08/02/2016240091119Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)3
08/13/2026X00295230-I1Open ↗
08/13/2026X00226596-I1Open ↗
08/13/2026X00294409-I1Open ↗
▸BISSHED LETTER2
10/12/2018240167617Open ↗
12/12/2017240167617Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP Variance (V5) letter1
08/13/2026X01165482-I1Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT12
05/13/2025240243982Open ↗
01/27/2025240091119Open ↗
02/25/2020240269623Open ↗
Showing 3 of 12 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
01/27/2021240269623Open ↗
▸Filing & Intake Forms29
▸BISADDITIONAL INFORMATION12
07/28/2022240243982Open ↗
02/04/2022240243982Open ↗
08/02/2021240243982Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
02/25/2020240269623Open ↗
12/14/2018240244222Open ↗
12/06/2018240243982Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM5
02/19/2020240167699Open ↗
02/19/2020240167617Open ↗
02/06/2020240167617Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET5
09/23/2019220715475Open ↗
05/24/2017220420293Open ↗
03/20/2014220358636Open ↗
Showing 3 of 5 on file for this type
▸Other Documents8
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
02/04/2022240243982Open ↗
10/28/2015220361695Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026X01143415-I1Open ↗
08/13/2026X01220172-I1Open ↗
▸DOB NOWCalculations2
08/13/2026X01220172-I1Open ↗
08/13/2026X01143415-I1Open ↗
▸BISFEE EXEMPTION DOCUMENTATION1
02/25/2020240269623Open ↗
▸DOB NOWIRA Certification1
08/13/2026X01265212-I1Open ↗