← Back
City residence, one family
360 QUINCY STREET
BROOKLYN · Bedford-Stuyvesant (West) · BIN 3050937
💬 Discuss this project
1899Year Built
2Stories
A4Building Class
R6BZoning
1,210 sfGross Floor Area
1Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
City residence, one family · 2,000 sf lot · 0.61 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 20 docs
Cellar3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BRICKSTONE GROUP1107/08/2026
STELLAR INDUSTRIES103/22/2026
360 CHAI LLC203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/22/2023$1.9M—360 CHAI LLC → Private party$1,591/sf building
02/03/2022$925K—Private party → 360 CHAI LLC$764/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THOMAS C. TUNG, P.E.601/26/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WM ARCH1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STELLAR INDUSTRIES INCGeneral Contractor507/08/2026
C & A ELECTRICAL CORPElectrical103/22/2026
HORBRIDGE PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DY SPECIAL INSPECTION LLC7210301/26/2023
CL ENGINEERING P.C.6781304/18/2022
Building Lifecycle
All (93)Filed (6)Permit Issued (4)Signed Off (3)Violation (3)Inspection (9)Objection (46)Special Inspection (22)
11/28/2023
Violation issued (HPD, closed)
I
03/08/2023
Signed off — Alteration
EXISTING TWO STORY ONE FAMILY HOUSE WITH VERTICAL & HORIZONTAL ENLARGEMENT AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00695723-S2
03/07/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/01/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/27/2023
Signed off — Alteration
EXISTING TWO STORY ONE FAMILY HOUSE WITH VERTICAL & HORIZONTAL ENLARGEMENT AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00695723-I1
02/27/2023
Signed off — Alteration
EXISTING TWO STORY ONE FAMILY HOUSE WITH VERTICAL & HORIZONTAL ENLARGEMENT AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00695723-S1
02/17/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/14/2023
Permit issued — Structural
B00695723-S2-GC-CX
02/13/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/10/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/08/2023
Objection raised — Energy
02/08/2023
Objection resolved — Addressed
02/07/2023
Objection resolved — Addressed
02/07/2023
Objection resolved — Addressed
02/02/2023
Objection resolved — Addressed
02/01/2023
Objection resolved — Addressed
02/01/2023
Objection resolved — Addressed
02/01/2023
Objection resolved — Addressed
01/31/2023
Objection resolved — Addressed
01/27/2023
Objection raised — Structural
01/27/2023
Objection raised — Mechanical
01/27/2023
Objection raised — Other
01/27/2023
Objection raised — Zoning
01/27/2023
Objection raised — Fire_Protection
01/26/2023
Filed — Alteration
EXISTING TWO STORY ONE FAMILY HOUSE WITH VERTICAL & HORIZONTAL ENLARGEMENT AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00695723-P3
01/26/2023
Objection raised — Other
01/26/2023
Objection raised — Other
01/25/2023
Filed — Alteration
EXISTING TWO STORY ONE FAMILY HOUSE WITH VERTICAL & HORIZONTAL ENLARGEMENT AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00695723-P2
01/25/2023
Special inspection requirement — HVAC-R and service water heating system controls
THOMAS TUNG
01/25/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
THOMAS TUNG
01/25/2023
Special inspection requirement — Protection of exposed foundation insulation
THOMAS TUNG
01/25/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
THOMAS TUNG
01/25/2023
Special inspection requirement — Insulation placement and R values
THOMAS TUNG
01/25/2023
Special inspection requirement — Interior lighting power
THOMAS TUNG
01/25/2023
Special inspection requirement — HVAC-R and service water heating equipment
THOMAS TUNG
01/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
THOMAS TUNG
01/25/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
THOMAS TUNG
01/25/2023
Special inspection requirement — Energy Code Compliance Inspections
THOMAS TUNG
01/25/2023
Special inspection requirement — Fire-Resistance Rated Construction
THOMAS TUNG
01/25/2023
Special inspection requirement — Maintenance information
THOMAS TUNG
01/25/2023
Special inspection requirement — Air barrier - visual inspection
THOMAS TUNG
01/25/2023
Special inspection requirement — Fenestration air leakage
THOMAS TUNG
01/25/2023
Special inspection requirement — Metering
THOMAS TUNG
01/25/2023
Special inspection requirement — Fenestration areas
THOMAS TUNG
01/20/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/28/2022
Special inspection requirement — Footing and Foundation
THOMAS TUNG
11/28/2022
Special inspection requirement — Final
Anurag Upadhyay
11/28/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRISTIAN LOZADA
11/17/2022
Violation issued (HPD, closed)
I
11/14/2022
Filed — Alteration
EXISTING TWO STORY ONE FAMILY HOUSE WITH VERTICAL & HORIZONTAL ENLARGEMENT AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00695723-P1
11/02/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
THOMAS TUNG
11/02/2022
Special inspection requirement — Final
Anurag Upadhyay
11/02/2022
Special inspection requirement — Footing and Foundation
THOMAS TUNG
10/11/2022
Permit issued — General Construction
B00695723-I1-GC
08/30/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/30/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/30/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/25/2022
Violation issued (ECB, closed)
Construction
05/31/2022
Permit issued — Plumbing
B00695723-S1-PL
05/20/2022
Permit issued — General Construction
B00695723-I1-GC
Latest 60 of 93 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offSTELLAR INDUSTRIES INC02/14/2023
DOB NOWGeneral ConstructionSigned-offSTELLAR INDUSTRIES INC10/11/2022
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT05/31/2022
DOB NOWGeneral ConstructionSigned-offSTELLAR INDUSTRIES INC05/20/2022
2 projects · most recent 03/28/2023
General Wiring
FiledStatusContractorScope
03/28/2023CompleteC & A ELECTRICAL CORPGeneral Wiring
09/19/2022CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
03/07/2023Pass-Final General Construction Non-Directive 14PassView ↗
03/01/2023Fail-Final General Construction Non-Directive 14FailView ↗
02/17/2023Pass-Final General Construction Non-Directive 14PassView ↗
02/13/2023Fail-Final General Construction Non-Directive 14FailView ↗
02/10/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/20/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/30/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/30/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/30/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
01/25/2023HVAC-R and service water heating system controlsTHOMAS TUNGenergy_progress
01/25/2023Fenestration and door U-factor and product ratingsTHOMAS TUNGenergy_progress
01/25/2023Protection of exposed foundation insulationTHOMAS TUNGenergy_progress
01/25/2023HVAC-R and service water piping design and insulationTHOMAS TUNGenergy_progress
01/25/2023Insulation placement and R valuesTHOMAS TUNGenergy_progress
01/25/2023Interior lighting powerTHOMAS TUNGenergy_progress
01/25/2023HVAC-R and service water heating equipmentTHOMAS TUNGenergy_progress
01/25/2023Fire-Resistant Penetrations and JointsTHOMAS TUNGspecial
01/25/2023Structural Stability – Alterations of existing buildingsTHOMAS TUNGspecial
01/25/2023Energy Code Compliance InspectionsTHOMAS TUNGprogress
01/25/2023Fire-Resistance Rated ConstructionTHOMAS TUNGprogress
01/25/2023Maintenance informationTHOMAS TUNGenergy_progress
01/25/2023Air barrier - visual inspectionTHOMAS TUNGenergy_progress
01/25/2023Fenestration air leakageTHOMAS TUNGenergy_progress
01/25/2023MeteringTHOMAS TUNGenergy_progress
01/25/2023Fenestration areasTHOMAS TUNGenergy_progress
11/28/2022Footing and FoundationTHOMAS TUNGprogress
11/28/2022FinalAnurag Upadhyayprogress
11/28/2022Structural Stability – Alterations of existing buildingsCHRISTIAN LOZADAspecial
11/02/2022Structural Stability – Alterations of existing buildingsTHOMAS TUNGspecial
11/02/2022FinalAnurag Upadhyayprogress
11/02/2022Footing and FoundationTHOMAS TUNGprogress
▾Documents — 49 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/30/2026B00695723-P1Request digital key ↗
08/15/2026B00695723-S2Request digital key ↗
08/15/2026B00695723-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram4
08/30/2026B00695723-P1Open ↗
08/15/2026B00695723-S2Open ↗
08/15/2026B00695723-I1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications15
▸DOB NOWProgress Inspector Seal & Signature6
09/27/2026B00695723-S2Open ↗
09/27/2026B00695723-S2Open ↗
08/28/2026B00695723-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/30/2026B00695723-P3Open ↗
08/30/2026B00695723-S2Open ↗
08/30/2026B00695723-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/27/2026B00695723-S2Open ↗
08/28/2026B00695723-P1Open ↗
08/25/2026B00695723-P3Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/30/2026B00695723-P1Open ↗
08/15/2026B00695723-S2Open ↗
08/15/2026B00695723-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/30/2026B00695723-P1Open ↗
08/15/2026B00695723-S2Open ↗
08/15/2026B00695723-I1Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/15/2026B00695723-I1Open ↗
08/14/2026B00695723-S1Open ↗
▸Other Documents12
▸DOB NOWSite Survey: Initial4
08/30/2026B00695723-P1Open ↗
08/15/2026B00695723-S2Open ↗
08/15/2026B00695723-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/30/2026B00695723-P1Open ↗
08/15/2026B00695723-S2Open ↗
08/15/2026B00695723-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlot Diagram4
08/30/2026B00695723-P1Open ↗
08/15/2026B00695723-S2Open ↗
08/15/2026B00695723-I1Open ↗
Showing 3 of 4 on file for this type