3602 HOLLAND AVENUE
BRONX · Williamsbridge-Olinville · BIN 2057803
💬 Discuss this project
1910Year Built
2Stories
C3Building Class
R7AZoning
3,800 sfGross Floor Area
4Units
Rent Stabilized16 Open Violations ▸
Four families · Owner of record: SHG 3602 LLC · 2,970 sf lot · 1.28 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Roof56p · 4 filings · 20 docs
Penthouse59p · 4 filings · 20 docs
Floor 458p · 4 filings · 20 docs
Floor 359p · 4 filings · 20 docs
Floor 260p · 4 filings · 20 docs
Floor 140p · 4 filings · 20 docs
Cellar66p · 5 filings · 20 docs
Site & exterior26p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
IONIC GROUP4207/08/2026
SHG 36062007/08/2026
AFS SYSTEMS407/08/2026
SHG EQUITIES203/21/2026
SHG 3602 LLC103/22/2026
SHG EQUITIES GMAILC COM103/21/2026
248 DRIGGS LLC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/07/2020$810K—— → —$213/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AG ENGINEERING PLLC207/17/2024
CAVALRY ASSOCIATES507/02/2024
KNF SERVICES CROP104/21/2024
MOHAMMAD AHEAD, PE501/29/2024
ELEVATED ENGINEERING NYC306/30/2023
ADAM TADDONIO PE103/18/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CAVALRY LLC403/21/2026
EXPRESS FILING INC1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JSB WORKS INCGeneral Contractor1307/08/2026
BUILDERS GROUP USA INCGeneral Contractor807/08/2026
ROCK BUILDERS INCGeneral Contractor603/21/2026
UPPERCLASS MAINTENANCE INGeneral Contractor603/21/2026
DYNAMIX SCAFFOLD GROUP LLGeneral Contractor307/08/2026
PRIME PIPING & HEATING INFire Protection207/08/2026
A M B MECHANICALPlumbing203/22/2026
A. M. PLUMBING COMPANYPlumbing107/08/2026
KAUFMAN GROUP INCGeneral Contractor107/08/2026
DEANGELO, MATTIAElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616907/17/2024
Building Lifecycle
All (145)Filed (17)Permit Issued (20)Signed Off (7)Violation (60)Inspection (6)Objection (2)Special Inspection (30)Tax Incentive (3)
04/30/2026
Violation issued (HPD, open)
A
11/18/2025
Violation issued (HPD, closed)
I
09/01/2025
421-a(16) construction completed
06/05/2025
Violation issued (HPD, open)
A
11/25/2024
Violation issued (HPD, closed)
I
09/10/2024
421-a(16) registration filed
07/23/2024
Signed off — Alteration
Installation of heavy duty sidewalk shed as per chapter 33 of NYCBC. No change in use, egress, or occupancy
X00804529-I1
07/22/2024
Signed off — Alteration
MECHANICAL FILING IN CONJUNCTION WITH ALT I APPLICATION 220726436. NO CHANGE IN USE, EGRESS OR OCCUPANCY
X08043515-I1
07/18/2024
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
07/18/2024
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
07/18/2024
Special inspection requirement — Mechanical Systems
FAHAD FATEH
07/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
07/18/2024
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
07/18/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
07/18/2024
Special inspection requirement — Final
FAHAD FATEH
07/18/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
07/18/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
07/18/2024
Special inspection requirement — Duct leakage testing, insulation and design
FAHAD FATEH
07/17/2024
Filed — Alteration
MECHANICAL FILING IN CONJUNCTION WITH ALT I APPLICATION 220726436. NO CHANGE IN USE, EGRESS OR OCCUPANCY
X08043515-P1
07/16/2024
Signed off — Alteration
X00736919-I1
07/15/2024
Signed off — Alteration
INSTALLATION OF PUMPJACK SCAFFOLD AS PER PLANS
X01030830-I1
07/11/2024
Signed off — Alteration
new sprinkler system filing in conjunction with alt I application 220726436
X08043509-I1
07/08/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
07/03/2024
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
07/03/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
07/03/2024
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
07/03/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
07/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
07/03/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
07/03/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
07/03/2024
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
07/03/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
07/03/2024
Special inspection requirement — Duct leakage testing, insulation and design
FAHAD FATEH
07/03/2024
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
07/03/2024
Special inspection requirement — Final
FAHAD FATEH
07/03/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
07/03/2024
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
07/03/2024
Special inspection requirement — Mechanical Systems
FAHAD FATEH
07/02/2024
Filed — Alteration
PLUMBING FILING IN CONJUNCTION WITH ALT I APPLICATION 220726436
X08043503-P2
07/02/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/01/2024
Filed — Alteration
new sprinkler system filing in conjunction with alt I application 220726436
X08043509-P1
06/27/2024
Permit issued — Sprinklers
X08043509-I1-EW-SP
06/26/2024
Signed off — Alteration
FOUNDATION AND STRUCTURAL APPLICATION FILED HEREWITH FOR NEW FIVE STORY (FOUR STORY PLUS PENTHOUSE) CFS BEARING WALL BUILDING AT EXISTING 2 STORY BRICK BLDG. IN CONJUNCTION WITH ALTERATION TYPE I 220726436.
X08015623-I1
06/24/2024
Permit issued — Supported Scaffold
X01030830-I1-SF
06/17/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
06/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/17/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
06/17/2024
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
06/06/2024
Signed off — Alteration
TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH ALTERATION 1 APPLICATION 220726436.
X00316295-I1
06/06/2024
Violation issued (ECB, closed)
Construction
05/06/2024
Objection resolved — Addressed
04/26/2024
Objection raised — Other
04/21/2024
Filed — Alteration
INSTALLATION OF PUMPJACK SCAFFOLD AS PER PLANS
X01030830-I1
04/03/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/02/2024
Violation issued (ECB, closed)
Unknown
04/02/2024
Violation issued (HPD, open)
A
02/27/2024
Violation issued (ECB, closed)
Unknown
02/27/2024
Violation issued (ECB, closed)
Construction
02/27/2024
Violation issued (ECB, closed)
Unknown
Latest 60 of 145 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offA M B MECHANICAL INC06/27/2024
DOB NOWSupported ScaffoldSigned-offBUILDERS GROUP USA06/24/2024
DOB NOWSidewalk ShedSigned-offDYNAMIX SCAFFOLD GROUP LL12/27/2023
DOB NOWFoundationSigned-offBUILDERS GROUP USA11/28/2023
DOB NOWStructuralSigned-offBUILDERS GROUP USA11/22/2023
DOB NOWConstruction FenceSigned-offBUILDERS GROUP USA11/21/2023
DOB NOWMechanical SystemsSigned-offBUILDERS GROUP USA11/21/2023
DOB NOWGeneral ConstructionSigned-offJSB WORKS INC07/13/2023
DOB NOWMechanical SystemsSigned-offJSB WORKS INC06/27/2023
DOB NOWSprinklersSigned-offA M B MECHANICAL INC05/22/2023
DOB NOWPlumbingSigned-offA. M. PLUMBING COMPANY05/05/2023
DOB NOWFoundationSigned-offJSB WORKS INC01/10/2023
DOB NOWConstruction FenceSigned-offJSB WORKS INC01/05/2023
DOB NOWSidewalk ShedSigned-offDYNAMIX SCAFFOLD GROUP LL12/28/2022
DOB NOWFoundationSigned-offROCK BUILDERS INC10/26/2022
DOB NOWConstruction FenceSigned-offROCK BUILDERS INC09/15/2022
DOB NOWFoundationSigned-offUPPERCLASS MAINTENANCE IN06/30/2022
DOB NOWFoundationSigned-offUPPERCLASS MAINTENANCE IN06/04/2022
DOB NOWConstruction FenceSigned-offJSB WORKS INC09/01/2021
DOB NOWConstruction FenceSigned-offKAUFMAN GROUP INC07/31/2020
BIS—ISSUEDBUILDERS GROUP USA INC01/28/2025
BIS—ISSUEDBUILDERS GROUP USA INC01/03/2024
BISEQISSUEDCHESAKL ENTERPRISES INC07/28/2023
BIS—ISSUEDJSB WORKS INC12/29/2022
BIS—ISSUEDROCK BUILDERS INC12/07/2022
BIS—ISSUEDROCK BUILDERS INC07/12/2022
BIS—ISSUEDROCK BUILDERS INC06/24/2022
BISPLISSUEDDAVID JABLON02/27/2007
BIS—ISSUEDBEST CHOICE HOME REMODELING INC04/22/2002
BIS—ISSUEDWES-MAR DEVELOPMENT INC.11/22/1991
1 project · most recent 07/02/2024
Storm Water/Sanitary
FiledStatusContractorScope
07/02/2024Signed-offA. M. PLUMBING COMPANYStorm, Water/Sanitary
3 projects · most recent 09/23/2024
General Wiring
FiledStatusContractorScope
09/23/2024Permit IssuedD & W ELECTRICAL CONT CORGeneral Wiring
06/10/2024Permit IssuedFRIED ELECTRIC CO.—
12/28/2022CompleteHIGH QUALITY ELECTRIC OF—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
07/08/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/02/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/03/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/15/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/21/2023Pass-Final PL - UndergroundPassView ↗
12/14/2023Fail-Final PL - UndergroundFailView ↗
▾Special Inspection Requirements (DOB NOW) — 58
DateRequirementInspectorRole
07/18/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
07/18/2024HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
07/18/2024Mechanical SystemsFAHAD FATEHspecial
07/18/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
07/18/2024Post-installed AnchorsFAHAD FATEHspecial
07/18/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
07/18/2024FinalFAHAD FATEHprogress
07/18/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
07/18/2024Maintenance informationFAHAD FATEHenergy_progress
07/18/2024Duct leakage testing, insulation and designFAHAD FATEHenergy_progress
07/03/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
07/03/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
07/03/2024Maintenance informationFAHAD FATEHenergy_progress
07/03/2024HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
07/03/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
07/03/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
07/03/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
07/03/2024Maintenance informationFAHAD FATEHenergy_progress
07/03/2024HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
07/03/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
07/03/2024Duct leakage testing, insulation and designFAHAD FATEHenergy_progress
07/03/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
07/03/2024FinalFAHAD FATEHprogress
07/03/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
07/03/2024Post-installed AnchorsFAHAD FATEHspecial
Latest 25 of 58.
▾Documents — 258 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch16
08/24/2026X00736919-I1Request digital key ↗
08/23/2026X08015623-P2Request digital key ↗
08/23/2026X08015623-P1Request digital key ↗
Showing 3 of 16 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/26/2026X00316295-I1Request digital key ↗
▸Applications & Permits57
▸BISPLAN / WORK APPROVAL APPLICATION43
03/14/2025220726436Open ↗
03/03/2025220744960Open ↗
02/27/2025220726436Open ↗
Showing 3 of 43 on file for this type
▸BISWORK PERMIT APPLICATION7
02/11/2025220726436Open ↗
01/04/2024220726436Open ↗
07/28/2023240352051Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION3
04/05/2024220726436Open ↗
04/02/2024220726436Open ↗
03/28/2024220726436Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
02/23/2023240273501Open ↗
07/08/2020240273501Open ↗
▸BISLL104/19 REQUEST FOR EXECEPTION TO PERMIT RESTRICTION2
07/28/2023240352051Open ↗
06/13/2022220726436Open ↗
▸Zoning, Tax Lot & Property Records13
▸BISZONING DIAGRAM6
02/28/2025220726436Open ↗
07/08/2024220726436Open ↗
08/10/2022220726436Open ↗
Showing 3 of 6 on file for this type
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP2
06/26/2024220726436Open ↗
06/26/2024220726436Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
10/01/2024220726436Open ↗
▸BISVERIFY TAX LOT1
04/08/2024220726436Open ↗
▸BISZONING EXHIBIT IV: CERTIFICATION1
10/01/2024220726436Open ↗
▸BISFLOOD ZONE DESIGN CERTIFICATION1
06/11/2020220726436Open ↗
▸BISZONING EXHIBIT II: CERTIFICATION1
10/01/2024220726436Open ↗
▸Seals & Professional Certifications41
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/26/2026X00316295-I1Open ↗
08/24/2026X00736919-I1Open ↗
08/23/2026X08015623-P1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/29/2026X08043515-I1Open ↗
09/29/2026X08043515-I1Open ↗
09/27/2026X08015623-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/29/2026X08043515-I1Open ↗
09/27/2026X08015623-P2Open ↗
09/27/2026X08015623-P2Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/20/2023240352051Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
07/02/2020240273501Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/20/2023240352051Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
02/24/2020220726436Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/20/2023240352051Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST3
02/23/2023240273501Open ↗
08/14/2020240273501Open ↗
02/24/2020220726436Open ↗
▸BISBPP: STREET TREES SITE PLAN1
07/08/2020240273501Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/24/2026X00736919-I1Open ↗
08/23/2026X08015623-P1Open ↗
08/23/2026X08015623-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPROVIDE ACP-5 PRIOR TO PERMIT.1
06/13/2022220726436Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
08/22/2024220726436Open ↗
06/24/2022220726436Open ↗
06/13/2022220726436Open ↗
Showing 3 of 4 on file for this type
▸BISAIR SEALING AND INSULATION - TESTING1
07/02/2024220726436Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
07/02/2024220726436Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
07/02/2024220726436Open ↗
▸BISLIGHTING CONTROLS1
07/02/2024220726436Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
02/24/2020220726436Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/02/2024220726436Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
07/02/2024220726436Open ↗
▸BISEXTERIOR LIGHTING POWER1
07/02/2024220726436Open ↗
▸BISFENESTRATION AIR LEAKAGE1
07/02/2024220726436Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
07/02/2024220726436Open ↗
▸BISINTERIOR LIGHTING POWER1
07/02/2024220726436Open ↗
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: RESPONSIBILITY6
08/22/2024220726436Open ↗
07/27/2023240352051Open ↗
07/20/2023240352051Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSOIL REPORT3
08/23/2026X08015623-I1Open ↗
08/23/2026X08015623-P1Open ↗
08/13/2026X08015623-P2Open ↗
▸BISMASONRY1
07/02/2024220726436Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
03/25/2025220726436Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
06/17/2022220726436Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
06/17/2022220726436Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
07/02/2024220726436Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
07/02/2024220726436Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
07/02/2024220726436Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026X08015623-I1Open ↗
▸Approvals, Objections & Sign-offs31
▸BISSCHEDULE A - OCCUPANCY / USE18
10/02/2024220726436Open ↗
09/20/2024220726436Open ↗
08/28/2024220726436Open ↗
Showing 3 of 18 on file for this type
▸BISSUPERSEDING LETTER7
08/28/2024220726436Open ↗
01/04/2024220726436Open ↗
02/23/2023240273501Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
02/28/2025220726436Open ↗
02/28/2025220726436Open ↗
02/28/2025220726436Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
08/02/2024240352051Open ↗
08/01/2024240352051Open ↗
▸BISFINAL1
07/29/2024240352051Open ↗
▸Cost, Insurance & Ownership13
▸BISPROJECT-SPECIFIC GL INSURANCE6
01/29/2025220726436Open ↗
01/04/2024220726436Open ↗
12/29/2022220726436Open ↗
Showing 3 of 6 on file for this type
▸BISCOST AFFIDAVIT4
03/18/2025220726436Open ↗
03/18/2025220726436Open ↗
07/20/2023240352051Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
07/29/2024240352051Open ↗
05/23/2024240352051Open ↗
04/09/2024220726436Open ↗
▸Filing & Intake Forms28
▸BISADDITIONAL INFORMATION22
03/04/2025220726436Open ↗
10/15/2024220726436Open ↗
10/01/2024220726436Open ↗
Showing 3 of 22 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
07/20/2023240352051Open ↗
07/08/2020240273501Open ↗
▸BISEFILING COVER SHEET2
03/03/2025220744960Open ↗
02/24/2020220726436Open ↗
▸BISBOROUGH INTAKE FORM1
12/12/2022220726436Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
07/08/2020240273501Open ↗
▸Other Documents8
▸BISPLOT DIAGRAM2
10/01/2024220726436Open ↗
02/24/2020220726436Open ↗
▸BISVESTIBULES1
07/02/2024220726436Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL1
07/02/2024220726436Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
09/25/2020240273501Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
09/25/2020240273501Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
06/11/2020220726436Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
09/25/2020240273501Open ↗